SCRAP KAIZEN
8
SCRAP KAIZEN CCL LABEL HIGHTSTOWN, NJ
-
Upload
james-mack -
Category
Documents
-
view
168 -
download
0
Transcript of SCRAP KAIZEN
AFTER ALL CHANGES WERE MADE WASTE WENT UNDER 20%
1. We now only give operators what work order allows for material if operator needs more material they need a Supervisors signature and a reason.
2. We are now saving butt rolls for set-up material and measuring it’s usage.
3. We are now training Set-Up Personnel to run presses so when Press Operators go on breaks they run presses, this increases output and reduces start up waste which could be up 5000 feet.