การไฟฟ้าส่วนภูมิภาค
ww
w.p
ea.c
o.t
h c
all c
en
ter 1
12
9
PEA Smart Grid
การไฟฟ้าสว่นภมูภิาค PROVINCIAL ELECTRICITY AUTHORITY
February 15, 2012
Mr.Pongsakorn Yuthagovit
การไฟฟ้าส่วนภูมิภาค
“Smart Grid Policy Announcement”
March 10, 2011
การไฟฟ้าส่วนภูมิภาค
“First Move Beyond the Future PEA Smart Grid Road map”
August 19, 2011
Renewable Energy
Status of Power Purchase from
VSPPs
Detail Number of project Proposals sales to PEA
(MW)
Currently supplying power to the grid 203 547
PPA signed 737 3,826
Received notification of acceptance 155 514
Submitted proposals 275 1,211
Total 1,370 6,100
(29 September 2011)
Supply to Grid
8.8%
67.0%
15.9%
6.2% 2.0%0.1%
0.1%
SolarWindHydroBiomassBiogasWasteCogen
Total
203 Projects
547 MW
PEA Smart Grid
Central Power Plant
Industrial Plants
Houses
Offices
Existing
Power Flow
Future
Road Map
2555-2559 Planning & Pilot
Project
2565-2569
2560-2564 Large Scale Expansion
Stage 1
2555-2559 2560-2564 2565-2569 Year
30
70
100 Smart Level
Stage 2
Stage 3
Optimal Stage
Stage 1 Planning & Pilot Project
(2555 – 2559)
Stage 2 Large Scale
Expansion
(2560 – 2564)
Stage 3 Optimal Stage
(2565 – 2569)
2570 2565 2560 2555
Stage 1 : Planning and Pilot Project
2555
Smart Level
2556 2557 2558 2559
Microgrid (Community Power Network)
Pilot Energy Storage
Supply
Grid
Pilot : Smart Grid at Pattaya city
Microgrid at Kood Island Maehongson
Integration of Enterprise System
Pilot Green and Low
Carbon Samui Island
Electricity networks in 4
cities with automated systems
Demand
Intelligent street lighting/ public lighting
AMI Pilot at Pattaya City
110,000 Units Pilot EV Charging Station
AMI Complete in Central region and 9 other large cities 3,000,000 Units
30
Year
2560
Smart Level
2561 2562 2563 2564
Development of Renewable energy sources and energy storage
Supply
Grid Expand fully automated
network covering major
cities across the country
Demand
Energy Management covering all large / medium cities
Complete of
Substation Automation
Domestic consumers can produce their
own electricity; surpluses can be sold to the utility
The use of electric transportation available extensively
70
30
AMI across the country 15,000,000 Units
Year
Stage 2 : Large Scale Expansion
2565
Smart Level
2566 2567 2568 2569
Supply
Demand
Two way power supply of electric vehicles (V2G)
Power users can buy or sell
and choose to buy electricity from different suppliers
Energy management optimized
The balance and forecast
system of production and energy utilization Virtual Power Plant
created
100
70
Year
Stage 3 : Optimal Stage
Grid Cyber security system adequate
Automated electricity networks nationwide/ self-healing features enabled
05 000
10 00015 00020 00025 00030 00035 00040 00045 00050 00055 00060 00065 00070 000
2555-2559 2560-2564 2565-2569
21 004 25 000
35 000
1 000 3 000 2 000 5 000
43 000
64 000
Bath
(M
illi
on
s) Cost - Benefit Analysis
Cost O&M Benefit
PEA Smart Grid investment Plan
การไฟฟ้าส่วนภูมิภาค 14
Electricity for moving towards to improve quality of life
and be eco-friendly.