Rekap & Boq Cipta Praja (A7) Kec. Kluang

download Rekap & Boq Cipta Praja (A7) Kec. Kluang

of 2

description

n

Transcript of Rekap & Boq Cipta Praja (A7) Kec. Kluang

  • SKPD : DINAS PU BINA MARGA KAB. MUSI BANYUASIN - APBD TA. 2014

    Kegiatan : ...................................................................................................................................................................

    Pekerjaan : ...................................................................................................................................................................

    Kecamatan : ...................................................................................................................................................................

    Kabupaten : ...................................................................................................................................................................

    No. Mata Uraian Satuan Perkiraan Harga Jumlah

    Pembayaran Kuantitas Satuan Harga-Harga(Rupiah) (Rupiah)

    a b c d e f = (d x e)

    DIVISI 1. UMUM- Papan Nama Kegiatan Bh 1,00 350.000,00 350.000,00

    Ls Pengukuran dan Pasang Patok Ls 1,00 ########## 2.500.000,00 Ls Mobilisasi Alat Ls 1,00 ########## 12.650.000,00 - Gudang + Barak Kerja M2 24,00 250.000,00 6.000.000,00

    Ls Quality Control Ls 1,00 ########## 3.500.000,00 Ls Administrasi dan Dokumentasi Ls 1,00 ########## 2.636.000,00 Ls Biaya Jaga Malam Ls 1,00 ########## 2.500.000,00 Ls Demobilisasi Alat Ls 1,00 ########## 3.795.000,00

    Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 33.931.000,00

    DIVISI 3. PEKERJAAN TANAH

    3.2.(2) Timbunan Tanah Pilihan M3 179,53 129.204,75 23.196.129,60 3,3 Penyiapan Badan Jalan M2 2.160,00 1.207,17 2.607.488,13

    Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 25.803.617,74

    DIVISI 5. PERKERASAN BERBUTIR

    5.2.(1) Lapis Pondasi Krokos M3 237,60 705.819,86 167.702.799,81

    Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 167.702.799,81

    KOP. PERUSAHAAN

    BILL OF QUANTITY( BOQ )

    DIVISI 6. PERKERASAN ASPAL

    6.2.(3) Bahan Aspal untuk Pekerjaan Pelaburan Liter 1.440,00 15.307,81 22.043.250,06

    Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 22.043.250,06

    DIVISI 7. STRUKTUR

    7.1.(5) Beton K.250 (Untuk Badan Jalan) M3 360,00 ########## 621.883.245,14

    Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 621.883.245,14

  • S K P D : DINAS PU BINA MARGA KAB. MUSI BANYUASIN - APBD TA. 2014 KEGIATAN : ............................................................................................................................................... PEKERJAAN : ............................................................................................................................................... KECAMATAN : ............................................................................................................................................... KABUPATEN : ...............................................................................................................................................

    Jumlah HargaNo. Divisi Pekerjaan

    (Rupiah)

    1 Umum2 Drainase3 Pekerjaan Tanah4 Pelebaran Perkerasan dan Bahu Jalan5 Pekerasan Non Aspal6 Perkerasan Aspal7 Struktur8 Pengembalian Kondisi dan Pekerjaan Minor9 Pekerjaan Harian

    10 Pekerjaan Pemeliharaan Rutin

    (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) (B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) (C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) (D) DIBULATKAN

    KOP. PERUSAHAAN

    REKAPITULASI

    CV/PT, ..............................................

    33.931.000,00 -

    25.803.617,74 -

    167.702.799,81 22.043.250,06

    621.883.245,14 - - -

    871.363.912,74 87.136.391,27

    958.500.000,00

    Uraian

    958.500.304,02

    BILL OF QUANTITI ( BOQ )

    .................................... Terbilang :

    ...................... , ............................. 20..

    ............................................................Nama Jelas / Jabatan