VALORIZACION 1

7
ANEXO N°02 GRAFICO DE AVANCE DE OBRA ACUMULADO PROGRAMADO Vs. EJECUTADO OBRA: "MEJORAMIENTO DEL SERVICIO DEL CEMENTERIO SANTA ROSA DE AGOCAS, DISTRITO DE MARCABAL, SANCHEZ CARRION, LA LIBERTAD" LUGAR: LOCALIDAD DE MARCABAL 140,000.00 130,000.00 120,000.00 110,000.00 100,000.00 90,000.00 80,000.00 70,000.00 60,000.00 50,000.00 40,000.00 30,000.00 20,000.00 10,000.00 0.00 del al 30 de Septiem 1 del al 31 de Octubre 1 del al 22 de Noviembre PROGRMADO 16,569.00 46,269.41 0.00 EJECUTADO 17,708.96 MES PROGRAMADO MENSUAL EJECUTADO MENSUAL PROGRAMADO ACUMULADO JECUTADO ACUMULADO ESTADO S/. % S/. % S/. % S/. % ADELANTO (S/.) ATRAZADO(S/.) del al 30 de Septiemb 16,569.00 12.52% ### 16.12% 16,569.00 12.52% 17,708.96 16.12% 1,139.96 1 del al 31 de Octubre 46,269.41 34.97% 0.00% 62,838.41 47.49% del al 22 de Noviembr 0.00 52.51% 0.00% 0.00 100.00% N U E V O S S O L E S CURVA DE AVANCE EJECUTADO ACUMULADO CURVA DE AVANCE PROGRAMADO ACUMULADO

Transcript of VALORIZACION 1

Page 1: VALORIZACION 1

ANEXO N°02

GRAFICO DE AVANCE DE OBRA ACUMULADO PROGRAMADO Vs. EJECUTADO OBRA:

LUGAR: LOCALIDAD DE MARCABAL

140,000.00130,000.00120,000.00110,000.00100,000.0090,000.0080,000.0070,000.0060,000.0050,000.0040,000.0030,000.0020,000.0010,000.00

0.0022 del al 30 de Septiembre 1 del al 31 de Octubre 1 del al 22 de Noviembre

PROGRMADO 16,569.00 46,269.41 0.00EJECUTADO 17,708.96

MESPROGRAMADO MENSUAL EJECUTADO MENSUAL PROGRAMADO ACUMULADO JECUTADO ACUMULADO ESTADO

S/. % S/. % S/. % S/. % ADELANTO (S/.) ATRAZADO(S/.)22 del al 30 de Septiembre 16,569.00 12.52% 17,708.96 16.12% 16,569.00 12.52% 17,708.96 16.12% 1,139.96

1 del al 31 de Octubre 46,269.41 34.97% 0.00% 62,838.41 47.49% 1 del al 22 de Noviembre 0.00 52.51% 0.00% 0.00 100.00%

"MEJORAMIENTO DEL SERVICIO DEL CEMENTERIO SANTA ROSA DE AGOCAS, DISTRITO DE MARCABAL, SANCHEZ CARRION, LA LIBERTAD"

NUEVOS SOLES

CURVA DE AVANCE EJECUTADO ACUMULADO

CURVA DE AVANCE PROGRAMADO ACUMULADO

Page 2: VALORIZACION 1

ANEXO N°01

VALORIZACION DE AVANCE DE OBRA N° 01OBRA: "MEJORAMIENTO DEL SERVICIO DEL CEMENTERIO SANTA ROSA DE AGOCAS, DISTRITO DE MARCABAL, SANCHEZ CARRION, LA LIBERTAD"LUGAR: SANTA ROSA DE AGOCAS, DISTRITO DE MARCABAL, SANCHEZ CARRION, LA LIBERTADMONTO VALOR REFERENCIAL: S/ 109,830.02MONTO VALOR ADJUDICADO: S/ 132,330.02MONTO VALORIZADOFECHA DE ENTREGA DE TERRENO: 22 DE SEPTIEMBREFECHA DE INICIO DE COMPUTO DE PLAZO: 60 DIAS CALENDARIOFECHA DE TERMINO DE OBRA: 22 DE NOVIEMBRE

Item PARTIDA PRESUPUESTO AVANCE ANTERIOR AVANCE DE MES AVANCE ACOMULADO SALDO

Und. Metrado METRADO PARCIAL METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %

OBRAS PROVISIONALES 6,442.05 0.00 6,442.05 100% 6,442.05 100% 0.00 0%01.01 Cartel de Obra de 2.40 x 3.60m und 1.00 1,488.37 1,488.37 0.00 1.00 1,488.37 100% 1.00 1,488.37 100% 0.00 0.00 0%01.02 CASETA DE ALMACEN Y/O GUARDIANIA m2 24.00 56.61 1,358.64 0.00 24.00 1,358.64 100% 24.00 1,358.64 100% 0.00 0.00 0%01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 3,500.00 3,500.00 0.00 1.00 3,500.00 100% 1.00 3,500.00 100% 0.00 0.00 0%01.04 CINTA PARA SEÑAL DE PELIGRO m 96.00 0.99 95.04 0.00 96.00 95.04 100% 96.00 95.04 100% 0.00 0.00 0%02 OBRAS PRELIMINARES 129.60 0.00 129.60 100% 129.60 100% 0.00 0%02.01 LIMPIEZA DEL TERRENO MANUAL m2 96.00 0.32 30.72 0.00 96.00 30.72 100% 96.00 30.72 100% 0.00 0.00 0%02.02 TRAZO Y REPLANTEO PRELIMINAR m2 96.00 1.03 98.88 0.00 96.00 98.88 100% 96.00 98.88 100% 0.00 0.00 0%03 MOVIMIENTO DE TIERRAS 3,996.06 0.00 1,446.24 36% 1,446.24 36% 2,549.82 64%03.01 EXCAVACION A MANUAL HASTA NIVEL DE SUBRAZANTE m3 89.60 9.58 858.37 0.00 89.60 858.37 100% 89.60 858.37 100% 0.00 0.00 0%03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 m TERRENO NORMAL m3 12.80 9.58 122.62 0.00 12.80 122.62 100% 12.80 122.62 100% 0.00 0.00 0%03.03 EXCAVACION PARA ZAPATAS m3 8.32 12.77 106.25 0.00 8.32 106.25 100% 8.32 106.25 100% 0.00 0.00 0%03.04 NIVELACION INTERIOR Y APISONADO PARA EL FALSO PISO, PATIO Y VEREDAS m2 136.00 1.13 153.68 0.00 0.00 0.00 0% 0.00 0.00 0% 136.00 153.68 100%03.05 RELLENO CON MATERIAL PROPIO m3 1.71 7.02 12.00 0.00 0.00 0.00 0% 0.00 0.00 0% 1.71 12.00 100%03.06 RELLENO COMPACTADO C/EQUIPO MAT./PRESTAMO m3 26.27 85.80 2,253.97 0.00 0.00 0.00 0% 0.00 0.00 0% 26.27 2,253.97 100%03.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 136.26 3.59 489.17 0.00 100.00 359.00 73% 100.00 359.00 73% 36.26 130.17 27%04 OBRAS DE CONCRETO SIMPLE 4,639.85 0.00 3,097.51 67% 3,097.51 67% 1,542.34 33%04.01 CIMIENTOS Y SOBRECIMIENTOS 3,097.51 0.00 3,097.51 100% 3,097.51 100% 0.00 0%04.01.01 SOLADO PARA ZAPATAS E=4", CON MEZCLA 1:10 m2 8.32 22.31 185.62 0.00 8.32 185.62 100% 8.32 185.62 100% 0.00 0.00 0%04.01.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H +30% P.G m3 11.09 118.65 1,315.83 0.00 11.09 1,315.83 100% 11.09 1,315.83 100% 0.00 0.00 0%04.01.03 SOBRECIMIENTOS DE CONCRETO 1:8 + 25% P.M. m3 3.33 166.64 554.91 0.00 3.33 554.91 100% 3.33 554.91 100% 0.00 0.00 0%04.01.04 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 44.38 23.46 1,041.15 0.00 44.38 1,041.15 100% 44.38 1,041.15 100% 0.00 0.00 0%04.02 FALSO PISO 1,542.34 0.00 0.00 0% 0.00 0% 1,542.34 100%04.02.01 FALSO PISO, MEZCLA C:H, 1:8, E=4" m2 90.09 17.12 1,542.34 0.00 0.00 0.00 0% 0.00 0.00 0% 90.09 1,542.34 100%05 OBRAS DE CONCRETO ARMADO ### 0.00 2,527.87 22% 2,527.87 22% 8,862.89 78%05.01 ZAPATAS 2,527.87 0.00 2,527.87 100% 2,527.87 100% 0.00 0%05.01.01 CONCRETO f'c=210 kg/cm2 m3 7.49 282.66 2,117.12 0.00 7.49 2,117.12 100% 7.49 2,117.12 100% 0.00 0.00 0%05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 116.36 3.53 410.75 0.00 116.36 410.75 100% 116.36 410.75 100% 0.00 0.00 0%05.02 COLUMNAS 7,211.20 0.00 0.00 0% 0.00 0% 7,211.20 100%05.02.01 CONCRETO f'c=210 kg/cm2 m3 3.99 302.06 1,205.22 0.00 0.00 0.00 0% 0.00 0.00 0% 3.99 1,205.22 100%05.02.02 ENCOFRADO Y DESENCOFRADO m2 43.48 30.97 1,346.58 0.00 0.00 0.00 0% 0.00 0.00 0% 43.48 1,346.58 100%05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,350.55 3.45 4,659.40 0.00 0.00 0.00 0% 0.00 0.00 0% 1,350.55 4,659.40 100%05.03 VIGAS Y VIGUETAS DE ALFEIZAR 1,651.69 0.00 0.00 0% 0.00 0% 1,651.69 100%05.03.01 CONCRETO f'c=210 kg/cm2 m3 1.75 270.49 473.36 0.00 0.00 0.00 0% 0.00 0.00 0% 1.75 473.36 100%05.03.02 ENCOFRADO Y DESENCOFRADO m2 16.63 30.97 515.03 0.00 0.00 0.00 0% 0.00 0.00 0% 16.63 515.03 100%05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 192.26 3.45 663.30 0.00 0.00 0.00 0% 0.00 0.00 0% 192.26 663.30 100%06 ESTRUCTURAS ESPECIALES 4,548.06 0.00 0.00 0% 0.00 0% 4,548.06 100%06.01 PILETA 118.90 0.00 0.00 0% 0.00 0% 118.90 100%06.01.01 CONCRETO f'c=175 kg/cm2 m3 0.21 223.67 46.97 0.00 0.00 0.00 0% 0.00 0.00 0% 0.21 46.97 100%06.01.02 ENCOFRADO Y DESENCOFRADO m2 1.72 30.97 53.27 0.00 0.00 0.00 0% 0.00 0.00 0% 1.72 53.27 100%06.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 5.41 3.45 18.66 0.00 0.00 0.00 0% 0.00 0.00 0% 5.41 18.66 100%06.02 COLUMNETA DE PROTECCION PLUVIAL 4,429.16 0.00 0.00 0% 0.00 0% 4,429.16 100%06.02.01 CONCRETO f'c=175 kg/cm2 m3 0.11 223.67 24.60 0.00 0.00 0.00 0% 0.00 0.00 0% 0.11 24.60 100%06.02.02 ENCOFRADO Y DESENCOFRADO m2 2.25 30.97 69.68 0.00 0.00 0.00 0% 0.00 0.00 0% 2.25 69.68 100%06.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 3.40 3.45 11.73 0.00 0.00 0.00 0% 0.00 0.00 0% 3.40 11.73 100%06.02.04 TUBERIA PVC S25 D=250 mm, U.F. m 248.60 17.39 4,323.15 0.00 0.00 0.00 0% 0.00 0.00 0% 248.60 4,323.15 100%07 ESTRUCTURAS DE MADERA Y COBERTURAS ### 0.00 0.00 0% 0.00 0% 22,897.92 100%

Precio Unitario

(S/.)P.Parcial

(S/.)

Page 3: VALORIZACION 1

07.01 TIJERALES 6,411.78 0.00 0.00 0% 0.00 0% 6,411.78 100%07.01.01 TIJERAL DE MADERA, SEGUN DISEÑO TIPO A-1, INC. COLOC. pza 3.00 2,137.26 6,411.78 0.00 0.00 0.00 0% 0.00 0.00 0% 3.00 6,411.78 100%07.02 CORREAS, SOLERAS Y SIMILARES 7,156.83 0.00 0.00 0% 0.00 0% 7,156.83 100%07.02.01 CORREA DE MADERA DE 3"x6" m 206.40 29.18 6,022.75 0.00 0.00 0.00 0% 0.00 0.00 0% 206.40 6,022.75 100%07.02.02 SOLERA DE MADERA DE 2 1/2" x 2 1/2" m 32.00 19.29 617.28 0.00 0.00 0.00 0% 0.00 0.00 0% 32.00 617.28 100%07.02.03 FRISOS DE MADERA DE 2" x 3 1/2" m 40.00 12.92 516.80 0.00 0.00 0.00 0% 0.00 0.00 0% 40.00 516.80 100%07.03 COBERTURAS 9,329.31 0.00 0.00 0% 0.00 0% 9,329.31 100%07.03.01 CON PLANCHA DE FIBROCEMENTO -TIPO TEJA ANDINA m2 158.56 55.08 8,733.48 0.00 0.00 0.00 0% 0.00 0.00 0% 158.56 8,733.48 100%07.03.02 CUMBRERA DE FIBROCEMENTO - TIPO TEJA ANDINA m2 14.60 40.81 595.83 0.00 0.00 0.00 0% 0.00 0.00 0% 14.60 595.83 100%08 MUROS Y TABIQUES DE ALBAÑILERIA 3,398.46 0.00 0.00 0% 0.00 0% 3,398.46 100%08.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA m2 85.95 39.54 3,398.46 0.00 0.00 0.00 0% 0.00 0.00 0% 85.95 3,398.46 100%09 FLETE 9,638.33 0.00 0.00 0% 0.00 0% 9,638.33 100%09.01 FLETE TERRESTRE glb 1.00 9,638.33 9,638.33 0.00 0.00 0.00 0% 0.00 0.00 0% 1.00 9,638.33 100%10 REVOQUES Y ENLUCIDOS 3,249.63 0.00 0.00 0% 0.00 0% 3,249.63 100%10.01 TARRAJEO DE MUROS INTERIORES Y EXTERIORES m2 171.90 10.53 1,810.11 0.00 0.00 0.00 0% 0.00 0.00 0% 171.90 1,810.11 100%10.02 TARRAJEO DE COLUMNAS m2 43.68 15.31 668.74 0.00 0.00 0.00 0% 0.00 0.00 0% 43.68 668.74 100%10.03 TARRAJEO DE VIGAS m2 16.63 16.61 276.22 0.00 0.00 0.00 0% 0.00 0.00 0% 16.63 276.22 100%10.04 VESTIDURA DE DERRAMES m 41.40 3.54 146.56 0.00 0.00 0.00 0% 0.00 0.00 0% 41.40 146.56 100%10.05 BRUÑAS DE 1 X 1 cm m 120.00 2.90 348.00 0.00 0.00 0.00 0% 0.00 0.00 0% 120.00 348.00 100%11 CIELO RASOS 1,703.07 0.00 0.00 0% 0.00 0% 1,703.07 100%11.01 CIELO RASO DE TRIPLAY m2 119.85 14.21 1,703.07 0.00 0.00 0.00 0% 0.00 0.00 0% 119.85 1,703.07 100%12 PISOS Y VEREDAS 3,050.20 0.00 0.00 0% 0.00 0% 3,050.20 100%12.01 PISO DE CEMENTO FROTACHADO Y BRUÑADO m2 90.09 22.77 2,051.35 0.00 0.00 0.00 0% 0.00 0.00 0% 90.09 2,051.35 100%12.02 VEREDA DE CONCRETO e=4" f'c=140 kg/cm2, INC. ENCOFRADO m2 16.19 35.56 575.72 0.00 0.00 0.00 0% 0.00 0.00 0% 16.19 575.72 100%12.03 CONCRETO EN UÑAS DE VEREDA m3 1.73 220.36 381.22 0.00 0.00 0.00 0% 0.00 0.00 0% 1.73 381.22 100%12.04 JUNTA DE DILATACION CON SELLO ASFALTICO e=1" m 13.39 3.13 41.91 0.00 0.00 0.00 0% 0.00 0.00 0% 13.39 41.91 100%13 ZOCALOS Y CONTRAZOCALOS 448.59 0.00 0.00 0% 0.00 0% 448.59 100%13.01 CONTRAZOCALO DE CEMENTO S/COLOREAR h=0.15 m m 35.80 4.81 172.20 0.00 0.00 0.00 0% 0.00 0.00 0% 35.80 172.20 100%13.02 CONTRAZOCALO DE CEMENTO S/COLOREAR h=0.30 m m 37.00 7.47 276.39 0.00 0.00 0.00 0% 0.00 0.00 0% 37.00 276.39 100%14 CARPINTERIA DE MADERA 2,707.30 0.00 0.00 0% 0.00 0% 2,707.30 100%14.01 PUERTA DE MADERA: TABLERO DE CEDRO 4.5 MM m2 9.60 282.01 2,707.30 0.00 0.00 0.00 0% 0.00 0.00 0% 9.60 2,707.30 100%15 CARPINTERIA METALICA 2,612.18 0.00 0.00 0% 0.00 0% 2,612.18 100%15.01 PUERTA METALICA (TIPO REJILLA) m2 9.80 122.52 1,200.70 0.00 0.00 0.00 0% 0.00 0.00 0% 9.80 1,200.70 100%15.02 VENTANA METALICA C/PERF. 1" X 1" X 1/8" m2 10.75 118.85 1,277.64 0.00 0.00 0.00 0% 0.00 0.00 0% 10.75 1,277.64 100%15.03 ABRAZADERAS DE FIJACION PARA TUBERIAS DE 1/8" und 8.00 16.73 133.84 0.00 0.00 0.00 0% 0.00 0.00 0% 8.00 133.84 100%16 CERRAJERIA 79.73 0.00 0.00 0% 0.00 0% 79.73 100%16.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" x 3" pza 8.00 3.48 27.84 0.00 0.00 0.00 0% 0.00 0.00 0% 8.00 27.84 100%16.02 CERRADURA EXTERIOR TIPO FORTE 3 GOLPES pza 1.00 51.89 51.89 0.00 0.00 0.00 0% 0.00 0.00 0% 1.00 51.89 100%17 VIDRIOS, CRISTALES Y SIMILARES 456.07 0.00 0.00 0% 0.00 0% 456.07 100%17.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 115.46 3.95 456.07 0.00 0.00 0.00 0% 0.00 0.00 0% 115.46 456.07 100%18 PINTURAS 2709.67 0.00 0.00 0% 0.00 0% 2,709.67 100%18.01 PINTURA LATEX DOS MANOS EN CIELORASO Y VIGAS m2 136.48 7.38 1007.22 0.00 0.00 0.00 0% 0.00 0.00 0% 136.48 1,007.22 100%18.02 PINTURA LATEX DOS EN MUROS Y COLUMNAS m2 215.58 6.78 1461.63 0.00 0.00 0.00 0% 0.00 0.00 0% 215.58 1,461.63 100%18.03 PINTURA CON BARNIZ EN CARPINTERIA DE MADERA m2 9.60 6.27 60.19 0.00 0.00 0.00 0% 0.00 0.00 0% 9.60 60.19 100%18.04 PINTURA ANTICORROCIVA EN ESTRUCTURAS METALICAS m2 11.15 16.20 180.63 0.00 0.00 0.00 0% 0.00 0.00 0% 11.15 180.63 100%19 VARIOS 517.28 0.00 0.00 0% 0.00 0% 517.28 100%19.01 TUBERIA DE BAJADA DE PVC PARA AGUA DE LLUVIAS m 8.00 12.46 99.68 0.00 0.00 0.00 0% 0.00 0.00 0% 8.00 99.68 100%19.02 TUBERIA PVC SAP C-10 1/2" m 90.00 4.64 417.6 0.00 0.00 0.00 0% 0.00 0.00 0% 90.00 417.60 100%

1 COSTO DIRECTO S/. 84,614.81 0.00 S/. 13,643.27 S/. 13,643.27 S/. 70,971.54PORCENTAJE DE AVANCE DE OBRA EJECUTADO (%) 0.00% 16.12% 16.12% 83.88%

2 GASTOS GENERALES(10%) S/. 8,461.48 0.00 S/. 1,364.33 S/. 1,364.33 S/. 7,097.15

3 SUB TOTAL S/. 93,076.29 0.00 S/. 15,007.60 S/. 15,007.60 S/. 78,068.694 IMPUESTO (18%) S/. 16,753.73 0.00 S/. 2,701.37 S/. 2,701.37 S/. 14,052.36

5 VALOR REFERENCIA S/. 109,830.02 0.00 S/. 17,708.96 S/. 17,708.96 S/. 92,121.066 SUPERVICION S/. 11,000.00 S/. 11,000.007 EXPEDIENTE TECNICO S/. 11,500.00 S/. 11,500.00

8 COSTO TOTAL S/. 132,330.02 0.00 S/. 17,708.96 S/. 17,708.96 S/. 114,621.06

Page 4: VALORIZACION 1

Item PARTIDA und

AVANCE DE MES

METRADO

OBRAS PROVISIONALES01.01 Cartel de Obra de 2.40 x 3.60m und 1.0001.02 CASETA DE ALMACEN Y/O GUARDIANIA m2 24.0001.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.0001.04 CINTA PARA SEÑAL DE PELIGRO m 96.0002 OBRAS PRELIMINARES02.01 LIMPIEZA DEL TERRENO MANUAL m2 96.0002.02 TRAZO Y REPLANTEO PRELIMINAR m2 96.0003 MOVIMIENTO DE TIERRAS03.01 EXCAVACION A MANUAL HASTA NIVEL DE SUBRAZANTE m3 89.6003.02 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 m TERRENO NORMAL m3 12.8003.03 EXCAVACION PARA ZAPATAS m3 8.3203.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 100.0004 OBRAS DE CONCRETO SIMPLE04.01 CIMIENTOS Y SOBRECIMIENTOS04.01.01 SOLADO PARA ZAPATAS E=4", CON MEZCLA 1:10 m2 8.3204.01.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H +30% P.G m3 11.0904.01.03 SOBRECIMIENTOS DE CONCRETO 1:8 + 25% P.M. m3 3.3304.01.04 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 44.3805 OBRAS DE CONCRETO ARMADO05.01 ZAPATAS05.01.01 CONCRETO f'c=210 kg/cm2 m3 7.4905.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 116.36

Page 5: VALORIZACION 1

Item PARTIDA und

AVANCE ANTERIOR AVANCE DE MES AVANCE ACOMULADO

METRADO METRADO METRADO PARCIAL %

OBRAS PROVISIONALES 6,442.05 100%01.01 Cartel de Obra de 2.40 x 3.60m und 1.00 1.00 1,488.37 100%01.02 CASETA DE ALMACEN Y/O GUARDIANIA m2 24.00 24.00 1,358.64 100%01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00 3,500.00 100%01.04 CINTA PARA SEÑAL DE PELIGRO m 96.00 96.00 95.04 100%02 OBRAS PRELIMINARES 129.60 100%02.01 LIMPIEZA DEL TERRENO MANUAL m2 96.00 96.00 30.72 100%02.02 TRAZO Y REPLANTEO PRELIMINAR m2 96.00 96.00 98.88 100%03 MOVIMIENTO DE TIERRAS 1,446.24 36%03.01 EXCAVACION A MANUAL HASTA NIVEL DE SUBRAZANTE m3 89.60 89.60 858.37 100%03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 m TERRENO NORMAL m3 12.80 12.80 122.62 100%03.03 EXCAVACION PARA ZAPATAS m3 8.32 8.32 106.25 100%03.07 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 100.00 100.00 359.00 73%04 OBRAS DE CONCRETO SIMPLE 3,097.51 67%04.01 CIMIENTOS Y SOBRECIMIENTOS 3,097.51 100%04.01.01 SOLADO PARA ZAPATAS E=4", CON MEZCLA 1:10 m2 8.32 8.32 185.62 100%04.01.02 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H +30% P.G m3 11.09 11.09 1,315.83 100%04.01.03 SOBRECIMIENTOS DE CONCRETO 1:8 + 25% P.M. m3 3.33 3.33 554.91 100%04.01.04 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 44.38 44.38 1,041.15 100%05 OBRAS DE CONCRETO ARMADO 2,527.87 22%05.01 ZAPATAS 2,527.87 100%05.01.01 CONCRETO f'c=210 kg/cm2 m3 7.49 7.49 2,117.12 100%05.01.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 116.36 116.36 410.75 100%