Understanding the Challenge for the East Midlands
Click here to load reader
-
Upload
nhs-improving-quality -
Category
Healthcare
-
view
93 -
download
2
description
Transcript of Understanding the Challenge for the East Midlands
Understanding the Challenge for the
East Midlands
Gavin Boyle
Chief Executive
Chesterfield Royal
NHS FT
A Chief Executive’s Perspective
• It’s the right thing to do
• Hard wired into the ‘system’ e.g. regulators, contracts etc.
• Not just hospitals
The Chesterfield Experience
• Early HFMA work
• NHS IQ National Pilot
• EM SCN & Senate
• Working Together – S. Yorks.
HFMA - Costing Workstream
• 1 of 8 trusts involved in Finance workstream of 7 Day Service Forum – HFMA
• Fieldwork Summer 2013 (Emergency and Urgent Services + Supporting Diagnostics)
• Not currently meeting all standards Mon-Fri e.g. time to first consultant review.
• Main cost driving standards
• Standard 2 - Consultant Time to Review
• Standard 3 – MDT Review
• Standard 5 – Diagnostics
• Standard 8 – On-going Review (daily consultant ward rounds)
HFMA - Potential Costs
• Pilots – £1.4m investment = £1.7m Saving (reduced LOS)
• Gross Investment of £3.8m ( to meet all standards)
• This is equivalent to 2.9% of Pay bill
• Or 2.0% of patient care income
0
10
20
30
40
50
60
70
wte's
Other
Therapies
Nursing
Radiology
Our Local Schemes
• Successful pilots made recurrent with 7 day services as a key theme:
• Acute Re-ablement Unit (Frailty Unit)
• Transitional Care Ward – including Social Care Workers
• Senior Clinical Decision Makers – increased presence
• Therapy and Diagnostic Services
• Primary Care support co-located with ED
• Over half a day per General Medicine NEL spell already achieved >9000 bed days circa £1.7m
7 Day Collaboration
• North Derbyshire – NHSIQ National Pilot
• East Midlands SCN & Senate (10 Acute Trusts)
• NHS IQ self–assessment tool
• Data Collection
• Case note audit
• Service level interviews
• South Yorkshire – Working Together Programme
• Smaller specialities e.g. Ophthalmology, ENT, OMFS
• Radiology