Rifat Kangi Bled , Slovenia - 12.04.2012
description
Transcript of Rifat Kangi Bled , Slovenia - 12.04.2012
![Page 1: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/1.jpg)
www.ptline.com
Dynamic reference vacuum system for calibration and characterization of
Quadrupole Mass Spectrometers
TUBITAK UME
Rifat KangiBled, Slovenia -12.04.2012
![Page 2: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/2.jpg)
Dynamic Reference Vacuum System
![Page 3: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/3.jpg)
Throughput Method
Orifice Method
Mass Flow:- MFC
ba ppCQ Mass Flow:-Variable Leak Valve-Orifice
2
1
1
32d
dLM
RTC D
0PP
QS
10
0
bb
aa
PP
PPCS
![Page 4: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/4.jpg)
System design information and examination (ISO 21360, 5302, 27892)
![Page 5: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/5.jpg)
Dynamic Reference Vacuum System
![Page 6: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/6.jpg)
Single Chamber System
Throughput Method
![Page 7: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/7.jpg)
Double Chamber System
Orifice Method
![Page 8: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/8.jpg)
Dynamic Reference Vacuum System
![Page 9: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/9.jpg)
Mass flow traceability chain needed in the future
The MFC system is not enough to cover the mass flow traceability chain necessary in the vacuum metrology field. Must design and build other mass flow standard in UME.
10-12 10-11 10-10 10-9 10-8 10-7 10-6 10-5 10-4 10-3 10-2 10-1 100 101 102 103
10-9
10-8
10-7
10-6
10-5
10-4
10-3
10-2
10-1
100
101
102
103
104
1 sccm: min. commercially available
Effective Area: High Vacuum Pumps
Effective Area: Low Vacuum Pumps500 slm
30 slm
2000 sccm
100 sccm
5 sccm
MFP [m] = 5x10-5/P(Torr)
Space Environment Simulation: generation, measurement & control
iQDP80 Vendor iQDP80a Experiment V1000A Vendor V1000HT Vendor WS 600 L/min Vendor E02k150 Vendor iQMB250 Vendor VacIonPlus500 Vendor STP H1303C Vendor Ebara 30000L/min Vendor
Thr
ough
put [
mba
r-L
/s]
Pressure [mbar]
10-14
10-13
10-12
10-11
10-10
10-9
10-8
10-7
10-6
10-5
10-4
10-3
10-2
10-1
Mas
s, N
2 [kg
/s]
± 2 %
CVFM
Sonic Nozzle
± 0.2 %
CPFM± 5 %
OrificeMetho
d
Under Establishment:[>110-2 mbar.L/s]
![Page 10: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/10.jpg)
System can be used for
• Gas Flow Measurement [Q=C×∆P] (Double Chamber System)
• TMP Evaluation (High Vacuum Pumps)
• Scroll Pump Evaluation (Low Vacuum Pump)
• Mass Flow Rate Measurement [dP/dt] at Constant Volume Chamber
• System can be improved to continuous expansion system
• QMS Evaluation
![Page 11: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/11.jpg)
Long Term Stability Results of Leak Valve
Pressure (mbar) St.Dev.Base Pr. 1,2E-115,00E-09 8,8E-111,00E-08 1,0E-101,00E-07 1,1E-091,00E-06 8,2E-091,00E-05 3,2E-08
0 300 600 900
8.3E-09
8.3E-08
8.3E-07
8.3E-06
Long term stability of leak valve (MDC/ULV-150)
Base Pressure
5.00E-09
1.00E-08
1.00E-07
1.00E-06
1.00E-05
Time (s)
Pre
ssu
re (
mb
ar)
![Page 12: Rifat Kangi Bled , Slovenia - 12.04.2012](https://reader033.fdocument.pub/reader033/viewer/2022061602/56815aa8550346895dc83ebb/html5/thumbnails/12.jpg)
Long Term Stability Results of Leak Valve
0 300 600 9009.0E-09
1.0E-08
1.1E-08
1.2E-08
1.00E-08
Time (s)
Pre
ssu
re (
mb
ar)
0 300 600 9009.0E-08
1.0E-07
1.1E-07
1.2E-07
1.00E-07
Time (s)
Pre
ssu
re (
mb
ar)
0 300 600 9009.0E-07
1.0E-06
1.1E-06
1.2E-06
1.00E-06
Time (s)
Pre
ssu
re (
mb
ar)
0 300 600 9009.0E-06
1.0E-05
1.1E-05
1.2E-05
1.00E-5
Time (s)
Pre
ssu
re (
mb
ar)