Total E&P
-
Upload
maulana-hikam -
Category
Documents
-
view
48 -
download
3
Transcript of Total E&P
- 1 -
CONFIDENTIAL
Jakarta Head Office: Kuningan Plaza, Menara Utara . Jl. HR. Rasuna Said Kav.C 11-14, Jakarta 12940. Indonesia
Telp. +62 (21) 523 1999 . Fax. +62 (21) 523 1888 . Telex 60980 TotalJ IA . PO. Box 1010/Jkt 10010.
East Kalimantan District : Jl. Yos Sudarso, Balikpapan 76123, East Kalimantan . Indonesia
Telp. +62 (542) 53 3999 . Fax. +62 (542) 53 3888 . Telex 37101 Bpp IA . PO.Box 606/Bpp 76106
- 2 -
Date :
:
PERSONAL DATA
Full Name :
Present Address :
Permanent Address :
Mobile Phone : 62-812-30908628
Email Address :
Place & Date of Birth :
Sex : Male Female
Marital Status : Single Married
Divorced / Widowed / Separated
Occupation
Spouse
Children 1
2
3
Extended Family :
Father
Mother
Sibling: 1
2
3
4
5
Do you have any siblings who are working with TOTAL E&P INDONESIE?
Yes No
Have you ever followed recruitment process in TOTAL E&P INDONESIE before?
Yes No
If yes, How many times? When?
We deeply appreciate your interest in our organization and assure
you that we are sincerely interested in your qualifications.
PHOTO (3x4)A clear understanding of your background and work history will help
us in orienting you to the position that best meets your qualifications
and may assist us in possible future development.
To Applicant
Name
None
Is Herawati 48 S-1 Entrepreneur
OccupationEducationAge
Name Age
None
None
None
Nuclear Family :
Education
FOR OFFICE USE
Home Phone :
Place DD MM YY
Maulana Hikam
Areng-areng 331 St, Dadaprejo Village
District of Junrejo, Batu City, East Java Region
Indonesia, 65323
Areng-areng 331 St, Dadaprejo Village
District of Junrejo, Batu City, East Java Region
Indonesia, 65323
62-341-8648664
Malang 10 9109
-
-
-
-
-
-
-
-
-
-
Irwan Gunawan - S-2 Passed Away
-
-
Shofia Shobah 19 S-1 Student
Zaneta C. Fitri 12Jr. High
SchoolStudent
- 3 -
WORK INTEREST
Position applied for :
Why do you choose this position ?
How do you know about this vacancy ?
Website Advertisement Apply Spontaneously
Other (please mention)
Other position(s) for which you consider to be qualified :
Monthly Salary expected (Take Home Pay) :
Work location preferred :
Yes No
Country preferred :
All Middle East Asia/Pacific
Africa
If your application is considered favorable, on what date you will be available
to start working with TOTAL E&P INDONESIE ?
EDUCATION BACKGROUND
Name and Graduated/
Location Major Course Degree GPA
of School Received
Jr. High
Sr. High
Academy
University :
- Bachelor
- Master
- PhD
FOREIGN LANGUAGE SKILLS
Read Write Speak
F G V E F G V E F G V E
English F = Fair
French G = Good
V = Very Good
E = Excellent
Would you agree to work in remote area or developing
country ?
FOR OFFICE USE
or
Drilling Supervisory Training (DST)
2008-2012
high motivation, high responsibility, good communication skill, and hard willingness to learn.
With humbleness and respectful, I am confident fulfill the requirements as I mentioned.
Planning Engineer Field Engineer
All Total E&P Work Location
December 12, 2012
From - To
Rp.
School
SMPN 1 Batu
SMAN 3 Malang
ITS Surabaya Offshore Eng. S.T./BEng
2002-2005
2005-2008
3.39
27.99
51.25
Indonesian
Language
In my opinion, to be DS should have strong leadership,
6,500,000
- 4 -
TRAINING/COURSE/APPRENTICESHIP RECORDS
Kind of Training/Course/
Apprenticeship
EMPLOYMENT RECORDS
List all present and past employment records, starting with the most recent one.
Use separate block for each employment.
1 Period :
Company :
Type of business :
Starting position :
Current position :
: Salary at Leaving
Number of employees supervised ( if any ) :
Brief description of activities ( in the last position) :
One Star SCUBA Diver Certification April 28-30, 2011 POSSI - CMAS Situbondo
Pagerungan Besar
Gas Plant
Pagerungan Besar
Gas Plant
Basic Sea Survival July 26th, 2012PT. Safety Training
Solusindo
Basic Fire Fighting and First Aid
Jakarta
August 10th, 2012PT. Safety Training
Solusindo
Helicopter Underwater Escape Training July 25th, 2012PT. Safety Training
Solusindo
Pagerungan Besar
Gas Plant
July 16-18, 2012IMAREST
Indoesia
NASDEC Building,
Surabaya
Oct. 1st-Nov 30th
2011
July 25th-August
26th 2011
Kangean Energy
Indonesia Ltd.
PT. Biro Klasifikasi
Indonesia
FOR OFFICE USE
From - To Organized by Location
6,000,000
1. Draws up master schedule to establish sequence and lead time of each operation
to
Starting Salary
(THP/net)
12 persons (3 piping construction team)
Pagerungan Besar
Gas Plant
of construction worker;
to meet client forecasted master schedule;
EPCI-Oil & Gas Company Client
Project Support Engineer and Scheduler
Project Support Engineer and Scheduler
6,000,000
8. Preparing and checking drawing of key plan drawing and piping construction drawing
9. Collecting and arrange the project documents such as MTO, RFM, PO, MT, MDR, etc
2. Plans sequence of fabrication, assembly,installation, and other operation for guidance
materials, tools, and equipment;
7. Prepares daily fabrication/production reports;
10. Leader for daily meeting for explaining daily working order from engineering division
to field worker (Civil, Mechanics, Structure, and Piping Personnel);
01 07 2012 Present
PT Supraco Indonesia-Kangean Energy Indonesia Ltd.
11. Supervising for piping construction working;
condition;
6. Prepare lists of required materials, tools, and equipment and purchase orders to obtain
Professional Training of Marine Pollution
Technology (ANNEX VI) for Ships
Internship Programme at Kangean Energy
Indonesia Ltd., Pagerungan Field
Internship Programme at PT. Biro Klasifikasi
Indonesia (Persero) Jakarta
3. Plans and schedules workflow for each craft and operation according to previously
established client sequences and lead times;
4. Planner/Scheduler confers with Client management to determine status of projects;
5. Expedites operations that delay schedules and alters schedules to meet unforeseen
- 5 -
EMPLOYMENT RECORDS
List all present and past employment records, starting with the most recent one.
Use separate block for each employment.
2 Period :
Company :
Type of business :
Starting position :
Position at leaving :
: Salary at Leaving ( THP / Net )
Number of employees supervised ( if any ) :
Brief description of activities ( in the last position) :
Helper of Hydro-Oceanography Surveyor
Jr. Hydro-Oceanography Surveyor
FOR OFFICE USE
2 helpers
LPPM ITS
Research and Devotion Social Bodies
1,500,000
to
Starting Salary
(THP/net)
31 07 2009 01
500,000
e. Plotting and reporting the result of survey for reviewing by Surveyor;
1. Helper of Hydro-Oceanography Surveyor
a. Provide all equipment of survey and ensuring all equipment completed;
b. Preparing all material, equipment, accomodation, and transportation for survey;
c. Stand by at survey's site and ready for first aid during accident;
d. Help Surveyor for administration working (photo copier, press, etc)
f. Ensuring the Topography Survey work as the procedure.
g. Preparing for tendering by arranging a good proposal acceptable;
h. Assisting Surveyor during tendering and bidding process.
08 2012
2. Jr. Hydro-Oceanography Surveyor
a. Organize manpower needed during preparation of survey;
b. Cost estimator for survey need both personnel needed and equipment needed;
c. Recording all the pre-survey, survey, and pasca- survey activity chronologistly;
d. Lead Bathimetry and Tidal Survey as procedure of Hydro-Oceanography Survey;
- 6 -
ACTIVITIES & HOBBIES
Membership of Professional Association :
Hobbies & Sports :
Social Activities :
PERSONAL REFERENCES (Former Employers or Lecturers)
Name :
Occupation :
Address :
Name :
Occupation :
Address :
ADDITIONAL INFORMATION (if any)
Date : Applicant's Signature :
N.B. :
I am having a strong academic background, an outgoing personality, plus some interesting
work experience in the oil/gas industries gained whilst studying for my Bachelor degree. Of
the many things in my working and academic career, all of them performed exceptionally
well, I am excited by the possibilities of contributing in such position that supporting oil and
gas company work. I enjoy a challenge and working with highly experienced and
professional people, especially in a fast moving international environment
November 14th, 2012
1. Member of International Diving Association (CMAS)
2. Student Member of The Institute of Marine Engineering, Science and Technology
Member of Nahdlatul Ulama Young Community (IPNU)
Member of ITS Alumni Community Indonesia
Please supply documentary evidence which supports the statements you have made above. Do not, in any event, submit
the originals of references, testimonials, certificates or diplomas, unless they have been obtained for the sole use of TOTAL
E&P INDONESIE.
Photographs and documents are non returnable and shall thereafter be deemed to be the property of TOTAL E&P
INDONESIE.
FOR OFFICE USE
The facts stated in this application for employment are true and complete to the best of my knowledge and belief.
I understand that false information in this application shall be considered sufficient for dismissal from employment.
Prof. Daniel M. Rosyid, Ph.D
Outdoor Activity (Mountaneering, Diving, Paragliding)
Water Sport Activity (Swimming, Diving, Rowing)
Eki Primudi
Energy Indonesia Ltd. In-House Project
Wisma Mulia 25th & 26th Floor, Gatot Subroto St. Kav.42
Jakarta (Office Address)
Facility Engineer on duty as Project Manager Kangean
Lecture of Ocean Engineering Dept., ITS Surabaya
WA Building 2nd Floor, Sukolilo ITS Campus, Surabaya
- 7 -
Date :
Name :
Why should we hire you ? What can you contribute to our company ?
November 14th, 2012
Maulana Hikam
According to your education and experiences, what do you expect from your future job in TOTAL E&P INDONESIE ?
What is your plan in the 3 - 5 years to come ? How are you going to realize your plan ?
Describe a specific situation in your professional life or studies period, during which you have been appointed to
assume certain responsibilities in leading a team !
about responsibility, tried to work harder, increasing my ability to work in a sequence, and of course learn about
Because as fresh graduate I had a little experience in oil and gas company which was rarely gotten by another
candidate. With high respectful and humbleness, I had an opportunity to supervise a piping construction team
and scheduling the details project working. Both of my responsibilities had taught me to build a good team work
in order to reach the target efficiently. In my opinion, working at oil and gas upstream section related to high
risk and closed to loss of investation. So that's way, beside a good management of working environment, oil and
opinion for my future job in Total E&P Indonesie, I just need to be appreciated not only hired by Total E&P Indonesie
response to be solved. I was usual to work in these condition. By high motivation and my ability as fast learner,
I am sure I met your qualification. I will do my best and try to prove that your choice to me was not wrong.
I have planned to work at oil and gas upstream section for my future. I written down all my dreams at my dreaming
book. I will learn and work harder to reach my dream. Joining an amazing team to help others for providing
energy demands was holyness duty for person who understand about the energy needed. My experience worked
at one of oil and gas company proved that high responsibility and strong motivation based on awareness to others
absolutely needed. I have arranged my dream on a dreaming book and placed being Drilling Supervisor as top
chart dream in five years to come. Beside that, I have broken down my plan into specific activity which must had
to do. The first thing that I must to do, increasing my supporting ability such as communication skill, learning deeply
Joining a Total E&P Indonesie was my dream since I was at first grade. At that time, I dreamed one day I could
join with one of the biggest energy suppliers in the world. It was an honor to work together with professional worker
supporting by professional management to provide condusive working environment. The strongest motivation
for me by joining Total E&P Indonesie was become professional worker. As we know, a high appreciation of Total
E&P Indonesie to all worker personally and awareness to energy demands conducted by Total E&P Indonesie
has lead Total E&P Indonesie to become foremost provider energy in Indonesia. So that's way, I have a simple
drilling process both onshore and offshore clearly. By joining Drilling Supervisory Training will make my dream
come true and realize all my dream in truly working environment.
gas company need personnels with high integrity, responsibility, and ready to work in all condition needed fast
Actually, we had to make a decision for getting a new pressure vessel with lower pressure then the old one. If we
did the new procurement process, it needed more time for these process. But, if my construction team fabricated
by ourselves, we would have any problems related to procedures from MIGAS. So, we faced a problem related to
decide fabricated by ourselves or doing a new procurement process. In this case, my Project Manager and
Project Engineer had an off duty. Also, I received a letter of delegation from Construction Manager to be a
decision maker during his regular leave program. Meanwhile, the piping construction working was postponed for
a few days during receiving material period. In other side, management team at field pushed me to plan other
construction working
- 8 -
I did several step to decide it as bellows:
1. I tried to consult with my Project Manager about these situation;
2. He instructed to me to call vendor of pressure vessel and Migas inspector related to fabrication procedures;
3. I requested to material-man and material control to make calculation, if we took a risk for doing procurement
process;
4. After all information that I thought enough, I consulted to Maintenance planner as the project supervisor about
this situation;
5. Field Spv advised me to consider all the possibilities;
6. I decided that we would to fabricate PV by ourselves but we would to invite Migas Inspector, NDT Team, and
Third Party to be spot witness at these process;
7. Management, Project Manager, Project Engineer, Engineer Team, Construction Manager, and Migas Inspector
approved my decision;
8. I instructed to Material-man to provide the old PV, consumable material, and all equipment to modify the old
PV. Also mobilized to workshop and welding-shop ;
9. During the field working preparation process, I held teleconference meeting with Process Engineer, Pressure
Vessel Engineer, Piping Engineer, and QC Company to discuss about it. The we calculated and drawn the sketch
drawing which reviewed and published drawing for construction immediately;
10. After all material, man-power, and procedures published, I consulted with Camp and Transportation
Superintendent to invite the Migas Inspector and Third Party to come our field;
11. Two days after these meeting, our project working continued to fabricate the PV and its accessories.
The result of my decision was appreciated my KEI Management then Management instructed to all division to
support our project all-out.
A week later, the PV has been fabricated then ready for tested by QC Team (NDT, Migas Inspector, and Third
Party). The result of testing (Hydrostatic Pressure Test, NDT, Leak Test, Pneumatic Test,etc) was very satisfactory and
could be operated quite well.Also, we get the certificate from Migas to use it as a part of our facility.
- 9 -
- 10 -
- 11 -
- 12 -
- 13 -
- 14 -
- 15 -
- 16 -