Réseau électrique métropolitain(REM)
cdpqinfra.com
Technical briefingProject update
November 2016
![Page 2: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/2.jpg)
AFTER 15 MONTHS OF WORK
> Review of all studies carried out in the past for two separate projects
> Review of assumptions – ridership, route, stations and operations – based on a single integrated project
> Continuous project management
> Consultations with stakeholders
> 6 open house sessions
> Meeting with + than 150 stakeholders
> BAPE public hearings
> Second series of open houses
> Land reserves – land proneto property speculation
> Technical plans and estimates
> Qualification process
> Environmental studies, analyses and reports
> Agreement with CN (access to Gare Centrale)
> Call for proposals process
> Business model relying on diverse sources of financing
> Technical solutions for three downtown Montréal stations
1
![Page 3: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/3.jpg)
TECHNICAL SOLUTIONS – DOWNTOWN STATIONS 2
Édouard-Montpetit, McGill and Bassin Peel stations
> Technical solutions identifiedby the CDPQ Infra teams:
> meet the specificchallenges and needsof each station
> ensure efficient user transfer from the REM to the métro
![Page 4: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/4.jpg)
TECHNICAL CHALLENGES MET 3
Mont-Royal4-elevator systemHigh-speed: 20 secondsHigh-capacity: 5,000 people / hour
> Integration of stations in the Mont-Royal Tunnel
Depth of the station70 metres – 20 floors
Densely built environmentMontréal’s underground city
Start of tunnel
Canora StationÉdouard-Montpetit Station
McGill Station Gare Centrale
McTavish ventilation unit
Édouard-Montpetit
ventilation unit
![Page 5: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/5.jpg)
Technical features> Depth of the station: 70 metres(20 floors) – among the deepestin North America
> High-capacity elevators(5,000 people / hour), high-frequencyand high-speed, allowing access to the surface and the platform in 20 seconds
> Excavation of 25,000 m3 of rockExcavation methods similar to those usedin underground mining
ÉDOUARD-MONTPETIT STATION 4
Station 70 metres under Mont-Royal
20 floors in20 seconds
20-second connection by way of 4 elevators
Blue line
![Page 6: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/6.jpg)
Technical features> Retainment work to support foundations of the surroundingbuildings and tunnel vaults
> Integration into urban technical networks
McGILL STATION 5
Station under McGill College Avenue
Different access points to Montréal’s underground city
Access to Place Montréal Trust
Access to Centre Eaton
Green line
![Page 7: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/7.jpg)
BASSIN PEEL STATION 6
Technical features> Two potential stations (Bridge-Wellington and Du Havre) initially planned in this area> One station now planned to consolidate transit service and align with Montréal’sdevelopment plans for these areas
> Central platform for boarding in both directions> Two entrances will provide access to north and south:North: towards the Griffintown area / South: towards Pointe-Saint-Charles
> Substantial work to consolidate soil and rock under the Peel Basin
Griffintown
Pointe-Saint-Charles
Station under the Peel Basin
![Page 8: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/8.jpg)
7
> Connecting the Blue and Green lines – connection 10 times faster
Current travel time: 30 minutes in both directions
Projected travel time: 2 to 3 minutes
2-3 min.
Édouard-Montpetit
McGill
Édouard-Montpetit
McGill
MAIN BENEFITS
![Page 9: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/9.jpg)
MAIN BENEFITS 8
> Alleviates pressure on the Orange line south of the Blue lineNew high-frequency north-south
public transit axisConvergence point saturated
towards downtown
![Page 10: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/10.jpg)
9
Mont-Royal
Examples of hubs served:• Université de Montréal• HEC Montréal• Polytechnique Montréal
Certain hospitals:• CHU Sainte-Justine• Jewish General Hospital• St. Mary’s Hospital
Examples of hubs served:• McGill University• Montréal’s underground city (RÉSO)• Business district
MAIN BENEFITS
> Different strategic hubs served
Édouard-Montpetit StationMcGill Station
![Page 11: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/11.jpg)
MAIN BENEFITS 10
> New points of departure from downtown to the Montréal airport
Three direct points of departure to the airport from downtown
![Page 12: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/12.jpg)
NEXT STEPS 11
Call for proposalsfrom qualifiedconsortiums
Second seriesof open houses
Governments’ final decisionon the project
Creationof a communityrelations office
Start of construction
Operationof first trains
Submissionof BAPE report
Submissionsof proposals
Fall2016
Winter2017
Spring2017 2020
End of December2016
![Page 13: Réseau électrique métropolitain (REM)](https://reader033.fdocument.pub/reader033/viewer/2022042611/5859736f1a28ab6e328f9c8e/html5/thumbnails/13.jpg)