Sustainability at the Olympic Delivery Authority
Think London Panel Event
June 2009
Dan Epstein – Head of Sustainable Development & Design
![Page 3: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/3.jpg)
30.4.2009
3
Who we are
Olympic
Board
BOA
GLA
LOCOG
Govt.
IOC
LOCOG
Olympic Delivery
Authority
CLM Delivery Partner
![Page 4: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/4.jpg)
30.4.2009
4
Central
LondonOlympic Park
Lea
Valley
Park
Central
London
![Page 5: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/5.jpg)
30.4.2009
5
Progress on London 2012
![Page 6: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/6.jpg)
30.4.2009
6
The Olympic Park
– 2.5km2 (618 acres)
– £9.3bn budget
– 3 year construction programme
– 30 new bridges
– 190 buildings demolished
– 600,000t contaminated soil
washed
– 0.1 av. accident frequency
– 7.7m spectators
– 15,000 athletes
– 20,000 accredited media
![Page 7: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/7.jpg)
30.4.2009
7
![Page 8: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/8.jpg)
30.4.2009
8
![Page 9: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/9.jpg)
30.4.2009
9
![Page 10: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/10.jpg)
30.4.2009
10
![Page 11: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/11.jpg)
30.4.2009
11
![Page 12: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/12.jpg)
30.4.2009
12
![Page 13: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/13.jpg)
30.4.2009
13
![Page 14: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/14.jpg)
30.4.2009
14
![Page 15: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/15.jpg)
30.4.2009
15
![Page 16: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/16.jpg)
30.4.2009
16
Sustainable Development Strategy - A Holistic Approach
Environmental Sustainability– Carbon– Water– Waste– Materials– Biodiversity– Environmental impacts
Socio-economic Sustainability– Supporting Communities– Transport and mobility – Access– Employment and business – Health and well-being– Inclusion
![Page 17: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/17.jpg)
30.4.2009
17
Delivering sustainability through the project:
Commitments and challenges
Project specifications and design reviews
Contract requirements
Code of Construction PracticeEnvironment and Sustainability Management System
Auditing and Reporting
Bid commitments
and strategies
Design and
specification
Procurement
Construction
![Page 18: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/18.jpg)
30.4.2009
18
![Page 19: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/19.jpg)
30.4.2009
19
![Page 20: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/20.jpg)
30.4.2009
20
Aquatics Centre – Games-time exterior – aerial view
![Page 21: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/21.jpg)
30.4.2009
21
![Page 22: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/22.jpg)
30.4.2009
22
Energy Strategy
MEAN
Energy
efficiency
Efficient
conversion
(CHP)
Renewable energy
MEAN…
LEAN…
GREEN…
£ / CO2 emission savings
Energy
efficiency
Efficient
conversion
(CHP)
Renewable energy
MEAN…
LEAN…
GREEN…
£ / CO2 emission savings
MEAN - Delivered by Venue
Teams: Reduction on Part L for
all Legacy Buildings;
LEAN - Delivered by the Energy
Centre Contractor (CCHP);
GREEN - Delivered by the Energy
Centre Contractor (Biomass), Wind
Turbine Contractor and Venues;
![Page 23: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/23.jpg)
30.4.2009
23
Energy Centre
•20% CO2 savings contractually
agreed;
•30% CO2 savings by reasonable
endeavours to 2013/14;
•3MWth energy from biomass
•Gasification technology using
wood chip
•16 km of pipe and wire
![Page 24: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/24.jpg)
30.4.2009
24
![Page 25: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/25.jpg)
30.4.2009
25
London 2012 Carbon Footprint
Transport
Infrastructure
12%
Operations
6%
Venues
49%
Spectators
33%
![Page 26: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/26.jpg)
30.4.2009
26
Embodied Energy
Trade associations and WRAP
- Lean design and construction
- Recycled aggregate
- Carbon emissions in concrete
- Sustainable transport
![Page 27: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/27.jpg)
30.4.2009
27
Challenges
1. Costs are an issue but ODA
constantly driving VfM
2. Strategic approach to SD
across programme
3. Commitment by venues is
essential (BREEAM) coupled
with pragmatism
4. Critical to get strategy into
construction tenders and
contracts
5. Strong and robust assurance
system vital
6. Partnership with other
stakeholders is vital to deliver
greenest games ever
![Page 28: Route To 2012 Daniel Epstein Presentation 10.06.09](https://reader034.fdocument.pub/reader034/viewer/2022042814/54c553cb4a7959ea038b464d/html5/thumbnails/28.jpg)
30.4.2009
28The official Emblem of the London Organising Committee of the Olympic Games
and Paralympic Games Ltd is protected by copyright. © London Organising Committee
of the Olympic Games and Paralympic Games Ltd 2007. All rights reserved.
Thank you