Status report SOLEIL September 2006
description
Transcript of Status report SOLEIL September 2006
ESRF: september 2006
Status reportSOLEIL
September 2006
ESRF: september 2006
Accelerator status
• Storage ring is now operational• First turns done on the 14th of May 2006• First beam stored the 1st of June 2006
• 8.35 mA during 10 minutes
• 4 weeks of continuous operation 24H/24H in June and July 2006
• Up to 117 mA
ESRF: september 2006
Accelerator status
• Still to be done : • New stuff to install and test
• Insertions devices • New diagnostics• Slow and fast orbit feedbacks• Top up operation
• Heavy work to be scheduled• On the cold water fluilds distribution network (for magnet
cooling system)
• 10 weeks of Storage Ring operation are scheduled before end of 2006
• Part of the time will be dedicated for beamlines commissioning
• Leaving the construction phase • Entering slowly the operation
phase
ESRF: september 2006
Beamlines status
• First beam on 2 beamlines is scheduled next week– DIFFABS: Diffraction and absorption beamline
• With last generation 6 circles Kappa diffractometer
– TEMPO : Time resolved Experiments on Materials with PhOtoelectron spectroscopy
• With SCIENTA detector
• 6 others beamlines should get beam before end of 2006
• Entering the commissioning phase
ESRF: september 2006
Control status
ESRF: september 2006
Control and Acquisition Electronics: current status on accelerators
In operation : • More than 100 PLC in
operation• 15 Control Systems• 60 CompactCPI crates• More that 3000 cables
connected to Control units
The timing system: • Installed in less than one
year between the call for tender and deployment
• A master system distributes software messages to about 20 local CPCI boards which generate clocks and pulses to equipments
T e s t Master
Slave board
Slave 2
176.101 Mhz 2.94 hz
Optical coupler
Optical fiber
Optical coupler
ESRF: september 2006
The Ethernet network is now fully operational 1 main node 21 secondary nodes distributed around the Machine Up to 900 ethernet connections are cabled and operational Wifi network will be installed this summer (used only during
shutdown periods)
Network & Computers infrastructure is ready for exploitation phase
About 40 linux rack mounted servers are operational and provide:
•Required network services (DNS, DHCP, LDAP, NTP, ..)
•Tango Services (configuration, archiving, etc ..)
•Support for GlobalSCREEN Applications
•Support for high level Tango DeviceServers (calculations, etc ..)
A filer provides 1 Terabyte of storage space
•its backup solution is also operational
About 30 operator stations are operational
TX
ESRF: september 2006
The DeviceServers
Status of the Control System
ESRF: september 2006
0
50
100
150
200
250
Nu
mb
er o
f Dev
iceS
erve
rs r
equ
ired
for
co
mm
issi
on
ing
an
d fi
rst 6
mo
nth
s o
f op
erat
ion
Todo
In progress
Completed
Insertion devices, new Diags Insertion devices, new Diags, BL Front ends, RF complements
TANGO Device Server status (in june !!)
ESRF: september 2006
Today on accelerators
ESRF: september 2006
On beamlines
• DIFFABS
• TEMPO– First Device deployment scheduled on Friday !!
ESRF: september 2006
The Supervision layer
Status of the Control System
ESRF: september 2006
Present state for supervision applications
• PSS• TL1• Booster
– General application– RF
• TL2
• Storage ring– Vacuum system– Power supplies– Machine Interlocks– RF system– Diagnostics– BL Front end – ID control (to come)
More than 10 GlobalSCREEN applications in full operation
ESRF: september 2006
Booster RF GlobalSCREEN Application
ESRF: september 2006
SR Power Supply GlobalSCREEN Application
ESRF: september 2006
4 Labview Applications : Tune measurement, MRSV, Pinhole
Tune measurement
•H plane•Vplane
Sources
•Spectrum analyser•Turn By turn signal
Output
•Publish into TANGO•Tune meas. device
Excitation
•Shaker magnet•striplines
H-tune V-tune
H-tuneZoom
V-tuneZoom
Auto-tracking
ESRF: september 2006
Other applications
•Archiving and Setpoint management•MAMBO java application for
HDB and TDB systems•Bensikin application
•Machine Status•Heavy use of Tango Generic applications
• (ATKPanel, DeviceTree, ATKTrend, etc ..)
ESRF: september 2006
On beamlines
• DIFFABS– First version of GlobalScreen application in
operation– First acquisition process sequences done
by scientists with the PASSERELLE software
ESRF: september 2006
Project Management facts
• We are leaving the pic load period– Software :
• 10 people in the software group with 6 additional subcontractors are
– Hardware : About 12 people are working on the electronics installation
• A constant job is to follow up priorities and requirements from our internal customers
– Sources– Experiments
• A list of DeviceServers has been setup with associate dates for delivery
– For Machine– And the first 10 beamlines
• A subcontractor is working fulltime with us on this matter
0
50
100
150
200
250
300
Spécif
icatio
n G
énér
ique
Spécif
icatio
n M
achi
ne
Spécif
icatio
n Tra
nsve
rseL
igne
s
Spécif
icatio
n DIF
FABS
Spécif
icatio
n SAM
BA
Spécif
icatio
n O
DE
Spécif
icatio
n CASSIO
PEE
Réalis
atio
n Gén
ériq
ue
Réalis
atio
n M
achin
e
Réalis
atio
n Tr
ansv
erse
Ligne
s
Réalis
atio
n DIF
FABS
Réalis
atio
n SAM
BA
Réalis
atio
n ODE
Réalis
atio
n CASSIO
PEE
Insta
llatio
n Gén
ériq
ue
Insta
llatio
n M
achi
ne
Insta
llatio
n Tr
ansv
erse
Ligne
s
Insta
llatio
n DIF
FABS
Insta
llatio
n SAM
BA
Insta
llatio
n ODE
Insta
llatio
n CASSIO
PEE
Valida
tion
Génér
ique
Valida
tion
Mac
hine
Valida
tion
Tran
sver
seLi
gnes
Valida
tion
DIFFABS
Valida
tion
SAMBA
Valida
tion
ODE
Valida
tion
CASSIOPEE
Nombre total de livrables ICA
à faire
blocages
en cours
achevés à 100%
ESRF: september 2006
Conclusion
Status of the Control System
ESRF: september 2006
Some Successful outcomes to date
Software integration of all subsystems of the storage ring has been done within less than 2 weeks
Software has (till now !!) never delayed Machine tests
Tango Devices provide also high level services (level 2 and 3 device servers)
up to calculations applications (like tune measurement), process management, state and attribute composers, equipment monitoring, etc ..
and is not limited to simple I/O distribution on the network ..
Software quality is satisfactory thanks to good software engineering practices
Versioning management (also adopted by Source division for GlobalSCREEN applications)
Large internal and external use of a Bug tracker system
Continuously updated Report Boards
About 4 calls during the nights during the first 4 weeks of operation
ESRF: september 2006
Next steps
Installation of Full TANGO Control systems on SOLEIL Beamlines
Transition to exploitation for the Accelerators