Railway Modernization Project (Romania) Problem Addressed by the Project The European Union (EU) has planned to open Europe-Caucasus-Central Asia (TRACERA) transport corridors by railway and road. These corridors cross the Black Sea and the Caspian Sea from east to west and connect with important Pan-European Transport Corridors. Corridor IV with a total length of 3,285 km crosses the countries of Germany, Austria, Czech Republic, Slovakia, Hungary, Romania, Bulgaria, Greece and Turkey. On Romanian territory, Corridor IV has a railway component with a total length of 841 km across the north and to the east on a route through Curtici- Arad-Sibiu-Brasov-Constanta. This railway route is the most important of the lines and carries about 25% of the total traffic of the Romanian Railway compared with only 8% of the total railway network length. However, the facilities of the line were deteriorated and needed to be upgraded to meet European standards by removing speed restrictions, modernizing facilities to enable high-speed train operations (160 km/h for passenger trains and 120 km/h for freight trains) and to increase the carrying capacity of the railway system. Services Provided As lead consultant of the consortium, OC Global performed: Engineering designs and preparation of tender documents Tender Assistance including evaluation and awarding support Construction and installation supervisory services. Actual Project Works Design works and tender documentation services were performed from 2001 to 2004. Afterwards, construction supervision services were performed from 2005 to 2007. The rehabilitation promoted distribution of goods in the region, and contributed to the growth of Romania and neighboring countries. Sector Railways Project Type Inter-City Railway Project Title Railway Modernization Project of Bucharest- Constanta Line Location Bucharest - Constanta, Romania Client National Railway Company (CFR-SA) Project Period February 2003 – July 2008 The modernized railway promoted distribution of goods in the region, and contributed to the growth of Romania and neighboring countries

Transcript of Railway Modernization (Romania) - 株式会社オリエンタ · PDF file ·...

Page 1: Railway Modernization (Romania) - 株式会社オリエンタ · PDF file · 2015-05-07Railway Modernization Project ... Railways Project Type Inter-City Railway ... Microsoft Word

Railway Modernization Project (Romania) 

Problem Addressed by the Project

The European Union (EU) has planned to open Europe-Caucasus-CentralAsia (TRACERA) transport corridors by railway and road. These corridorscross the Black Sea and the Caspian Sea from east to west and connect withimportant Pan-European Transport Corridors. Corridor IV with a total lengthof 3,285 km crosses the countries of Germany, Austria, Czech Republic,Slovakia, Hungary, Romania, Bulgaria, Greece and Turkey.

On Romanian territory, Corridor IV has a railway component with a totallength of 841 km across the north and to the east on a route through Curtici-Arad-Sibiu-Brasov-Constanta. This railway route is the most important of thelines and carries about 25% of the total traffic of the Romanian Railwaycompared with only 8% of the total railway network length. However, thefacilities of the line were deteriorated and needed to be upgraded to meetEuropean standards by removing speed restrictions, modernizing facilities toenable high-speed train operations (160 km/h for passenger trains and 120km/h for freight trains) and to increase the carrying capacity of the railwaysystem.

Services Provided

As lead consultant of the consortium, OC Global performed:

Engineering designs and preparation of tender documents Tender Assistance including evaluation and awarding support Construction and installation supervisory services.

Actual Project Works

Design works and tender documentation services were performed from 2001to 2004. Afterwards, construction supervision services were performed from2005 to 2007. The rehabilitation promoted distribution of goods in the region,and contributed to the growth of Romania and neighboring countries.

Sector Railways

Project Type Inter-City Railway

Project Title Railway Modernization Project of Bucharest-Constanta Line

Location Bucharest - Constanta, Romania

Client National Railway Company (CFR-SA)

Project Period February 2003 – July 2008

The modernized railway promoted distribution of goods in the region, and contributed to the growth of Romania and neighboring countries