Sri H Tanguturi

download Sri H Tanguturi

of 8

Transcript of Sri H Tanguturi

  • 8/14/2019 Sri H Tanguturi

    1/8

    Sri H Tanguturi

    [email protected]

    425-301 6168

    S r i H T a n g u t u r iP r o f e s s i o n a l P r o f i l e

    Over 7 years of QA experience in all phases of life cycle, including requirements gathering, risk analysis, project pscheduling, testing, defect tracking, management, and reporting

    E d u c a t i o n a n d C e r t i f i c a t i o n s

    University of Madras Bachelors Degree (Electronics and Communication Engineering).

    Certified in Software Quality Assurance testing methodologies in May 2004.

    I n d u s t r i e s

    Insurance

    Banking

    E- Services

    E-Procurement

    HealthCare

    V i s a S t a t u s

    US Citizen.

    A r e a s o f E x p e r t i s e

    Expertise in testing GUI Objects, Functional testing, System testing including Integration testing, Regression Testingof Client/Server multi-tier and web based applications

    Good knowledge and understanding in both Black-Box Testing and White-Box Testing

    Expertise in problem solving and reporting tools like Test Directorand locally developed tools

    Good at analyzing requirements based on Business needs

    Proficient knowledge in ERP tools such as Ariba and Oracle Apps.

    Extensively involved in Quality Assurance of Web based and Client/Server applications.

    Hands-on experience leading all stages of QA Software Development Life cycle.

    Worked in several capacities, including Sr. QA Analyst, Test Engineer & Programmer.

    Outstanding Leadership abilities; able to coordinate and direct all phases of project-based efforts while managing,motivating and leading test team.

    Good team player and have ability to work independently.

    Self-motivated and have ensured execution of tasks across multiple customers and priorities.

    P a g e 1 o f 8

  • 8/14/2019 Sri H Tanguturi

    2/8

    S r i H T a n g u t u r i

    [email protected]

    E x p e r i e n c e a n d S k i l l s

    Testing Tools: WinRunner, Quick test professional, LoadRunner, SilkTest.

    Defect Management Tool: Test Director, Bugzilla, Test track pro and Quality center.

    ATM Hardware: Imaging Diebold 720, Diebold 520, Diebold 522, NCR Persona, NCR 2030, NCR 2000, NCR

    4000, NCR DIP, NCR Swipe, Non-imaging Diebold

    E-Procurement tools: Ariba Buyer8.2 and i2 5.6

    Operating Systems: Linux, Windows 9X, Windows NT/2000/XP/VISTA, XFS

    Programming Language: C/C++, .NET, TSL, 4Test script, XML, PVCS, VB Script, PL/SQL, Adobe

    Database: SQL, Oracle 8i/9i, AQT and MS-Access

    Web Technologies: ASP.net, J2EE, XML, WML, and HTML.

    Fifth Third Bank, Cincinnati OH Feb 07 - present

    Project 1: Integrated Customer Experience (ICE ATM Preferences)QA Lead / Test RM

    Environment: Windows NT/2000/XPTools: Quality Center, Quick test pro 8.0, Clear quest, Clear case, MS Office Tools, DB2, SQL Server, Junit, J2EE,

    JavaScript, Asp.net, VistaATM

    Description:

    The Integrated Customer Experience (ICE) project will present a similar look and feel as well as common functionality from

    Internet Banking to the touch screen ATMs, expand the current Internet Banking Bill Payment functionality to the ATMs, Jeanie

    Audio and Jeanie Bill Pay and present a marketing campaign targeting both Fifth Third and Non- Fifth Third customers. Fifth Third

    Retail is committed to success in all customer channels in order to meet the following objectives.

    o Provide outstanding customer service

    o Increase Deposits

    o Increase customer retention and attract new customers by providing cutting edge technology

    o Increase cross sell and up sell opportunities for other Fifth Third products.

    o Create a consistent banking experience for our customers

    o Build out an ATM program that will support ongoing internet-based enhancements

    Project 2: Mortgage Imaging

    QA Lead

    Environment: UniFi LOS System, Fiserv Imagesoft, DB2,Nautilus, File Net, Test Director, Load Runner, QTP, Image Scanner,

    RightFax, EDM, Outlook Integration, Print to Nautilus.

    Description:

    Currently the mortgage process at Fifth Third Mortgage Company is 100% a paper process. Fiserv Imagesoft and Fifth Third

    Mortgage are aligning to work toward a paperless mortgage process beginning with origination all the way through the loan process to

    post closing and archiving.Complete integration of Nautilus ECM application to UniFi LOS to enable the Wholesale Channel and the Wholesale loans

    sent to the Post Closing department to be able to be ingested, indexed and archived as imaged loan documentationPhase 1

    Wholesale Channel is to allow for more effective use of our FTEs time by providing the technology to allow them to work

    from faxed, emailed and scanned images. In addition the implementation of the imaging solution enables access to all FC

    loans through the manager queue tool and the imaged documents making it possible for the FC managers to load balance the

    Wholesale loan volume. The imaging solution also decreases the amount of paper loan documentation that needs stored.

    P a g e 2 o f 8

    mailto:[email protected]:[email protected]
  • 8/14/2019 Sri H Tanguturi

    3/8

    S r i H T a n g u t u r i

    [email protected]

    Project 3: ATM Imaging

    QA Lead / Test RM

    Environment: NCR and Diebold ATMs, RAFT, Consolidation server, Transaction manager, Super Micr, Depsi (Adjustment file),

    Internet Banking, ACE, Federal Banks, Mainframes, C++, XFS, Windows Vista, XML, WAS 5.1, AQT, SQL, Clear Quest,Test

    Director and Quality Center 9.2.

    Description:

    This project will enable check/cash deposit imaging on Fifth Third ATMs through the use of ATM software. This will allow a

    customer to deposit checks and/or notes at an ATM without the use of an envelope. The notes and check will be viewable on thescreen upon input into the ATM. When the customer has completed their transaction, an image of the check will be printed on their

    receipt along with through the pre-existing ImageMark CS, TM and SuperMicr for clearing. Images will be sent to the check image

    archive for access by Fifth Third applications (ACE, 53.com, Fifth Third Direct, WEBVIEW.)

    Project 4: ATM Usability Phase 1

    Sr. QA Lead / Test RM

    Environment:NCR and Diebold ATMs, RAFT, Internet Banking, ACE, Mainframes, Windows Vista, XML, AQT, C++, XFS, SQL,

    Test Director, Quick Test Pro and Quality Center 9.2.

    Project 5: Quality Center upgradeUAT member

    Environment: Citrix, Test director, Quality Center 9.2, QTP, Reports, and MS office.

    Project 6: ATM Web Transfer

    Sr. QA Lead / Test RM

    Environment:NCR and Diebold ATMs, RAFT, Internet Banking, ACE, C++, XFS, Https, WAS 6.1, Web methods, Mainframes,

    Windows Vista, XML, AQT, DB2, SQL, Test Director, Quick Test Pro and Quality Center 9.2.

    Project 7: Websphere upgradeSr. QA lead

    Environment: Websphere 6.1,NCR and Diebold ATMs, RAFT, IB, AQT

    Project 8: ICE Contact me (ATM)Sr. QA Lead / Test RM

    Environment:NCR and Diebold ATMs, RAFT, Internet Banking, ACE, C++, XFS, Https, WAS 6.1, Web methods, Mainframes,

    Windows Vista, UDS, ATG, Customer support, XML, AQT, SQL, Test Director, Quick Test Pro and Quality Center 9.2.

    Project 9: Mobile BankingQA lead

    Environment:Directory ID, EAR, EJB, Host Integration, IB/Internet Banking, J2EE, RAFT, REDS, WAR

    Project 10: Account to Account (A2A) Transfers

    QA lead

    Environment:Directory ID, EAR, EJB, Host Integration, IB/Internet Banking, J2EE, RAFT, REDS, WAR, Quick Test Proand Quality Center 9.2, SQL, Microsoft Outlook, 3rd Party Compass, CashEdge.

    Project 11: ICE Optimization (ATM)Sr. QA Lead

    Environment:NCR and Diebold ATMs, RAFT, Internet Banking, ACE, C++, XFS, Https, WebServices, WAS 6.1, Web methods,Mainframes, Windows Vista, XML, AQT, DB2, SQL, Test Director, Quick Test Pro and Quality Center 9.2.

    Operations and Maintenance projects delivered:

    1. ICE Usability Phase2

    P a g e 3 o f 8

    mailto:[email protected]:[email protected]
  • 8/14/2019 Sri H Tanguturi

    4/8

    S r i H T a n g u t u r i

    [email protected]

    2. Stamp release

    3. Marketing Ad update

    4. ATG BigTicket

    5. Combined package release

    6. Gold Disk Installation

    7. Config CD 4.2 certification

    8. NCR Dancing Cursor fix9. Stamps ATG and BigTicket release

    10. ATG GiftCard

    11. ATG Q3+BigTicket+ATG GiftCard12. Production HotFix patch release

    13. Diebold 522 ATM certification

    14. Card Reader and HF31816 release

    15. Goal Setter and Stamps release

    16. Encryption Production Hotfix release

    17. Stamp attract loop release

    Responsibilities:

    Worked with development and business teams to define requirements and document decisions.

    Analyzed the requirements and Design Document to meet the Business prior responsibilities. Worked with network and developers to setup the test and stage environments.

    Performed ATM hardware testing and analyzed device failures.

    Performed Whitebox and Sanity testing at a code level and also modified XML files to install the files on ATMs.

    Worked on more than 2 releases simultaneously and successfully completed the implementations.

    Installed Applications on various machines and maintained the code in clear case version control.

    Extensively involved in identifying bugs, Problem solving and also verified ATM logs, Web services logs and XMLfiles to identify the root cause of the defect.

    Performed role of QA lead as well as test Release Manager for various projects.

    Performed UAT testing with LOBs.

    Developed and Documented the Test plan based on the SDLC methodology.

    Followed all PMO Standards during the complete testing cycle to make sure the project is audited successfully.

    Used Test Case Management system to maintain the test cases.

    Performed extensive manual and automation testing of the application.

    Performed System, Regression, Integration, Adhoc and Functional testing.

    Involved in Smoke Testing and Adhoc testing.

    Creating OS Test Images for different Operating Systems and carried over in different levels of Testing.

    Coordinated with offshore team and Onsite management.

    Analyzed the issues reported by offshore team.

    Used Test Director / Quality Center Tool for reporting the bugs.

    Involved in tracking, reviewing, analyzing and comparing bugs using the Test Director / Quality Center.

    Fast learner and quickly accustomed to the environment.

    Worked with different third party vendors.

    Involved in knowledge transitions on various projects to the clients.

    Responsible for providing the UAT team appropriate direction.

    Washington Mutual Bank, Seattle WA Dec 04 Feb07

    Project 1: Procure To Pay

    Functional QA Lead

    Environment: Win Runner 7.5, Load Runner 7.8, Test Director 8.0, Quick Test Pro 8.0, Java, JDK1.4, Web Sphere 5.1, AML,

    Ariba Supplier Network, Ariba Buyer 8.2, Oracle 9i, IBM HTTP Server, MS Outlook, MS word, MS Excel.

    Description:

    P a g e 4 o f 8

    mailto:[email protected]:[email protected]
  • 8/14/2019 Sri H Tanguturi

    5/8

    S r i H T a n g u t u r i

    [email protected]

    Procurement lifecycle of pre-established supplier, price and delivery acceptance controls. The consolidation and automation of

    the spend channels will allow strategic sourcing and AP to efficiently automate Ariba procure pay. The purpose of this project isto support the full lifecycle of procure pay process: Requisition, Purchase Order, Receiving, and Invoicing for both contracted and

    non-contracted goods and services.

    Ariba Buyer Modules are listed below for which I have involved in testing from scratch.

    Release 1.0:

    Sourcing 4.4, Contracts Workbench 3.0, Category Management 2.0, Contracts Compliance, Financial Controls, ITProfessional Services (Collab), Print forms, Invoicing, User Roles and Permissions, Email/Blackberry approvals, Analysis 3.1,

    Buyer Reports.

    Release 2.0:

    Request Management and Asset Management system Integration, Contracts enhancements, Buyer reports, Qvalent

    Decommission, and Travel and Expense.

    Responsibilities:

    Managed a team of size four members as a QA Lead.

    Experienced in the complete process ofOnsite/Offshore model to observe the Cost effective factor in the business.

    Developed and Documented the Test plan based on the SDLC methodology.

    Performed End-End testing of the whole application.

    Test analyzing and prioritizing the Test Cases for the Execution.

    Data validating and feeding the data from the MIIS to the Ariba Buyer.

    Performed Integration testing for the modules such as Request Management and Asset Management.

    Maintained all requirement and developed test plan and test case using Test Director.

    Recommending continuous process improvement, maintain QA standards.

    Data Validated using SQL queries by the Inspector.

    Organized Bug Triage Meetings to analyze the defects entered in the Test Director.

    Reports are generated everyday to keep track of changes made in Test Director.

    Recommendable changes are made to the Functional specification and are updated in a newer version.

    Consolidated in meetings with Business, Project Managers, Technical Analysts and Technical Developers.

    Project 2: STAMA (Security Testing And Monitoring Automation)QA Lead

    Environment: Test Director 8.0, Quick Test Pro 8.0, Archer, ASP.Net, SQL, ETL, XML, Excel, MS Access, Oracle 8i, TOAD7.6.0.11, and Microsoft IIS.

    Description:

    A compliance management and risk analysis software application that combines knowledge of regulatory and standards compliance

    with automation to:

    o Efficiently gather and analyze information from disparate sources across the enterprise.

    o Built-in regulatory framework such as GLBA 501(b), FFIEC Handbook, Sarbanes Oxley 404, and ISO 17799 to assess

    level of information security compliance.

    o Direct and track progress toward achieving compliance with applicable standards, regulations, and policies.

    o Demonstrate risk reduction and the compliance state of the Information Security Program.

    Archer modules that I have involved in testing from scratch.

    Asset Management, Risk Management, Threat Management, Policy Management, Vendor Management, Enterprise Security

    Management, Graphs.

    Project 3: SBO2000 to ED

    ED QA Lead

    P a g e 5 o f 8

    mailto:[email protected]:[email protected]
  • 8/14/2019 Sri H Tanguturi

    6/8

    S r i H T a n g u t u r i

    [email protected]

    Environment:

    Test Director8.0, MS Excel, MS Access, Oracle 9i, SQL, TOAD 7.6.0.11, UNIX Server, Sun Solaris, ETL.

    Description:

    SBO2000 to ED project is to replace Sporty application by SBO2000 system, so all the loans in Sporty will be migrated to SBO2000.

    Because of this change ED Loans table will receive the data from SBO2000 instead of Sporty once this project is implemented in

    production. The existing ETL interface between Sporty to ED will be used to receive the data from SBO2000.

    Project 4: Intrader

    ED QA Analyst

    Environment:

    Test Director8.0, Quick Test Pro 6.5, Excel, MS Access, SQL, TOAD 7.6.0.11, ETL, UNIX Server, ETL.

    Description

    Currently, Enterprise Data Warehouse (ED) receives data from Intrader and it has been initiated to replace the Intrader Investments

    Assets system of record with the TPG System. This project mainly involves in the development of process to load TPG source system

    in to ED target system.

    Responsibilities:

    Developed and Documented the Test plan based on the SDLC methodology.

    Involved in Testing the complete End-Endprocess.

    Data validating and feeding the data from the ETL in to the Archer Application.

    Performed Integration testing between Applications, Databases, Server, Corporate properties and generated surveys to

    identify the Assets.

    Validated data between Source system and Target system based on the mapping document provided.

    Wrote SQL queries to validate data and the Data Feeds.

    Executed automated scripts using Quick Test Pro

    Compared Source and Target files after the ETL workflow has been run.

    Performed data integrity testing by executing SQL and PL/SQL statements

    Generated test report and test summary report in Test director.

    Organized Bug Triage Meetings to analyze the defects entered in the Test Director.

    Consolidated in meetings with Business, Project Managers, Technical Analysts and Technical Developers.

    State Farm Insurance, Bloomington IL Mar04 Nov04

    Project: Enterprise Form Management

    QA Engineer

    Environment:Silk Test, Silk Performer, Test Director 8.0, MS Office, Ariba, DB2, IBM, CICS, XML, Java, Web logic8.1, AIX 5.1, JRE 1.4.1.

    Description:

    Its major businesses include Auto, Mortgage, Fire, Life, and Annuities Insurances. The process of this application is developed to

    support the complete life cycle of eProcurement process from Requisition through Invoicing for all contract and non-contract based

    projects that run across the business in an organization.

    Responsibilities:

    Developed Test Plan andoverall Test Strategy for the program.

    Developed Test Cases and Test Scripts forSystem and UAT Testing.

    Tested all applications End-End Manually.

    Participated in Business Analysis, Requirement Analysis and Data Analysis meetings.

    Maintained all requirement and developed test plan and test case using Test Director.

    Tested the Interfaces and managed reports.

    P a g e 6 o f 8

    mailto:[email protected]:[email protected]
  • 8/14/2019 Sri H Tanguturi

    7/8

  • 8/14/2019 Sri H Tanguturi

    8/8

    S r i H T a n g u t u r i

    [email protected]

    Developed automation test scripts in WinRunner using TSL language.

    Worked with development and business teams to define requirements and document decisions.

    Responsible for providing the UAT team appropriate direction.

    P a g e 8 o f 8

    mailto:[email protected]:[email protected]