Improving the Competence of Protection OfficersVishal Singh, GM Rail Corridor Safety April 2017
![Page 2: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/2.jpg)
2
The Protection Officer
• Is the person responsible for managing the safety of workers within the Sydney Trains Rail Corridor
• Primary responsibility: – to remove the risk of a worker being struck by a train through
implementing the appropriate level of Worksite Protection
Why is this role safety critical and what are the implications for poor PO performance?
![Page 3: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/3.jpg)
3
![Page 4: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/4.jpg)
4
Outline
1. Previously identified issues with PO performance
2. Methods and initiatives employed to overcome these issues
3. Results and effectiveness of these initiatives
4. Future initiatives and approaches
![Page 5: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/5.jpg)
5
Who we are…
14 Rail Safety Coaches and 4 Safeworking Mentors:
– Subject matter experts in Worksite Protection
– PO4 & Workplace Trainer Assessor qualified
– Demonstrated excellence in non-technical skills
– Respected by their peers
![Page 6: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/6.jpg)
6
What we do…Coaches and Mentors:
– Initially provided assistance to POs à extended to Signal Box
and station staff
– Provide advice on Network Rules & Procedures
– Promote collaboration
– Conduct routine and targeted Competency Assurance reviews
for POs
– Provide upskilling for POs
– Assist in audits & investigations
![Page 7: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/7.jpg)
7
2010 –The Story Begins
– 160 – Worksite protection incidents– 49 – of these were high potential– 1 fatality
![Page 8: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/8.jpg)
8
Worksite Protection Program Established
• Implemented projects to– Improve Safety Culture– Introduce engineering safety
solutions– Tighten Network rules and
procedures
• Major focus now on developing Protection Officers -
![Page 9: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/9.jpg)
9
The IssueWorksite Protection (WSP) Incident Report (2013-14) identified:
Opportunities for
improvement
An increase in the number of high potential Worksite Protection
Incidents
A decrease in reporting compliance breaches
A high number POs requiring further development
Common WSP root causes and contributing factors
![Page 10: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/10.jpg)
10
Root Causes & Contributing Factors
• Poor Communication
• Poor Planning
• Lack of Situational Awareness
• Complacency
• Lack of Knowledge / Competence
![Page 11: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/11.jpg)
11
Authority Gradient Poor Supervision Workplace Norms
Distraction Lack of Teamwork Lack of Resources
Fatigue Work Pressure
Root Causes & Contributing Factors
![Page 12: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/12.jpg)
12
Project 41: Improving PO Performance
• Project Aim:To deliver initiatives that reduce and/or eliminate the risk of a
track worker being struck by a train.
• Project Initiatives:1. Reduce number of POs
2. Selection and Training
3. Competence Management and Assurance
4. Tools and Technology
5. Data collection and analysis
![Page 13: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/13.jpg)
13
1. Reduce number of POs• Aims:
– Establish no. POs required for the business
– Smaller pool of POs to allow for more targeted training and
development opportunities
• Initiatives:– Revised requirements for Protection Officer Evidence Portfolio
– Introduced Assess Corridor Safety qualification
– Revised approval process for new PO’s
• Result: Reduction in number of Protection Officers2013-14 2015-16 Current≈1900 ≈1100 <1000
![Page 14: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/14.jpg)
14
2. PO Selection & Training• Aim:
– Identify the key skills required in the role of a Protection Officer and
improve selection & Training processes to target these skills
• (e.g. non-technical skills, communication, safety behaviours, planning)
• Initiatives:– Introduced Protection Officer Pre-assessment
• Scenario-based and psychometric assessments
• Pre-requisite for PO1 Training
![Page 15: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/15.jpg)
15
2. Selection & TrainingResult:
– April 2016 à Feb 2017: 52% met the benchmark
![Page 16: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/16.jpg)
16
Selection & Training• Reviewed PO1 Initial Training Curriculum and amended sign-off
process for PO1 on-job workbook
![Page 17: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/17.jpg)
17
3. Competence Management & Assurance
• Aim:
– To identify active POs
– To improve the technical and
non-technical skills of POs
• Initiatives
– Evidence of Practice
– PO Recertification
– Coaching and Reviews
– Other Interventions
![Page 18: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/18.jpg)
18
Evidence of PracticeMinimum requirement: implement Work on Track Protection at
least once every quarter
![Page 19: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/19.jpg)
19
Coaching & Reviews
• 12 monthly assurance cycle reviews
– 1 x Worksite Protection Plan
– 1 x Audio Review
– 1 x Coaching Session
![Page 20: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/20.jpg)
20
Coaching Template
![Page 21: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/21.jpg)
21
PO Recertification• Introduced:
– PO Evidence Portfolio
• Submit 1 x WPP every quarter
– Revised interactive curriculum
• Reality Centre
• Multimedia curriculum delivery
• Results:– Identified PO’s that required further coaching and development
– Removal of qualification for those not regularly practicing
![Page 22: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/22.jpg)
22
4. Tools & Technology
• Use of SKS, ATWS, TCOD
• Access to information on the go
![Page 23: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/23.jpg)
23
5. Data Collection & Analysis
• RCS Incident data
• WPP & Audio Review data
• Coaching/Mentoring Data analysis
• Corridor Safety Centre Data
– Corrections data
![Page 24: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/24.jpg)
24
Average PO Review Scores: July 2016 – March 2017
![Page 25: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/25.jpg)
25
The Results
• $3.5M savings p/annum
• Safety culture change
• Improved competence of POs
• Better communications between POs and Signallers
![Page 26: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/26.jpg)
26
The Results• 85% reduction in high severity incidents over 6 years
![Page 27: Vishal Singh - Sydney Trains](https://reader034.fdocument.pub/reader034/viewer/2022050900/58e4bf3d1a28abc24e8b481b/html5/thumbnails/27.jpg)
27
What’s Next?
Safety Interactions during Configuration Possession
Electronic Workbooks
Better Planning of work on track
Safety Critical Communications training for all
Increased coverage at nights and on weekends
Use of Automatic Track Warning System
Corridor Safety System extended 24/7
Non-Technical Skills training for Rail Safety Workers