Summer Co-opAssignment PresentationJeremy Smithes
Marion Metal Center
Area: Manufacturing EngineeringMay 26th – December 19th
Supervisor: Dave Hall
Mentor: Bryon Winters
![Page 2: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/2.jpg)
2
Background• Education:
• Purdue University• Electrical Engineering Technology• Graduation Date: May 2016
• Work Experience:• Co-op Student at MMC
-May 13 – August 2, 2013-May 26 – December 19, 2014
![Page 3: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/3.jpg)
3
Project 1 Introduction – Drive Upgrade
Problem: -Obsolete-Prone to failure-Expensive to repair-Heat
![Page 5: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/5.jpg)
5
Project 1 – Drive UpgradeBefore After
![Page 6: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/6.jpg)
6
Project 1 – Drive Upgrade
![Page 7: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/7.jpg)
7
Project 1 – Drive Upgrade
![Page 8: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/8.jpg)
8
Project 1 AccomplishmentsCommunicat
ion
Proper Documentation
Safety
Saving Money
![Page 9: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/9.jpg)
9
Project 2 Introduction – HMI Panelviews
Problem: -Need more info!
Project Description: -Indicators-Reorganization
-Troubleshooting screens
![Page 10: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/10.jpg)
10
Project 2 Responsibilities- Create interactive screens
- Blocked/Starved and efficiency
- ADC troubleshooting indicators
- TIP Info
![Page 11: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/11.jpg)
11
Project 2 Example 1
![Page 12: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/12.jpg)
12
Project 2 Example 2
![Page 13: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/13.jpg)
13
Project 2 Example 3.2
![Page 14: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/14.jpg)
14
Project 2 Example 3.3
![Page 15: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/15.jpg)
15
Project 2 Example 3.4
![Page 16: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/16.jpg)
16
Project 2 Accomplishments
Made logic easier to
navigate throughProgramming
Experience
Helpful Indicators
TIP Data
![Page 17: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/17.jpg)
17
Project 3 Introduction – ER Line Improvement
Problem: -Lack of Lubrication on ER Line
-Double Stacking Parts
![Page 18: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/18.jpg)
18
Project 3 Responsibilities-Program an autonomous lubrication system-Install a sensing device
![Page 19: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/19.jpg)
19
Project 3 AccomplishmentsProgrammed Functional Lube
SystemNo double
stacking!
![Page 20: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/20.jpg)
20
Lessons Learned
Interlock Mapping
Stay Curious
Positivity
![Page 21: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/21.jpg)
Future Plans –
21
![Page 22: Smithes - Coop Presentation 2](https://reader036.fdocument.pub/reader036/viewer/2022062503/5879208d1a28abf13a8b6f19/html5/thumbnails/22.jpg)
22
Acknowledgements• Dave Hall, Controls Engineer• Brad Eller, Manufacturing Engineer Group Leader• Toya Jackson, Manufacturing Engineering Superintendent• Don Natoli, Director of Engineering• Eric Gonzales, Plant Manager• Sue Baber, Supervisor Salaried Personnel• Nikki Minor, Personnel Director• Bryon Winters, Controls Engineer