Sheet1RESUME RAPAT PEKERJAAN MALAM

Kesepakatan dengan pak Samsun tgl 25/10/14NoAreaKebutuhan SDMKeteranganPICAlatKTSWika1TR-17 orangF=2, R=3, H=2SlametWidodoSeling 12 mm = 100 mtrPipa = 500 btg2Undercone10 org wikaw=2, f=3,h=5AndreMomonClamp mati = 1.000 Pcs5 org KTSF=2, H=3Clamp hidup = 1.000 PcsHiap + Operator3Roofing & Cladding2 orang wikaSahrojiTotokSopir + Trailer2 orang SahrojiOperator GensetOperator Forklift4Bolt& psg,ganti +touch up2 orang wikaf=2, h=2CacukSuhartokoCrane 25 Ttightening2 orang KTSWidodoCrane 50 TLampu ( di wilayah ada 5 unit)5Repaired Welding2 orang wikaw=1, f=1 dan h=2AdeNyarlan2 orang KTS

Tambahan :6Install checkered plate3W + 3F + 3HSugionoDony

7Install Handrail (A1+A2)1W+1F+1HMichle

8Repaired G3 (bolt,cat,1W+2F+3HSlametWidodopurlyn,llasan)5W+6F+7H

9P6A+B (7+7)2W+2F+10HHanafiBudi

10Langsir (P11) G3 Penthouse2F + 3HKarsoAngga

11GA Penthouse 2F + 2HIndoSlamet.RNyarlanRigger KTS : 5+6+6Schafolding : 6+4Total kebutuhan untuk shift malam = 23 + 41 + 11 = 75 org

ALOKASI 75 ORANG SHIFT MALAMNoSubWeldingFitterHelperMechErectionRiggerSchafolding1KTS312132Suyudi551010643Liemas2134Pabrik2355Lam12Total102231221064AdaSuyudiKurangW103-752F222-2015 +5015 masuk tgl 29/10/13H315-26-265 masuk tgl 31/10/13Ket : 15 dari pak SuyudiLokasi KerjaSupervisor 5 dari PT Lam1InstallChecker Plate PutraJam 20.00 - 08.00(TF,FT1,G3)

2UnderconeJOKO (dme)Jam 20.00 - 08.00

3Langsir (P6A&B) P11 - P6AnggaJam 20.00 - 08.00Untuk tgl 29 sampai jam 22.00 wibG3Citeureup, 29 Oktober 2013AnsoriPimpinan Rapat