Solution on the Contaminatio Problem in the Veliki Backi Kanal

32
SOLUTION ON THE CONTAMINATION PROBLEM SOLUTION ON THE CONTAMINATION PROBLEM IN THE VELIKI BA IN THE VELIKI BA Č Č KI KANAL KI KANAL Tomislav Tomislav Djivuljskij Djivuljskij , Engineering Department Head , Engineering Department Head Public Company Public Company Directorate for Construction Directorate for Construction Vrbas Vrbas Serbia DREPR Project Serbia DREPR Project REGIONAL CONFERENCE 2010. REGIONAL CONFERENCE 2010.

Transcript of Solution on the Contaminatio Problem in the Veliki Backi Kanal

Page 1: Solution on the Contaminatio Problem in the Veliki Backi Kanal

SOLUTION ON THE CONTAMINATION PROBLEM SOLUTION ON THE CONTAMINATION PROBLEM IN THE VELIKI BAIN THE VELIKI BAČČKI KANALKI KANAL

�� TomislavTomislav DjivuljskijDjivuljskij, Engineering Department Head, Engineering Department Head

�� Public Company Public Company ““Directorate for ConstructionDirectorate for Construction”” VrbasVrbas

�� Serbia DREPR Project Serbia DREPR Project –– REGIONAL CONFERENCE 2010. REGIONAL CONFERENCE 2010.

Page 2: Solution on the Contaminatio Problem in the Veliki Backi Kanal

VELIKI BAVELIKI BAČČKI KANALKI KANAL

Page 3: Solution on the Contaminatio Problem in the Veliki Backi Kanal

КАРАКТЕРИСТИКЕКАРАКТЕРИСТИКЕ ВЕЛИКОГВЕЛИКОГ БАЧКОГБАЧКОГ КАНАЛАКАНАЛА

СПАЈА ДУНАВ И ТИСУ

•ДУЖИНА У СРЕДЊОЈ БАЧКОЈ ЈЕ 118 КМ

•ПЕРИОДИ ЕКСПЛОАТАЦИЈЕ ВАЖНИ ЗА РЕЖИМ ВОДЕ:период високог водостаја у Дунаву близу Бездана

период одбране од поплава

период без протока

период производње шећера

Page 4: Solution on the Contaminatio Problem in the Veliki Backi Kanal

SLAVNI REKORDISLAVNI REKORDI

�� GRAĐEN OD GRAĐEN OD 1793 1793 –– 1802 g 1802 g �� NAJSKUPLJI PRIVREDNI OBJEKAT AUSTRONAJSKUPLJI PRIVREDNI OBJEKAT AUSTRO--UGARSKE CAREVINEUGARSKE CAREVINE�� UTROUTROŠŠENO 3,062.690 ForintiENO 3,062.690 Forinti�� PROKOPAVAN JE RUPROKOPAVAN JE RUČČNO UZ ANGANO UZ ANGAŽŽOVANJE 3.000 RADNIKAOVANJE 3.000 RADNIKA�� ISKOPANA JE KOLIISKOPANA JE KOLIČČINA ZEMLJE RAVNA ISKOPU SUECKOG KANALAINA ZEMLJE RAVNA ISKOPU SUECKOG KANALA�� KANAL JE NA DNU KANAL JE NA DNU ŠŠIROK 17 m, A NA POVRIROK 17 m, A NA POVRŠŠINI 23 INI 23 –– 25 25 mm�� IZGRAĐEN JE PUTEM KONCESIJE IZGRAĐEN JE PUTEM KONCESIJE –– GRADITELJI SU DOBILI EKSKLUZIVNO GRADITELJI SU DOBILI EKSKLUZIVNO

PRAVO PREVOZA SOLI IZ RUMUNIJE NA BEPRAVO PREVOZA SOLI IZ RUMUNIJE NA BEČČKI DVORKI DVOR�� KANAL JE VIKANAL JE VIŠŠENAMENSKI ENAMENSKI –– SLUSLUŽŽI ZA ODVODNJAVANJE, PLOVIDBU I I ZA ODVODNJAVANJE, PLOVIDBU I

NAVODNJAVANJENAVODNJAVANJE�� VELIKI BAVELIKI BAČČKI KANAL JE OKOSNICA 1972.g DOVRKI KANAL JE OKOSNICA 1972.g DOVRŠŠENOG HIDROSISTEMA ENOG HIDROSISTEMA

DUNAV DUNAV –– TISA TISA –– DUNAV, NAJVEDUNAV, NAJVEĆĆEG U EVROPIEG U EVROPI

Page 5: Solution on the Contaminatio Problem in the Veliki Backi Kanal

ХСХС ДУНАВДУНАВ-- ТИСАТИСА-- ДУНАВДУНАВ

�� једанједан ододнајвећихнајвећих ууEEвропивропи ии једанједанододнајзначајнијихнајзначајнијихуу светскимсветским

размерамаразмерама..

Page 6: Solution on the Contaminatio Problem in the Veliki Backi Kanal

NESLAVNI REKORDINESLAVNI REKORDI

VELIKI BAVELIKI BAČČKI KANALKI KANALNAJZAGAĐENIJI VODOTOK U NAJZAGAĐENIJI VODOTOK U

EVROPIEVROPI

Page 7: Solution on the Contaminatio Problem in the Veliki Backi Kanal

DANUBE POLLUTION REDUCTION DANUBE POLLUTION REDUCTION PROGRAMMEPROGRAMME

NATIONAL REVIEWS 1998NATIONAL REVIEWS 1998Federal Republic of YugoslaviaFederal Republic of Yugoslavia

UNDP/GEF AssistanceUNDP/GEF Assistance

Page 8: Solution on the Contaminatio Problem in the Veliki Backi Kanal

AGRICULTURAL HOT SPOTSAGRICULTURAL HOT SPOTS

Page 9: Solution on the Contaminatio Problem in the Veliki Backi Kanal
Page 10: Solution on the Contaminatio Problem in the Veliki Backi Kanal

INDUSTRIAL HOT SPOTSINDUSTRIAL HOT SPOTS

Page 11: Solution on the Contaminatio Problem in the Veliki Backi Kanal
Page 12: Solution on the Contaminatio Problem in the Veliki Backi Kanal

MUNICIPAL HOT SPOTSMUNICIPAL HOT SPOTS

Page 13: Solution on the Contaminatio Problem in the Veliki Backi Kanal
Page 14: Solution on the Contaminatio Problem in the Veliki Backi Kanal

NIVA REPORT 2004 NIVA REPORT 2004 -- 20062006

Page 15: Solution on the Contaminatio Problem in the Veliki Backi Kanal

DEKONTA REPORT 2005 DEKONTA REPORT 2005 -- 2006 2006

Page 16: Solution on the Contaminatio Problem in the Veliki Backi Kanal

REVITALIZACIJA REVITALIZACIJA VELIKOG BAVELIKOG BAČČKOG KANALAKOG KANALA

Page 17: Solution on the Contaminatio Problem in the Veliki Backi Kanal

KOMPONENTE PROJEKTAKOMPONENTE PROJEKTA

�� SAKUPLJANJE OTPADNIH VODA ( Magistralni SAKUPLJANJE OTPADNIH VODA ( Magistralni kolektorkolektor; ; KasnalizacijaKasnalizacija: : VrbasVrbas , Kula , , Kula , CrvenkaCrvenka i i 5 5 selasela opopšštine Vrbastine Vrbas

�� CENTRALNO POSTROJENJE ZA PRECENTRALNO POSTROJENJE ZA PREČČIIŠŠĆĆAVANJE AVANJE OTPADNIH VODA OTPADNIH VODA –– CPPOV VRBASA i KULE CPPOV VRBASA i KULE KAPACITETA 120.000 ESKAPACITETA 120.000 ES

�� IZMULJEMJE I REMEDIJACIJA VELIKOG BAIZMULJEMJE I REMEDIJACIJA VELIKOG BAČČKOG KOG KANALA KANALA –– od prevodnice od prevodnice ““VRBASVRBAS”” do do ““TRIANGLATRIANGLA””u duu dužžini od 6 km ini od 6 km

Page 18: Solution on the Contaminatio Problem in the Veliki Backi Kanal
Page 19: Solution on the Contaminatio Problem in the Veliki Backi Kanal

PROJEKTI U FAZI REALIZACIJEPROJEKTI U FAZI REALIZACIJE

1.1. Sistem za evakuaciju i preSistem za evakuaciju i preččiiššććavanje avanje otpadnih voda naselja u Opotpadnih voda naselja u Opšštini Vrbas tini Vrbas 2007 2007 –– 20201111

2.2. Magistralni kolektor V Faza 2010Magistralni kolektor V Faza 2010--2011 2011 3.3. CPPOV Vrbasa i Kule 2011 CPPOV Vrbasa i Kule 2011 -- 20122012

Page 20: Solution on the Contaminatio Problem in the Veliki Backi Kanal

KANALIZACIONA MREZA U NASELJIMA OPKANALIZACIONA MREZA U NASELJIMA OPŠŠTINE VRBASTINE VRBAS

Page 21: Solution on the Contaminatio Problem in the Veliki Backi Kanal

Izgradnja IV i V faze magistralnog kolektoraIzgradnja IV i V faze magistralnog kolektora

Revitalizacija Velikog Bačkog Kanala

Page 22: Solution on the Contaminatio Problem in the Veliki Backi Kanal

CPPOV CPPOV VrbasVrbas -- KulaKula

�� KapacitetKapacitet 120.000 ES120.000 ES

�� OrganskoOrgansko optereoptereććenje enje 7.500 kg BPK5/dan7.500 kg BPK5/dan

�� HidrauliHidrauliččko optereko optereććenje enje 23.730 m3/dan23.730 m3/dan

�� Propisan kvalitet vode nakon tretmana:Propisan kvalitet vode nakon tretmana:

�� BPK5 max 20 mg/lBPK5 max 20 mg/l

�� SM max 30 mg/lSM max 30 mg/l

�� Ntot maxNtot max 10 mg/l10 mg/l

�� Ptot maxPtot max 1 mg/l1 mg/l

Revitalizacija Velikog Bačkog Kanala

Page 23: Solution on the Contaminatio Problem in the Veliki Backi Kanal

SNOWBALLSNOWBALL

SNOWBALL STARTED SNOWBALL STARTED

ROLLING GETTING ROLLING GETTING

BIGGER AND TAKES BIGGER AND TAKES

EVERYTHING INSIDEEVERYTHING INSIDE

Page 24: Solution on the Contaminatio Problem in the Veliki Backi Kanal

ČČIIŠŠĆĆENJE MULJA I REVITALIZACIJA ENJE MULJA I REVITALIZACIJA VELIKOG BAVELIKOG BAČČKOG KANALAKOG KANALA

2010 g2010 g

Page 25: Solution on the Contaminatio Problem in the Veliki Backi Kanal

Project Project Site Site -- Grand Canal, Grand Canal, VrbasVrbas

Page 26: Solution on the Contaminatio Problem in the Veliki Backi Kanal

Sludge sediment excavation and preSludge sediment excavation and pre--treatmenttreatment

1) Excavation (floating dredger / suck-pump dredger))

2) Dewatering (passive approach)

3) Sampling and selection of an appropriate technology

- collect at least 3 samples from each 10 000 tones

- define contamination character

The samples should be analysed for priority pollutants:

- Petroleum hydrocarbons (C10-C40)

- PCBs

- Heavy metals

- Content of coliform bacteria (ecotoxicity)

Page 27: Solution on the Contaminatio Problem in the Veliki Backi Kanal

1) Treatment of sediments contaminated only microbially1) Treatment of sediments contaminated only microbially

- chemical hygienisation is a method which is economically more advantageous,

and therefore commendable for sludge sediment treatment (compare to

composting / thermal hygienisation)

- mixing with 3 wt% of quicklime is proposed

Page 28: Solution on the Contaminatio Problem in the Veliki Backi Kanal

2) Treatment of sediments contaminated by petroleum 2) Treatment of sediments contaminated by petroleum hydocarbonshydocarbons

- treatment of the most contaminated parts

(TPHs between 2,000 ppm – 5,000 ppm) can

be completed in two years (seasons)

- treatment of less contaminated parts (TPHs

concentration below 2,000 ppm) can completed

in one year season

Contaminated material

Decontaminated material

bacterial mixture

lyofilizate

reinoculation on

slant agar

cultivation on

specific media

inoculum for

bioreactor

cultivation in

bioreactor

addition of

minerals,

aeration,

heating

final bioculture

Material in remediation process

minerals

+ additives cultivation,

moistening

+ inert

material

Periodic operation during

biotechnology process

Page 29: Solution on the Contaminatio Problem in the Veliki Backi Kanal

3) Treatment of sediments contaminated by heavy metals3) Treatment of sediments contaminated by heavy metals

� we propose to to install a mobile S/S unit in

the vicinity of dewatering basins

(minimization the influence on

environment)

� The stabilisation product will be disposed

onto the interdepony (approximately 2

weeks) and afterwards transported at non-

hazardous waste landfill

� 2 mixing units will run simultaneously, with a

total treatment capacity of approx. 200 tons

of sediment per day (treatment completed in

two years)

Page 30: Solution on the Contaminatio Problem in the Veliki Backi Kanal

CILJCILJ: : VELIKI BAVELIKI BAČČKI KANAL 201KI KANAL 2015.5.

Page 31: Solution on the Contaminatio Problem in the Veliki Backi Kanal

НАМЕНЕНАМЕНЕ ИИ УПРАВЉАЊЕУПРАВЉАЊЕ КАНАЛОМКАНАЛОМ

•ОДВОДЊАВАЊЕ

•НАВОДЊАВАЊЕ

•СНАДБЕВАЊЕ ВОДОМ

•РЕЦИПИЈЕНТ ЗА

ОТПАДНЕ ВОДЕ

•РЕЧНИ САОБРАЋАЈ

•УЗГОЈ РИБЕ

•ТУРИЗАМ И РЕКРЕАЦИЈА

Page 32: Solution on the Contaminatio Problem in the Veliki Backi Kanal

[email protected]@dirvrbas.co.rs

HVALA NA PAHVALA NA PAŽŽNJI !NJI !