Turbomachinery Controls (TMC) Case Study Brownfield Industrial Compressor Projects (Malaysia Fertilizer + Korea Refinery)
Confidential Property of Schneider Electric
Taiwan Compressor Seminar
Page 2 Confidential Property of Schneider Electric |
Contents
Case Study – Brownfield Integrated Turbine Compressor Controls (ITCC) upgrade at a Malaysian Fertilizer Plant
Case Study – Brownfield Compressor upgrade at a Korean Refinery
Case Study – Brownfield Integrated Turbine Compressor Controls (ITCC) upgrade at a Malaysian Fertilizer Plant
Page 3 Confidential Property of Schneider Electric |
ITCC Project Case Study
Fertilizer plant configuration;
• Process Air Compressor
• Synthesis Gas Compressor
• Natural Gas Compressor
• Ammonia Compressor
• Carbon Dioxide(CO2) Refrigeration Compressor
Existing Control System;
• Woodward Turbine Control + CCC Anti-surge, Woodward changed to CCC
Slide 4 Confidential Property of Schneider Electric
ITCC – Integrated Turbine Compressor Control
SE’s ITCC is positioned strongly compared with conventional configurations and specs;
• TMR Hardware platform ensures high availability/reliability
• Minimized engineering and complexity thru integration
• Strength on both turbine control and compressor control solutions
• Customer specific control applications
• Market proven experience on Greenfield and Brownfield
• Regional project engineering and service support in Asia Pacific
Slide 5 Confidential Property of Schneider Electric
Client Feedback
Engineering department feedback on current control system;
• “The existing platform is like black box, hard to approach and difficult to troubleshoot”
• “We have upgraded the existing turbine controls 5 years ago, but I’m still not happy with existing turbine control”
• “The past governors we have upgraded to governor controls with existing, but looks like this vendor is not really experienced in the turbine portion”
• “Once we decided to upgrade all turbine control and anti-surge control systems, the price from existing was higher than your ITCC configuration”
Slide 6 Confidential Property of Schneider Electric
Existing System Configuration
Conventional configuration;
• Turbine control done with Woodward digital governor and compressor protection done with CCC surge protection
• Old Mitsubishi MHI unit installed with separate controllers. It is common nowadays that OEMs like MHI, EETC dictates the controls solution for ITCC packages
• Total 5 units of turbine-compressors, with most of the interfacing done by hardwiring between controllers
Slide 7 Confidential Property of Schneider Electric
Existing System Configuration
Slide 8
Equip No. Description Governor Controller
Anti Surge Controller
KT/K-11-01 Natural Gas compressor (single stage) driven by back pressure steam turbine
CCC Series 5 Vanguard CCC Series 3+/DCS
KT/K-16-01 Syn gas compressor (3 stages) driven by condensing steam turbine with single extraction
CCC Series 5 Vanguard CCC Series 3+/DCS
KT/K-12-01 Process Air compressor (2 stages) driven by condensing steam turbine with steam Admission control
CCC Series 5 Vanguard CCC Series 3+/DCS
KT/K-19-01 Ammonia Refrigeration (3 stages) driven by back pressure steam turbine
CCC Series 5 Vanguard CCC Series 3+/DCS
KT/K-31-01 CO2 compressor (3 stages) driven by condensing single extraction steam turbine
CCC Series 5 Vanguard – Total Train Control
Confidential Property of Schneider Electric
Package ITCC offering
Invensys project not only was ITCC but also included;
• DynSim modeling package - Control checkout
• Wonderware InTouch HMI package
• Integrated simulation - Triconex/Wonderware/DynSim
• Integration with existing DCS
• Tight delivery timeframe required strong project management
• Structured team with correct technical capability
• Customer Peer review meetings
• Site installation and commissioning services
Slide 11 Confidential Property of Schneider Electric
Decision Making Factors
System configuration was simplified and the customer convinced;
• Recent EPC Samsung Engineering project executed used as a reference
• Cost effective solution for customer (5 machines, 3 control platforms)
• Single engineering team to execute project of multiple scope offering
• ITCC package that integrated turbine-compressor controls
• Fertilizer Plant and typical design by licenser (Udhe, Germany)
• Triconex TMR reliability of the new control platform
Slide 12 Confidential Property of Schneider Electric
Project Outcomes and Success
Before and after project a lot of qualification and verification activities;
• Communication with other experienced Triconex users with ITCC
• Customer-KOM with team
• Technical Peer Review meeting
• Project successfully delivered with End-user well satisfied
Slide 13 Confidential Property of Schneider Electric
Case Study – Brownfield Compressor upgrade at a Korean Refinery
Page 21 Confidential Property of Schneider Electric |
Slide 22
Project Background For economical reasons, a customer in Korea decided to replace its oversized LP/HP steam turbo-compressor (4 stages) with a fixed speed motor and hydraulic turbo coupler driving only the existing LP 2 stages compressor (HP compressor has been removed)
At the same time, the existing Woodward 505 governor and CCC series 3 had to be upgraded and retrofitted to match the overall Hydraulic coupling start-up sequence and anti-surge application. This was implemented into a Tricon TMC.
Confidential Property of Schneider Electric
Slide 24 Confidential Property of Schneider Electric
Solutions
This Schneider Electric project not only was the original governor and compressor control replacement by a Tricon TMC but also included;
• A Hydraulic Turbo coupling control together with our customized anti-surge control algorithm
• DynSim modeling package – (For Control checkout)
• Wonderware InTouch HMI package
• Integrated simulation – Triconex/Wonderware/DynSim
• Site installation and commissioning services including surge test to redefine the compressor surge line
Hydraulic Coupling Control
• The Voith Hydraulic coupling control included:
• Pre-Start conditions
• Main motor start and shutoff Sequence
• Auxiliary lube oil pump control. Lube oil pressure and bearing temperature monitoring
• Oil Tank heater control and level monitoring
• Shaft vibration monitoring
• Scoop tube speed control sequence
• Suction pressure control cascaded to scoop tube speed control
Slide 26 Confidential Property of Schneider Electric
Anti-Surge Control
• Together with the Hydraulic coupling control, we integrated in the same Tricon controller our standard compressor control solution to replace the redundant CCC (backup) Series 3 based on the existing P&ID, compressor data sheets and performance maps and flow elements
Slide 28 Confidential Property of Schneider Electric
Surge Test
Slide 33
The real surge experienced was recorded using Trilogger and happened when the margin reached -12% for a pressure ratio at 8.1365 and an operating point at 22.9%. This was repeated at 3 different pressure ratio conditions to plot the newly implemented surge line
Confidential Property of Schneider Electric