Presented by
Using the PI
System to Improve
Safety at Suncor’s
SAGD Operations
Tripti Somani
Tom Luo
© Copyr i gh t 2014 O SIs o f t , LLC .
Agenda
• Suncor at a Glance
• History with the PI System
• Improving Safety and Performance
– Observations wells monitoring for Steam-Assisted Gravity Drainage (SAGD) operations
– Safety Interlock Bypass Monitoring and Reporting
• Concluding Remarks
2
© Copyr i gh t 2014 O SIs o f t , LLC . 3
About Suncor
© Copyr i gh t 2014 O SIs o f t , LLC .
Canada’s Leading Integrated Energy Company
• HQ in Calgary
• 14,000 employees
• Global E&P ~170 kboe/d
• Oil Sands – ~499 kbbls/d
• 4 Refineries – 460k kbbls/d
• +1,500 Petro-Canada stations
• 6 wind farms – 255 MW
• 1 Ethanol Plant
4
© Copyr i gh t 2014 O SIs o f t , LLC .
Our Journey from a “Historian” to an Infrastructure
5
• First PI System installed in 2006 at Firebag SAGD
• Current installed base– 4 sites/18 EA PI System servers, 2 non-EA sites/3 server w ~100k tags
– PI-AF, PI Notification, PI ACE, and other advanced functionality
– Remote asset surveillance and support of all PI installations (Managed PI)
• EA Signed in late 2009 covering our In Situ operations
• EA Expanded in late 2012 to include Oil Sands (Mines, Extraction, Upgraders, E&U)
• Key areas of Use:– Operations visibility and KPI
– Energy and environmental regulatory reporting (WPT, MARP)
– Plant & Asset performance and monitoring
– Assist in managing safety
© Copyr i gh t 2014 O SIs o f t , LLC .
Steam-Assisted Gravity Drainage (SAGD)
• Approximately 80% of Canada’s Oil Sands too deep to mine
• Two key SAGD facilities – Firebag & MacKay River
• Parallel pairs of horizontal wells are drilled: – one for steam injection
– one for oil recovery
• Safety and Operational challenges:
– Large numbers of assets and instrumentations
– Complex logic and criteria
– Process Changes
6
© Copyr i gh t 2014 O SIs o f t , LLC .
Solution Results and Benefits
Enhancing SAGD Operational Safety &
Reservoir Monitoring & Optimization
Business Challenge
• Identify abnormal pressure,
temperature and steam migration
outside of the reservoir
• Real-time information for large
number of wells and conditions
• Selected and installed the
PI System as a real-time
integration infrastructure
• PI System infrastructure
key components - PI-AF, PI
Notifications
7
• Enable enhanced safety,
environment & production
• Assist in SAGD operations, &
asset reliability & optimization
• Continuous improvement, and
collaboration
“Any abnormal reservoir responses are captured
automatically and alert the responsible parties
immediately, so that prompt actions are taken place
to ensure a safe operation.“
Manager Reservoir Management, Firebag
© Copyr i gh t 2014 O SIs o f t , LLC .
Proactive Reservoir Monitoring – The Role of Observation Wells
8
© Copyr i gh t 2014 O SIs o f t , LLC .
Legacy Monitoring System without PI AF
9
C#
Challenges:
- Longer development time
- Unhandled exceptions trigger false alarms
- Challenge to manage business change requests
© Copyr i gh t 2014 O SIs o f t , LLC .
Synchronization of Object Models
10
System ModelProduction Model
© Copyr i gh t 2014 O SIs o f t , LLC .
PI AF and PI Notifications
11
• Ease of use • Templates to set up new notifications
• Support & development
• Better Exceptions handling
• Highly reliable than custom code
• No False Alarms
• Historize notifications
High or lower levels alarms available on DCS.
© Copyr i gh t 2014 O SIs o f t , LLC .
PI AF and PI Notifications
12
© Copyr i gh t 2014 O SIs o f t , LLC .
Blanket gas pressure increased Investigation End of alarm status
Alert type: High Blanket Gas
Pressure
Reservoir Engineer called the field
to get the confirmation that there
was a hydrate/freezing in the
pipeline which caused the blanket
gas pressure to increase.
High Blanket Gas Pressure
Alarm Ended.
High Blanket Gas Pressure
13
Blanket gas pressure
Tubing steam rate
Casing steam rate
© Copyr i gh t 2014 O SIs o f t , LLC .
Low Flow alerts on ESPs (electric submersible pump)
14
A Low Flow event was detected
in one of the pumps based on
wellhead temperature fall off
• Lost production
• Potentially fail of an ESP, around
$0.5 million at risk
• 130+ wells at Firebag
Wellhead temperature
Motor current
© Copyr i gh t 2014 O SIs o f t , LLC .
Solution Results and Benefits
Using the PI System to Monitor
Critical Interlock Bypasses and
Equipment Trips
Business Challenge
• Thousands of bypass tags
• Custom logic and reporting
requirements
• Multiple points can be used
to monitor one bypass
• Monitor, report, and audit
safety critical bypasses
through
• PI Data Access
Server,
• PI JDBC
• ETL and BI
It is very important to continuously monitor
and audit safety critical bypasses as
bypasses compromise the protection
functions that are designed to protect human
Health & Safety and the Environment.
15
• Improved governance of
critical interlock bypass
• Ability to track bypass
history for audit purposes
• Enable risk mitigation
planning (responsible
groups, bypass duration)
© Copyr i gh t 2014 O SIs o f t , LLC . 16
Example - Bypass in Control System
© Copyr i gh t 2014 O SIs o f t , LLC .
Corp Data
Oracle
SQL
DCS
17
DCS -> PI System ->
PI JDBC -> SQL ->
Business
Intelligence Tools
Data Flow for the Bypass & Equipment Trips Monitoring
© Copyr i gh t 2014 O SIs o f t , LLC . 18
Extract history from PI Archive into SQL
jdbc:pisql://localhost/Data
source=FIREBAGPI; Integrated
Security=SSPI; command timeout = 1200;
JDBC driver: com.osisoft.jdbc.Driver
© Copyr i gh t 2014 O SIs o f t , LLC . 19
Equipment Trip Report
To be replaced with Event Frames
to understand Downtime and
Overall Equipment Effectiveness
© Copyr i gh t 2014 O SIs o f t , LLC .
Closing Comments
1. Increased data availability to users through PI System
2. Assist in following operations strategy and optimize production
3. Enhanced decision making & collaboration
4. PI AF enabled us to meet rapid business growth
5. Increasing PI System installations with the EA
6. What is next?
– PI Event Frames and PI Analytics
– Migrate custom alerts to PI AF
7. Use of PI system to assist in improving safety
20
© Copyr i gh t 2014 O SIs o f t , LLC .