Nº DESCRIPCION UND.CANT.
MEDIDASSUB TOTAL TOTALLARGO ANCHO ALTO
1 ESTRUCTURAS1.1 MOVIMIENTO DE TIERRAS
1.1.1 EXCAVACION M31.1.1.1 EXCAVACION DE ZAPATAS M3 43.131
Z-1 2 1 1.35 1.6 1.65 7.128Z-2 2 1 1.4 1.6 1.65 7.392Z-3 6 1 1.7 1.7 1.65 28.611
1.1.1.2 EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO M3 0 9.8592EJE 1 TRAMO AB 1 1 1.16 0.4 0.8 0.3712EJE 1 TRAMO BC 1 1 1.39 0.4 0.8 0.4448EJE 1 TRAMO CD 1 1 2.09 0.4 0.8 0.6688EJE 1 TRAMO DE 1 1 2.42 0.4 0.8 0.7744EJE 2 TRAMO CD 1 1 2.25 0.4 0.8 0.72EJE 3 TRAMO AB 1 1 1.16 0.4 0.8 0.3712EJE 3 TRAMO BC 1 1 1.39 0.4 0.8 0.4448EJE 3 TRAMO CD 1 1 2.09 0.4 0.8 0.6688EJE 3 TRAMO DE 1 1 1.15 0.4 0.8 0.368EJE B TRAMO 1-3 1 1 4.6 0.4 0.8 1.472EJE D TRAMO 1-3 1 1 6.04 0.4 0.8 1.9328EJE C TRAMO 1-2 1 1 2.9 0.4 0.8 0.928EJE C TRAMO 2-3 1 1 2.17 0.4 0.8 0.6944
1.1.1.3 EXACAVACION PARA VIGA DE CIMENTACION M3 0 9.9161EJE A TRAMO 1-3 1 1 6.14 0.85 0.95 4.95805EJE E TRAMO 1-3 1 1 6.14 0.85 0.95 4.95805
1.1.2 RELLENO 01.1.2.1 RELLENO DE CIMIENTOS CORRIDOS M3 0 1.5629625
EJE 1 TRAMO AB 1 1 1.16 0.135 0.15 0.023491 1 1.16 0.135 0.2 0.03132
Nº DE VECES
EJE 1 TRAMO BC 1 1 1.39 0.135 0.15 0.02814751 1 1.39 0.135 0.2 0.03753
EJE 1 TRAMO CD 1 1 2.09 0.135 0.15 0.04232251 1 1.96 0.135 0.2 0.05292
EJE 1 TRAMO DE 1 1 2.42 0.135 0.15 0.0490051 1 2.42 0.135 0.2 0.06534
EJE 2 TRAMO CD 1 2 2.25 0.135 0.2 0.1215EJE 3 TRAMO AB 1 1 1.16 0.135 0.15 0.02349
1 1 1.16 0.135 0.2 0.03132EJE 3 TRAMO BC 1 1 1.39 0.135 0.15 0.0281475
1 1 1.39 0.135 0.2 0.03753EJE 3 TRAMO CD 1 1 2.09 0.135 0.15 0.0423225
1 1 1.96 0.135 0.2 0.05292EJE 3 TRAMO DE 1 1 1.15 0.135 0.15 0.0232875
1 1 1.15 0.135 0.2 0.03105EJE B TRAMO 1-3 1 2 4.6 0.135 0.2 0.2484EJE D TRAMO 1-3 1 2 5.91 0.135 0.2 0.31914EJE C TRAMO 1-2 1 2 2.9 0.135 0.2 0.1566EJE C TRAMO 2-3 1 2 2.17 0.135 0.2 0.11718
1.1.2.2 RELLENO EN VIGAS DE CIMENTACION M3 0 6.2628EJE A TRAMO 1-3 1 1 6.14 0.85 0.6 3.1314EJE E TRAMO 1-3 1 1 6.14 0.85 0.6 3.1314
1.1.2.3 RELLENO DE ZAPATAS M3 Z-1 AREAEJE E-E (ZAPATA) 1.25 2 1.15 2.875EJE E-E (CIMIENTO CORRIDO) 0.11 2 0.15 0.033EJE E-E (VIGA DE CIMENTACION) 0.35 2 0.6 0.42Z-2
1.2 CONCRETO SIMPLE1.2.1 CONCRETO EN CIMIENTO CORRIDO M3
eje 1- tramo -A-B