Satheeshkumar - resume- 4-1-2016

6
CURRICULAM VITAE SATHEESHKUMAR C Address: #10, 3 rd main Road, , Mobile : +91-9740360783 Iyappa Reddy garden, LIC colony, Email : smreee @gmail.com Yeshwanthpur, Bangalore - 560022 CAREER OBJECTIVE: To become a dynamic professional designing and developing sophisticated and challenging applications, using my analytical and logical skills and constant learning CORE COMPETENCIES - Over 7 years of experience in Testing and Certification of Products as per National and International standards. - Specialization in UPS, Measuring, control and laboratory equipments, DC motors, Control transformers and Household appliance testing. - Sound knowledge in Fixture preparations and developing new test methods. - Experience in Equipment handling, including calibration, uncertainity measurements, procurement and selection of equipment as per requirement. - NABL Core team member. CAREER ACHIEVEMENTS Consistent “A” player in Intertek India. Developed In-house facility for Water Heaters, Auxiliary devices with International standard requirements. Key testing member for UPS, Water heaters, Mixer grinder, DC motors and Control Transformers. Sucessfully implemented ISO 17025 Quality System and Procedures and Got NABL to Intertek India Pvt Ltd, Bangalore location. PROFESSIONAL EXPERIENCE: PRESENT EXPERIENCE: Employer : Intertek India Pvt Ltd, Bangalore Duration : August 2011 to till Date Designation : Engineer (Testing And Certification) Department : Commercial & Electrical (ETL and ASTA Certification & Testing Laboratory) Responsibilities : Product Certification Testing and Inspection & Functions (BIS & CE Safety Certification and Testing) EXPERIENCE SUMMARY: 1

Transcript of Satheeshkumar - resume- 4-1-2016

Page 1: Satheeshkumar - resume- 4-1-2016

CURRICULAM VITAE

SATHEESHKUMAR CAddress:#10, 3rd main Road, ,

Mobile : +91-9740360783 Iyappa Reddy garden, LIC colony, Email : smreee @gmail.com Yeshwanthpur, Bangalore - 560022

CAREER OBJECTIVE:

To become a dynamic professional designing and developing sophisticated and challenging applications, using my analytical and logical skills and constant learning

CORE COMPETENCIES

- Over 7 years of experience in Testing and Certification of Products as per National and International standards.

- Specialization in UPS, Measuring, control and laboratory equipments, DC motors, Control transformers and Household appliance testing.

- Sound knowledge in Fixture preparations and developing new test methods.- Experience in Equipment handling, including calibration, uncertainity measurements, procurement

and selection of equipment as per requirement.- NABL Core team member.

CAREER ACHIEVEMENTS Consistent “A” player in Intertek India. Developed In-house facility for Water Heaters, Auxiliary devices with International standard

requirements. Key testing member for UPS, Water heaters, Mixer grinder, DC motors and Control Transformers. Sucessfully implemented ISO 17025 Quality System and Procedures and Got NABL to Intertek

India Pvt Ltd, Bangalore location.

PROFESSIONAL EXPERIENCE:

PRESENT EXPERIENCE:Employer : Intertek India Pvt Ltd, BangaloreDuration : August 2011 to till Date Designation : Engineer (Testing And Certification)Department : Commercial & Electrical (ETL and ASTA Certification & Testing Laboratory)Responsibilities : Product Certification Testing and Inspection & Functions (BIS & CE Safety Certification and Testing)

EXPERIENCE SUMMARY:

Control of full testing, including Project file preparation, test data sheet preparation, testing, report writing and sample disposal as per Global management system, in line with NABL requirements.

New test facility development as and when requirement from the management.

Conducting all Test like HV Test, IR Test, Earth Bond Test, Temperature Rise, Leakage current, Mechanical, Humidity, Abnormal, and single fault test etc as per UL/IEC/EN 61010-1, IEC/EN

1

Page 2: Satheeshkumar - resume- 4-1-2016

60950-1, IS 13252, IEC/EN 60335-1, IS 302-2-21, IEC/EN 60335-2-21, IEC/EN 60335-2-14, IS 302-2-14, IEC/EN 60335-2-40, IEC/EN 60335-2-41, IEC/EN 61558-2-2, IEC/EN 61558-2-13, IS 2082, IEC/EN 60034-1, EN 60204-1:2006, IEC/EN 62040-1, in our lab, ON-Site (Testing at Manufacturer site) & witness Testing.

Associated with Testing & certification related project executions of following Low voltage products as per the IS & IEC/EN standards

Storage water heaters (IS 302-2-21/IS 2082/IEC/EN 60335-2-21) Mixer grinder (IS 302-2-14/IEC/EN 60335-2-14) Uninterrupted power supply (UPS) (IEC/EN 62040-1) Panel Air conditioner (IEC/EN 60335-2-40) Submersible pumps (IEC/EN 60335-2-41) Motor compressor (IEC/EN 60335-2-34) ATM Machine (IEC/EN 60950-1) Liquid chromatography (IEC/EN/UL 61010-1) Power source with AC static Eliminating bar (EN 61010-1) Variable frequency drive (VFD) (IEC/EN 61800-5-1) Batteries (IEC 62259) DC motors (EN 60034-1) Control Transformer (IEC/EN 61558-2-2) Stabilizer (IEC/EN 61558-2-13) Fan (NIS 65) Machinery (IEC/EN 60204-1) Most of the project handled as per client request with particular clause of the

standards

I am also working in a cross cultural environment, frequently interacting with overseas Intertek offices in China, Sweden and USA

Co-ordinate the Product testing with accredited external agencies like CPRI, ETDC etc.

Reliability Testing – Preparing test plan for reliability tests and conduct the tests, and analyze the life for each product.

Managing the activities, handling instruments in the Test lab like Power Analyzer, Temperature Rise test bench, Digital Oscilloscope, Electrical safety compliance analyzer, Power Meter, Endurance Test Bench, Auto transformer upto 470V, 60A, Test Probes, Temperature data logger, leakage current tester, millimeter, clamp meter with all digital and analog instruments for measurements.

Perform periodic Calibration of instruments and keep them ready for testing requirements. Generate and Maintain the Documents related to the tests like preparation of test reports,

Test data sheet and analysis of test parameters. Involved in procurement of equipment in line with Intertek process. Safe handling and establishing a preventive maintenance program for testing and

measurement equipment, reference standards, and reference materials used for testing, 2

Page 3: Satheeshkumar - resume- 4-1-2016

certification or inspection services and supporting equipment which is required for the successful conduct of testing (e.g. power source).

Equipment calibration Handling, Calibration Results Validation and Suspect Equipment Handling

Handling and security of samples and support equipment contained in the sample record system of the site/office and used for quotation purposes, testing and evaluation.

Practical knowledge for performing all the tests as per IEC/EN/UL/CSA.

PAST EXPERIENCE 1:Employer : CPRI, BangaloreDuration : October 2010 to August 2011 Designation : Graduate Engineering Associates (Testing)

Department : Diagnostic Cables and Capacitors Division Responsibilities : Tesing for substation equipment& Functions

EXPERIENCE SUMMARY:

Associated with Condition Monitoring Assessment and Analysis of various in-service High Power apparatus like:

Power Transformers Current Transformers Potential Transformers and CVTs HT Motors Power Cables Generators

Testing activities of the above apparatus in the different sites are IOCL, Chennai IOCL, Mathura Nagjhari Power House, Ambikanagar, Karnataka

PAST EXPERIENCE 2:

Employer : CPRI, BangaloreDuration : Mar2008-May2009/May2009-Jun2010/July2010-Aug2010Designation : Graduate Trainee/Contract Engineer/Expert Panel (Testing)Department : Short Circuit LaboratoryResponsibilities : Testing activities of Low voltage equipments

EXPERIENCE SUMMARY:

Associated with testing activities of following Power apparatus as per the IS & IEC standards:

Distribution Transformers Current Transformers Potential Transformers Circuit Breakers Switch-disconnectors Switch-fuse units

3

Page 4: Satheeshkumar - resume- 4-1-2016

Contactors DOL Starters Power Connectors Fuses Panels, Bus ducts, Isolators & Earth Switches

And also, In-house calibration of Laboratory Equipments Field testing in WBSETCL Substations Preparation of Test reports and quality documents Drawing verification of testing equipments

STRENGTH: Self motivated individual with strong technical and management skills. Effective team player with communication and interpersonal skills. Ability to focus under pressure.

ACADEMIC QUALIFICATON:

Name of Exam Name of the Institution Board / University Year Of

Passing Percentage

BE (EEE) Muthayammal Engineering College, Rasipuram, Tamil Nadu , India Anna University 2007 76.31

Diploma (EEE)

The Kavery Polytechnic College, Mecheri, Tamil Nadu , India DOTE 2004 91.33

XII (+2) V.C. higher sec. school, Omalur, Tamil Nadu, India State Board 2002 64.08

X (SSLC) V.C. higher sec. school, Omalur. Tamil Nadu, India State Board 2000 58.40

TECHNICAL SKILLS:

Product Safety Testing & Certification Product Reliability & Qualification Testing Product Environmental & Mechanical Testing MS Office, MS Excel & MS Power Point AutoCAD

TRAINING ATTENDED:

Estimation of uncertainty in Electrical & Mechanical Measurements conducted by System & Training, Mumbai (B. Bhattacharya) conducted on 2nd & 3rd April 2014, Certificate No.: 2014/117

PERSONAL PARTICULARS:

Father Name : ChinnarajuMother Name : NeelaSpouse Name : SuganyaDate of Birth : 26th April 1985Gender : Male Marital status : MarriedNationality : IndianLanguages : English, Tamil, Telugu and Kannada.

4

Page 5: Satheeshkumar - resume- 4-1-2016

Hobbies and Interests : Playing cricket, Chess, listening to Songs & Cooking.Permanent Address : 1/148-3, Indira nagar, Kottamettupatty,

Omalur post, Salem dist. - 636455, Tamilnadu, India. Pass port Number : N0446660PAN Number : AOZPC1590ATotal Experience : 7 years and above

DECLARATION: I hereby declare that the information given above are mentioned true and correct to the best of my knowledge.

Date: 4th January 2016Place: Bangalore (SATHEESHKUMAR. C)

5