Transcript of WQD2011 - KAIZEN - EMAL - To conserve DM water
KAIZEN REPORT
Quality Month: November 2011 Kaizen No. Page No.:
Company logo
Company Name: Emirates Aluminium, Abu Dhabi
Department: Power Operations
Section/Process: Combined Cycle Power Plant
Improvement Title: To conserve DM water
Category: [ ] Quality improvement [ ] Health & Safety [ ] Environment [ * ] Productivity [ ] Office processes [ ] Product design improvement [ ] Service improvement
Before Situation Root Cause Analysis Improvement Measures After Situation • STG20 condenser hot well(HW) make-up rate has
been more since commissioning and HRSG21 & 22 HP FW flow 8 T/h is more in each boiler.
• Due to above, hot well level make-up CV opens 100% constantly, emergency m/up CV opens frequently and HW level maintaining between
-350 and -300 mm with level set point of 0 mm.
HW m/up 16T/h more
H21&22 FW 16T/h more
1. Excessive H21 CBD. 2. Excessive H22 CBD. 3. Condensate passing to
cooling tower-20 sump. 4. FW passing from H21
HP/LP Eco. & Evp. Drains. 5. FW passing from H22
HP/LP Eco. & Evp. Drains. 6. H21 boiler tube leak. 7. H22 boiler tube leak.
1. Throttled H21 CBD (2900C) metering valve from 100 to 25%, by doing this 8 T/h HP FW flow decreased.
2. Throttled H22 CBD (2900C) metering valve from 100 to 25%, by doing this 8 T/h HP FW flow decreased.
3. ST20 HW level increased and became normal level of 0 mm, m/up flow rate decreased by 16 T/h and m/up CV is closed to 50%.
4. Boiler blow down tank spray water flow decreased by 5T/h in each boiler.
1. DM water conserved = 384 T/day = 277.6 $/day 2. Ser. water conserved= 240 T/day = 180 $/day 3. Phosphate conserved= 2.3 kg/day = 2.08 $/day 4. Ammonia conserved = 4.6 kg/day = 3.02 $/day 5. O2 scavenger conserved= 1 kg/day = 4.1 $/day 6. Aux. power conserved=2520 kWh/day= 55.44 $/day 7. Natural gas conserved equivalent to
heat gain in H21 & 22 = 10656 m3/day = 596 $/day. 8. ST20 HW level became to normal level of 0 mm,
m/up CV opening is 50%. ST20 HW level Trend:
Benefits: Participation:
Total cost savings = 1118.24 $/day
Standardization: Horizontal Deployment Opportunities (Replication):
Single Point Lesson:
Remark / Management Comments: Sign
Copy Distribution:
Date of Starting: 15-Sep-2011
Date of Completion: 24-Sep-2011
Control No. (by DQG)
Declaration: We are submitting this Kaizen case voluntarily to DQG for participation in Kaizen Blitz competition. We are glad to authorize DQG to share this information with the Business
community at large to promote Continual Improvement and good practices. We confirm that the improvement has been initiated and completed during the Kaizen Blitz week. Signed by Authorised signatory: _______________________Name:________________________________Designation:_____________________________________ Date: ____/____/________