RSPO Principles & Criteria Re- Assessment Report Report ......RSPO Principles & Criteria Re-...
Transcript of RSPO Principles & Criteria Re- Assessment Report Report ......RSPO Principles & Criteria Re-...
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 1 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO PRINCIPLES & CRITERIA
PUBLIC SUMMARY REPORT
ANNUAL SURVEILLANCE ASSESSMENT 4
INDONESIA
PT AGROWIRATAMA POM
2014
Report prepared by: Mahaswaran Maliyapan (Lead Assessor)
Certification decision by: Gerben Stegeman (Certifier)
Certifying Office
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa,
Off Jalan Sg Bertih, Teluk Gadong, 41100 Klang, Selangor, Malaysia
Tel: +603-3377 1600 / 1700
Control Union Certifications Control Union Certifications is a member of the Control Union World Group - an international
inspection and certification body. CUC performs assessments and certification in many agricultural
based fields such as FSC, RSPO, and Organic production, Sustainable Textile Production, Organic
Exchange, GLOBALGAP, HACCP, BRC, GMP and GTP.
CUC is accredited by the Dutch Council of Accreditation (RVA) on the European quality standard EN
45011 for the inspection and certification of CUC Organic program (according to the EU regulation
2092/91) and GLOBALGAP program. When requested a copy of the accreditation certificate can be
obtained from CUC.
Control Union (Malaysia) Sdn Bhd is a registered affiliate member of RSPO and is a private limited
company owned by the Control Union World Group based in Malaysia. Control Union (Malaysia) Sdn
Bhd is authorized to conduct and issue certification on behalf of RSPO and Control Union
Certifications.
Control Union (Malaysia) Sdn Bhd is a registered affiliate member of RSPO and is a private limited
company owned by the Control Union World Group based in Malaysia. Control Union (Malaysia)
Sdn Bhd is authorized to conduct and issue certification on behalf of RSPO and Control Union
Certifications.
RSPO Membership Number 8-0025-06-000-00
RSPO Approval Date 12/01/2006
Affiliate Membership http://www.rspo.org/en/member/339
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 2 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Table of Contents
PART 1: SCOPE OF THE CERTIFICATION ASSESSMENT AUDIT .............................................................. 4
1.1 COMPANY AND CONTACT DETAILS ....................................................................................................................... 4 1.2 RSPO MEMBERSHIP & CERTIFICATION DETAILS ..................................................................................................... 4 1.3 ANNUAL SURVEILLANCE ASSESSMENT DETAILS ....................................................................................................... 4 1.4 ASSESSMENT TYPE ............................................................................................................................................ 4 1.5 LOCATION OF THE PALM OIL MILL ........................................................................................................................ 4 1.6 PALM OIL MILL OUTPUT AND APPROXIMATE TONNAGES CERTIFIED ............................................................................. 4 1.7 GENERAL DESCRIPTION OF SUPPLY BASE ............................................................................................................... 5
1.7.2 Statistics of the Supply Base and Estimated Tonnes of FFB produced per year ................................................. 6 1.7.5 Calculation of the Number of Production Units (N) to Sample for the Mill ............................................................. 6
1.8 PROGRESS OF ASSOCIATED SMALLHOLDERS OR OUT-GROWERS, IF APPLICABLE TO THIS ASSESSMENT .................................. 6 1.9 LOCATION MAP FOR THIS CERTIFICATION UNIT (SEE APPENDIX 1) .............................................................................. 7
PART 2: PARTIAL CERTIFICATION ........................................................................................................ 7
2.1 MANAGEMENT STRUCTURE................................................................................................................................. 7 2.2 NON-COMPLIANCE IDENTIFIED WITH 2.1 ABOVE ..................................................................................................... 7 2.3 SUMMARY OF THE TIME BOUND PLAN .................................................................................................................. 7 2.4 UN-CERTIFIED UNITS OR HOLDINGS...................................................................................................................... 8 2.5 SUMMARY OF THE FINDINGS FOR PARTIAL CERTIFICATION ......................................................................................... 9 2.6 PARTIAL CERTIFICATION AUDIT AGENDA................................................................................................................ 9
PART 3: AUDIT PROCESS...................................................................................................................... 9
3.1 ABOUT THE CERTIFICATION BODY ......................................................................................................................... 9 3.2 AUDIT TEAM .................................................................................................................................................... 9
3.2.1 Qualifications of the Lead Auditor ............................................................................................................................... 10 3.2.2 Qualifications of the Assessment Team....................................................................................................................... 10
3.3 AUDIT METHODOLOGY .................................................................................................................................... 11 3.3.1 General Overview .............................................................................................................................................. 11 3.3.2 ..................................................................................................................................................................................... 12 3.3.3 Assessment agenda for this Audit ..................................................................................................................... 12
PART 4 ASSESSMENT FINDINGS ........................................................................................................ 13
4.1 LEAD ASSESSOR’S SUMMARY AND RECOMMENDATION FOR CERTIFICATION ................................................................ 13 4.2 SUMMARY OF THE FINDINGS BY PRINCIPLES AND CRITERIA ...................................................................................... 14
Principle 1: Commitment to Transparency .......................................................................................................................... 14 Principle 2: Compliance with Applicable Laws and Regulations .......................................................................................... 14 Principle 3: Commitment to Long-Term Economic and Financial Viability .......................................................................... 15 Principle 4: Use of Appropriate Best Practices by Growers and Millers .............................................................................. 16 Principle 5: Environmental Responsibility and Conservation of Natural Resources and Biodiversity .................................. 20 Principle 6: Responsible Consideration of Employees and of Individuals and Communities by Growers and Millers .......... 22 Principle 7: Responsible Development of New Plantings ..................................................................................................... 25 Principle 8: Commitment to Continuous Improvement in Key Areas of Activity .................................................................. 26 4.2.1: Summary findings for Scheme Smallholders (KKPA) KSBSAMB .................................................................................. 26
4.3 NON-CONFORMITY RAISED DURING THIS AUDIT AND ANY FROM THE PREVIOUS YEAR, IF APPLICABLE ............................. 29 4.3.1 Non-Conformities Identified during this Audit ........................................................................................................... 30 Non-were raised during this audit. ...................................................................................................................................... 30 4.3.2 Non-Conformity Identified during the last ASA, not applicable for MA ..................................................................... 30 Non-were raised during the last audit as this is the Main Assessment. .............................................................................. 30
4.4 ISSUES THAT WERE RAISED DURING THE STAKEHOLDER CONSULTATION, IF ANY ............................................................ 30
PART 5: RSPO SUPPLY CHAIN CERTIFICATION ................................................................................... 30
5.1 POM INCLUDED IN THE SCOPE OF THE AUDIT ...................................................................................................... 30 5.2 CONFIRMATION OF THE COMPANY’S SUMMARY OF ANNUAL CERTIFIED VOLUME OF RSPO CERTIFIED PALM OIL AND PALM
KERNEL OVER A SPECIFIED PERIOD ................................................................................................................................ 31 5.3 SUMMARY REPORT INCLUDING A BRIEF DESCRIPTION OF THE SCOPE OF CERTIFICATION ................................................ 31 5.4 MONTHLY RECORDS OF CERTIFIED AND UNCERTIFIED FFB RECEIVED SINCE THE LAST AUDIT ............................................ 31 5.5 MONTHLY RECORDS OF CERTIFIED CPO AND PK PRODUCED SINCE THE LAST AUDIT ...................................................... 31 5.6 RECORDS OF CERTIFIED CPO & PK SOLD UNDER UTZ ETRACE TO BUYERS SINCE THE LAST AUDIT, IF ANY .......................... 32 5.7 NON-CONFORMITIES IDENTIFIED DURING THIS AUDIT .............................................................................................. 32 5.8 DESCRIPTION OF THE ORGANIZATIONAL MANAGEMENT SYSTEMS............................................................................... 32
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 3 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
5.9 FINAL CERTIFICATION DECISION BY CONTROL UNION FOR THE RSPO SCCS AUDIT OF THE POM ...................................... 32
PART 6: CERTIFIED ORGANISATION’S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY ........... 32
6.1 DATE OF NEXT ASA ......................................................................................................................................... 32 6.2 DATE FOR CLOSURE OF NON-CONFORMITIES ........................................................................................................ 32 6.3 SIGNING BY THE CLIENT .................................................................................................................................... 33 6.4 SIGNING BY THE LEAD AUDITOR ......................................................................................................................... 33 6.5 SIGNING BY THE CERTIFIER ................................................................................................................................ 33
PART 7: APPENDICIES ........................................................................................................................ 34
APPENDIX 1: LOCATION MAP FOR THIS CERTIFICATION UNIT ............................................................................................. 34 APPENDIX 2: LIST OF ABBREVIATIONS ............................................................................................................................. 38
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 4 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
PART 1: SCOPE OF THE CERTIFICATION ASSESSMENT AUDIT
1.1 Company and Contact Details
Company Name: PT. Agrowiratama
Business Address: Spring Tower 06-61, Jl. K.L. Yos Sudarso Km 7,8, Tanjung Mulia, Medan
20241, Indonesia.
Contact Person: Dr. Gan Lian Tiong
Office Telephone: +62 61 661 5511
E-Mail: [email protected]
Web Site: -
Other Certifications Held: ISCC, ISPO
1.2 RSPO Membership & Certification Details
RSPO Membership Number: 1-0054-08-000-00 [old number: 029-08(O) dated 26th May 2008] Registered Client Name: PT. Agrowiratama
Certificate Number: Old certificate No. C813182CU-RSPO-01-.2013
New Certificate No. CU-RSPO-813182
Start Date Of Certificate: 17th
June 2010
End Date Of Certificate: 16th
June 2015
Date Of Original Certification: 17th
June 2010
Scope: Certification of the Palm Oil Mill and Supply Bases
Type Of Certification: Single site
Duration Of Certificate: 5 Years from date of certification
1.3 Annual Surveillance Assessment Details
Dates Of This Audit: 14th
April – 16th
April 2014
Audit Number: 4 [Four]
1.4 Assessment Type
This is a RSPO Principles &Criteria Compliance assessment of the palm oil mill and its respective supply bases as
listed in this report below.
1.5 Location of the Palm Oil Mill
Name
Palm Oil Mill
Mill
Capacity Location GPS Reference
(POM) MT/Hour Address Longitude Latitude
PT Agrowiratama 45
Jorong Aie Aji, Nagari Sungai Aua,
Kecamatan Sungai Aua, Kabupaten
Pasaman Barat, Propinsi Sumatera
Barat, Indonesia.
99° 37’ 35.72”E
0° 11’ 56.25” N
1.6 Palm Oil Mill Output and Approximate Tonnages Certified
Figures below are from:
• Only from certified supply bases (Y/N). YES
• Combining certified with uncertified supply bases (Y/N). NO
• If the Mill is receiving FFB from uncertified supply bases outside the audit scope, such uncertified
sources is highlighted under the following sections as seen applicable:
a. PART 1, Section 1.7 – General Description of Supply Base,
b. PART 2: Partial Certification, Section 2.4 – Uncertified Units or Holdings,
c. PART 5: RSPO Supply Chain Certification of this report
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 5 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Projected Production from the last 12 Months (MT)
FFB CPO PK PKO PKE
203,416 48,820 12,714 - -
Actual production MT
FFB* CPO* PK* PKO** PKE**
204,550 49,152 13,111 - -
Projected Production from the next 12 Months (MT)
FFB CPO PK PKO** PKE**
191,932 47,983 11,996 - -
Note :
* Actual Production 17th June 2013 – 31st March 2014 + estimated production April 2014 – 16th June 2014
** PKO and PKE produced by PT Wira Inno Mas KCP Plant at another location which is RSPO SCCS certified.
1.7 General Description of Supply Base
PT Agrowiratama palm oil mill and its supply base including the KKPA Scheme Smallholders were certified on
17th June 2010. The supply base comprises of PT Agrowiratama - Estate Sei Aur and scheme smallholders (KKPA)
KSB I & KSB II, KSBSAMB and KSDBS which are fully managed by PT Agrowiratama. During this audit, the National
Interpretation of RSPO P&C for Indonesia was used to assess the palm oil mill, estate and KKPA Scheme
Smallholder. The mill processing capacity is 45 tons of FFB per hour.
1.7.1 Location of the Supply Base
OPP
Oil Palm
Plantation Location GPS reference Area Summary (Ha)
Name Address Longitude Latitude Total Mature
OPP
01
PT.Agrowiratama
- Estate Sei Aur
Jorong Aie Aji, Nagari
Sungai Aua Kecamatan
Sungai Aua Kabupaten
Pasaman Barat Propinsi
Sumatera Barat,
Indonesia.
99o 34’ 12” E 0
o 10’ 48” N 5,860.38 5,593.64
OPP
02
KSB I & KSB II
(Koperasi Sawit
Bersama)
Jorong Aie Aji, Nagari
Sungai Aua, Kecamatan
Sungai Aua, Kabupaten
Pasaman Barat, Propinsi
Sumatera Barat,
Indonesia
99o 36’ 35” E 0
o 11’ 24,86” N 524 524
OPP
03
KSBSAMB
(Koperasi Sawit
Bosa Sungai Aua
Manjunjung
Bilang)
Jorong Sungai Aua,
Nagari Sungai Aua,
Kecamatan Sungai Aua,
Kabupaten Pasaman
Barat, Propinsi
Sumatera Barat,
Indonesia
99o 31’ 15” E 0
o 09’ 44,92” N 500 500
OPP
04
KSDBS
(Koperasi Sawit
Datuk Bosa
Sikilang)
Jorong Sikilang, Nagari
Sungai Aua, Kecamatan
Sungai Aua, Kabupaten
Pasaman Barat, Propinsi
Sumatera Barat,
Indonesia
99o 31’ 16” E 0
o 08’ 42,02” N 500 500
TOTAL 7,384.38 7,117.64
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 6 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Note : Reduction of 181.61 Ha in Estate Sei Aur due to replanting area.
1.7.2 Statistics of the Supply Base and Estimated Tonnes of FFB produced per year
OPP Oil Palm Plantation FFB Estimate (mt) (budget
Jun ’14 – May ‘15)
Planting Years Cycle (Years)
OPP 01 PT.Agrowiratama - Estate Sei
Aur 148,410 1990 - 2013 25
OPP 02 KSB I & KSB II (Koperasi Sawit
Bersama) 13,976 1996 - 2002 25
OPP 03 KSBSAMB (Koperasi Sawit Bosa
Sungai Aua Manjunjung Bilang) 14,701 2005 25
OPP 04
KSDBS
(Koperasi Sawit Datuk Bosa
Sikilang)
14,845 2005 25
TOTAL 191,932
1.7.3 Conservation and HCV Area (Ha)
OPP Oil Palm Plantation Conservation Area (Ha) HCV Area (Ha) * HCV part of
Conservation
OPP 01 PT.Agrowiratama - Estate Sei
Aur
- 752.17Ha Yes
TOTAL - 752.17Ha
* Indicate if HCV area is part of the Conservation Area. If the HCV area is part of the Conservation Area, then
“YES” otherwise, “No”
1.7.4 1.7.5 Percentage of Planted Oil Palm by different Age Ranges
CU Code
Planting Years by 5 year Ranges (March 2014)
1990 – 1994 1995-1999 2000-2004 2005-2009 2010-2014 TOTAL
P01 1,636.83
( 27.93 % )
1,148.58
( 19.60 % )
2,669.76
( 45.56 % )
138.47
( 2.36 % )
266.74
( 4.55 % )
5,860.38
( 100 %)
P02 -
134
( 25.57 % )
390
( 74.43 % ) - -
524
( 100 % )
P03 - - -
500
( 100 % ) -
500
( 100 % )
P04 - - -
500
( 100 % ) -
500
( 100 % )
Total 1,636.83
( 22.17 % )
1,282.58
( 17.37 % )
3,059.76
( 41.43 % )
1,138.47
( 15.42 % )
266.74
( 3.61 % )
7,384.38
( 100 % )
1.7.5 Calculation of the Number of Production Units (N) to Sample for the Mill
N = 0.8√Y, where “Y” is the number of units, with the result always to be rounded “up” to the next whole
integer. Where only a sample of the supply base is assessed, units not previously assessed, or assessed earlier in
the certification program, are to be preferred over those more recently assessed
For the Mill, how many units make up the production base?
Owned estates (Y) N = 0.8√Y Smallholders (Z) N = 0.8√Z
1 1 3 1
Explanation as to the selection of estates sampled
1 estate and 1 KKPA were assessed.
1.8 Progress of associated Smallholders or Out-growers, if applicable to this assessment
Progress of associated Smallholders or Out-growers towards Compliance with relevant Standards - should be in
accordance to the 3 year implementation plan, if applicable to this assessment
NA
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 7 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
1.9 Location Map for this Certification Unit (See Appendix 1)
PART 2: PARTIAL CERTIFICATION
The rules for partial certification allow organizations that have a majority holding in and / or management
control of more than one autonomous company growing oil palm to certify individual management units and /
or subsidiary companies subject to certain rules.
2.1 Management Structure
Section Criteria Yes/No If “Yes” If “No”
2.1.1 Is the certified operation (POM and supply base as
detailed above) a stand-alone operation and there are
no other plantations or mills owned by the same
company?
No Section 2 is
N/A
Go to 2.1.2
2.1.2 Is the certified operation part of a simple structure of
operations owned by one company?
Yes Go to 2.1.5 Go to 2.1.3
2.1.3 Are there statements of the ultimate controlling
shareholders and directors in the managing agency
company/companies:
a. Explaining the legal relationship and the
management arrangements with the subsidiary
companies and / or with any operating groups?
- Go to 2.1.4
Go to 2.2.1
2.1.4 b. A statement of commitment to complying with the
spirit of the RSPO for all companies and
subsidiaries involved with the growing of oil palm
and for the production of palm oil?
- Go to 2.4 Go to 2.2.2
2.1.5 Is there a time bound plan in place for all subsidiaries,
estates and palm oil mills?
Yes Go to 2.3 2.2.3
2.1.6 Is the parent company or one of its majority owned and /
or managed subsidiaries a member of RSPO.
Yes
2.2 Non-compliance Identified with 2.1 Above
Section Non-compliance findings NC raised Category
2.2.1 There is no explanation as to the company’s structure and therefore it
Is not possible to conduct an effective audit against the rules for
partial certification.
- Major
2.2.2 There is no statement of commitment to complying with the spirit of
the RSPO for all companies within the company structure.
- Major
2.2.3 There is no time bound plan in place for the certification for all
subsidiaries, estates and mills.
- Major
2.2.4 No applicable membership of the RSPO. - Major
2.3 Summary of the Time Bound Plan
Section Requirement Findings and any action required Compliance
2.3.1 Does the plan include all subsidiaries, estates and
mills?
Yes, all subsidiaries were
certified in 2010 and 2011. Yes
2.3.2 Is the time bound plan challenging?
� Age of plantations.
� Location.
� Mill development.
� Infrastructure.
� Compliance with applicable law.
Yes, all subsidiaries were
certified in 2010 and 2011. Yes
2.3.3 Have there been any changes since the last audit? New Plantings were carried as Yes
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 8 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Are they justified? detailed in 2.3.9.
2.3.4 If there have been changes, what circumstances
have occurred?
None.
Yes
2.3.5 Have there been any stakeholder comments? No comment was received. Yes
2.3.6 Have there been any newly acquired subsidiaries? No new acquisition. Yes
2.3.7 Have there been any isolated lapses in the
implementation of the plan?
None. Yes
2.3.8 Has there been any systematic failure to proceed
with the implementation of the plan?
None. Yes
2.3.9 General statement as to progress made since the
last audit?
The following plantations have
under-gone the NPP process:
1. PT. Mulia Indah – Sambas,
West Kalimantan (NPP on 27 July
2011 – 29 July 2011, NPP
Notification on 25 August 2011 –
24 September 2011).
2. PT. Multipersada Gatramegah,
Central Kalimantan (NPP on 12
December 2012 – 13 December
2012, NPP Notification on 14
December 2012 – 13 January
2013).
3. PT. Globalindo Alam Perkasa
(Alam Murni Estate), Central
Kalimantan (NPP on 10 December
2012 – 11 December 2012, NPP
Notification on 13 December
2012 – 12 January 2013).
4. PT. Agrowiratama – Sambas
(Stage II), West Kalimantan (NPP
on 11 Dec 2012 – 12 Dec 2012,
NPP Notification on 13 February
– 14 March 2013).
Yes
2.4 Un-Certified Units or Holdings
NOTE: Companies may demonstrate compliance by clear evidence of a self-audit (i.e. an internal audit for all
subsidiaries, estates and Palm Oil Mills)
Section Requirement Findings and any action required Compliance
2.4.1 Did the company conduct an internal audit? If so,
has a positive assurance statement been
produced?
The company has been
conducted internal audit and
positive assurance statement and
all the subsidiaries have been
certified successfully.
Yes
2.4.2 No replacement after dates defined in NIs
Criterion 7.3 of:
• Primary forest.
• Any area identified as containing High
Conservation Values (HCVs).
• Any area required to maintain or enhance
HCVs in accordance with RSPO criterion 7.3.
No replacement of primary forest
was noted. Areas containing
HCVs have been noted. These
designated areas are maintained
and enhanced according to the
requirements of RSPO. The above
mentioned [2.3.9] plantations
have under-gone the NPP
process.
Yes
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 9 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
2.4.3 Any new plantings since January 1st
2010 must
comply with the RSPO New Plantings Procedure.
No new planting were noted
during the audit. All previous
planting had undergone the NPP
notification.
Yes
2.4.4 Any Land conflicts are being resolved through a
mutually agreed process, e.g. RSPO Grievance
procedure or Dispute Settlement Facility, in
accordance with RSPO criteria 6.4, 7.5 and 7.6.
None noted. No stakeholder
comments or complaints noted
during this assessment. Yes
2.4.5 Any Labor disputes are being resolved through a
mutually agreed process, in accordance with RSPO
criterion 6.3.
None noted. No stakeholder
comments or complaints noted
during this assessment.
Yes
2.4.6 Any Legal non-compliance is being resolved in
accordance with the legal requirements, with
reference to RSPO criteria 2.1 and 2.2.
The company has met its legal
requirements. See also audit
findings under PART 4, criteria
2.1 and 2.2 below as well.
Yes
2.5 Summary of the findings for Partial Certification
The audit team assessed compliance with the above requirements during this audit. Failure to address any non-
compliance identified may lead to certification suspension.
No failure or non-compliance against the partial certification requirement was noted during in this audit.
2.6 Partial Certification Audit Agenda
Date Location Agenda
NA
PART 3: AUDIT PROCESS
3.1 About the Certification Body
Control Union Certifications is a member of the Control Union World Group – an international inspection and
certification body. CUC performs Audits and certification in many agricultural based fields such as FSC, RSPO,
and Organic production, Sustainable Textile Production, Organic Exchange, GLOBALGAP, HACCP, BRC, GMP and
GTP.
CUC is accredited by the Dutch Council of Accreditation (RVA) on the European quality standard EN 45011 for
the inspection and certification of CUC Organic program (according to the EU regulation 2092/91) and
EUREPGAP program. When requested a copy of the accreditation certificate can be obtained from CUC.
Control Union (Malaysia) Sdn Bhd is a registered affiliate member of RSPO and is a private limited company
owned by the Control Union World Group based in Malaysia. Control Union (Malaysia) Sdn Bhd is authorized to
conduct and issue certification on behalf of RSPO and Control Union Certifications.
3.2 Audit Team
Lead auditor: Mahaswaran Maliyapan
Team member 1: Mr. Rizal Kassim
Team member 2: Mr. Hasnop
Team member 3: Mr. Mohd Jamalul Arif Hamin
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 10 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
3.2.1 Qualifications of the Lead Auditor
Requirement Qualifications
A minimum of post high school (post-secondary
school) training in either agriculture/forestry,
environmental science or social sciences;
Certified ISO 14001:2004 and OHSAS 18001:2007 Lead
Auditor.
At least 5 years professional experience in area of
work relevant to the assessment (e.g., palm oil
management; agriculture/forestry; ecology; social
science);
More than 15 years of working experience in various
industries. Fully trained in similar agriculture certification
programmes such as RSPO, SCCS and RFS2.
Training in the practical application of the RSPO
criteria, and RSPO certification systems;
Involved in RSPO assessment since 2012. Member of CUC
RSPO audit team. Involved in audits conducted in
Malaysia and Indonesia. Successfully completion of an ISO 9000:19011 lead
auditors course;
Completed ISO 9001:2008, ISO 14001:2004 and OHSAS
18001:2007 lead auditor course in June 2007.
Training in the practical application of RSPO
certification systems.
Involved in RSPO assessment since 2012. Member of CUC
RSPO audit team. Involved in audits conducted in
Malaysia and Indonesia. A supervised period of training in practical auditing
against the RSPO criteria or similar sustainability
standards, with a minimum of 15 days audit
experience and at least 3 audits at different
organizations.
Involved in audits conducted in for many different
companies in Malaysia and Indonesia.
RSPO endorsed lead auditors course. Completed RSPO Lead Auditor training in Oct 2013 Signed code of conduct. Yes
General knowledge of: Yes
• RSPO P&C standards. Yes
• CUC organizational structure. Yes
• CUC quality systems. Yes
• Lead auditor role. Yes
• Report writing. Yes
• Stakeholder consultation. Yes
• Certification decision process. Yes
• RSPO SCCS program manual. Yes
• CUC filing systems. Yes
• Correct use of RSPO trademarks. Yes
• History and objectives of RSPO. Yes
• CV available. Yes
Completion of CUC RSPO lead auditor training. Yes
3.2.2 Qualifications of the Assessment Team
RSPO Requirement Team Member Name Qualifications
Fluent in main local
languages and English.
Mr. Rizal Kassim Fluent in Bahasa and English
Mr. Hasnop Fluent in Bahasa and English
Mr. Mohd Jamalul Arif Hamin Fluent in Bahasa and English
Field working
experience in the palm
oil sector, or a
demonstrable
equivalent.
Mohd. Rizal Md. Kassim Forestry and wood base working knowledge and
qualified QMS and OHSAS auditor. Currently
active in SCCS and ISCC audits globally.
Mohd Jamalul Arif Hamin Global GAP and agriculture auditing experience
and RSPO is the prime auditing scope in CUC.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 11 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Mr. Hasnop Agriculture and engineering background with
many years’ experience in 2nd and 3rd party
auditing of QMS, EMS, OHSAS and RSPO. well
verse in local legal requirements.
Good agricultural
practices (GAP),
integrated pest
management (IPM),
pesticide and fertilizer
use.
Mr. Rizal Kassim Experience as safety office in Manufacturing
company
Mr. Mohd Jamalul Arif Hamin Involve in RSPO auditing since Jan 2011
Mr. Hasnop RSPO certified auditor
Health and Safety
auditing on the farm
and in processing
facilities. (For example
OHSAS 18001 or
occupational. Health
and safety assurance
system).
Mr. Mohd Jamalul Arif Hamin Involve in RSPO auditing since Jan 2011
Mr. Hasnop OHSAS certified auditor
Workers welfare issues
and social auditing
experience. (For
example with SA8000 or
related social or ethical
accountability codes).
Mr. Mohd Jamalul Arif Hamin Involve in RSPO auditing since Jan 2011
Environmental and
ecological auditing. (For
example experience
with organic agriculture,
ISO 14001 or
environmental
management systems).
Mr. Mohd Jamalul Arif Hamin Involve in RSPO auditing since Jan 2011
Mr. Hasnop EMS certified auditor
Economic issues. Mr. Mohd Jamalul Arif Hamin Involve in RSPO auditing since Jan 2011
3.3 Audit Methodology
3.3.1 General Overview
The Audit was carried out in conformity with the procedures as laid down in the CUC Procedure Manual and the
RSPO Program Manual for the auditors and Certifier. During the Audit the qualified CUC auditors used the RSPO
standard as endorsed for the country in which the audit took place and recorded their findings.
Workers and local communities were interviewed and evidence sought to confirm ongoing compliance to
include:
• Chemical stores. Storage, MSDS leaflets, Herbicide mixing areas, PPE, Ventilation, Security.
• Field inspections. Herbicide application programs. Harvesting sites and efficiency. Fertilizing operations.
SOP’s. Soil maps. Land preparation. Ground cover. IPM. First aiders and boxes. Ground cover. Soil erosion.
Field observations of all operations.
• Worker interviews. OSH. Sexual, religious, racial harassment. Pay and contracts. Child labor. First aid.
Awareness.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 12 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
• Re-planting sites. Zero burn.
• HCV’s. Identification. Management plans. Environmental Impact Assessments. Implementation.
• Riparian zones. Width. Current and future management. Non maintenance regimes.
• Water management. Water courses. Water monitoring.
• Road maintenance. Run off.
• Social amenities. Social Impact Audits.
• Local communities. Contributions made. Employment opportunities. Social impacts. Complaints procedures.
• Workshops. Oil traps. Safe working environment. PPE. Diesel tanks. Environmental waste management.
• Line sites. Interviews with householders. Inspection of water discharge points. Water improvement plans.
Waste disposal.
• Documentation review.
The Palm Oil Mill audit verification included the following activities:
• Mill and workshop inspections. Documentation review & worker interviews.
• Mill. SOP’s. Safe working environment. Gen sets. Walk ways. Signs. EFB. POME treatment. Emissions. Mass
balance. Diesel tanks. PPE. Fire extinguishers. First aiders and boxes. Fuel and water usage.
• OSH. Training. Management structure. First aiders.
• Full document review. Completion of the checklist. Review and documentation of evidence. All aspects of
RSPO P&C’s applicable.
• Worker interviews. OSH. Sexual, religious, racial harassment. Pay and contracts.
• Compliance against the RSPO SCCS certification scheme.
Verification:
Verification of implementation was done through field observations, workshop and chemical store inspections,
worker and community interviews and mill inspections as summarized above.
3.3.2 3.3.3 Assessment agenda for this Audit
Date Auditor Location Main activities
14/04/2014
[Monday]
All Auditors PT. Agro
[training room]
08.30 Opening meeting
Chaired by the audit team leader
• Introduction by team leader
• Presentation by respective managers
• Presentation of Palm Oil Mill source of FFB by
respective managers
Mahas
Jamal
Hasnop
PT. Agro POM
09.30am
Supply Chain Certification Assessment of the POM (RSPO
SCCS)
Mill inspection
• Workshops
• Stores
• POM application
• Document review
Field operations
• Worker interviews
• Housing
• Medical
• Schools
• Local communities
• Environmental
15/04/2014
[Tuesday]
Jamal
Mahas Sei Aur Estate
Document & Field operations.
• Worker interviews
• Chemical stores
• Workshops
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 13 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Hasnop KKPA
[KSBSAMB]
• Housing
• Medical
• Schools
• Local communities
• Environmental
16/04/2014
[Wednesday] All auditors
PT. Agro
[training room]
Preparation for closing meeting
Additional field visits and meetings with managers as
necessary
Closing meeting
Chaired by the audit team leader
• Welcome and introduction by the team leader
• Presentation of findings by the audit team
• Questions and answers
• Final summary by team leader
End of assessment
PART 4 ASSESSMENT FINDINGS
4.1 Lead Assessor’s Summary and Recommendation for Certification
The mill and supply bases visited (as per the above Tables 1.5 and 1.7.1) were assessed at field, office, facilities,
stores and a document review was carried out in accordance to the RSPO principles and criteria. The subscribed
RSPO management system’s documentations seen with minor changes that due to internal and external
influenced such as replanting SOP [peat soil treatment / long range replanting program].
Specific evidence was recorded for estate and mill. Interviews with Estate Managers, Mill Manager, members of
workers union and committee took place in both formal and informal environments and worker interviews were
conducted at the supply base and the mill. The management is highly committed in maintaining the RSPO
system by adopting to continuous improvement programs.
RSPO has helped the operating units in identifying needs based analysis prior to any CSR programme.
Improvement was also sighted in PPE allocation, monthly / annual medical check, the workers quarters has
improved with better facilities. The HCV program has created great awareness among all stakeholders as well
among the employees.
The management continually monitors the established KPI / objectives that significantly rule the achievement of
company’s corporate policy on RSPO. The establishment of “Audit & Certification” from HQ will perform audits
on monthly basis which will be reported to Sustainability team head in HQ. Top management continuously
establishes directions for the middle and upper management to execute in ways to sustain the RSPO
management system. Every quarterly, a review for the performance of mill and its supply bases will be carried
out with the President Director.
It is therefore the recommendation of the lead assessor that:
• A certificate of compliance is issued.
Signed:
Name: Mahaswaran Maliyapan
Date: 17/04/2014
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 14 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
4.2 Summary of the findings by Principles and Criteria
• Over the 5 year period of the life of the certificate, there will be 4 annual surveillance audits
• Identified Non-Conformities and noteworthy Positive and Negative Observations.
• The RSPO require that this report contain findings by each principle and some example criteria. Please see
table below.
Principle 1: Commitment to Transparency
Criterion by Audit
Summary
Records of request and respond are maintain effectively by
HUMAS, however each operating unit are made known of the
process. Documents that are required to make publicly available
are being managed well. Overall the application of principle 1 at
all operating units found satisfactory.
ASA 4 1.1 The Humas team whom based in Medan navigates with mill and
estates operating units. Sighted the “Records of Information
Request and Respond” [001-SHE/03.01/1.4]. Since April 2013 to
Mar 2014, there were 18 requests were made [8 for legal, 8 for
environment, 1 for social and 1 for estate]. However the “External
Complaint & Grievances Book” seen still not fills as no such events
took place.
Sighted the “Records of Information Request and Respond” [001-
SHE/03.01/1.4] booklet adequately provided with information
that were responded. Observed the most recent request was
made by Bpk Ardisyah Putra from Baristand Padang on
09/04/2014 requesting permission to perform sampling for air
monitoring, it was responded by Bpk Dimas.
Policy MM-POD/01.01/6.3.0 (rev.3) dated 17/08/13 and AGR-
POD/01.01/1.4.0 dated 07/08/13 indicate of documents related
to operational activities to retained at least for 10 years, labour
document for one year, legal documents until expiry, research
document for 7 years and SCCS and ISCC for 10 years.
ASA 4 1.2 Company maintains SOP no. AGR-SOP/03.01/3.26.0 with title
“Stakeholders Information Request” refers also to POD no. AGR-
POD/01.01/1.1.0 with title “Company Confidential” stating what
are the document treated confidential such as financial and
company strategy, intellectual property and others issue is think
to give negative effect to company. Documents other than
mentioned above are considered as publicly available upon
request. These include legal, environment, social, OSH and
continues improvement plan.
Principle 2: Compliance with Applicable Laws and Regulations
Criterion by Audit
Summary
The company has a comprehensive system for ensuring all
estates, KKPA and mill managers are up to date with the
applicable laws and they have an internal monitoring system to
ensure compliance. The boundary stones are inspected in the
fields confirmed that these have been maintained.
ASA 4 2.1 Sighted some legal documents, such as IUP (Plantation permit),
HGU documents, AMDAL documents and some other mandatory
permits are maintaining well at respective operating units.
Observed the implementation of best practice in mill and estate
operation such as waste water treatment, best agriculture
practices, chemical handling and usage, company regulation, etc.
Checklist and implementation of regulation and compliance
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 15 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
analyses of legal and other regulation is available to evaluate the
compliance. Public relation (HUMAS) department is responsible
to update any new regulation and analyse the compliance.
Sighted the SSP [Surat Storan Pajak] – NPWP 01-327-729-8-123-
000 dated on 23/08/2013 being evidence of land title payment
[Rp 1.093.128.000] for the HGU [7.990 Ha] ref #
03.07.01.29.2.0001.
Seen the “List of Machine Correspondences’ matrix that overview
of the list of machineries and the competence person’s
requirement. Sighted the competency record for Bpk. Rahmad
Heriadi Hutabarat whom has valid licence of competence
electrician
ASA 4 2.2 There aren’t any disputes or conflicts with local community were
evidence during this assessment. Unless if there is any, a
mechanism to resolve the conflict or disputes shall be refer to
“Keluhan & Komplain external” No. AGR-SOP/01.01/5.1 issued on
01 December 2007 and first revised on 01 March 2014.
Negotiation and agreement by win-win solution for all parties is
part of mechanism prior to the court way.
ASA 4 2.3 No land claim from community and no use of customary land.
Principle 3: Commitment to Long-Term Economic and Financial Viability
Criterion by Audit
Summary
A documented operational plan and budget covered operational
strategies to meet the plan and budget have been prepared by
the estates and mill. Replanting programme in the near future
made available in proper records.
ASA 4 3.1 “Master Copy Verifiers” [AGR-RSPV/03.01/1.2] – REV 08 @
10/02/2014. The plan starts from 2014 – 2023 that consisted for
estate, KKPA and the mill. The plan effectively describes of the
FFB generation by respective sites as well the CPO production by
the mill. Sighted the hectarage statement, replanting schedule
and replanting layout in accordance to the programme.
Sighted the recent 3 years of the actual against budgeted
production expenditure for Sei Aur estate.
2011 2012 2013
Budget 169,954.50 174,617.57 160,494.55
Actual 175,769.28 164,880.55 158,411.49
Also sighted the income trend of smallholders in 2013.
Oct ‘13 Nov ‘13 Dec ‘13
KSB I 4927.09 5,262.25 4,061.17
KSB II 4,656.10 5,487.59 3,796.21
KSDBS 3,488.68 4,093.72 3,514.99
KSBSAMB 3,586.71 3,462.15 2,723.66
Estate has a replanting programme until years 2030 involved
6,043.84 Ha of matured area. For 2014, total as 378.82 Ha was
planned to be replanting. Until March 2014, 183.46 Ha was
completed chipping, pulverarate and stacking in the field. The
progress is planned to be completed by Dec 2014.
Monthly Management Report available to monitored the
progress of the replanting as according to the programme. Yearly
review will be conducted by HQ to this programme.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 16 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Principle 4: Use of Appropriate Best Practices by Growers and Millers
Criterion by Audit
Summary
The company has established the relevant SOPs for all stages of
operations in the estates and mill and there were sufficient
evidences that these have been implemented. Risk assessments
are conducted and the necessary attention to OSH is given.
Training is conducted for all workers and contractors.
ASA 4 4.1 GAP-group agriculture policy from Land clearing to harvesting
established, maintained and updated.
• Nursery POD/01.01/2.1.1, 26-10-13
• Land Preparation POD/01.01/2.2.1, 10-05-13
• Land conservation POD/01.01/2.3.1, 02-02-12
• Thinning POD/01.01/2.4.1, 01-02-11
• Upkeep, POD/01.01/2.5.1, 09-08-01
• Pest and disease, POD/01.01/2.6.1, 15-12-12
• Manuring, POD/01.01/2.7.2, 21-05-12
• Harvesting policy, POD/01.01/2.8.3, 02-01-12
Water analysis for Sikilang and Batang Alin River carried out once
per year according to GAP Group guidelines. Analysis report for
period 2013-2014 available dated 20 Sept 2013 includes 4 points
of sampling. Report reference no.
1292/BPKIMI/BRSIP/LAB/X/2013 by Industrial Standardization
Department using parameters such as pH, BOD, COD, Dissolved
oxygen, Phosphate, Nitrate, Ammonia, Arsenic, Cadmium,
Chrome, Copper etc. The analysis report concluded as meeting
the requirements.
ASA 4 4.2 Soil analysis carried out every year to determine soil fertility and
recommendation of fertilizer by R&D Department from Pekan
Baru. For 2013, 40 soils sample was taken for 2014 fertilizer
recommendations. For leaf analysis, 57 samples taken and report
of analysis available:
• 033/RDL-INT/LV/13 dated 06/05/13 for 27 samples
• 034/RDL-INT/LV/13 dated 06/05/13 for 4 samples
• 035/RDL-INT/LV/13 dated 06/05/13 for 26 samples
Both sampling process will be conducted on annual basis include
major elements such as N, P, K, Mg, Ca, and also minor elements
such as Boron, Cu and Zinc.
From the soil analysis report 2013, total mineral soil is 2843.99 Ha
and vast area identified as Peat soil area( 3199.85 Ha) Breakdown
for type of peat soil identified as:
Peat 0-150 cm 412.20 Ha
Peat 0-300 cm 85.40 Ha
Peat 150-300 1,942.89 Ha
Peat 300-500 cm 644.83 Ha
Peat >500cm 114.53 Ha
From recommendations of R&D also, estate applied a Dried
Decanter Solid (DDS) and Boiler Ash from palm oil mill to improve
soil fertility in field. For peat soil management, estate was
maintained 563 water gates to secure the water level in peat soils
area. Water level is monitored by appointed staff and reported
every month. Level of water is maintained in range 50 – 60cm
based on company GAP policy. Peat soil subsidence monitoring
also include in peat soil water management. Monitoring done
every 6 month commenced on April 2014.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 17 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
ASA 4 4.3 Soil map “verification peat soil map" dated 06-04-13, Extent &
distribution of various soil type, soil series updated. No fragile soil
identified. Estate have very minimum of slopes area. Range in 0 –
6 degree of slopes all around the estate. Slope map available
surveyed by external consultant, JH Agriculture Services latest on
2014. Road maintenance program 2013-2014, total meters done
for grading 179,344 meters, compared to budget 2012 (297,910
meters). The 3 years planning from 2012-2014. The priority of the
maintenance will be done to the road areas that needed priority.
From the soil analysis report 2013, vast area identified as Peat soil
area (3199.85 Ha). For peat soil management, estate is
maintaining a total of 563 water gates to secure the water level of
soils. Water level is monitored by appointed staff and reported
every month. Level of water is maintained in range 50 – 60cm
based on company GAP policy. Peat soil subsidence monitoring
also include in peat soil water management. Monitoring done
every 6 month commenced on April 2014.
No low organic soil and slope areas. The monitoring of water
management is done weekly. Record monitoring of number of
water weir. Condition of water, main rain collection drain and
outlet. Flow and direction of flow and water level between 50-60
cm. Monitoring record of March 2014 is verified.
ASA 4 4.4 Estate has 2 rivers, Batang Alin River and Sikilang River. Company
policy is river width above 10m must maintained 100m buffer
zone alongside the river. Buffer zone is maintained with proper
management such as planting of jungle trees and no chemical
activities allowed in this area. Area where previously planted oil
palms removed to incorporate biodiversity enhancement plan and
restore the riparian along the river was planted with forest trees.
Restoration of Riparian zone along the river riparian has been
given high priority for planting of forest trees such as Samanea
saman, Swietenia macrophylla, Shorea sp, Terminalia
cattapa, Durio Zibethinus, Mimusops elengi. Previous planted
trees have grown about 3-4 meter and biodiversity enhancement
is taking place along this river green belt area.
50 meter riparian zone is maintained without any chemical
application. Appropriate signage also maintained at this area to
give awareness to the workers and community. Estate also does
the monitoring such as water sampling for Batang Alin and
Sikilang River. Water analysis is carried out once per year based
on Group GAP guidelines and be included in RKL/RPL report.
Furthermore, various visitors come and do their research with
collaborations of estate management such as water analysis
report by University of Andalas on 21-12-2013.
ASA 4 4.5 IPM plan were documented in Group GAP guidelines, which
includes beneficial planting and barn owl. Planning and realization
of IPM programmes were monitored by mapping the beneficial
plant to be planted with types of plant. The plans are monitored
by daily completion of planting. IPM Monitoring and census
carried out monthly basis for leaf eating caterpillar setora nittens
and sethotosea asigna, barn owl census, termite census and rat
census.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 18 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Apart from normal routine maintenance of the barn owl boxes,
monitoring of the owl population is carried out on monthly basis.
Census record shows no serious attack. Trainings are given to all
staff on IPM. Pesticide toxicity units monitored by each active
ingredient and it are calculated based on LD 50(Mg/Kg), chemical
usage, total a.i. Used, Ha planted, FFB produce, pesticide usage
(L/Ha), L/ton and finally result shown in Pesticide toxicity units
monitored (Kg/LD 50/FFB) by monthly and up to date.
ASA 4 4.6 Estate has a list of approved type of chemicals to use in field by
R&D Department. Total 15 types of chemicals are used in PT.
Agrowiratama estate. List of chemical available included type of
chemicals (herbicide, fungicide and insecticide), commercial
name, LD 50 (mg/kg), active ingredients, supplier name, license
number and permit validity.
Record of the pesticides usage included active ingredients, area
treated, amount applied per ha and liter per ha. Record of
Capture 100EC (a.i Cypermethrin) was shown high due to
replanting programme in progress. Sample of pesticide record on
March as Agrimec 18EC (a.i Abamectin) 0.60 liter, a.i used 0.11 kg,
Ha planted 5860.38 Ha, FFB produce 13,421.77 and 0.000102382
liter/ha.
Pesticide usage is from recommendations of R&D Department.
Agrochemicals waste is centralized at scheduled waste store at
estate with permit number No. 188.45/229/BUP-PASBAR/2014
on date 10 March 2014 according to the regulations. Then the
waste will be collected by PT. Primanru Jaya (Permit no. 234) not
exceed than 90 days waste is stored in estate. Record of
inventory is well maintained by estate, last collecting made on 10
March 2014 as details below:
- Oil drum – 5 x 1000 liter
- Used battery – 10 units
- Bulb lamp – 29 units
- Oil filter – 93 units
- Chemical containers
- Workshop Rags
Company used chemical type 1B Sime Ebor Baits (a.i Warfarin) for
rat attacking in the field based on the census carried out every
month. No using Paraquat in any operation. So far, only pesticide
Warfarin 0.05% (class 1b) is using but company has commitment
to reduce the usage through IPM practice in the field.
Record shown the usage of this pesticide is still less due only will
use if census of rat is higher and cannot be control by IPM
practice. This chemical only is used when census result is
exceeding the 5% limitations of attacks. However, sighted highly
usage of Sime Ebor Baits from Jan – 1515.63 kg and February –
5,799.92 Kg. Justification of February application according to
Group Agriculture Policy for Pest and Disease management, for
palm oil tree above 3 meters area, baits must be applied every 6
months until the baits effects below than 20%. (refers to Group
Agriculture Policy 6 – 4.2 Pengendalian Tikus di Perkebunan
Kelapa Sawit dated 18 April 2012).
Annual medical checkup carried out by Laboratory Clinic
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 19 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Anugerah besides monthly checkup by internal estate clinic for all
workers related to chemicals. Medical checkup for workers such
as Chemical store operator, mandor/sprayer, mandor/weeder
workers, mechanic, machine operator and gensets operator. On
15 March 2014, total 226 workers were sent for medical checkup
involved blood test, urine, lungs and audiometric test. Sample of
medical checkup report for Sprayers, Siti Kholipa and Ernawati is
verified. Record of all agrochemical verified no pregnant or breast
feeding woman was involved in chemical activity. Monthly health
checks to all sprayers to ensure they are free said issue.
ASA 4 4.7 In the mill, the safety, healty and hygiene policy dated 07-07-
2007, revised 01-02-2011. The policy covers minimize the risk of
accident, poor health, unsanitary working environment, identify,
assessing and controlling the risk, provide information thought
training, announcement, to ensure safe work practice, discuss
OSH issues in work place, contractors/employees and visitors to
obligate the rules and regulations of OSH in work place.
As for the estate, Documented Occupational Safety & Health
(OSH) policy and its implementation seen effectively
communicated and implemented. Among the programs that
associated with OHS includes OSH training, medical check-up,
daily safety briefing, Hazard and risk analysis of work place,
implementation of PPE usage and inspection, safety committee,
safety meeting, internal safety audit where the subjects in this
implementation.
Responsible person for OSH in PT. Agrowiratama is headed by
safety officer, Mr. Andi Roy Silalahi (certificate no.
KEP.5120/M/DJPPK/II/2014. Sighted the insurance coverage for
month of Jan and Feb 2014. All the employees covered by
insurance. Jamsostek insurance coverage for all workers. i.e.
number DD 001041000 and DD 000529. Sighted the 2013 and
2014 medical report summary for 131 workers.
The summary made to 3 types of sickness from 20 workers that
needed further attention from panel doctors. Monthly Records of
health examination for worker applying agrochemicals available,
verified from Medical check-up record for individual worker for
year 2012. It is conducted on monthly basis. Verified from medical
check-up for employee Ms. Ernawati - sprayer leader, details of
check-up are skin irritation, breath, nail, blood pressure, weight,
with details result.
Risk assessment for OSH available in HIRARC document for 2014.
HIRARC included all activities in estate operations from planting,
harvesting, pruning, transportation, weeding, chemical handled
such as mixing and application, pest management, workshop
works, scheduled waste management, administration etc. Last
revision on January 2014. The revision also will be made if any
accident happen, amendment from legal, changes to the
operation activities and annual revision.
HIRARC document contains as what the process, sample of
activity, hazard identified, potential level, risk level and existing
control measures (ECM). OSH training programme is divided into
4 category in estate:
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 20 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
- Inspection team training
- Fire Team Training
- Emergency situation Training
- OSH environment Training
The most recent OSH training dated 29 March 2014 by safety
officer, Mr. Roy to 14 personnel at workshop workers. Estate has
6 certified persons for first aid training. Certificate available and
verified:
- Sukrihadi – 410/BK3-MDN/XII/2008
- Nispan – 416/BK3-MDN/XII/2008
- Syafrizal - 420/BK3-MDN/XII/2008
As part of future programme in 2014, 2 persons from estate will
be send for first aider training as additional to existing first aider.
20 minor accidents reported in period Jan – March 2014. 1 level
accidents sighted on March 29 2014 for criminal case in work
time. Accidents was reviewed and reported
ASA 4 4.8 Training calendar seen integrated of environment, social and OHS
with training status well indicated. Since Mar 2013 to Mar 2014,
there were 174 trainings were effectively carried out by estate
and mill. Sighted the records of attendance for RSPO & ISPO
awareness to workers, OHS and first aid training, HCV awareness
for staff, understanding of SOPs and PODs, spraying techniques
etc.
Both in mill and estate, the training programme for all workers is
based on “Training Need Analysis” assessment. TNA document is
developed on 30 Dec 2013 for 2014 training programme. TNA is
divided in each estate operation and type of working condition.
Programme for 2014 sighted, divided by several training aspect
such as Agronomist Training, Administration Training, HRD
Training, OSH Training and General Training. Document is in
matrix included type of training, trainer, level of workers,
realization and planning date.
In estate, record of training for each employee kept in the
personal workers file. Files of workers name Ernawati (sprayer),
Lia Martoya (sprayer) and Yuhendri (Store operator). Sighted the
training attendance record for building contractor [CV Bukit Mas]
and engineering works contractor [PT. Binajaya Mitra Persada]
dated on 23/08/2013. The required PPE during the work
assignment shall be managed by contractor.
The number of workers required for the assignment closely
monitor by the safety officer on daily basis. Additional workforce
from contractor required another training session. In estate
Agreement with CV. Bangkit Jaya Lestari was sighted for school
renovation. Training record available.
Principle 5: Environmental Responsibility and Conservation of Natural Resources and Biodiversity
Criterion by Audit
Summary
AMDAL is prepared for the entire complex that dated in 2011. RKL
and RPL submission to the local authorities was in place and
sighted as evidence. HCV assessment has also been done for the
entire complex with sufficient inputs produced during the audit.
Waste management being controlled and monitored effectively in
all the operating units and records are maintained by respective in
chargers. The mill has documented fossil fuel usage and
communicates the figures with HQ.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 21 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
ASA 4 5.1 RKL-RPL for both covers effectively of the environmental and
social aspect. Sighted the DPPL [Dokumen Pengelolaan dan
Pemantauan Lingkungan] from Oct 2007 to Jan 2008, conducted
by PT Bentang Cakrawala. Company was committed to
environment aspect. Activity such as planting jungle tree species
alongside the river, monitoring HCV, birds and protected animals
is carried out by monthly. To date there are 608 jungle trees
planted along Sikilang River and will be monitored once a year.
ASA 4 5.2 Identification of HCV conducted by consultant - Aksenta in April
2008 HCV areas total 752.17 Ha. Area A 154.96 Ha, Area B 597, 21
Ha. Type HCV 1, 3, 4 and 5. Mammal 8 Species, reptiles 9 species,
birds 38 species. From all species monitored, 10 species of birds is
protected, 1 mammal is protected (North Sumatran leaf monkey).
Internal monitoring of protected animal done in every month.
Meeting with the central management every year to review the
HCV areas and habitats. In estate on every year there will be a
stakeholders meeting on HCV and observed the latest meeting
was held in August 2013 with attendance record along with HCV
socialization with community. Signage of Forbidding any use of
chemical in HCV area and riparian zones. No burning, illegal
hunting. Sign boards are monitoring by check list every three
months. Internal monitoring is done by audit and certifications
together with Pak Junef Murtri S. - Staff Sustainability
ASA 4 5.3 In estate the waste identifications document be revised per
semester. Total 22 checkpoints is identified to potential generate
the waste. Source of waste includes pre-mix centre, fertilizer
store, oil store etc. Waste management includes recycle
programme in progress. Segregation of waste is carried out from
housing, office until land fill site. Schedule also is followed by
collector 2 days once strictly. Collaborations with third party to
sell back recycle items to reduce the waste in estate. Schedule
waste is collected by PT. Primanru Jaya. Refer to P4.
ASA 4 5.4 Electricity from Bio gas energy / power supply to workers started
in April 2013. Biogas power being distributed on 24 hours and
record is to be on monthly basis. Sighted a map on CDM supply,
to workers living quarters and to school. Efficiency usage of Palm
Methyl Ester (PME) for March 2014, Actual consumption is
recorded monthly. Efficiency of energy consumption and records
of energy usage per ton COP and PK from 2013 and up to March
2014 are updated and verified. In estate PME is replacing fossil
fuels. Transportations: dump truck, mini tractors use Palm Methyl
ester (PME).
ASA 4 5.5 Policy on “No burning” well implemented. Appropriate signages
maintained surround the estate and mill. Condition to not use the
fire well mention in SPK of replanting work. It is found and verified
the procedure of emergency response to land burning
(Penanganan Keadaan Darurat) No. OSH/01.01/2.4 dated July,
20th 2012. This procedure is about every actions need to be taken
due its fire existence and also its organizational structure. Fire
extinguisher well maintained sighted in proper places.
ASA 4 5.6 Sources of the emission well identified in the identification matrix
dated on 02/01/2014. The category of emissions rage from noise,
air, reusable, hazardous waste and domestic waste. The noise
emission test carried out on 03/03/2014for sterilizer, engine
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 22 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
room, kernel recovery process and biogas plant.
The maximum reading was recorded at engine room [88.5dBA].
Sighted also the chimney test result for both boilers [1 & 3] dated
on 07/11/2013 [ref: 1650/BPKIMI/BRSIP/LAB/XII/2013. Verified
the latest 3 months record [Jan – Mar 2014] for BoD reduction,
Month inlet outlet
Jan 164.7 50.32
Feb 271.7 116.2
Mar 142,2 121.3
As for noise reduction, the most significant area is engine room,
hence tighten measure for PPE usage [ear muffler] being monitor.
For the air pollution, the dust collector monitoring interval is on
monthly basis.
Sighted the fossil fuel usage reduction programs and below is the
overview since 2011.
2011 2012 2013 Mar’ 14
Fossil fuel 692.834 682.256 43.041 0.00
CDM - - 507.650 100.602
Since the introduction of Aeroflow in 2008, the BOD level is within
300ppm [standard 5000]. The pH is being monitor on daily basis
before proceeding for land application.
Principle 6: Responsible Consideration of Employees and of Individuals and Communities by Growers and
Millers
Criterion by Audit
Summary
SIA conducted effectively covering the socio economy; culture
and health of surrounding people who may be affected by
plantation activities by company either from negative or positive
impact. Policy for sexual harassment displayed and
communicated. Violence towards women mentioned clearly in
the group policy. CSR programs are well executed and budget
against the plan sighted.
ASA 4 6.1 SIA was initially done by Aksenta from 20/04/2008 - 26/04/2008.
The assessment output categorized into social, economic and
health. There is a plan available to mitigate the negative impacts.
As for the estate, the RKL and RPL evidence the assessment done
in accordance to local government’s requirement that to be done
in every 6 months.
Noted there was no change in the operational scope. Estate has
to provide monitoring report called RKL & RPL every semester as
per Indonesian Laws and Regulations. This assessment is
improvement from DPPL and covered environment such as
pollutions, animals, sources of pollution, best agricultural
practices, riparian zone management and land burning
monitoring.
From social aspects is cover about workers and smallholders such
as labour conditions, water consumption, financial income and
people perception, CSR and providing necessary infrastructure to
local people. The monitoring of soil, HCV and conservation area,
drinking water and water way status being included in report on
6 months interval.
On operation side, assessment also includes herbicide and
fertilizer applications, IPM, pest disease and weeds and biological
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 23 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
control agents. This assessment also cover to safety requirement
in mill and estate area such as providing workers with PPE,
enforcement of SOP’s, providing trainings and medical checkup
for the workers.
ASA 4 6.2 AGR-SOP/03.01/3.26.1 is available for Program Konsultasi Berkala
Dengan Stakeholder. AGR-SOP/03.01/3.10.0 established for
Penyampaian Keluh Kesah Pekerja. Other than that, the AGR-
SOP/03.01/3.9.0 developed for Keluhan & Komplain External. 151
list of stakeholders from the nearby villages. Government
provincial and district level, Police, Army, Bank, In house worker
union, suppliers, contractor & hospital. Last updated Jan 2014
approved by Humas Mr. Ibrahim. External Socialisation to the
nearest villages done and sighted report “Stakeholder Konsultasi
Report” dated 19.6.2013. Sighted some discussion within the
villages and organization Ex: Explanation of CSR; Awareness of
SOP; etc. Head of HUMAS (Public Relation), Mr. Ibrahim.
ASA 4 6.3 The SOP, AGR-SOP/01.01/5.1 dated on 01/03/2014 is related to
the Complaint is in place along with the complaint flow chart to
manage the complaints. Also sighted procedure no. AGR-
SOP/01.01/6.1 dated on 1 January 2008. No disputes recorded.
No complaint recorded for last 3 years. The established procedure
of AGR-SOP/01.01/1.0 for Land Compensation sighted.
ASA 4 6.4 AGR-SOP/01.01/1.0 Ganti Rugi Lahan dated 1.7.2012. No
compensation occurred.
ASA 4 6.5 Sighted the minimum wage instruction “Upah Minimum Provinsi –
Sumatra Barat 2014” from the Governor [ref: 562-846-2013]. Rp.
1,490,000. All workers will receive monthly pay slip mentioned
total wages of the workers. Pay slip and contract workers name
Ernawati and Siti Kolipa was verified. Work term and conditions is
agreed and documented into “Perjanjjian Kerja Bersama”
between company and workers union.PKB for period 2014 – 2016
is verified.
Sighted the monthly salary record for Feb 2014, sampled for
sterilizer operator, Bpk. Yuliasmi [00080003] whom being
deducted on insurance [accident, retirement, fatality
&retirement] Rp 32,700.00 [2% from employee + 4.54% from
employer and for health insurance 0.5% from employee and 4.0%
from the employer. The new salary paid in Feb 2014 along with
the increment of Rp 140,000.00 and the overtime rate incurred.
The company provides housing for both staff and workers.
Facilities provided as:
� Mosque
� Electric – subsidy till 900KwH
� Water – Free
� School bus for children to go to school (Secondary school) 10
km ] with driver and attendant
� Polyclinic –
Kindergarten & Primary School is under the Yayasan Anwar
Karim. Work agreement [for heavy equipment rental] No 001-
HO/PT.AGR/P042/III/2013. Sighted:
� The contractor must provide insurance to their worker as per
Indonesian law - Law UU 13
� Environmental Law
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 24 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
� Safety & Health Law – UU K3
ASA 4 6.6 Policy no. MM-POD/01.01/1.3.3 title “Kebebasan Berserikat”
dated on 15 April 2008. The policy is based on Indonesia
regulation (UUD) 1945 item 28 & 28 E and Labour laws
(Ketenagakerjaan No. 13 year 2003 item 104 says every workers
have a rights to create or join a workers union. Estate
management have implement monthly meeting with the workers
union. Meeting between workers union with management held
on monthly basis. Last meeting on 12 March 2014. Issue was
raised such as delayed to pay the loan by management thru ATM
machine.
ASA 4 6.7 Sighted the evidence of communication of the Policy for minimum
age restriction dated 18.4.2012 signed by Director Mr.Lim Teong
Kwee. Requirement of the staff and employee recruitment
minimum age is 18 yrs. old. Randomly check of workers date of
birth in records and not found any worker age below 18 in PT.
Agrowiratama Sei Aur estate and in the mill.
ASA 4 6.8 Policy no. MM-POD/01.01/1.3.4 title “Kesetaraan Kesempatan”
(equal opportunities) dated on 15 April 2008 is well implemented.
Policy for equal opportunities sighted dated 13.3.2012; and a
separate Discrimination policy dated 13.3.2012. Displayed and
communicated. Signed by Director Mr. Lim Teong Kwee.
“Lowongan Kerja” sighted include restriction through gender &
“perbedaan lainnya”;
ASA 4 6.9 Revised Sexual Harassment and Violence policy dated on
21/10/2013. Violence towards women mentioned in MM-
POD/01.01/4.3.0 under Committee Gender procedure. Policy for
protection of reproductive rights sighted dated 13.3.2012.
Displayed and communicated. Gender committee established to
implement the sexual harassment policy.
Interviewed Gender Committee Head is Ms Ernawati and noticed
that meetings and trainings conducted. Last minutes of meeting
dated 14.03.2014; seen agenda on review of management plan
2014; Sexual Harassment and Violence case; Pregnancy &
Breastfeeding. A SOP derived ref to AGR-SOP/01.01/5.4 under
Committee Gender procedure; explaining procedures of sexual
harassment & violence by identifying type of harassment & report
to Gender committee within 24 hours & an investigation will be
conducted by management team & if found guilty, discipline
action will be taken.
ASA 4 6.10 Sighted the FFB price instruction from Pemerintah Provinsi
Sumatera Barat [ref: 521.3/437.1/PPH.2/III-2014 dated on
28/03/2014. The listing indicates the palm from 3 years to 24
years [Rp 1.541,01 to Rp 1.873,40]. FFB prices are controlled by
“Authority of Sumatera Barat Province” which will revise every
month. Prices will communicate to Plasma farmers by circular on
monthly. Ex: Latest circular from government dated on 28 March
2014 no. 525/K.688/2014.
During mill visit, observed the price list display at main entrance
[notice board at guard house]. Work agreement with PT Sejahtera
No. 003/SPK/POM/XI/2013 for civil work for upgrading cooling
pond; dated 27.11.2013. Work agreement is agreed both parties
with term and condition is included into a contract.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 25 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
All the payment is made by financial Department in Central. Letter
no. 001/SPK/POM/IV/2013 are acknowledgement from Financial
Dept to mill as payment has been made. The payment amount is
verified in estate’s Annual Budget. Agreement sighted for 3
smallholders:
1). Ref: 001/KKPA-KSB1/I/2014, dated 02/01/2014 and
represented by Bpk Nasran.
2). Ref: 002/KKPA-KSBSAMB/I/2014, dated on 02/01/2014 and
represented by Bpk Ahmad Zirwan.
3). Ref: 001/KKPA-KSDBS/I/2014, dated 02/01/2014 and
represented by Bpk Raspudin Aras.
ASA 4 6.11 The CSR program covers both the estate and mill. A list of
breakdown seen along with the photograph evidences. Sighted
the budgeted amount for CSR in year 2013 was Rp
1.664.578.000,- and the realization was Rp 1.200.396.620,-. As for
2014, it is budgeted for Rp 1.967.005.685,-.
In 2013, 28 CSR programme in infrastructure was done by the
company. Samples as:
� Mosque renovation aid – February 2013 Rp. 23, 000,000
� Construction of religion education centre – March 2013
6,200,000
� Drainage construction at community field – July 2013
� Road maintenance for local community at Jorong Padang
Timbalun – April 2013
� The budget for CSR is prepared by Head of Humas Plantations
every years and be approved by estate director.
� CSR realization document on 2013 available and verified.
Principle 7: Responsible Development of New Plantings
Criterion by Audit
Summary
Oil palm plantings are from the land purchased from the local
communities. These lands have been previously planted with
other crops such as rubber, cash crops and shrub land. Hence
there were no new plantings involving forest land.
ASA 4 7.1 Sighted the initial AMDAL covering the socio economy; culture
and health of surrounding people who may be affected by
plantation activities by company either from negative or positive
impact. It is found that local authority has signed the letter as
evidence. There is a smallholder development plan established at
the time of assessment.
ASA 4 7.2 There is no new land surveyed for the growing of oil palm.
However there are sufficient SOPs available for the soil and land
type that being implemented at all operating units. A general soil
map, slope classes map and elevation map, to provide a general
recommendation for soil and water management practices to
overcome soil limitations are available.
ASA 4 7.3 Maps are available to show that land clearing avoided identified
HCVs. There was no forest areas converted since November 2005.
The lands were on land purchased from the local communities
land planted with rubber, cash crops and shrub land etc.
ASA 4 7.4 The company has prepared soil maps which include fragile soils,
excessive gradients and peat soils. SOPs are in place to protect
fragile and marginal soils. Terracing implemented above 6° as per
the topographic map. Field inspection confirmed on the
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 26 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
implementations.
ASA 4 7.5 SIAs and EIAs developed with participation form affected parties
and include an analysis of both positive and negative impacts.
ASA 4 7.6 The company has a procedure to identify the people who may be
entitled to receive compensation.
ASA 4 7.7 The company has a zero burning policy for preparing land for
planting and has a procedure in place to respond to land burning
on neighboring properties.
Principle 8: Commitment to Continuous Improvement in Key Areas of Activity
Criterion by Audit
Summary
There are many improvement programs as mentioned in
respective principles published in their annual company
presentation. Both mill and estates has sufficient records and
documents to justify the achievements.
ASA 4 8.1 As part of improvement, many numbers of SOPs and PODs revised
and effectively documented of the changes. The continuous
improvement dated on 01/04/2014, divided into air quality
measurement, waste water management, water usage in the mill,
electricity usage for per ton of FFB, reduction in fossil fuel usage,
reduction in chemical usage and POME. The chemical usage for
water treatment plant and boiler. Sighted the monthly
consumption for boiler -Nalco 3273, 22310, 2811 and Caustic
Soda. As for water treatment plant, the use of Nalco 8173,
Tawas/Alum and Salt Non Yodium.
4.2.1: Summary findings for Scheme Smallholders (KKPA) KSBSAMB
The assessment team conducted a thorough assessment of all the principles, criteria and indicators. Evidence was
sought for conformity with the RSPO Indonesian NI of both systems and their implementation. The findings column
reflects the findings in accordance with each criteria and indicator and the comments column includes some of the
evidence found. (The full and complete checklist contains some confidential information and is an extensive
document used for peer review and by the certification decision panel and certifier). Where non conformity was
found, a summary of the non-conformity is included.
Principle 1: Commitment to Transparency
Criterion 1.1
Scheme Manager provide adequate information to other stakeholders on environmental, social
and legal issues relevant to RSPO Criteria, in appropriate languages & forms to allow for
effective participation on decision making.
Documented both parties agreement between KKPA-KSBSAMB and PT. Agrowiratama (as scheme
manager of the KKPA) is verified during the 4th annual surveillance audit. It is well implemented.
The following both parties documentation were checked and verified during the 4th anuual
surveillance audit:
• Document agreement no. 01/KSBSAMB/III/2004 and no. 036.Hm/AG/III/2004 dated on 11
March 2004;
• Legal permit established the KKPA-KSBSAMB no. 245/BH/KDK.32/XII/2003 dated on 29
December 2003;
Letter of the FFB price from the Ministry of Forestry and Agriculture no. 627/Kpts-II/98 dated on
11 September 1998. A document evident of land titlles for KKPA-KSBSAMB and applicable. The
land of KKPA-KSBSAMB occupied total 500 Ha. It is accordance with the agreement. The letter of
landtitles/smallholders by scheme manager (PT. Agrowiratama) to KKPA-KSBSAMB dated on 08
March 2004. SEIA (Analisa Dampak Sosial dan Lingkungan) for Smallholders is available. The survey
was conducted by external consultant (AKSENTA) in April 20 -26, 2008.
Criterion 1.2:
Management documents are publicly available except where this is prevented by commercial
confidentiality or where disclosure of information would result in negative environmental or
social outcomes.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 27 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
All legal permits are available publicly at the KKPA office, such as: land certificate (land title), Ijin
Badan Hukum/ Akta Pendirian Perusahaan (article incorporation), DPPL (Social and Environmental
Impact Assessment) incorporated in estate, TDP (Cooperative registration), Surat Ijin Usaha
Perdagangan – SIUP (Trading permit), Surat Ijin Tempat Usaha-SITU (Placing Operational Permit).
The Work Agreement Contract “Surat Perjanjian Kerjasama” (Memorandum of Understanding)
between KKPA KSBSAMB and PT. Agrowiratama was signed.
Principle 2: Compliance with applicable laws and regulations
The maps showing land allocation for KKPA (smallholders) is available per farmer group. The legal
ownership of the land (land title certificates/sertifikat hak milik) from all individual farmer
member are presented. Each farmer has 2 ha (average).e.d land title (land certificate) owned by
Mr. Bosa (member of KKPA KSBSAMB). The land ownership is very clear. Sertifikat hak milik (SHM)
from BPN (Badan Pertanahan Nasional). So far no claimed or contested land.Interview with the
farmers group so far there is no dispute. Not relevant to be verified as KKPA-KSBSAMB scheme
applied.Interview with scheme manager for KKPA-KSBSAMB that the lands acquired must be clear
in the ownership as requirement before the MOU or agreement signed between company and
KKPA. Land title is SHM (highest level), it is very clear in land ownership legal document.No
indication customary land is available in KKPA plantation area.
Principle 3: Commitment to long-term economic and financial viability.
The scheme manager and cooperative prepared the budget for 3 years (2013-2015), covering:
productivity (ton/Ha/Year), cost of fertilizing (Rp/year), production estimate (ton/year),
transportation cost and harvesting cost, those documents were approved by Leader of
cooperative. Scheme Smallholders’ organization (cooperative) was involved in saving towards
future replanting and for Corporate Social Responsibility (CSR) funds. Scheme smallholders
received training from scheme managers in relating to the management plantation method to
optimize continuous productivity, technical support, training and advice on best agriculture
practices.
Principle 4: Use of appropriate best practices by Scheme Manager
Criterion 4.2 Practices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures
optimal and sustained yield.
The fertilizer were supplied and managed by PT. Agrowiratama directly to smallholders as
recommended by scheme managers. The record of type and volume of fertilizer application is
available. Record of FFB production in smallholder’s plantation maintained for last 5 years.
Records are separated by each group, actual production and ton per hectare. Records showed
increasing of production from 2010-2013.
Criterion 4.6 Agrochemicals are used in such a way that does not endanger health or the environment. There
is no prophylactic use, and where agrochemicals are used that are categorized as World Health
Organization Type 1A or 1B, or are listed by the Stockholm or Rotterdam Conventions, growers
are actively seeking to identify alternatives, and this is documented
The commitment management of mill and estate to implement permitted using agrochemicals
regulated by The Minister of Agriculture is evident. Also using agrochemcals for Smallholders were
registered. Its showing evidence on “Daftar Penggunaan Bahan Kimia (Agrochemicals) Tahun
2014”.There is one of agrochemicals for Rodentisida (Sime Ebor Baits 0.05 BB) with registration
no. R1.01120120113997 is extremely dangerous. However, the comsumption is limited and well
monitored controlling. Record of pesticide used is kept in estate office for smallholders and a
monthly tabulation released for monthly comparison.
It shown record of agrochemicals in March 2014, for HER META PRIMA 20 WDG
• a.i [Metsulfuron methyl 20%,
• LD 50 [mg/kg] – 5000
• Used 2.90 Kg/Ltr per Month > total a.i 0.58 per Month
• Planted area – 500 Ha
• Pesticide [L/Ha] - 0.005800000 per Month
• Pesticide [L/Ton] - 0.002862388 per Month
• Pesticide Toxicity Unints [Kg/LD50/FFB] – 0.000000114 per Month
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 28 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
The management of smallholders provided sufficiently working equipments concerning on safety.
There list of safety equipments for smallholders workers on “Pedoman Standard Alat Kerja dan
APD Tahun 2014” Ref no. RGM I-HQ/100/IX/2013 dated on 21 September 2013. The management
of smallholders well preparing to kept and disposed of pesticide containers accordance standard
operation procedure (AGR-SOP/01.01/7.6 dated on 24 January 2008). Used agrochemical
containers will be stored within 90 days before sent to waste collector company. The record of
despacth used agrochemical is maintained and checked in place. No records available.
There was no accident occured due to pesticide toxiciy for smallholder operators. The
documented working instruction of pesticide spraying (IKA/22//AGR/2014) approved by
management of PT. Agrowiratama dated on 02 January 2014. Total 66 workers (smallholder) were
trained for limited pesticide in January 27, 2014. The training was done by Chief of K3 PT.
Agrowiratama. Training record of limited pesticide for for Rodentisida (Sime Ebor Baits 0.05 BB)
and MSDS Sime Ebor Baits 0.05 BB are available and checked in place.
Principle 5: Environmental responsibility and conservation of natural resources and Biodiversity
Criterion 5.1 Aspects of plantation and mill management that have environmental impacts are identified, and
plans to mitigate the negative impacts and promote the positive ones are made, implemented
and monitored, to demonstrate continuous improvement
SIA (Social Impact Assessment) for Smallholders is available. The survey was conducted by
external consultant (AKSENTA) in April 20 -26, 2008. Environmental Impact Assessment (revision)
documents (AMDAL document and RKL & RPL document) are available period 2013 – 2014 and
approved 25 January 2014. The environmental impact assessment and HIRA_OSH document
covers scope for KKPA-KSBSAMB. Regular report on environmental management is presented.
Letter of report submission to Envoronmental Dept officer (Badan Lingkungan Hidup) is available
as evidence to report regularlyevery 6 month basis.
Criterion 5.5 Use of fire for waste disposal and for preparing land for replanting is avoided except in specific
situations, as identified in the ASEAN guidelines or other regional best practice
Under scheme manager (PT. Agrowiratama) policy for zero burning on replanting. During this
audit no replanting activity done. The management smallholders established a policy for zero
burning for replanting. The policy was approved and signed by chief of KKPA-KSBSAMB dated on
27 September 2007. KKPA-KSBSAMB has fire fighting team and trained by scheme manager (PT
Agrowiratama). The procedure (AGR-OSH/01.01/2.4, dated on 20 July 2012) trained to KKPA
members by company.Training was conducted in January 29, 2014. Record of emergency drill is
available in place and checked. Fire extinguishers are provided in KKPA-KSBSAMB office. Estate
(scheme manager) will support the complete equipmets if fire happened in KKPA-KSBSAMB area.
Land preparation as company policy is Zero burning. For KKPA-KSBSAMB plantation area,
replanting operation will be handled by scheme manager (PT Agrowiratama).
Principle 6: Responsible consideration of employees and of individuals and communities affected by scheme
smallholders
Criterion 6.4 Any negotiations concerning compensation for loss of legal or customary rights are dealt with
through a documented system that enables indigenous peoples, local communities and other
stake holders to express their views through their own representative institutions
No dispute was noted during this assessment.
Criterion 6.6 The employer respects the right of all personnel to form and join trade unions of their choice
and to bargain collectively. Where the right to freedom of association and collective bargaining
are restricted under law, the employer facilitates parallel means of independent and free
association and bargaining for all such personnel.
The management established a policy of no restriction for workers and contractors to join unions
for KKPA – KSBSAMB (Koperasi Sawit Bosa Sungai Aua Manjunjung Bilang) that documented on
“Kebijakan Kebebasan Berserikat”. The policy is approved and signed by Chief of KKPA-KSBSAMB
dated on 12 March 2012. There are 34 persons as Member of KKPA-KSBSAMB involving joins to
the union (PUK.SPPP-SPSI) since January 2014.
Criterion 6.10 Scheme managers deal fairly and transparently with smallholders and other local businesses.
Any complaints that received by smallholders from nucleus estate and other local business are not
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 29 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
exist. However, there is complaint recorded on “Saran-Saran Anggota dari KKPA” . There have also
feedback from third parties that recorded on “Anjuran Instalasi Lain”. The price of FFB is
determined by local goverment (Pemerintah Provinsi Sumatera Barat – Dinas Perkebunan) that
documented on letter no. 521.3/4371/PPH.2/III – 2014 dated on 28 March 2014.
The list of FFB prices base on planted years on table below
Planted
years
Price of
FFB (Rp)
Planted
years
Price of
FFB (Rp)
3 1,541.01 9 2,071.80
4 1,742.18 10 – 20 2,074.82
5 1,842.17 21 2,004.95
6 1,863.43 22 1,998.01
7 1,877.13 23 1,971.31
8 2,043.84 24 1,873.40
There is document on the premium prices for FFB smallholders certified by letter of Estate
Director no ref. ED/014/IV/2014, dated on 01 April 2014. These letter was communicated and
socialized to all smallholders on April 2014. The management mill and estate will be paid for the
FFB smallholders certified for Rp 3/Kg of FFB. Smallholder of KKPA-KSBSAMB organization chart is
evident on “Struktur Organisasi KSBSAMB dated on 06 July 2013”. “Berita Acara Rapat Anggta
untuk Pemilihan Pengurus Koperasi Sawit Bosa Sungai Aua Manjunjung Bilang Nagari Sungai AUA
Kec. Sungai AUA” on July 06, 2013.
Minute of meeting “Rapat Anggota Koperasi KKPA-KSBSAMB” is recorded on July 05, 2013. The
evident is available of contract payment slip for KKPA (KSBSAMB) on March 2014; Payment of
Jamsostek for KKPA on March 2014 is paid by Bank transfer (Pembayara Iuran Jamsostek Bulan
Maret 2014). Payment slips of salary to smallholders (KKPA-KSBSAMB) on March 2014 for MS.
Aldina (Up Keep), Salary is given amount Rp 1,492,000. According to Decree of governor Sumatera
Barat No. 562-846-2013 regarding Minimum payment of Sumatera Barat Province 2014 is, Rp.
1,490,000. She does member of jamsostek registered no 10031713836 since 09 November 2010.
List employess of smallholder (KKPA – KSBSAMB) 2014, Total of number KKPA – KSBSAMB are 65
employees. The company did not conduct any credit of payment to smallholder. Instead, the
credit is given internally to smallholders employees. There was evidence of road maintenance and
transportation for smallholders FFB. The maintenance schedule of KKPA-KSBSAMB in January –
February 2014 for 2,490 Metres long for raod compacting works was done by road contractors
(CV.Putra Hadia). These contractor has been evaluated and assessed to the competence criteria of
contractor performance.
The hand over letter of road compacting works is documented available on “Berita Acara
Pemeriksaan Hasil Kerja Kontraktor “ contract no. 005/KKPA-KSBSAMB/P011/II/2014. Records
show the planting was done in 2005 (500 ha); next replanting is planned 25 years according to
Agronomy Business Plan.
Principle 7: Responsible development of new plantings
Not applicable as no new planting has taken place.
Principle 8: Commitment to continuous improvement in key areas of activity
Criterion 8.1 Scheme Managers regularly monitor and review their activities and develop and implement
action plans that allow demonstrable continuous improvement in key operations
A continuous improvement plan has been incorporated in the annual budget which includes road
improvement by grading – compacting.
4.3 Non-conformity Raised During this Audit and Any from the Previous Year, if applicable
This section gives an over view of new or revised non-conformities raised during this audit and of action taken to
close out non-conformities raised during the previous audits, if applicable
• If a minor-non-conformity raised at the last audit, is not closed out, then this will be raised to Major status
and the company given 60 days to close this out.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 30 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
• The NC number is comprised of 2 parts to include the year in which the NC was raised as well as a
sequential number.
4.3.1 Non-Conformities Identified during this Audit
Non-were raised during this audit.
4.3.2 Non-Conformity Identified during the last ASA, not applicable for MA
Non-were raised during the last audit as this is the Main Assessment.
4.3.3 Observations Raised During this Audit
Non-were raised during this assessment.
4.4 Issues that were raised during the Stakeholder Consultation, if any
Stakeholders were either informed by the client or by Control Union via the RSPO website.
• For Main Assessments, a 30 day Stakeholder consultation announcement is published on the RSPO website
prior to the audit. The same announcement is circulated by the client prior to the audit
• For subsequent Annual Assessments, it is based on stakeholders reading the approved public summary
reports available on the RSPO website, the client’s procedures in receiving on-going feedback or if feedback
was sent directly to Control Union prior to an audit or thorough RSPO complaints procedures.
During each assessment, the audit team will review the company’s implemented procedures in receiving
feedback and will execute field visits and interviews. Not limited to the following questions, any feedback
received is reviewed and summarized in this summary report for either Part 2 – Partial Certification or Part 4 –
Assessment Findings above or noted below, if applicable:
1. Do you have any remarks on the RSPO standard?
2. What is your relation with the applicant?
3. Are there any plantation or mill management practices that affect you?
4. Do you consider any management is in conflict with the RSPO principles and criteria?
5. Do you have any suggestions for management?
6. Are you aware of any HCV in the plantations or in adjacent land?
7. Are you aware of any endangered or rare species?
8. Are there any adverse (or positive) effects on local communities?
9. Additional comments?
11. Do you have any comments about the assessment team and would you like to meet with them?
12. Do you have any comments for the client’s management of any other plantations?
Subject raised Company response and
proposed action to be taken Audit team findings
PART 5: RSPO SUPPLY CHAIN CERTIFICATION
The palm mill mentioned in the scope of the audit was audited against the requirements of the following:
RSPO Supply Chain Certification Systems. November 2011
RSPO Supply Chain Certification Standard. November 2011
5.1 POM Included In The Scope Of The Audit
Name
Palm Oil Mill
Mill
Capacity Location Supply Chain Model
(POM) MT/Hour Address (IP or SG or MB)
PT Agrowiratama 45
Jorong Aie Aji, Nagari Sungai Aua,
Kecamatan Sungai Aua, Kabupaten
Pasaman Barat, Propinsi Sumatera
Barat, Indonesia.
IP, SG, MB
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 31 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
5.2 Confirmation Of The Company’s Summary Of Annual Certified Volume Of RSPO Certified Palm Oil And
Palm Kernel Over A Specified Period
Product CPO (MT) PK (MT) Specified 12 month period
CU Code
POM 1 47,983 11,996 Forecasted volume from June 2014 – June 2015
5.3 Summary Report Including A Brief Description Of The Scope Of Certification
Based on the information from marketing, the Buyer will send “Surat Kuasa Pengangkutan” to the mill for
necessey despatching. On despatch day, the appointed logistic driver will pass the “D/O” to the security guard
which will let the security guard issu the “Izin Masuk” that to be sign by mill manager. Before the despatching,
the security guard and despatch staff will inspect the vehicle by using “ Berita Acara Penimbanga” and “ Berita
Acara Pemeriksaan Kenderaan” nrespectively that will permit to fill in the CPO. Later the despatch staff to take
sample for laboratory inspection and perform the sealing. Finally the load to be weighted and ticket printed for
reference.
5.4 Monthly Records of Certified and Uncertified FFB Received Since the Last Audit
If this is the 1st Main Assessment, the figures used are from the last 12 months.
If this is an Annual Surveillance Assessment, the figures used are since the last audit.
No MONTH-YEAR Certified Supply Bases
(MT)
Uncertified Supply Bases (MT), if any Total (MT)
1 April 2013 15,221.01 15,221.01
2 May 2013 16,231.98 16,231.98
3 June 013 18,871.65 18,871.65
4 July 2013 21,940.26 21,940.26
5 August 2013 18,905.15 18,905.15
6 September 2013 15,910.96 15,910.96
7 October 2013 17,483.72 17,483.72
8 November 2013 17,413.57 17,413.57
9 December 2013 14,445.15 14,445.15
10 January 2014 17,065.66 17,065.66
11 February 2014 14,375.66 14,375.66
12 March 2014 16,699.74 16,699.74
TOTAL 204,564.51 204,564.51
5.5 Monthly Records of Certified CPO and PK Produced Since the Last Audit
If this is the 1st Main Assessment, the figures used are from the last 12 months.
If this is an Annual Surveillance Assessment, the figures used are since the last audit.
No MONTH-YEAR Certified CPO (MT) Certified PK Total (MT)
1 April 2013 3,444.81 908.43 4,353.24
2 May 2013 3,682.57 982.92 4,665.49
3 June 013 4,299.85 1,191.36 5,491.21
4 July 2013 5,119.34 1,323.86 6,443.20
5 August 2013 4,372.25 1,249.48 5,621.73
6 September 2013 3,877.32 1,054.67 4,931.99
7 October 2013 4,205.51 1,122.35 5,327.86
8 November 2013 4,142.98 1,127.88 5,270.86
9 December 2013 3,421.65 872.7 4,294.35
10 January 2014 4,099.64 1,101.79 5,201.43
11 February 2014 3,534.05 909.84 4,443.89
12 March 2014 4,025.65 1,062.61 5,088.26
TOTAL 48,225.62 12,907.89 61,133.51
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 32 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
5.6 Records of Certified CPO & PK Sold under UTZ eTrace to Buyers since the Last Audit, if Any
No Buyers Name UTZ eTrace Trading No Certified CPO
(MT) Sold
Certified PK
(MT) Sold
1 PT Wira Innomas TR-b3795da5-67aa 210.35
2 PT Wira Innomas TR-cce04f87-54f3 140.13
3 PT Wira Innomas TR-f6dea424-4ad3 1,083.75
4 PT Wira Innomas TR-f0aeab96-2c95 1,419.55
5 PT Wira Innomas TR-9640b2eb-9ec4 207.38
5.7 Non-Conformities Identified during this Audit
Timeline for compliance:
1. All non-conformances observed during an audit shall be classified as ‘major’ since all requirements for
Supply Chain certification have to be met before granting certification.
2. For Main Assessments, all non-conformances shall be addressed satisfactorily by the operation before
certification may be granted by the certification body. If non-conformances are not addressed within three
(3) months of the audit, a full re-audit shall be required. The certification body shall assess the effectiveness
of the corrective and/or preventive actions taken before closing out the non-conformances.
3. For Annual Surveillance Assessments, non-conformances raised after the certification are serious (i.e. must
be considered as a major) and the integrity of the RSPO Supply Chain Certification is at risk. A maximum of
one month is to be given to the certified client to satisfactorily address the non-conformance. The
certification body shall assess the effectiveness of the corrective and/or or preventive actions taken. Should
the nonconformance not be addressed within the one-month maximum timeframe, a suspension or
withdrawal of the certificate and a full re-audit may be necessary.
4. If no non-conformances are observed at an audit or when the corrective action plan has satisfactorily
addressed raised non-conformance(s), the client shall be recommended for (re-) certification.
Non-were raised during this audit.
5.8 Description of the Organizational Management Systems
Including organizations, management and operational systems to ensure compliance with the RSPO Supply
Chain Certification Systems and Standards as detailed above
The management continually improving the established RSPO Supply Chain standards since the main
assessment. As part of continuous improvement, many trainings being planned in the mill. eTrace data
management is managed by HQ [Medan].
5.9 Final Certification decision by Control Union for the RSPO SCCS Audit of the POM
Recommendations made: Yes
Summary of non-
compliances: Nil
Certification status of client: The POM included in the scope of this audit demonstrated full compliance with
the RSPO SCCS. With effect from the certification date given in the RSPOPC
certificate, this POM mentioned in
the scope of this report is considered to be certified in accordance with the
RSPO SCCS.
PART 6: CERTIFIED ORGANISATION’S ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY
6.1 Date of next ASA
The provisional date for the next ASA is: Nov 2014
6.2 Date for Closure of Non-Conformities
• All major NCs to be closed by: No NC raised
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 33 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
• All minor NCs to be closed by: No NC raised
6.3 Signing by the Client
I the undersigned, being the most senior relevant management representative of the operation seeking or
holding certification, agree with the contents and audit findings as presented in this document .
I also confirm:
• Acceptance of liability in execution of the instructions given.
• That this company was made aware that the findings of the audit team are tentative; pending review and
decision making by the duly designated representatives of Control Union Certifications.
• That during the closing meeting all agenda items was covered by the Lead Auditor.
Acknowledged by:
Name: Dr. Gan Lian Tiong.
Position: Head of Sustainability
Date: 11 June, 2014 Signature
6.4 Signing by the Lead Auditor
I the undersigned, being the Lead Auditor, confirm that this report is an accurate record of the findings and of
the closing meeting. I further confirm that the summary of the findings as presented in this report are a true
representation of the actual findings of the audit team.
Acknowledged by:
Name: Mahaswaran Maliyapan
Position: Lead Auditor
Date: 17/04/2014 Signature
6.5 Signing by the Certifier
I the undersigned, being the Certifier, confirm that the information and conclusions included in this report have
been prepared in good faith and that the certification decision has been based upon this information.
Acknowledged by:
Name: Gerben Stegeman
Position: Certifier
Date: 11-09-14 Signature
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 34 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
PART 7: APPENDICIES
Appendix 1: Location Map for this Certification Unit
From 1.9, the location map(s)
Map 1: Map showing the location of estates (PT. Agrowiratama) in Indonesia..
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 35 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Map 2 : Map showing the location of PT Agrowiratama in West Sumatra, Indonesia.
Map 3 : Map showing the location of PT. Agrowiratama estate and palm oil mill with surrounding entities.
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 36 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Map 4: Map showing the location of Scheme Smallholder KSB
Map 5 : Map showing the location of Scheme Smallholder KSBSAMB
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 37 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Map 6 : Map showing the location of Scheme Smallholder KSDBS
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 38 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
Appendix 2: List of Abbreviations
AMDAL Analisis Mengenai Dampak Lingkungan
BOD Biological Oxygen Demand
BRC British Retail Consortium
CHRA Chemical Health Risk Assessment
CoC Chain of Custody
COD Chemical Oxygen Demand
CPO Crude Palm Oil
CSR Corporate Social Responsibility
CU Control Union
CUC Control Union Certifications
DOE Department of Environment
EFB Empty Fruit Bunch
EIA Environment Impact Assessment
ERT Endangered Rare or Threatened species
EU European Union
FFB Fresh Fruit Bunch
FSC Forest Stewardship Council
FSC COC Forest Stewardship Council Chain of Custody
FSC FM Forest Stewardship Council Forest Management
GGL Green Gold Label
GMP Good Manufacturing Practice
GOTS Global Organic Textile Standard
GTP Good Trading Practice
GPS Global Positioning System
HACCP Hazard Analysis and Critical Control Point
HCV High Conservation Value
HCVF High Conservation Value Forest
HGU Hak Guna Usaha
IPM Integrated Pest Management
JAS Japanese Agricultural Standard
MSDS Material Safety Data Sheet
NC Non Conformity
OE Organic Exchange
OER Oil Extraction Rate. (CPO as a % of the mass of FFB).
OSH Occupational Safety and Health
OSHAS Occupational Safety and Health Assessment Scheme
P&C Principle and Criteria
PEFC Programme for the Endorsement of Forest Certification
PET Polyethylene Terephthalate
PK Palm Kernel
POM Palm Oil Mill
POME Palm Oil Mill Effluent
PPE Personal Protective Equipment
RKL Rencana Pengelolaan Lingkungan
RPL Rencana Pemantauan Lingkungan
RSPO Roundtable on Sustainable Palm Oil
RSPO NI Roundtable on Sustainable Palm Oil National Interpretation
RTE Rare, Threatened, and Endangered
SA8000 Social Accountability 8000
SEIA Social Environmental Impact Assessment.
SIA Social Impact Assessment
SOCSO Social Security Organisation
RSPO Principles & Criteria
Re- Assessment Report
Report Number CU813182
RSPOPC-SUM-REPORT.F01 OCT2013 Page 39 of 39
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
SOP Standard Operating Procedure
UKL/UPL Upaya Pengelolaan lingkungan (UKL) / Upaya Pemantauan Lingkungan (UPL)
USDA/NOP United States Department of Agriculture – National Organic Program
MT Metric Tonnes
WHO World Health Organization