PRESENTED BY: TOMMY CARPENTER COMPUTER SCIENCE UNIVERSITY OF WATERLOO.
Real Performance of Green Buildings: The Role of Delivered Performance to Achieve Real Savings -...
-
Upload
sbcbreakfastsessions -
Category
Education
-
view
69 -
download
1
Transcript of Real Performance of Green Buildings: The Role of Delivered Performance to Achieve Real Savings -...
Real Performance of Green Buildings:
The Role of Delivered Performance to Achieve Real Savings
Stephen CarpenterEnermodal EngineeringJune 3, 2009
Creating energy and resource efficient buildings
Background
USGBC presented results that US LEED projects saved ~25% energy compared to standard buildingsLstibrek said “LEED plaques should come with screws until performance is proven” “Gifford makes the controversial case that LEED certified buildings use more energy than comparables, not less- as much as 29% more.”
Creating energy and resource efficient buildings
Background
What are results for Canada?
Enermodal is leading green consultant in Canada with 43 LEED certified projects 45% of all LEED Canada NC certified buildings Results for 6 LEED buildings presentedShow how Delivered Performance helps buildings achieve their potential
Creating energy and resource efficient buildings
How Do We Determine if Green Buildings Really Work?
Very little data on real performance of green buildingsSome well known green buildings have not shown significant savings over other new buildingsMost claims are based on design phase computer simulationsSimulations must be calibrated to real operation, weather etc. Better to compare utility bills to utility bills
Creating energy and resource efficient buildings
How Do Conventional and Green Buildings Perform?
Creating energy and resource efficient buildings
Energy Use of All Buildings – By Age of Construction
0
100
200
300
400
500
Before 1920 1920 - 1959 1960s 1970s 1980s 1990s
kWh/
m2
Year built
Survey of Energy Use in Canadian Buildings 2000
100 93
Ref: Commercial and Institutional Building Energy Use, NRCAN 2002Sample size: 137,039 buildings, 302,570,981 sq m
Creating energy and resource efficient buildings
Monitored Performance of 6 LEED Projects
Creating energy and resource efficient buildings
Water Savings: A Tale of Two Fire Stations
Station 79 was intended to be duplicate of 7879 was greened up but floor plan unaltered
Creating energy and resource efficient buildings
Water Use at Two Identical Fire Stations
68% annual water savings
Creating energy and resource efficient buildings
Are Green Buildings Performing Up to Expectations?
The Role of Delivered Performance
Creating energy and resource efficient buildings
What is Delivered Performance?
Comprehensive post-construction consulting service that delivers better performing buildings Single packaged service that includes: – Fundamental Commissioning– Best Practice Commissioning– M & V– Building airtightness review and testing– Building IAQ Testing– Green Education and Promotion (optional)The whole is more than the sum of the parts
Creating energy and resource efficient buildings
What is Delivered Performance?
A mindset where we are designing buildings to achieve real savings not predicted savingsDon’t do things that don’t save energy – occupancy sensors in hospital corridorsDo do things that save energy even if no sim credit– instantaneous heaters and avoid hot water recirc systemOur role is to work with the owner to get the building to perform as close as possible to its potential and identify action the owner could take to further improve operation
Creating energy and resource efficient buildings
Delivered Performance in Practice
LEED-NC currently assesses building energy performance based on simulated performance
But energy simulations are really just an indication of the potential for a design to be efficient… relative to a particular reference case… and under a specific set assumptions
Need to “calibrate” the energy simulation
Creating energy and resource efficient buildings
Calibrated Energy Consumption
Most simulations do not account for all energy uses in a building – sometimes “ignored” energy in LEED compliance simulations can be very significant:
– Exterior lighting, Kitchens, Servers, Elevators, Humidification
Energy uses can be highly dependent on occupant behaviour and hard to predict
Creating energy and resource efficient buildings 15
4.8 L/100 km 11.5 L/100km
Occupants Affects on Energy Consumption
Creating energy and resource efficient buildings
Calibrated Energy Consumption
Example Building Calibration Process:1. Weather2. Exterior lights3. Ground loop temperature revision4. Kitchen electricity5. Kitchen process loads6. Humidification7. Kitchen gas use8. Heat pump spec update9. Elevator electricity10. Ground loop pump update11. Ground temperature updates
1 2 3 4 5 6 7 8 9 10 11
Calibration Iteration
Preliminary Model Measured Performance
Creating energy and resource efficient buildings
Process 51
2 4
5
3
Creating energy and resource efficient buildings
Importance of Energy Monitoring
Initial monitored results were 15% above predictedCommissioning with M&V reduced to 2% below predicted
200000
400000
600000
800000
1000000
Dec. 2007 - Feb. 2008 March - May 2008 June - August 2008 Sep. - Nov. 2008
ekW
h
Annual Energy Performance
Baseline Actual Potential
Creating energy and resource efficient buildings
Case Study: TRCA Restoration Services
Design Phase Simulation Results
LEED Status: Platinum LEED Energy Savings: 65% (10 pts)
AnnualEnergy
ekWh/m2
Creating energy and resource efficient buildings
0
50
100
150
200
250
Feb '05 (SL) Mar '05 (SL) Aug '06 (CBIP) Feb '07 (Review) May '07 to Apr '08
Simulated
Actual
Case Study: TRCA Restoration Services
Actual Performance
AnnualEnergy
ekWh/m2
Is this just luck?
Creating energy and resource efficient buildings
Case Study: TRCA
Changes to “calibrate” energy simulation:Update with weather informationAdd in “kitchen processes” (including cooking appliances and make-up air/exhaust system)Add in energy use related to the snow melt systemUpdate affecting ground loop pump energy calculation
Creating energy and resource efficient buildings
Case Study: Natural Gas
Contractor had crossed floor loops: office t’statcontrolling floor heat in storage room. Investigations revealed user issues: garage doors being left open, unit heater operation, t-stat settings.
Creating energy and resource efficient buildings
Case Study: Electricity
1 meter not working, filled in the gaps with manual readings from clientFaulty heat pump: supplier blamed system, contractor blamed supplier (but no one measured any parameters)
Creating energy and resource efficient buildings
Case Study: Water
Rain water cistern, low-flow fixtures, composting toilets.Showers not being used as frequently as anticipated?
Creating energy and resource efficient buildings
Comparison of Actual to Predicted Water Use
Creating energy and resource efficient buildings
Conclusions
Initial data indicates LEED buildings appear to offer significant energy and water savings
Actual Energy use ~ 200 kWh/m2
M&V critical to diagnose problems and improve operation over time.
Calibrated simulation can accurately potential building performance
Poor agreement between predicted and actual water use
Creating energy and resource efficient buildings
www.enermodal.com