ANGERLEHNER –
A UNIQUE TRENCHLESS TECHNOLOGY EXPERT
Headquarter:
Obere Landstraße 19
4055 Pucking, Austria
Phone: +43 (0) 7229 / 79 888 – 0
Mail: [email protected]
Web: www.angerlehner.at
Angerlehner Hoch- und Tiefbau
Gesellschaft mbH
Project office Kolkata:
Unit 101-102, 1st Floor, Plot no. 45, 10B,
East Topsia Road, Kolkata 700 046
Phone: 0091 (33) 40 04 82 68
Mail: [email protected]
Web: www.angerlehner.com
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Business activities
Structural engineering
Latest technologies
Minimized construction periods
Optimized use of resources
Bridge building
Adherence to delivery dates
Highest quality requirements
Latest technologies
Pipeline rehabilitation
World-wide operation
Market leader
Research and development
Waste water treatment plant
General contractor
Comprehensive expertise
International demand and supply
Pipeline construction
Flexible order processing
Complete range of pipelines
Combined projects
Tank construction
Perfect coordination
Know-How due to experience
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Milestones
1985 Foundation by Eng. Alfred Angerlehner
1988 Foundation of RTU - Rohr TV Untersuchungsges.m.b.H.
1989 First developments – pipeline rehabilitation without excavation with own
procedures and specially developed machines
1993 Take over of a construction company
1994 Purchase of the new headquarter in Pucking
1999 "MCS-Inliner®" was internationally registered and patented
Entry into the Indian market
2003 Entry into the Croatian market
2004 Take over of the Rohrsanierungs GmbH
2006 Portfolio adjustment RTU
Market entry in Sri Lanka
2009 Market entry in Argentina
2012 Market entry in Malaysia
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Trenchless pipeline rehabilitation
… undisturbed traffic and abuttering owners due to trenchless technologies we execute!
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Rehabilitation technologies
• Preparatory works
• MCS Inliner
• Cured in place pipes
• Punctual rehabilitation
• Pipe bursting
• Robot rehabilitation
• Manhole rehabilitation
• GRP pipe production
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Preparatory works
Preparation works are crucial for purposeful
and cost efficient pipe rehabilitation
• CCTV
• Analsis of sewer condition
• Qualified engineers evaluate the pictures
immediately
• Rehabilitation concepts are elaborated
• Client receives most relevant data about the
condition of sewer and a cost estimation for the
rehabilitation
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
MCS Inliner
Dimensions: DN 300 – 3,000 mm
Area of application:
Drains, storm water, sewer
Profiles: Circular, egg, ovoid, and the like
Length:
Rehabilitation up to 500 m per
installation pit, reaming performance up to 6
m/hour (with AKF reaming machine)
Pipe materials:
Reaming only possible in brick sewer or in
situ concrete pipes
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
MCS Inliner – Phase 1
Assessment of existing sewer (pipeline)
• Wall thickness check
• Documentation of:
– Cracks
– Infiltrating water
– Loose bricks
– Root ingress
– Other observations as per prevailing standards
(e.g.WRc)
• Economic rehabilitation concept elaborated
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
MCS Inliner – Phase 2
Expansion of the existing pipe
• AKF reaming machine
• Increase of cross-section up to 35% possible
• Cutting depth up to 14 cm in a single work
cycle
• Machine is computer controlled
Reaming profile of the AKF - 3 frame sizes
• AKF 11: 600 / 900 - 750 / 1,050 mm
• AKF 22: 750 / 1,050 - 900 / 1,350 mm
• AKF 40: 900 / 1,350 - 1840 / 2,800 mm
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
DEWATERING –
EARLY WARNING SYSTEM
• Detects increase of water level
• Up to 5 kilometers away from the
construction site
• Warning to foreman
• Workers have about 10 minutes to
evacuate the sewer
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
MCS Inliner - Phase 3
Installation of the liner
• GRP pipes or other materials
• Insertion into installation shaft using a crane
and moving liner into position
• House connections are opened up and bound
thight
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
INSTALLATION OF LINERS
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
INSTALLATION OF LINERS
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
INSTALLATION OF LINERS
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
MCS Inliner – Phase 4
Grouting of the annular gap
• Grout has an excellent flow-capacity and is
shrinkage compensated
• Grout is delivered with pumps using hose pipes
and brought in via grouting holes in the pipe
• Fill the annular gap
• Durability
• Increase the load bearing capacity
• Grouting is done in sections and layers
• Closing of launch shaft
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Cured-in-place pipe
Details
Dimensions: DN 100 – 1,200 mm
Area of application: Sewer and water pipes, gravity
and pressure lines, gas lines
Profiles: preferably circular profile,
egg profile
Length: Sections up to 250 m
Pipe materials: Stoneware, fiber cement, cast,
concrete, PVC, GRP
Advantages
• Economical solution for non-accessible profiles
• Exceptional chemical resistance
• Resistant to age, dimensionally stable
• Good hydraulic characteristics
• Seamless pipe
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Cured-in-place pipe
• Liner is saturated with resin
• Liner is fixed on the inversion stand and
inverted into the damaged sewer via manhole
channels, using the hydrostatic pressure of hot
water
• Subsequently curing of liner
• House connections are re-opened precisely by
robots
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Pipe bursting
Details
Dimensions: DN 65 – 1,000 mm
Area of application: Drinking water pipeline, gas
line, drains and seep water
pipes, pressure pipes
Profile: only circular profiles
Length: Sections up to 150 – 200 m / day
Materials: Steal, grey cast iron, fiber
cement, concrete, PE/PVC,
stoneware
Advantages
• Enlargement of cross section between 1 and 2
dimensions (e.g. DN 80 to DN 90)
• Flexible and Reliable
• Insensitive to groundwater infiltration
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Pipe bursting
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
GRP pipe production
• Production of circular, egg and special shaped
profiles in various dimensions and length
• Dimensions: up to 3,200 mm diameter
• Length: from 0.5 to 6 meter
• 8.000 m² production hall
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Structure of the GRP liner:
• The liner has a chemically durable resin layer at
the inside, a barrier layer, a structural layer and
an external silica layer
• These willl be produced in different thicknesses
depending on the customer requirments
GRP pipe production
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
GRP pipe production
• Two production lines
• processing up to 750 tons of GRP materials
monthly
• Capacity of producing approx. 2,000 meter
medium egg-shaped liners per month
• ISO 9001:2008 certified
• In-house laboratory and testing centre
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Current projects in India
2011 - 2013 Kolkata – Rashbehari Avenue – MCS Inliner Technology
circular and special shaped profile 1,755/1,969 – 1,998/2,539 mm;
DN 2,751 – 2,892 mm; length 4,813 m
2011 - 2012 Kolkata – Canning Street – MCS Inliner Technology
special shaped profile 1,807/2,338 mm; length 558 m
2011 KMC NME Phase 1 – dewatering, cleaning, CCTV inspection
egg and circular profile; length 2,634 m
2009 – 2011 Kolkata Phase III – MCS Inliner Technology
egg shaped sewer; length 3,975 m
2008 – 2012 Delhi – Ring Road - Sliplining
circular profile DN 1,854 – 2,566 mm; length 4,953 m
2007 till now GRP pipe production
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
Current projects in Austria
2012 Vorarlberger Illwerke – Sliplining
circular shaped profile 2,740 – 2,800 mm; length 3,198 m
2011 Amstetten BA 90.3 – Sliplining
egg shaped profile 700/1,050 – 1,000/1,500 mm; length 725 m
2011 Austrian Railway Federation – Pipe Bursting, HDD, pipe construction
circular profile DN 100 mm; length 1,200 m
2011 Municipality Weißkirchen – Pipe Bursting
circular profile DN 110 mm; length 350 m
2010 Scharlinz IV – MCS Inliner
horse shoe profile 1,900/2,400 mm; length 632 m
Angerlehner Hoch- und Tiefbau Gesellschaft mbH ∙ www.angerlehner.com
WE LOVE TRENCHLESS TECHNOLOGIES!