The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use.
Terminology
used
may
not
necessarily
be
consistent
with
ADB
official
terms.
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 2/14
TWINNING EXPERIENCES
I NDI A A ND S R I L A NK A
2009 WaterLinks ForumJointly presented by : Mr M A M S L Attanayake and Mr Pranay Singh
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 3/14
STATUS OF NWSDB
IN SRI LANKA
\SERVICES
Piped Water Coverage 32%
Piped Sewerage Coverage 2.4%
NWSDB Schemes 295
No. of Connections 1.2 Million
Production Million cum/month 424
EFFICIENCY INDICATORS
Unit Production Cost Rs./m3 22.0
NRW % 33%
Operating Ratio 0.89
Collection efficiency 0.98
Staff per 1000 Connections 8.2
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 4/14
MAJOR ISSUES AND CHALLENGES
• Poor Cost Recovery
• Insufficient expansion
to cater the growth
• High NRW
• High Energy Costs
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 5/14
TWINNING PROGRAMMEDEVELOPMENT
Twinning design based onNWSDB’s needs
Various priorities, needed
to focus
Focus Areas
NRW Reduction in ModaraPilot Area
Energy reduction
Customer Relations
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 6/14
Diagnostics phase Find and mutually agree on right partner to give assistance
Review resources
Linked with Jamshedpur Utilities & Services Company of India
Started in 2008; ongoing
Work planning
Joint effort
TWINNING PROGRAMMENWSDB - JUSCO
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 7/14
NRW Reduction: to date and planned
Selected and demarcated a pilot DMA (4 sub
areas) Carried out base line assessment and Survey
Carried out house to House Survey
Installed isolation valves and Bulk Meters
Step Testing done in two sub zones
Identified most critical areas with poor piping for complete replacements (40 years old AC pipes)
Contd.,
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 8/14
NRW Reduction: to date and planned…contd.,
Completed relaying in two sub areas with thetransfer of house connections
Detected 11 illegal Meter Leakages/Service lineleakages
Repairing lag time reduced to 12 hr
Defective meter repairing lag time reduced toone month
Metered 50 unmetered premises
Introduced toll free number
Balance SLRs.55 million to be forward for
zone II & III completion
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 9/14
Energy Reduction: to date and
Planned• R eviewed water schemes based on Scheme specific separate energy consumption
• Selected one water scheme for implementation
• W orkshop carried out by JUSCO
of energy coordinators planned for October
• V isit to JUSCO by 4 energy
coordinators planned for early November
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 10/14
RESULTS OF THE NRW PROGRAMME
Reduction in NRW by JULY 2009 is 15.39%
48.00%
45.90%
43.80%
34.17%33.78%
32.61%
30.00%
35.00%
40.00%
45.00%
50.00%
FEB MAR APR MAY JUN JUL
MONTH
N
R W
V A L U E
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 11/14
BEST PRACTICES WITHIN NWSDB
•Re‐Engineered House Connection
Procedure
•Quick Response Systems
(Standard
Replies/
Toll
free
numbers
•Improving capacities of some treatment plants 2 times within available civil structures (with
minimum investments)
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 12/14
LESSONS LEARNED
•Twinn ing/Opera tor par tn ersh ipprogramme is not a pr ior ity with other
progra mm e - need to be int egra ted
with the count ry level investm ent
programme
•Cha nging personnel delay in
implement at ion - need perma nentchampions ident ified th roughout the
programme
•Access t o twinning network is verymuch helpfu l as to be fur th er expanded
an d str ength ened
•Lessons lear ned will be document edan d r eplica ted thr oughout th e island
8/6/2019 D2 S5 Sinha Attanayake
http://slidepdf.com/reader/full/d2-s5-sinha-attanayake 13/14
Discussion and Recommendations Investments required for NRW could be self
generated by institutions (for example if tariff reflected real cost recovery)
Twinning is not only one but an important tool
for improving the service efficiencyRecipient twinning also could be expert in
twinning in some other areas
When organization is national twinning with aregion would be more appropriate