SL-1101-M4-2

5
1 Pelaksanaan Konstruksi Plans, WBS, Gantt Charts, Plans, WBS, Gantt Charts, Standards, CPM/Precedence Standards, CPM/Precedence Diagrams, Controls, Variance Diagrams, Controls, Variance  Analys is, Metr ics, Meth ods, Earn ed  Analy sis, Met rics , Methods, Ear ned Values, S Values, S- -Curves, Risk Mgt., Status Curves, Risk Mgt., Status Reports, Meeting Agendas, Reports, Meeting Agendas, Resource Estimating, Leveling, Resource Estimating, Leveling, Training, Mentoring, Consulting Training, Mentoring, Consulting Effective Communications, Effective Communications, Trust, Integrity, Honesty, Trust, Integrity, Honesty, Sociability, Leadership, Values, Sociability, Leadership, Values, Staff Development, Flexibility, Staff Development, Flexibility, Decision Making, Perspective, Decision Making, Perspective, Sound Business Judgment Sound Business Judgment Negotiations, Customer Negotiations, Customer Relations, Problem Relations, Problem Solving, Managing Solving, Managing Change, Managing Change, Managing Expectation Expectation 80% 80% 20% 20% SCIENCE SCIENCE  ART  ART Pelaksanaan Konstruksi 5M’s of Construction 1. Manpower 2. Material 3. Machinery 4. Management 5. Money Project Objectives • Minimize cost • Project on schedule • Highest economically viable quality • Maximize safety during construction Pelaksanaan Konstruksi • Dimulai dengan startup planning  – Dimulai saat dikeluarkannya SPK  – Kegiatan2nya berupa : Pengadaan barang dan peralatan Menyerahkan rincia n teknis barang yang akan digunakan (daftar barang, Shop Drawing dll) Membuat rencana kerja rinci dan skejul Menyiapkan Site layout • Mobilisasi Tahapan Pelaksanaan Konstruksi Kasus : Bangunan Industri 20 30 40 50 60 70 80 90 Startup Electrical Controls Insulation Piping Ducts Struc. Steel Major Equipment Concrete Site Preparation 100 10 0 SEQUENCING STAGE PRODUCTION STAGE SYSTEM STAGE Latest system definition Startup planning should be complete Percent  Complete

description

sl

Transcript of SL-1101-M4-2

  • 1Pelaksanaan Konstruksi

    Plans, WBS, Gantt Charts, Plans, WBS, Gantt Charts, Standards, CPM/Precedence Standards, CPM/Precedence Diagrams, Controls, Variance Diagrams, Controls, Variance Analysis, Metrics, Methods, Earned Analysis, Metrics, Methods, Earned Values, SValues, S--Curves, Risk Mgt., Status Curves, Risk Mgt., Status Reports, Meeting Agendas, Reports, Meeting Agendas, Resource Estimating, Leveling, Resource Estimating, Leveling, Training, Mentoring, ConsultingTraining, Mentoring, Consulting

    Effective Communications, Effective Communications, Trust, Integrity, Honesty, Trust, Integrity, Honesty, Sociability, Leadership, Values, Sociability, Leadership, Values, Staff Development, Flexibility, Staff Development, Flexibility, Decision Making, Perspective, Decision Making, Perspective, Sound Business JudgmentSound Business Judgment Negotiations, Customer Negotiations, Customer

    Relations, Problem Relations, Problem Solving, Managing Solving, Managing Change, Managing Change, Managing ExpectationExpectation

    80%80%

    20%20%SCIENCESCIENCE

    ARTART

    Pelaksanaan Konstruksi

    5Ms of Construction

    1. Manpower2. Material3. Machinery4. Management5. Money

    Project Objectives

    Minimize cost Project on schedule Highest economically viable quality Maximize safety during construction

    Pelaksanaan Konstruksi

    Dimulai dengan startup planning Dimulai saat dikeluarkannya SPK Kegiatan2nya berupa :

    Pengadaan barang dan peralatan Menyerahkan rincian teknis barang yang akan

    digunakan (daftar barang, Shop Drawing dll) Membuat rencana kerja rinci dan skejul Menyiapkan Site layout Mobilisasi

    Tahapan Pelaksanaan KonstruksiKasus : Bangunan Industri

    20 30 40 50 60 70 80 90

    StartupElectrical & Controls

    InsulationPiping

    DuctsStruc. Steel

    Major EquipmentConcrete

    Site Preparation

    100100

    SEQUENCING STAGE

    PRODUCTION STAGE

    SYSTEM STAGE Latest system definition Startup planning should be complete

    Percent Complete

  • 2Dalam PelaksanaanKonstruksi dibutuhkan :

    Kemampuan teknis yang tinggi Penguasaan penggunaan

    peralatan Kemampuan organisasi

    Tahapan Kegiatan Konstruksi :

    Penyiapan tapak dan akses ke lokasi Mobilisasi Peralatan, material dan tenaga Staking Out Pelaksanaan kegiatan sub-struktur :

    Penyiapan lubang fundasi Konstruksi fundasi Test pembebanan

    Pelaksanaan kegiatan upper-struktur

    Mobilisasi : Pembuatan JalanAkses

    Penyiapan Lubang Fundasi

  • 3Pemancangan Fundasi Tiang Test Pembebanan Dilakukan untuk

    menjamin bahwafundasi mampumenahan bebanrencana

    Typical Remotely Cast Concrete Spread Footers Penyiapan Material

    Pematangan Lahan Pematangan lahan

  • 4PALISKIN INDUSTRIES

    Compactors Padded Drum

    Unloading Placement Compaction

    Delivery

    Mixing

    Storing &Loading

    Sequence ofHMA Operation

    Aggregate

    RecycledAsphalt

    Konstruksi Jalan Batch Plant

    Double barrel drum-mix plant Milling

  • 5Pelapisan Aspal Beton