SB-10 – THE ENVELOPE ULTIMATUM
Green Building Festival
12 October 2012
![Page 2: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/2.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Efficient
Enclosures & SB-10
![Page 3: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/3.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Why does it matter?
• Codes demand it
• Substantial portion of construction budget – 20% range
• Integration with HVAC requires that the building envelope
perform
• Sustainable buildings often incorporate innovative assemblies
and materials
• Envelope failure can require costly repairs to re-establish the
design intent
• Envelopes are complex systems with shared responsibilities
and are not typically commissioned
![Page 4: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/4.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
0
2
4
6
8
10
12
1 2
Mechanical
Envelope
Why does it matter?
Extract from NCBC 2010 Seminar “Successful
Exterior Enclosure Commissioning”
Performance
Gap
![Page 5: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/5.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Why does it matter?
$-
$10,000.00
$20,000.00
$30,000.00
$40,000.00
$50,000.00
$60,000.00
$70,000.00
$80,000.00
$90,000.00
1 2 3 4 5 6 7 8 9 10
Code Building
25% Better
based on 3%
annual inflation
over 10 years
![Page 6: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/6.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Enclosure Failure Energy & Durability
![Page 7: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/7.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Enclosure Failure Indoor Environmental Quality
![Page 8: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/8.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Code Trends
![Page 9: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/9.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Achieving SB-10
![Page 10: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/10.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
OBC and SB-10
• Meet ASHRAE 90.1-2010 + SB-10 Envelope
Values (i.e. ASHRAE 189)
• Exceed ASHRAE 90.1-2010 by minimum 5%
• Exceed MNECB (1997) by minimum 25%
• 40% maximum fenestration-to-wall ratio
LEED NC 2009 prerequisite equivalent
Prescriptive
Modeled
Modeled
Design Considerations
![Page 11: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/11.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
SB-10 Envelope Values Zone Comparison
Zone
5 6 7
Assembly
Max U-value (w/m
2 K)
Min. R-Value Max U-value (w/m
2 K)
Min. R-Value Max U-value (w/m
2 K)
Min. R-Value
Roof 0.22 R-25 ci 0.18 R-30 ci 0.16 R-35 ci
Mass Walls 0.45 R-13.3 ci 0.40 R-15.2 ci 0.34 R-20 ci
Metal Building 0.30 R-13 + R-13 ci 0.30 R-13 + R-13 ci 0.30 R-13 + R-13 ci
Steel Framed 0.31 R-13 + R-10 ci 0.31 R-13 + R-13 ci 0.31 R-13 + R-10 ci
Metal framed fenestration (max 40%)
1.99 0.35 SHGC 1.99 0.40 SHGC 1.70 0.45 SHGC
![Page 12: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/12.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Achieving SB-10 Solid Opaque Walls
![Page 13: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/13.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Achieving SB-10 Fenestration
![Page 14: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/14.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
OBC and SB-10
• Meet ASHRAE 90.1-2010 + SB-10 Envelope
Values (i.e. ASHRAE 189)
• Exceed ASHRAE 90.1-2010 by minimum 5%
• Exceed MNECB (1997) by minimum 25%
• 40% maximum fenestration-to-wall ratio
LEED NC 2009 prerequisite equivalent
Prescriptive
Modeled
Modeled
Design Considerations
![Page 15: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/15.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Accurate Performance
Prediction
(Energy Modeling that Works)
![Page 16: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/16.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Modeling That Works
![Page 17: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/17.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Energy Modeling That Works
![Page 18: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/18.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High Performance
Enclosures
![Page 19: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/19.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High-Performance Enclosures Building-Integrated PV
![Page 20: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/20.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High-Performance Enclosures External Shading
![Page 21: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/21.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
High-Performance Enclosures Vegetated Green Walls
![Page 22: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/22.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Analyzing Systems Fenestration
© Kawneer.com
![Page 23: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/23.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Delivering Quality Enclosure Commissioning
![Page 24: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/24.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Verifying Performance Enclosure Commissioning
![Page 25: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/25.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
Scott R Armstrong Dipl. Arch. Tech., A.Sc.T., LEED AP BD+C
Manager, Building Science & Sustainability
Associate
MMM Group Limited
100 Commerce Valley Drive West
Thornhill ON L3T 0A1
[email protected] | m: 647.923.9053 | t: 905.882.4211 xt. 6864 | www.mmm.ca
![Page 26: SB-10: The Envelope Ultimatum](https://reader033.fdocument.pub/reader033/viewer/2022042813/546e5fc4b4af9fa0268b462e/html5/thumbnails/26.jpg)
SB-10 – THE ENVELOPE ULTIMATUM | 12 OCT 2012
PROJECT EXPERTISE
& RESOURCES
Green Buildings &
LEED
Communities
Transportation
Buildings
Infrastructure
Building Science
Consulting