The Bentley Mining Solution

49
© 2014 Bentley Systems, Incorporated © 2014 Bentley Systems, Incorporated Nicolas Loubier, Senior Product Manager The Bentley Mining Solution

Transcript of The Bentley Mining Solution

Page 1: The Bentley Mining Solution

© 2014 Bentley Systems, Incorporated

© 2014 Bentley Systems, Incorporated

Nicolas Loubier, Senior Product Manager

The Bentley Mining Solution

Page 2: The Bentley Mining Solution

2 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Agenda

• Projects

• Industry

• Outcome of our Syndicated Driven Development Projects

Page 3: The Bentley Mining Solution

3 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

3 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

3 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Projects

Page 4: The Bentley Mining Solution

4 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

“Intelligent Mining” Examples

• Cloudbreak Mine, Australia

– 19 month delivery requirement

– Bentley’s MicroStation, Structural Modeler & PlantSpace

– Streamline workflows in an integrated, intelligent 3D modeling environment.

– Bentley Navigator used to visualize design concepts while model reviews minimized downtime for tie-ins to the existing plant.

Page 5: The Bentley Mining Solution

5 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

“Intelligent Mining” Examples

• Hazelwood Coal Mine, Australia

– Competitive and political constraints drive need for maximum efficiency

– Bentley’s WaterCAD, water distribution analysis and design application, to model & optimize the mine fire service water system

– Approx saving of $15.8m (AUD) over life of mine

Page 6: The Bentley Mining Solution

6 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

“Intelligent Mining” Examples

• Mponeng Mine, South Africa

–Laser scan (220 million points) survey/operational and maintenance access study

–Various 3D information models

–Animation of the manoeuvre incorporating the 3D information models

–Clash detection – identifying “soft” and “hard” clashes

Page 7: The Bentley Mining Solution

7 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• Bane Novaky, Slovakia

– UAV Survey – land subsidence over its underground coal operations

– Validate theoretical calculations, performed during the design phase

– Imagery and 750,000 point point cloud

– Est. saving of approx 30,000 Euros,

“Intelligent Mining” Examples

Page 8: The Bentley Mining Solution

8 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

“Intelligent Mining” Examples

• ArcelorMittal Mines, Canada

– Changed its repair/replace strategy for its mobile assets

– Old approach = service equipment at specified number of hours or at breakdowns

– Reliability Centered Maintenance approach – recommended a proactive, condition-based maintenance program

– Improved mine production levels by 28% without increasing resources = $7m p/a

Yr 1 Yr 2 Yr 3 Yr 4

190-ton Off-Highway Trucks:

Life span extended by > 60%

Page 9: The Bentley Mining Solution

9 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated 9 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Industry

Page 10: The Bentley Mining Solution

10 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Current State of the Industry & Industry Trends

“With commodity prices surging to all-time highs, accelerated production has become the mantra of most mining companies”

• Cyclic nature of the industry

• Currently in a downturn

–Exploration down by >30%

–Capital Expenditure ~0% Growth

–Capital Velocity – significantly down

Page 11: The Bentley Mining Solution

11 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Current State of the Industry & Industry Trends

Focus is now directed on “long term optimization of operating costs & capital allocation as sustainable measures for their business”

“When you talk about costs there are two elements. One is how you tighten your belt & make the easy changes.

The second is productivity, getting more out of your existing people, your equipment & your infrastructure.”

Page 12: The Bentley Mining Solution

12 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Current State of the Industry & Industry Trends

Today’s Mantra:

•Increasing Production;

•Improving Efficiencies;

•Reducing Costs

In short:

•Optimize current & future projects & operations by doing more with less

Page 13: The Bentley Mining Solution

13 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Current State of the Industry & Industry Trends

Innovation

•“The mining industry is currently in a phase where innovation is quickly turning tip-of-the-spear technologies into disruptive new capabilities that present opportunities for strong differentiation and massive leaps in efficiency".

Page 14: The Bentley Mining Solution

14 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Current State of the Industry & Industry Trends

Intelligent Mine / “Mine of the Future”

•“Application of information technology at every phase of the mining value chain to support the business processes and make them more efficient and effective”

•Searching for technology that provides a “Step Change”

–“Step Change” = 25% improvement in efficiencies

Page 15: The Bentley Mining Solution

15 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

15 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

15 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Syndicated Driven Development Projects

Page 16: The Bentley Mining Solution

16 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

SDDP – Syndicate Driven Development Program

• Solution benefits • Development of Commercial Off The Shelf products (COTs) that meet organizations’ needs

• Requirement Specifications compiled and signed off by SDDP members

• Monthly iteration sessions (22 iterations)

• Agile development: changes are possible

• Test firsthand Alpha and Beta releases

Page 17: The Bentley Mining Solution

17 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Syndicated Development MineCycleTM Designer & MineCycleTM Survey

Page 18: The Bentley Mining Solution

18 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Syndicated Development MineCycleTM Material Handling

Page 19: The Bentley Mining Solution

19 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

The Team

Development, Horsham

QA+ Doc, Huntsville

Product Management Quebec City

Product Management, Johannesburg

Solutions, Brisbane

Page 20: The Bentley Mining Solution

20 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Page 21: The Bentley Mining Solution

21 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Page 22: The Bentley Mining Solution

22 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Page 23: The Bentley Mining Solution

24 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

JOHANNESBURG, South Africa – 28 October 2014

• MineCycleTM Launch!

• Over 130 attendees

• Industry keynotes

• Product demos

Page 24: The Bentley Mining Solution

25 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle™ Product Line

• Dynamic design for optimal mine performance

• Rapid and accessible survey intelligence

• Faster, more competitive BMH designs

Page 25: The Bentley Mining Solution

26 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle™ Product Line

• Dynamic design for optimal mine performance

• Rapid and accessible survey intelligence

• Faster, more competitive BMH designs

Page 26: The Bentley Mining Solution

27 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Manual Design Manual

Scheduling Manual

Evaluation

Traditional Mine Planning Process

3 to 6 month process

Plans are out-of-date as soon as they are finished

Page 27: The Bentley Mining Solution

28 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Manual Design Manual

Scheduling Manual

Evaluation

Step 1: Apply Rule-based Automation

Automated

Design Automated

Scheduling

Automated

Evaluation

Page 28: The Bentley Mining Solution

29 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Single

Planning

Application

Automated

Scheduling

Step 2: Consolidate into a Single Application

Automated

Design Automated

Evaluation

Page 29: The Bentley Mining Solution

30 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle™ Designer Key Design Advantages

• Rule-based layout for design optioneering

• Open database for information mobility

• Configurable design standards to ensure compliant and consistent designs

• Rapid survey and geology updates to keep plans current

Faster, higher-quality designs

Page 30: The Bentley Mining Solution

31 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

CyestMine Scheduler – Advantages

• Template containing scheduling recipe

• Automated scheduling of mine design

• Includes all construction and services activities

• Crew scheduling and tracking

• What-if scenario capability

Rapid, realistic, rule-based production schedule with optioneering

Page 31: The Bentley Mining Solution

32 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

CyestMine Evaluation – Advantages

• 3D spatial intersection of mine design element and resource model

• On-the-fly evaluation

• Evaluation of design which enhances scheduling capabilities

A

B

D

C

See real-time impact of design and scheduling changes

Page 32: The Bentley Mining Solution

33 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle™ Designer A Single Dynamic Planning Environment

• Dramatically shortened planning cycles

• Timely optimization of design, crew management, and budget

• Increased planning agility

* Embedded additional capability from Cyest Technology

Page 33: The Bentley Mining Solution

34 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle™ Survey

• One application for all survey

• Automatic data processing

• Rapid analysis of as-mined versus as-planned

• Flexible enterprise data access

Accelerates the delivery of survey intelligence

Page 34: The Bentley Mining Solution

35 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

What Our Syndicate Members are Saying

“We have collectively given input regarding our various operating requirements in our fields of expertise to Bentley and Cyest over the past two years. This information has driven them to produce a product that not only looks and functions as we intended but has exceeded our expectations.”

– Devlin D. Andersen, Section Surveyor, Anglo American Platinum Ltd.

Page 35: The Bentley Mining Solution

36 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

What Our Syndicate Members are Saying

“Providing management with a collaborative view of our current vs planned scenarios will be an easy and effortless task by implementing Bentley’s MineCycle Designer and MineCycle Survey. This will simplify reporting and assist management in making constructive and informed operational decisions.”

– Bernice van der Merwe, IT Systems Coordinator—Core Business Applications, Royal Bafokeng Platinum

Page 36: The Bentley Mining Solution

37 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

What Our Syndicate Members are Saying

“Bentley is providing the software that will revolutionize the mine survey and planning discipline. Its commitment to the requirements of its clients goes above of what is required. We are looking forward to continued collaboration with Bentley to take the South African mining industry to higher technological heights.”

– Marthinus Steyn, Senior Mine Planner, AngloGold Ashanti

Page 37: The Bentley Mining Solution

38 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Continuous Mine Planning With MineCycle™

• Higher-quality decisions

• Plans that are current

• Agility to respond to market changes and unexpected events

• Better performing mines

Extract Survey

MineCycleTM

Designer*

MineCycleT

M Survey

Plan * Embedded

additional

capability from

Cyest Technology

Page 38: The Bentley Mining Solution

39 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• Dynamic design for optimal mine performance

• Rapid and accessible survey intelligence

• Faster, more competitive BMH designs

MineCycle™ Product Line

Page 39: The Bentley Mining Solution

40 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Who uses Bentley OpenMine Material Handling ?

• User Profile

– EPCs (pre-feasability groups)

– AE Consultants

– Mining Owner Operators

• Consultants such as

– Hatch

– GHD

– PDC consultants

Page 40: The Bentley Mining Solution

41 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• Intelligent conveyor layout

• Functional Components/ Parametric equipment library

• Multi-discipline environment

• Scenario management

• Integrated 3D modeling

MineCycle ™ Material Handling – Capabilities

Page 41: The Bentley Mining Solution

42 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• Optioneering

• Fast, accurate project estimates

• High-quality documentation

MineCycle ™ Material Handling - Advantages

Page 42: The Bentley Mining Solution

43 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• More competitive bids

• Saved time and costs

• Reduced risk

MineCycle ™ Material Handling – Benefits

Page 43: The Bentley Mining Solution

44 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle ™ Material Handling

3D renderings generated directly from the design environment enable compelling proposals and improved stakeholder communication.

Page 44: The Bentley Mining Solution

45 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

MineCycle ™ Material Handling

3D renderings generated directly from the design environment enable compelling proposals and improved stakeholder communication.

Page 45: The Bentley Mining Solution

46 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

“We estimate that MineCycle Material Handling will help us to produce FEL-1 and FEL-2 layout designs 20 to 40 percent faster. Specifically, the traditionally onerous process to extract 2D drawings is expected to be significantly reduced. When combined with the layout productivity gains, enabled by the equipment library and other capabilities, our conceptual design process will be much more efficient.”

– Hendrik Visser, Global Technical Coordinator – Bulk Material Handling,

What Our Syndicate Members are Saying

Page 46: The Bentley Mining Solution

47 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• Time and cost savings with a purpose-built application

• Higher-quality designs through optioneering

• More compelling deliverables

MineCycle ™ Material Handling

Faster, More Competitive BMH Designs

Page 47: The Bentley Mining Solution

48 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

• MineCycle™ Designer

–Consolidated planning with:

•CyestMine Scheduler

•CyestMine Evaluation

–Dynamic design for optimal mine performance

• MineCycle™ Survey –Rapid and accessible survey intelligence

• MineCycle™ Material Handling –Faster, more competitive BMH designs

MineCycle™ Product Line

* Embedded additional

capability from Cyest

Technology

Economics

Design Evaluation*

Scheduler*

Page 48: The Bentley Mining Solution

49 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

More Information in 2 other sessions :

• Friday November 14th

• “Washington”

–11h: Mining Planning - MineCycle Designer and MineCycle Survey

–13 h: Mining - MineCycle Material Handling

Page 49: The Bentley Mining Solution

50 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

50 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

50 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

Thanks for your time !!!

Questions ?

[email protected]