www. dimcom.co.kr 1 DONGIL MACHINERY CO.,LTD. · 2020. 12. 17. · E-MAIL : [email protected]...

38
DONGIL MACHINERY CO.,LTD. http://www. dimcom.co.kr 1

Transcript of www. dimcom.co.kr 1 DONGIL MACHINERY CO.,LTD. · 2020. 12. 17. · E-MAIL : [email protected]...

  • DONGIL MACHINERY CO.,LTD.http://www. dimcom.co.kr 1

  • DONGIL MACHINERY CO.,LTD.

    Contents

    2

    CEO Greetings

    Company Introduction

    History of Company

    MAIN products & Capacity

    Organization

    Manufacturing Facilities

    Test & Inspection Equipment

    Management Procedure

    Main Products

    Photos of Major Products

    Supply Records

    Registration & Certificate

    Photos of Products

    Approval

  • DONGIL MACHINERY CO.,LTD.

    1. CEO Greetings

    1986년 동일기계로 첫 출발한 후 국내 유수기업과 협력체계를 유지하면서 신뢰와 기술력을

    인정 받아 지금은 운반 하역 설비, 제철설비, 일반 산업 설비, 전 분야에 다양한 사업영역을

    확대해 나가고 있습니다.

    Started DONGIL 1986 , up to date DONGIL Machinery Co., Ltd is expanding various business

    sectors with reliable technical cooperation system such as Transportation, Loading &

    Unloading, fabrication & supply of Power plant structural, Steel metallurgy Industrial.

    끊임없는 기술개발과 최고의 품질로 고객 감동에 노력하고 미래의 성장 동력 ITEM 확보 및

    기술개발로 최선의 노력을 다하면서 또한 어려운 이웃들과 더불어 행복을 함께 나눌 수 있는

    기업 문화로 가꾸어 나가도록 하겠습니다.

    Based on continuous imrovement & development, we will contribute to all customers with

    highest quality as well as introduction of future growth Engines. With such an optimum efforts,

    DONGIL Machinery Co.,Ltd will build up the blessing enterprise culture sharing together

    neighbors

    감사합니다.

    Thank you sir

    DONGIL Machinery Co., Ltd Representative

    Director, GIL SIK, KIM

    3

  • DONGIL MACHINERY CO.,LTD.

    2. Company Introduction

    회사개요

    회 사 명(Company name)

    주식회사 동일기계 DONGIL MACHINERY CO., LTD

    대표이사(President)

    김 길 식 / Gil Sik, Kim

    소 재 지Address

    [본사공장/Factory] 경남 함안군 칠원읍 원서로 109109, Wonseo-ro, Chirwon-eup, Haman-gun, Gyeongsangnam-do, Korea

    Tel. +82-55-587-8200 Fax. +82-55-587-4985 E-MAIL : [email protected]

    사업자등록번호Business license

    608-81-27156

    공장등록Factory register

    함안군 제 10-151-97-70호Haman-gun 10-151-97-70

    공장규모Factory scale

    Area : 13000㎡ – 3,940m2Building : 2500㎡ _ 758m2Total :4,698m2

    인원현황Employees

    Management and workers : 25 persons.

    4

    mailto:[email protected]

  • DONGIL MACHINERY CO.,LTD.

    3. History of Company

    국내등록 및 실적고객사/ Registration

    Doosan Heavy

    Hyundae Samho

    POSCO PLANTEC

    Samsung Heavy

    Hyundai Rotem

    POSCO E&C

    DSME

    Hanjin Heavy

    Hyundai Steel

    Hyundai Wia

    Nippon Steel

    Mitsui E&S

    Mitubishi Heavy

    Sumitomo Heavy

    1986마산시 산호동 2가 103 동일기계로 설립/DongiL Machinery Co. established at 103, 2Ga, Sanho-dong, Masan city

    1996㈜동일기계로 법인 전환 및 함안 칠원면 이전/

    Changed to DongiL Machinery Co., Ltd & moved to ChirWon-myeon,Haman-gun.

    2001 ISO9001 : 2000 인증 취득/ Certified ISO9001

    2010

    선급인증 취득 (DNV, LR, GL)/ Approved by DNV, LR and GL

    대형물 및 기계 가공 조립 관련 창원공단 소재 HSG중공업㈜와 업무 협약서 (MOU) 체결For large processing products & assembly, MOU between HSG Heavy Industries and DongiL.

    한국전력㈜ 5개 발전소 정비적격업체 인증 취득/ Qualified for Maintenance by KEPCOP’s five subsidiary power plant station( Public enterprises)

    2011경남은행 유망중소기업 선정/ Selected blue-chip company as medium and small enterprises by Kyeongnam Bank

    5

  • DONGIL MACHINERY CO.,LTD.

    4. Organization

    President

    Kim Gil Sik

    6

    Vice President

    Park Sang Deok

    Quality assurance & control

    Department

    Lee Heung Goo

    NDE cooperation

    Jungwon E & I

    General Sales Department

    Park Sang Deok

    Production Department

    Baek Gum Chul

    Processing

    Team

    Assembly

    Team

    Fabrication

    Teamsubsupplies

    Design & Purchasing Department

    Choi Hye Min

    Design coperativefirm(Miga plant)

    Administration Department

    Jo Jeong Lee

  • DONGIL MACHINERY CO.,LTD.

    5. MAIN PRODUCT & CAPACITY

    7

    No Division Description Capacity Remark

    1 TransportationUnloading facility

    1. Gantry crane 1 set/ year

    2. Over head crane 5sets/ year

    3. Trolley, Travelling Ass’y 20 sets/ year

    2 Iron rolling facility

    1. Steelmaking 1000Ton/ year

    2. Electric furnace 100Ton/ Month

    3. Ladle 100Ton/ Month

    -. Transfer car 100Ton/ Month

    -. Roller table & Roll 100Ton/ Month

    -. Walking beam 100Ton/ Month

    -. Turn dish car 100Ton/ Month

    3 Others -. Power plant non-pressure parts & vessels 1000Ton/ Month

    -. Large sized frame manufacturing and processing

    500Ton/ Month

    -. Wire drum 100Ton/ Month

    -. Rudder Stock 200Ton/ Month

    -. Wind power Shaft 300Ton/ Month

    -. Ship engine Shaft 300Ton/ Month

    -. Tandem press300Ton/ Month

  • DONGIL MACHINERY CO.,LTD.

    NC LATHE

    (Φ1500×6000L)NC FLOOR BORING M/C

    (HB-150T)3500H×11000L×2000FLOOR BORING M/C

    (HB-130T)2000H×6000L×1500

    8

    6. Manufacturing Facilities

  • DONGIL MACHINERY CO.,LTD.

    NC VERTICAL TURNING LATHE

    (Φ4800×1500H)VERTICAL TURNING LATHE

    (Φ4800×1500H)NC 대형 LATHE

    (Φ3420×13000L)

    PROOF TEST M/C

    (CAPACITY : 1000TON)CNC 절단기(4M×12M)

    9

    6. Manufacturing Facilities

  • DONGIL MACHINERY CO.,LTD.

    GRINDIND MACHING

    (Φ3000×10000L)NC LATHE

    (Φ2540×11000L)LATHE

    (Φ1500×5000L)

    10

    6. Manufacturing Facilities

  • DONGIL MACHINERY CO.,LTD.

    No Test itemTesting machine

    nameSpecification Q’ty Calibration

    1 Dept, bore, Thickness VERNIER CALIPER 6 Corrected proofs

    2 High measure HEIGHT GAGE 2Corrected proofs

    3 Dept, I.D, Thickness DIGIMATIC CALIPER 1Corrected proofs

    4 Bore measure BORE GAUGE 7 Corrected proofs

    5O.D measure

    MICROMETER 15Corrected proofs

    6 Depth measure DEPTH GAUGE 1Corrected proofs

    7I.D measure

    INSIDE MICROMETER 1Corrected proofs

    8 Thickness measure THICKNESS GAGE 1Corrected proofs

    9GROOVE R value

    measureRADIUS GAGE 1

    Corrected proofs

    10 SCREW PITCH measure SCREW PITCH GAGE 3Corrected proofs

    7. Test & Inspection Equipment

    11

  • DONGIL MACHINERY CO.,LTD.

    NO.Certificate

    nameCertificate

    bodyEffectiveperiod

    Application Spec

    Approved addessCertificate

    range

    1 ISO 9001Magician certificate Institute

    2019. 08. 20~2022. 08. 19

    2001. 09. 05

    844, Yongjeong –ri, Chirwon myeon

    Haman-gun,Gyeongnam, Korea

    8. Approval

    NO. Licensing name Acquisition date Licensing autority Remarks

    1 Quality assurance 2005. 03. 31 Doosan Heavy

    2 Clean place of business 2006. 10. 18 Occupational Safety Authority

    Quality assurance system operating YES □ NO □ Introduction date 2001. 03. 09

    Governing law quality assurance Quality management manual

    Quality assurance audit – Inspection records

    Inspection Organization Inspection date Inspection reason

    있음 □ 없음 □Doosan heavy Quality Assurance

    Team2010. 11. 26

    Quality program building up & fulfillment state

    12

    Certification

    Approval

    Quality Management System

  • DONGIL MACHINERY CO.,LTD.

    NO. name Initial writing date Initial Revision Department

    1 NDT procedure 2005. 10. 01 2010. 09. 10 Quality management Dept

    2Heat treatment procedure

    2005. 10. 01 2010. 09. 10 Quality management Dept

    3 Welding procedure 2005. 10. 01 2010. 09. 10Quality management Dept

    4 Painting work procedure 2005. 10. 01 2010. 09. 10Quality management Dept

    5 Standard & Spec control procedure 2005. 10. 01Quality management Dept

    6 Drawing control procedure 2005. 10. 01 Quality management Dept

    7Quality record control procedure

    2005. 10. 01Quality management Dept

    8 Quality policy & Goal management procedure 2005. 10. 01 Quality management Dept

    9 Education & training procedure 2005. 10. 01Quality management Dept

    10 Process control procedure 2005. 10. 01Quality management Dept

    11 Inspection & testing equipment control procedure 2005. 10. 01Quality management Dept

    12 Customer satisfaction control procedure 2005. 10. 01 Quality management Dept

    13 Inspection & test control procedure 2005. 10. 01Quality management Dept

    14 Nonconformance quality control procedure 2005. 10. 01Quality management Dept

    15 Correct & prediction procedure 2005. 10. 01 Quality management Dept

    16 Service control procedure 2005. 10. 01Quality management Dept

    13

    9. Management procedure

  • DONGIL MACHINERY CO.,LTD.14

    10. Main Products

    Existing business model

    Transportation Loading & Unloading

    GOLIATH CRANE

    SHIP LOADER UNLOADERSTACKERRECLAIMEROVER HEAD CRANE GIRDERLEG PARTTROLLEY, TRAVELLING ASS’YTURNKEY BASE

    Steel Manufacturing Facility-Iron making, steel making facility

    Electric furnaceLADDLE, traverse car(Kiln car)COOLING DUCT, Rolling equipment

    - ROLL & ROLLERTABBLE, FRAME ASS’Y

    Large Sub parts processing & manufacturing

    Wire DrumRudder StockWind SHAFTMarine Engine Internal ShaftOthers

  • DONGIL MACHINERY CO.,LTD.

    Ordering body

    References

    Doosan heavy Samsung Heavy Hyundai Samho heavy SLS shipping Samho shipping Sungdong shipping Others

    GOLIATH C/R JIB C/R RMQC RMGC GANTRY C/R

    TROLLEY ASS’Y TRAVELLING ASS’Y LUFFING DEVICE SYSTEM GIRDER BOOM LEG PART

    Goliath Crane Goliath Crane

    Gantry Crane Level Luffing Crane

    11-1 Special Crane

    Electric Over head LM Crane Electric Over head LM Crane

    POSCO LADDLE 100Ton Wolsung nuclear 55/15Ton Hankuk steel 170/50Ton POSCO special steel 80/20TON Singori nuclear 250/50TON Hyundai samho 20TON

    MAGNET C/R Daehan steel 10TON

    MAGNET C/R

    15

    11. Photos of Major Products

  • DONGIL MACHINERY CO.,LTD.

    Odering body

    References

    Doosan Heavy Hyundai-roem Hyosung Heavy Hyundai samho heavy Others

    POSCO LADDLE 100Ton Wolsung Nuclear 55/15Ton HanKuk steel 170/50Ton POSCO 450TON Singori Nuclear 250/50TON Hyundai samho 20TON

    MAGNET C/R Daehan steel 10TON

    MAGNET C/R

    Over Head LADLE Crane 100/40T Crane Crab

    11-2 Over Head Crane

    HHI gunsn 80Ton J/C - JIB STRUCTURE supply

    Gyung In canal WSGC2기 -TROLLEY ASS’Y - HEAD BLOCK ASS’Y

    POSCO Gwangyang CSU 8, 9units SLEWING FRAME

    Pohang CSU 4, 5units- GANTRY TRAVEL ASS’Y

    References

    16

    450T Crane용 Wire Drum

    11. Photos of Major Products

  • DONGIL MACHINERY CO.,LTD.

    Ordering body

    References

    Hyundai -rotem Doosan Heavy Samho Heavy Samsung Heavy Others

    Samcheonpo themal#1~4Units

    Dangjin thermal # 5, 6units SANDVIK Boryung thermal #7, 8 TRAVELLING ASS’Y Rotating FRAME STEEL STRUCTURE BUCKET

    Continuously Ship Unloader Stacker

    Reclaimer

    11-3 Unloading facilities

    LADLE

    Rotem Unique Model

    Slab Caster

    Special steel 80Ton LADDLE SCRAP BUCKET SEGMENT & CASTING

    FRAMES ROLLER TABLE BAR-MILL PINCH ROLL & FRAME Trvelling cars Seahbestel VACUUM SYSTEM 37Ton COIL LIFTER

    17

    11. Photos of Major Products

  • DONGIL MACHINERY CO.,LTD.

    Odering body

    Hyundai- rotem Doosan Heavy Hanlla Heavy Others

    Rotem Unique Model

    Slab CasterRoller Table

    11-4 Iron-making equipment

    11-5 Press , Turbine Shaft

    Tandem Press Tryout Press

    Hyundai-rotem Hyndai-wia Others

    5400Ton 3000Ton 2400Ton 1200Ton

    BED, FRAME CLUTCH/BRAKE ASS’Y

    References

    18

    Turbine roto processing

    Odering body

    11. Photos of Major Products

  • DONGIL MACHINERY CO.,LTD.

    12. Registration & Certificate

    19

    Blue chip medium & small enterprises certificateBusiness License

    Korea Western power KOSEP Korea East-West PowerKOMIPO KOSPO

    Qualified maintenance enterprise appointed by five Electric generation subsidiary of KEPCO

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundae-RotemCHMC 5100톤 T/D PRESS 및 롤포밍 라인CLUTCH BRAKE ASS’Y

    1 SET 2013. 03

    HYOSUNG WHEEL ASS’Y 1 EA 2013. 03

    Hyundai –Samho Heavy브라질 OSX 조선소 G/C 1기LOWER/UPPER TROLLEY DRUM ASS’Y

    4 SET2013. 04

    Hyundai - Rotem HMC 울산2공장 5400T T/F PRESS-CLUTCH BRAKE ASS’Y 1 SET 2013. 03

    Korea Best 40T WINCH용 DRUM 제작 1 EA 2013. 05

    태원공업 SES DRUM 제작 2 SET 2013. 08

    Korea Best WIRE DRUM 제작 1 SET 2013. 09

    Hyundai - Rotem현대제철 항만하역장비 55TON BTCWIRE DRUM ASS’Y

    1 SET 2013. 11

    Hyundai - Rotem현대제철 항만하역장비 55TON BTCSTORM ANCHOR ASS’Y

    1 SET 2013. 10

    유림산업NHI SNNC 증설 PELLETIZERPELLETIZER MAIN SHAFT 외

    1 SET 2013. 09

    태원공업 SES DRUM 2 SET 2013. 11

    Hyundai –Samho Heavy 10,000TON HEAVY LIFTING VESSEL-BOSS SCW620 8 SET 2013. 12

    Doosan Heavy 삼척 CSU 4기 PULLEY 제작 4 LOT (64EA) 2014. 04

    Hyundai –Samho HeavyJIB CRANE (100T, 30T), NAKILAT, QATARHOIST DRIVE ASS’Y

    3 SET 2014. 01

    Hyundai –Samho HeavyQ-MAX FLOATING DOCK(QATAR)MINOR ITEM FOR ROLLER PATH

    2 EA 2014. 01

    13. Supply Records

    20

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundai –WIA브라질 EEP 20Ton Bridge Type CraneMAGNET BEAM, WHEEL, WIRE DRUM ASS’Y

    1 SET 2013. 10

    DS HEAVY INDUSTRIESPOSCO PLANTC BTC 50TONWIRE DRUM ASS’Y

    2 SET 2014. 07

    DS HEAVY INDUSTRIESPOSCO PLANTC GTSU 14, 15호기WIRE DRUM ASS’Y

    2 SET 2014. 08

    Doosan Heavy 신보령 #1, 2PULLEY

    1 LOT(10 EA) 2014. 09

    BUSAN ETO NIPPON STEEL WIRE DRUM 8 EA 2014. 09

    Hyundai –Samho Heavy10,000TON HEAVY LIFTING VESSELSHEAVE BLOCK FOR MAIN HOISTING

    8 SET 2014. 10

    Hyundai –Samho Heavy10,000TON HEAVY LIFTING VESSELWIRE ROPE SHEAVE

    1 SET 2014. 10

    Hyundai –Samho Heavy10,000TON HEAVY LIFTING VESSELBLOCK LOADER

    8 SET 2014. 12

    Doosan Heavy Ciaran PJTGTSU DRUM

    1 LOT 2014. 12

    Hyundai - Rotem현대제철 특수강 크레인LAMINATION HOOK

    6 SET 2015. 01

    BUSAN ETO MES WIRE DRUM 20 EA 2015. 03

    Doosan Heavy Cikarang PJT용 PULLEY제작 2 LOT(22 EA) 2015. 03

    21

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    BUSAN ETO MES WIRE DRUM 9 EA 2015. 03

    Hyundai –WIAKOBE STEEL 360/60ton 제강크레인 예비품Bogie(Wheel) Ass’y 2 SET 2015. 03

    BUSAN ETO MES WIRE DRUM - BT4325 6 EA 2015. 06

    BUSAN ETO MES WIRE DRUM - BT4331 6 EA 2015. 06

    태원공업 SES ¢2250 DRUM 2 SET 2015. 07

    CR ENG 삼성중공업㈜ 70/15ton LLC - Travelling Part 제작 1 SET 2015. 07

    Doosan Heavy 당진 CSU 2기 PULLEY 제작 2 LOT (16 EA) 2014. 01

    SLOT NANKAI 100/10T ×27.2M E.O.C 1 SET 2014. 09

    BUSAN ETO 新日鐵住金(株) 大分製鐵所殿薄板 HRT テーブルフレーム

    3 SET 2015. 08

    BUSAN ETO MES WIRE DRUM - BT4330 6 EA 2015. 08

    태원공업 SES ¢1850 DRUM 2 SET 2015. 09

    Doosan VINA Heavy SUPPLY CRANE DRUMNSRP RMQC 2UNIT

    8 SET 2015. 06

    Doosan VINA Heavy SUPPLY CRANE DRUMNSRP RMQC 2UNIT

    4 SET 2015. 09

    BUSAN ETO NIPPON EGALV STEEL SDN.BHDLOOPER WIRE ROPE DRUM

    2 SET 2015. 10

    BUSAN ETO NIPPON EGALV STEEL SDN.BHDLOOPER WIRE ROPE DRUM

    2 SET 2015. 10

    22

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundai - Rotem현대제철 특수강 옥외야드 20톤 캔트리크레인 제작 설치HOIST COMPONENT - WIRE DRUM ASS’Y

    1 SET 2016. 01

    BUSAN ETO MES WIRE DRUM – BT3374 2 SET 2016. 03

    BUSAN ETO MES WIRE DRUM – BT3368 7 SET 2016. 03

    Hyundai –WIA 중)COSMA SHENYANG 2000톤/ 1000톤 PRESS 4 SET 2016. 04

    BUSAN ETO MES WIRE DRUM – BT3375, BT3376 5 SET 2016. 05

    BUSAN ETO MES WIRE DRUM – BT3361 5 SET 2016. 07

    Hyundai –WIA 중)DAS 1600톤 프로그레시브 프레스 라인 1 SET 2016. 07

    BUSAN ETO MES WIRE DRUM – BT3380~3383 4 SET 2016. 06

    Hyundai –WIA 현대제철(인천) 160/60톤 크레인 - WIRE DRUM 1 SET 2016. 07

    BUSAN ETO 薄板 HRT フレーム & チョック 1 SET 2016. 07

    Doosan VINA Heavy SGP RTGC 8UNITS(MHS shop)RTGC CRANE DRUM

    8 EA 2016. 07

    BUSAN ETO MES WIRE DRUM – BT3378, 3379 5 SET 2016. 09

    Hyundai –Samho Heavy 모르코 Safi CHP –DRUM ASS’Y 3 SET 2016. 06

    Hyundai –Samho Heavy 모르코 Safi CHP – TROLLEY ASS’Y 3 SET 2016. 08

    대광기업 HD-10000 - SHEAVE BLOCK 4 SET 2016. 08

    Hyundai –WIA 미)Eagle Bend 3000톤 트랜스퍼 프레스 1 SET 2016. 09

    BUSAN ETO 三井造船大分営業所殿向け【BT3377 YILPORT/GEMLIK向け巻上ドラム】

    6 SET 2016. 12

    23

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    ㈜ 성진 E&IENTRY STORAGE LOOPERWINCH DRUM ASS’Y

    1 SET 2016. 11

    Hyundai –WIA P-5 클러치 피스톤 제작 1 EA 2016. 10

    ㈜SC ISP넥센 타이어 신항만공사 스태커 크레인DRUM

    20 SET 2016. 10

    BUSAN ETO NSSMC 君津殿向け 【サイドガイド】 1 SET 2016. 11

    BUSAN ETO 三井造船大分営業所殿向け【BT4338 巻上ワイヤードラム】

    9 SET 2016. 12

    BUSAN ETO 三井造船大分営業所殿向け【BT3365 WESTPORTS MALAYSLA SDN BHD 向け巻上ドラム】

    3 SET 2017. 01

    Hyundai - RotemBHMC #4 창주공장 5400T T/F 프레스 2라인CLUTCH & BRAKE ASS’Y

    1 SET 2016. 11

    BUSAN ETO NSSMC鹿鳥殿向け【BE 駆動ドフム】 1 SET 2017. 01

    와이케이중공업 리버스 드럼 7 EA 2017. 01

    BUSAN ETO 三井造船大分営業所殿向け【BT4339 ワイヤードラム】

    1 SET 2017. 02

    BUSAN ETO 三井造船大分営業所殿向け【BT4355 ワイヤードラム】

    1 SET 2017. 02

    BUSAN ETO 三井造船大分営業所殿向け【BT4350 ワイヤードラム】

    1 SET 2017. 02

    Hyundai - Rotem포스코(포항) 3연주공장 No.1 용강크레인 구권 Crane 경년 교체HOIST COMPONENT (DRUM)

    1 SET 2017. 02

    24

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    BUSAN ETO 三井造船大分営業所殿向け【BT3392 ワイヤードラム】

    13 SET 2017. 05

    ㈜ 대주기공 포항 2제강 KR 설비 WIRE DRUM 제작 납품 1 SET 2017. 04

    IMSK

    두산중공업-500TON 크레인용 WIRE DRUM ASS’Y 외TROLLEY FRAMEMAIN HOIST ASS’YTRAVERLLING ASS’YROCKER ASS’Y

    1 SET1 SET1 SET1 SET

    2017. 05

    BUSAN ETO 三井造船大分営業所殿向け【BT3394 巻上ワイヤードラム】

    3 SET 2017. 06

    BUSAN ETO 三井造船大分営業所殿向け【BT3396 巻上ワイヤードラム】

    3 SET 2017. 06

    Hyundai - RotemRENAULT BURSA 5400T TX 라인CLUTCH & BRAKE ASS’Y

    1 SET 2017. 03

    IMSK

    두산중공업-대형GT 크레인용 HOOK ASS’Y 제작, 납품500TON HOOK ASS’Y500TON TROLLEY ASS’Y500TON WIRE DRUM ASS’Y

    1 SET1 SET1 SET

    2017. 05

    IMSK두산중공업-대형GT 30/5TON 크레인용 TROLLEY ASS’Y 제작, 납품30/5TON×12.7M TROLLEY ASS’Y30/5TON×22.4M TROLLEY ASS’Y

    1 SET1 SET

    2017. 05

    Hyundai - Rotem현대제철 특수강 제강공장 수강기중기 신설LAMINATION HOOK

    1 SET 2017. 05

    Hyundai - Rotem현대제철 특수강 제강공장 수강기중기 신설HOOK ASS’Y

    1 SET 2017. 05

    25

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundai –Samho HeavyQATAR STEEL 1,500 SHIP UNLOADER 1기DRUM ASS’Y

    1 SET 2017. 08

    BUSAN ETO 三井造船大分営業所殿向け【BT4362 区分 31, 43 主巷, 走伏 ドラム】

    1 SET 2017. 07

    태원공업 WIRE DRUM 2 EA 2017. 06

    BUSAN ETO 三井造船大分営業所殿向け【BT3389パセコトランステーナケーブルリール方式】

    2 SET 2017. 08

    BUSAN ETO 三井造船大分営業所殿向け【BT3398 Nam Dinh Vu Port 向け トランステーナ】

    6 SET 2017. 07

    Hyundai - RotemBHMC #5 중경 공장 5400톤 TF 2라인CLUTCH & BRAKE ASS’Y

    1 SET 2017. 04

    BUSAN ETO 三井造船大分営業所殿向け【BT4365-17T31 主巷/ 走伏 ワイヤドラム】

    3 SET 2017. 12

    BUSAN ETO 三井造船大分営業所殿向け【BT4371-17T31 主巷/ 走伏 ワイヤドラム】

    1 SET 2017. 09

    BUSAN ETO 三井造船大分営業所殿向け【BT3399-17T31巻上ワイヤドラム】

    2 SET 2017. 05

    Hyundai –WIA인니) PT. WIKA 23톤 크레인 Spare partWHEEL ASS’Y(SPARE)

    1 EA 2017. 08

    Hyundai - Rotem현대제철 B열연 크레인 자동화 픽업크레인 신설Hoist COMPONENT

    1 SET 2017. 09

    Hyundai - RotemRenault Spain 고속프레스라인 6600톤CLUTCH & BRAKE ASS’Y

    1 SET 2017. 07

    26

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundai –WIAHMC(중국) 금형공장 2400톤 프레스CLUTCH & BRAKE 제작

    1 SET 2017. 09

    BUSAN ETO CT1644001A 2제강 수강대차 제작 1 SET 2018. 03

    BUSAN ETO DG밀 프로파일 프레임 1 SET 2017. 12

    BUSAN ETO 三井造船大分営業所殿向け【BT4361 主巷/ 走伏 ワイヤドラム】

    1 SET 2018. 01

    BUSAN ETO 三井造船大分営業所殿向け【BT4363 主巷/ 走伏 ワイヤドラム】

    1 SET 2018. 02

    대광기업120TON SNATCH BLOKC120TON ROLLER

    6 EA8 EA

    2017. 11

    BUSAN ETO SKIP DRUM 1 SET 2018. 03

    Hyundai - Rotem포스코(광양) 1제강 1용선 크레인HOIST COMPONENT

    1 SET 2018. 05

    Hyundai - Rotem포스코(광양) 1제강 1용선 크레인SHEAVE & HOOK ASS’Y

    1 SET 2018. 08

    BUSAN ETO 三井造船大分営業所殿向け【BT4364 主巷/ 走伏 ワイヤドラム】

    2 SET 2018. 04

    BUSAN ETO 三井造船大分営業所殿向け【BT4370 主巷/ 走伏 ワイヤドラム】

    1 SET 2018. 03

    ㈜석진이엔티 POSCO WIRE DRUM 1 EA 2018. 02

    BUSAN ETO 대차프레임-배장기 1 SET 2018. 04

    27

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundai –WIA P-5 클러치 피스톤 제작 1 EA 2018. 05

    BUSAN ETO 三井造船大分営業所殿向けBT4376主巻/起伏 ワイヤドラム

    6 SET 2018. 08

    Hyundai - RotemKMI 5400톤 T/F 프레스CLUTCH & BRAKE ASS’Y

    1 SET 2018. 05

    Hyundai - RotemKMI 2400톤 T/O 프레스CLUTCH & BRAKE ASS’Y

    1 SET 2018. 05

    BUSAN ETO 三井造船大分営業所殿向けBT4379 主巻/起伏 ワイヤドラム

    2 SET 2018. 10

    BUSAN ETO 三井造船大分営業所殿向けBT3403 主巻 ワイヤドラム

    3 EA 2018. 10

    BUSAN ETO 三井造船大分営業所殿向けBT3401 主巻 ワイヤドラム

    8 EA 2018. 10

    Hyundai - Rotem르노 MCA 고속프레스라인 6600톤CLUTCH & BRAKE ASS’Y

    1 SET 2018. 08

    D00SUNG COTEC신고리 #5호기950TON CRANE용 WIRE DRUM & FLANGE 제작 가공

    7 SET 2018. 08

    BestSaving BT4385 主卷/起伏 WIRE DRUM 4 SET 2019. 03

    POSCO PLANTEC포항 4제품부두 하역설비 신설(BTC)Wire Drum 제작 5.6호기

    2(8EA)SET 2019. 05

    POSCO PLANTEC포항 원료하역설비(GTSU #11)Wire Drum 제작

    1(5EA) SET 2019. 04

    28

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    BestSaving BT4380 主卷/起伏 WIRE DRUM 3 SET 2019. 05

    BestSaving BT4388 主卷/起伏 WIRE DRUM 6 SET 2019. 07

    Hyundai - RotemPOSCO 2제강공장 450TON LADLE CRANE 용Wire Drum ASSEMBLY

    4 SET 2019. 06

    BestSaving BT4389 主卷/起伏 WIRE DRUM 6 SET 2019. 09

    Hyundai - Rotem닛산 멕시코 2000톤 PRESS 공사CLUCH & BRAKE ASS’Y

    1 SET 2019. 09

    Hyundai - Rotem 현대제철 철근제강 장입 수강크레인 공사 HOIST COMPONENT2 SET

    2019. 09

    Hyundai - Rotem 현대제철 철근제강 장입/수강크레인 공사 HOOK ASSEMBLY 1 SET 2019. 09

    BestSaving BT3432 WIRE DRUM 16 EA 2019. 12

    태원코퍼레이션㈜HHBY1154/HHBY1174 DRUM제작CF5632H-1, Ø2700 DRUM 외

    3 SET 2019. 09

    Hyundai –Samho Heavy HHI 80TON JIB CRANE MAIN,AUX,LUFFING DRUM 3 SET 2019. 09

    BestSaving BT4395 主卷/起伏 WIRE DRUM 9 SET 2019 .09

    Hyundai - Rotem19년포스코 포항2제강450/100톤1,2,3용선크레인 주권감속기WIRE DRUM ASSEMBLY

    2 SET 2020. 02

    Hyundai –Samho Heavy사우디 아람코 조선소 크레인 공급공사DRUM ASSEMBLY

    12 SET 2020. 04

    29

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.

    Cmpany name Project name Q’ty Delivery date

    Hyundai –Samho Heavy 사우디 아람코 조선소 500Ton Goliath CRANE용 HOOK BLOCK 2 SET 2020. 07

    BestSaving BT3441,BT3442,BT3440 主券 WIRE DRUM 18 EA 2020. 07

    Hyundai - Rotem19년 미국 SMS-SDI Buffalo 프로젝트[PL/CGL] ROPE DRUM (Ø1600×6720)

    5 SET 2020. 05

    두인텍㈜ PUSAN PORT CONTAINER CRANE FOR WIRE DRUM ASS’Y 8 EA 2020. 05

    POSCO PLANTEC GTSU #17 WIRE DRUM ASS’Y 5 EA 2020. 06

    POSCO PLANTEC GTSU #10 WIRE DRUM ASS’Y 5 EA 2020 .07

    JIS㈜ 신일본제철 2제강 450TON WIRE DRUM ASS’Y 2 SET 2020 07

    BestSaving BT3448 主券 WIRE DRUM 13 EA 2020. 12

    BestSaving BT4414 권상/기복 WIRE DRUM 4 SET 2020. 12

    씨엠중공업 부산신항 2-5단계 C/C용 WIRE DRUM 1 SET 2020. 12

    30

    13. Supply records

  • DONGIL MACHINERY CO.,LTD.31

    14. Photos of Products

  • DONGIL MACHINERY CO.,LTD.32

    14. Photos of Products

  • DONGIL MACHINERY CO.,LTD.33

    14. Photos of Products

  • DONGIL MACHINERY CO.,LTD.34

    14. Photos of Products

  • DONGIL MACHINERY CO.,LTD.35

    450Ton용 WIRE DRUM

    500Ton Hook Ass’y500Ton Trolley Ass’y

    250T Ladle Hook Ass’y

    POSCO용선 크레인용 WIRE DRUM

    SKIP WIRE DRUM

    14. Photos of Products

  • DONGIL MACHINERY CO.,LTD.

    15. LAY-OUT

    36

  • DONGIL MACHINERY CO.,LTD.

    16. Road Map

    37

    경남 함안군 칠원읍 원서로 109

  • DONGIL MACHINERY CO.,LTD.38