    Finishing TPM Kaizen

    Clean Sweeps

    Hayes Lemmerz International, Inc.

    Gainesville Operations

    Nonproprietary

  • 8/22/2019 TPM Kaizen

    2/13

    NONPROPRIETARYDOCUMENT

    2

    Describe the ProblemDescribe the Problem11

    Team Champion / Sponsor: Rafael AlvarezApprovals:Team Leader: Jeff Routzahn

    Actual Completion Date:Expected Completion Date: 3-22-07

    Output Boundary: Final InspectionInput Boundary: Machining

    Metrics: % TPMs Completed for pretreatment, primer, liquid and clear coat systems.

    Team Objectives: The objective of this team will be to analyze each TPM to verify that it is a value added TPM, write-up a description of

    this TPM, how often this TPM must be completed, the time required to complete each TPM, what PPE is required to be worn, and to reviewfor other TPMs that might be value added but have not yet identified. Compliance to TPMs schedule is 100% obtainable each and everyweek.

    Problem Statement: The finishing area has many production related TPMs set-up for maintaining equipment, dumping tanks, and generalcleaning of the paint system. Adherence to this program has been very difficult to maintain and the TPMs that are required have not beencompletely documented as to what needs done, how to do it, and the time required to do each TPM. We also have no operating

    instructions that spell out what clothing should be worn during Paint Tech TPMs and system cleaning TPMs. When TPMs are notcompleted, rework and scrap increase for dirt and paint application issues, including paint drips, heavy clear and primer, etc. PMcompliance has averaged 46% in the last 4 weeks since we began painting again on 3 rd shift.

    Customers: Final Inspection

    Team Members: Samantha Turner, Dustin White, Gustavo #1 Menchacu, Bob Ribbit Kohler, and Lan Nguyen.

    Project Start Date: 3-21-07Team Name: Clean Sweeps

  • 8/22/2019 TPM Kaizen

    3/13

    NONPROPRIETARYDOCUMENT

    3

    Describe the ProblemDescribe the Problem11

    A systematic approach utilizing all employees through the

    implementation of team based activities to achieve maximumequipment effectiveness by reducing operating costs.Goals of TPM:Zero accidentsZero defectsZero breakdowns

    TPM

    TOTAL PRODUCTIVE MAINTENANCE

  • 8/22/2019 TPM Kaizen

    4/13

    NONPROPRIETARYDOCUMENT

    4

    Analyze Historic Results/Analyze Historic Results/

    Map Current ProcessMap Current Process22

    TOTAL TPM

    05

    10

    15

    20

    25

    30

    35

    40

    45

    12-Feb 19-Feb 26-Feb 5-Mar 12-Mar

    Due Complete

  • 8/22/2019 TPM Kaizen

    5/13

    NONPROPRIETARYDOCUMENT

    5

    Analyze Historic Results/Analyze Historic Results/

    Map Current ProcessMap Current Process22PRETREAT TPM

    0

    2

    4

    6

    8

    10

    12

    12-Feb 19-Feb 26-Feb 5-Mar 12-Mar

    Due Complete

    PRIMER TPM

    0

    2

    4

    6

    8

    10

    12

    12-Feb 19-Feb 26-Feb 5-Mar 12-Mar

    Due Complete

  • 8/22/2019 TPM Kaizen

    6/13

    NONPROPRIETARYDOCUMENT

    6

    Analyze Historic Results/Analyze Historic Results/

    Map Current ProcessMap Current Process22

    CLEARCOAT TPM

    0

    2

    4

    6

    8

    10

    12

    14

    12-Feb 19-Feb 26-Feb 5-Mar 12-Mar

    Due Complete

    LIQUID TPM

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    12-Feb 19-Feb 26-Feb 5-Mar 12-Mar

    Due Complete

  • 8/22/2019 TPM Kaizen

    7/13

    NONPROPRIETARYDOCUMENT

    7

    Analyze Historic Results/Analyze Historic Results/

    Map Current ProcessMap Current Process22

  • 8/22/2019 TPM Kaizen

    8/13

    NONPROPRIETARYDOCUMENT

    8

    Identify & Prioritize Waste

    33

    Check Marks = CompletedCircled = Not Completed

  • 8/22/2019 TPM Kaizen

    9/13

    NONPROPRIETARYDOCUMENT

    9

    Evaluate Root Cause/

    Identify Improvement Needs44

    TPM not

    Completed

    on Time

    Environment Methods

    Material

    Machines

    Personnel

    Lack of ownership by areas

    Lack of priorities

    Manning shortages

    Unplanned downtime

    Constant Machine breakdowns

    Lack of tools to per form PMs

    Not clear dir ection whenfacing a downtime situation

    Weekly tasks confused withdai ly tasks

    Lack of clear instructions

    Lack of planning

    High production demand

    Firefigthing instead ofpreventing

    Dirty environment

    TPM FINISH - KAIZEN

  • 8/22/2019 TPM Kaizen

    10/13

    NONPROPRIETARYDOCUMENT

    10

    Document Activities/

    Containment55

    AA

    3-27-07RoutzahnRevise Weekly PM List

    3-23-07Ribbit, Samantha, JeffTPM procedures for Clear

    3-23-07Ribbit, Samantha, JeffTPM procedures for Liquid

    3-22-07Ribbit, Samantha, JeffTPM procedures for Primer

    3-23-07Lan, Gustova, DustinTPM procedures for Pretreatment

    3-22-07TeamReview and write TPM procedures

    3-22-07TeamReview present paint TPMs

    3-21-07RoutzahnWrite Charter for team

    WhenWhoWhat

  • 8/22/2019 TPM Kaizen

    11/13

    NONPROPRIETARYDOCUMENT

    11

    Identify Countermeasures

    55BB

    3-28TurnerInstruct operators3-26RoutzahnPost new instructions in correct areas

    3-26RoutzahnPost revised Weekly TPM Sheet

  • 8/22/2019 TPM Kaizen

    12/13

    NONPROPRIETARYDOCUMENT

    12

    Review PerformanceReview Performance

    66

    PM completion will be tracked on a monthly basis.