SOME PICTURESOF PROJECTS
YASHAR POURANG INVOLVED
![Page 2: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/2.jpg)
Tenandra Irrigation Scheme Macquarie Valley, NSW June 2012-Present
![Page 3: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/3.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Bulk earthworks, Cut and overcut
![Page 4: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/4.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Bulk earthworks, Cut and overcut, adding water to get the optimum moisture
![Page 5: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/5.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Trimming Batters, Nuclear Density meter and compaction test
![Page 6: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/6.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Nuclear Density meter and compaction testPermeability tests
![Page 7: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/7.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Concrete pipes laying & installing headwalls
![Page 8: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/8.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Installing double barrel headwalls
![Page 9: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/9.jpg)
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Traffic control and Detour road to install 1800mm road crossing pipes
![Page 10: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/10.jpg)
Tanavob General Contractor (TGC)Earthworks, drainage, concreting and foundation
2008-2011
![Page 11: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/11.jpg)
Tanavob General Contractor (TGC)
Bulk earthworks and excavation; totally: 170,000 m³
![Page 12: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/12.jpg)
Tanavob General Contractor (TGC)
Drainage System to control and conduct underground water, before commencing construction of Foundation
![Page 13: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/13.jpg)
Tanavob General Contractor (TGC)
Completed Drainage System; 2000 m²
![Page 14: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/14.jpg)
Tanavob General Contractor (TGC)
Cleaning concrete and construction of Foundation (Reinforcement and Frame works)
![Page 15: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/15.jpg)
Tanavob General Contractor (TGC)
Construction of Foundation (Reinforcement and Frame works) and commencing of concreting
![Page 16: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/16.jpg)
Tanavob General Contractor (TGC)
Construction of Foundation , concreting
![Page 17: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/17.jpg)
Tanavob General Contractor (TGC)
Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system, Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month
![Page 18: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/18.jpg)
Tanavob General Contractor (TGC) Roads and Pavement 2008-2011
Primary excavation and earthworks
![Page 19: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/19.jpg)
Tanavob General Contractor (TGC)
Embankment, road bases and sub-bases, Side walk, pavements and drainage
![Page 20: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/20.jpg)
Tanavob General Contractor (TGC)
Embankment, road bases and sub-bases, Side walk, pavements
![Page 21: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/21.jpg)
Tanavob General Contractor (TGC)
Completion of project involves: Dual layer Asphalt & Spraying (17,000 m³)
Earthworks, excavation and embankment (120,000 m³)Pavement and Sidewalks ( 4,000 m²)
![Page 22: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/22.jpg)
Tanavob General Contractor (TGC)Roads and Pavement
Satellite pictures of the project (by Google Earth); before commencing the project and 6 month after
![Page 23: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/23.jpg)
Tanavob General Contractor (TGC)Roads and Pavement
Satellite pictures of the project (by Google Earth); 6 month after commencing the project
![Page 24: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/24.jpg)
Tanavob General Contractor (TGC)Construction of a 2800 m² Car park
![Page 25: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/25.jpg)
Tanavob General Contractor (TGC) Concrete Structures and Landscaping
![Page 26: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/26.jpg)
Tanavob General Contractor (TGC)
Setting out the foundation and center of columns
Foundation and Columns , Embankments
![Page 27: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/27.jpg)
Tanavob General Contractor (TGC)
Reinforcements of columns
Concrete structure, landscaping and stone works
![Page 28: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/28.jpg)
Persian Gulf Oil CompanyBulk earth work and Oil tank construction 2007-2008
Excavation
![Page 29: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/29.jpg)
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Embankment and leveling
![Page 30: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/30.jpg)
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Drainage and compaction
![Page 31: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/31.jpg)
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Welded above-ground oil tank construction
![Page 32: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/32.jpg)
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Satellite pictures of the project (by Google Earth) June 2007 ~ September 2008
![Page 33: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/33.jpg)
AAC Group 2004-2007
Construction of 52 piles , 24 meter depth each to increase bearing capacity of the soil
![Page 34: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/34.jpg)
AAC Group 2004-2007
Construction of two 16-floor & two 9-floor residential towers
Forming of columns and floors
![Page 35: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/35.jpg)
AAC Group
On-site concrete batching plant & tower cranes
![Page 36: Yashar Pourang Portfolio](https://reader036.fdocument.pub/reader036/viewer/2022062523/58ea432c1a28abc4698b4d43/html5/thumbnails/36.jpg)
AAC Group
Earthwork and excavation, early 2004 General site view, late 2006Satellite pictures of the project (by Google Earth)