Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

14
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 1 04 November, 2013 Interactions meeting @SLAC, US

description

Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators. Coming up …. Development of the project since Spring Development at LCB Development at LCC Development in KEK How the communication of International Lab should be? . - PowerPoint PPT Presentation

Transcript of Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

Page 1: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

1 Interactions meeting @SLAC, US

Status of Linear Collider Activities

Rika Takahashi on behalf of the LC Communicators

04 November, 2013

Page 2: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

2 Interactions meeting @SLAC, US

• Development of the project since Spring• Development at LCB• Development at LCC• Development in KEK• How the communication of International Lab

should be?

Coming up …

04 November, 2013

Page 3: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

3 Interactions meeting @SLAC, US

Lyn Evans said;

“You may think nothing is going on, but many things are happening under the surface.”

Development of the project since Spring

04 November, 2013

Page 4: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

4 Interactions meeting @SLAC, US

• In three consecutive ceremonies in Asia, Europe and the Americas, the authors of the Technical Design Report for the LC officially handed the report over to the international oversight board for projects in particle physics, the International Committee for Future Accelerators ICFA.

Jun 12, Official button-toss from GDE to LCC

04 November, 2013

Page 5: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

5 Interactions meeting @SLAC, US

Development at LCB

04 November, 2013

PAC ( Project Advisory Committee )

• Members has been elected

• First meeting in Feb 2014

• Producing a road-map for International authorization   

LCB⇒ICFA⇒IUPAP⇒OECD / UNESCO?

• Discuss the ILC Lab organization ( Governance 、 Project Management etc.. )

Page 6: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

6 Interactions meeting @SLAC, US

• LCB is discussing the LCC common fund and the signing of the MOU

• Signing with several lab have been settled, and with others in discussion.

• Common fund will be taken care by CERN

MOU for LCC

04 November, 2013

Page 7: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

7 Interactions meeting @SLAC, US

• The ILC site evaluation committee of Japan announced the result of the assessment on the two candidate sites in Japan. As a location, they recommended the Kitakami mountains in the Iwate and Miyagi prefectures.

23 August, Japan’s site selection made

04 November, 2013

Page 8: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

8 Interactions meeting @SLAC, US

• Started the site specific design based on Japan’s Kitakami site.

• LCC executives visited the site in 17 Oct, and confirmed that the site fulfills technical requirements.

• On the same day, LCC met members of the Diet members association for the ILC, and high level government officials including Foreign ministry.

Development at LCC

04 November, 2013

Page 9: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

9 Interactions meeting @SLAC, US

• 23 Aug, site evaluation in Japan• 30 August, Science Council of Japan’s

submission of the report on the ILC (English translation being prepared)

• 17 Oct, submitted the TDR, Site report, Organizational proposal to Science Ministry. (Official proposal to the government from scientific community)

Development in Japan

04 November, 2013

Page 10: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

Research community

Prepare the organization corresponding to LCC and LCB in Japan

2012 2013 2014 2015~6

Establish Int’l labStart construction

Site selection in Japan

Proposal to government

Other Promotional

bodies

Refining the recommendations

Expectation fordetailed study

Modeling of the global science city

Gain understanding from SCJ

Official statementfrom government

Establish ILC Preparation center at KEK

Expand the KEK lab to ILC Pre-Lab.

Government review

We are here!

Page 11: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

Possible  road-map for International authorization  as a Global Project  

ICFA IUPUP OECDUNESCO(?)

ILC Preparation organization in Japan(Pre-intergovernmental discussion,

government-lab talks)

Inter-governmental

discussion

Page 12: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

New ILC organization being planned at KEK

LCC

Director

Management office

Deputy Director

Project Office

Director Deputy

Accelerator, Detector, CFS, EDMS

Industrial cooperation

LCB

Organizational study for International lab (legal, human resources, procurement..)

Prepare roadmap for International approval.

R&D Conventional facility

design Site specific

accelerator design Write up project

proposal Industrial-academia

cooperation

Page 13: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

13 Interactions meeting @SLAC, US

Team4 communicators: Yilin LIU (IHEP),

Barbara Warmbein (DESY/CERN)PerrineRoyole-Degieux (CNRS/IN2P3) Rika Takahashi (KEK)

LCC Communication?

04 November, 2013

Page 14: Status of  Linear Collider Activities Rika Takahashi on behalf of the LC Communicators

14 Interactions meeting @SLAC, US

• Need to think the way to promote ILC as a global project

• Planning to organize communication advisory team

• Your comments, inputs are more than welcome!

What we should do next?

04 November, 2013