RAB Proyek Pemipaan

8
RENCANA ANGGARAN BIAYA ( RAB ) PEKERJAAN : PENGEMBANGAN JARINGAN AIR BERSIH DESA HARAPAN (1 PAKET) LOKASI : KEC. MAPPEDECENG KABUPATEN : LUWU UTARA T.A : 2009 HARGA SAT. VOLUME SATUAN JUMLAH (Rp.) (Rp.) I PEKERJAAN PERSIAPAN 1 Pembersihan Lahan dan Jalur Pipa Ls 1,00 - - II PEKERJAAN BANGUNAN INTAKE 1 Galian Tanah M 3 1,92 - 2 Pek. Beton Bertulang 1:2:3 M 3 2,65 - 3 Bulu Ijuk Untuk Saringan Pipa Ls 1,00 - III PEKERJAAN PENGADAAN PIPA DAN AKSESORIS 1 Pipa PVC S 12,5 dia 4" M' 920,00 - 2 Pipa PVC S 12,5 dia 3" M' 6.200,00 - 3 Pipa Gip 4" (Medium B) M' 750,00 - 4 Pipa Gip 3" (Medium B) M' 135,00 - 5 Pek. Pengadaan Aksesoris Pipa a Flange Steel dia. 4 " Bh 250,00 - b Flange Socket dia 4" Bh 1,00 - c Bell Reducer dia 4" x 3" Bh 1,00 - d Flange Steel dia. 3 " Bh 50,00 - e Bend All Flange 90 dia 4" Bh 6,00 - f Bend All Flange 45 dia 4" Bh 10,00 - g Bell Bend 90 PVC 4 " Bh 5,00 - h Bell Bend 45 PVC 4 " Bh 15,00 - i Bend All Flange 90 dia 3" Bh 12,00 - j Bend All Flange 45 dia 3" Bh 7,00 - k Bell Bend 90 PVC 3" Bh 7,00 - l Bell Bend 45 PVC 3" Bh 8,00 - m Ventil Udara dia 3" Bh 4,00 - n Baut 5/8 x 10 Cm Bh 2.688,00 - o Valve Cover 3" Bh 2,00 - p Karet Packing M2 10,00 - IV PEKERJAAN PEMASANGAN PIPA DAN AKSESORIS 1 Pipa PVC S 12,5 M' 7.120,00 - 2 Pipa GIP M' 885,00 - 3 Trust Block M3 2,00 - V PEKERJAAN PEMBUATAN BAK VENTIL UDARA 4 BH 1 Pek. Galian Tanah M3 1,18 - 2 Pek. Urugan Pasir M3 0,65 - 3 Pek. Beton Untuk dinding M3 0,50 - VI PEKERJAAN PEMBUATAN BAK VALVE COVER 2 BH 1 Pek. Galian Tanah M3 0,59 - 2 Pek. Urugan Pasir M3 0,32 - 3 Pek. Beton tanpa tulangan M3 0,25 - 4 Pek Pengelasan dan Pemasangan Pipa Riser Leng- Ls 2,00 - kap dengan flange dan baut VII PEKERJAAN PEMBUATAN WASH OUT DIA. 3" 1 Beel Tee dia. 3" Bh 1,00 - 2 Flange Bell End dia 3" Bh 4,00 - 3 Gate Valve Flange dia 3" Bh 2,00 - 4 Baut 5/8 " x 10 Cm Bh 16,00 - 5 Karet Packing M2 0,25 - - NO URAIAN Sub Total Sub Total

description

RAB Pekerjaan Besi dan Baja

Transcript of RAB Proyek Pemipaan

Page 1: RAB Proyek Pemipaan

RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PENGEMBANGAN JARINGAN AIR BERSIH DESA HARAPAN (1 PAKET)LOKASI : KEC. MAPPEDECENGKABUPATEN : LUWU UTARAT.A : 2009

HARGASAT. VOLUME SATUAN JUMLAH

(Rp.) (Rp.)I PEKERJAAN PERSIAPAN

1 Pembersihan Lahan dan Jalur Pipa Ls 1,00 - -

II PEKERJAAN BANGUNAN INTAKE1 Galian Tanah M3 1,92 - 2 Pek. Beton Bertulang 1:2:3 M3 2,65 - 3 Bulu Ijuk Untuk Saringan Pipa Ls 1,00 -

III PEKERJAAN PENGADAAN PIPA DAN AKSESORIS1 Pipa PVC S 12,5 dia 4" M' 920,00 - 2 Pipa PVC S 12,5 dia 3" M' 6.200,00 - 3 Pipa Gip 4" (Medium B) M' 750,00 - 4 Pipa Gip 3" (Medium B) M' 135,00 - 5 Pek. Pengadaan Aksesoris Pipa

a Flange Steel dia. 4 " Bh 250,00 - b Flange Socket dia 4" Bh 1,00 - c Bell Reducer dia 4" x 3" Bh 1,00 - d Flange Steel dia. 3 " Bh 50,00 - e Bend All Flange 90 dia 4" Bh 6,00 - f Bend All Flange 45 dia 4" Bh 10,00 - g Bell Bend 90 PVC 4 " Bh 5,00 - h Bell Bend 45 PVC 4 " Bh 15,00 - i Bend All Flange 90 dia 3" Bh 12,00 - j Bend All Flange 45 dia 3" Bh 7,00 - k Bell Bend 90 PVC 3" Bh 7,00 - l Bell Bend 45 PVC 3" Bh 8,00 -

m Ventil Udara dia 3" Bh 4,00 - n Baut 5/8 x 10 Cm Bh 2.688,00 - o Valve Cover 3" Bh 2,00 - p Karet Packing M2 10,00 -

IV PEKERJAAN PEMASANGAN PIPA DAN AKSESORIS1 Pipa PVC S 12,5 M' 7.120,00 - 2 Pipa GIP M' 885,00 - 3 Trust Block M3 2,00 -

V PEKERJAAN PEMBUATAN BAK VENTIL UDARA 4 BH1 Pek. Galian Tanah M3 1,18 - 2 Pek. Urugan Pasir M3 0,65 - 3 Pek. Beton Untuk dinding M3 0,50 -

VI PEKERJAAN PEMBUATAN BAK VALVE COVER 2 BH1 Pek. Galian Tanah M3 0,59 - 2 Pek. Urugan Pasir M3 0,32 - 3 Pek. Beton tanpa tulangan M3 0,25 - 4 Pek Pengelasan dan Pemasangan Pipa Riser Leng- Ls 2,00 -

kap dengan flange dan baut

VII PEKERJAAN PEMBUATAN WASH OUT DIA. 3"1 Beel Tee dia. 3" Bh 1,00 - 2 Flange Bell End dia 3" Bh 4,00 - 3 Gate Valve Flange dia 3" Bh 2,00 - 4 Baut 5/8 " x 10 Cm Bh 16,00 - 5 Karet Packing M2 0,25 -

-

NO URAIAN

Sub Total

Sub Total

Page 2: RAB Proyek Pemipaan

VIII PEKERJAAN PEMBUATAN 3 BUAH JEMBATAN PIPA1 Galian Tanah M3 6,36 - 2 Sleng dia. 3/4 " Penggantung Pipa Gip 3 " M' 75,00 - 3 Sleng dia. 1/2 " M' 35,00 - 4 Kuku Macan Bh 60,00 - 5 Pek. Beton Bertulang 1:2:3 M3 7,35 - 6 Warvel Bh 6,00 -

IX PEKERJAAN PENGETESAN PIPA1 Pengetesan Jaringan Pipa Jam 200,00 -

TOTAL

Page 3: RAB Proyek Pemipaan

REKAPITULASI

PEKERJAAN : PENGEMBANGAN JARINGAN AIR BERSIH DESA HARAPAN (1 PAKET)LOKASI : KEC. MAPPEDECENGKABUPATEN : LUWU UTARAT.A : 2009

I PEKERJAAN PERSIAPAN

II PEKERJAAN BANGUNAN INTAKE

III PEKERJAAN PENGADAAN PIPA DAN AKSESORIS

IV PEKERJAAN PEMASANGAN PIPA DAN AKSESORIS

V PEKERJAAN PEMBUATAN BAK VENTIL UDARA 4 BH

VI PEKERJAAN PEMBUATAN BAK VALVE COVER 2 BH

VII PEKERJAAN PEMBUATAN WASH OUT DIA. 3"

VIII PEKERJAAN PEMBUATAN 3 BUAH JEMBATAN PIPA

IX PEKERJAAN PENGETESAN PIPA

REAL COST

PAJAK PPN ( 10 % )

JUMLAH

DIBULATKAN

Terbilang :

JUMLAH

PENAWAR

NO URAIAN

Masamba, 2009

CV...........................................

RUPIAH,-

.................................................jabatan

Page 4: RAB Proyek Pemipaan

I. DAFTAR HARGA BAHAN

Harga

Di Lokasi

1 2 3 6

1 Batu Bata ukuran Standard Bh

2 Batu Bata ukuran Tebal Bh

3 Batu Kali M3

4 Dolken Btg

5 Kayu Klas - III M3

6 Kayu Klas - IV. Durian, Sipate untuk bekesting M3

7 Kerikil Ayak M3

8 Pasir Pasang M3

9 Pasir Urug/Timbunan M3

10 Sirtu M3

11 Semen Bosowa PC 50 Kg Zak

12 Semen Tonasa PC 50 Kg Zak

13 Tanah Timbunan M4

14 Lem Pipa Bh

15 Baja Tulangan Kg

16 Kran Air 3/4 " Kuningan Bh

17 Kawat Pengikat Beton Kg

18 Bak Reservoir Kap. 1000 Ltr. Bh

19 Flange Steel dia. 4 " Bh

20 Flange Socket dia 4" Bh

21 Bell Reducer dia 4" x 3" Bh

24 Flange Steel dia. 3 " Bh

25 Bend All Flange 90 dia 4" Bh

26 Bend All Flange 45 dia 4" Bh

27 Bell Bend 90 PVC 4 " Bh

28 Bell Bend 45 PVC 4 " Bh

29 Bend All Flange 90 dia 3" Bh

30 Bend All Flange 45 dia 3" Bh

31 Pipa Galvanis 2" x 6 m. Medium B Btg

32 Pipa Galvanis 2,5" x 6 m. Medium B Btg

33 Pipa Galvanis 3" x 6 m. Medium B Btg

34 Pipa Galvanis 4" x 6 m. Medium B Btg

35 Pipa PVC S 12,5 dia 2" Btg

36 Pipa PVC S 12,5 dia 3" Btg

37 Pipa PVC S 12,5 dia 4" Btg

38 Pipa PVC S 12,5 dia 1" Btg

39 Pipa PVC S 12,5 dia 3/4" Btg

40 Paku Biasa 5 - 10 Cm Kg

41 Stop Kran Ø4 " Bh

42 Stop Kran Ø3" Bh

43 Stop Kran Ø2" Bh

44 Doubel Nipple Bh

45 Knee Gip 1" Bh

46 Pelampung BH

47 Clamp Saddle 2"x1" Bh

48 Tee Gip Bh

49 Stop Kran 1" Bh

50 Band 90 PVC 3" Bh

51 Band 45 PVC 2 " Bh

52 Tutup Manhole Bh

53 Pentil Udara 3" Bh

54 Pentil Udara 2" Bh

55 Kabel Sleng dia 3/4" M'

56 Kabel Sleng dia 1/2" M'

DAFTAR HARGA BAHAN DAN UPAH

No Jenis Bahan Sat

Keterangan

Page 5: RAB Proyek Pemipaan

II. DAFTAR UPAH KERJA

UPAH

1 2 3

1 Buruh Terlatih hari

2 Buruh Tak Terlatih hari

3 Kepala Tukang hari

4 Mandor Lapangan hari

5 Mekanik hari

6 Mekanik Pembantu hari

7 Operator Kurang Terlatih hari

8 Operator Pembantu hari

9 Operator Terlatih hari

10 Sopir Pembantu hari

11 Sopir Personil hari

12 Sopir Truk hari

13 Tukang hari

Keterangan :

1. Harga di atas merupakan harga setempat di mana:

Zone I meliputi Kec. Mappideceng

2. Harga bahan yang belum ada disesuaikan dengan harga di pasaran

No Tenaga Kerja Sat.

Page 6: RAB Proyek Pemipaan

Jenis Pekerjaan : Galian Tanah BiasaSatuan Pembayaran : M3

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 0,4000 - -Rp

2 Mandor OH 0,0400 - -Rp

Jumlah Harga Satuan -Rp * Analisis SNI

Jenis Pekerjaan : Pemasangan Pipa PVC S 12,5Satuan Pembayaran : M'

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

I Pek. Galian Tanah

1. Pekerja OH 0,1690 -Rp

2. Mandor OH 0,0168 -Rp

II Pek. Penyambungan Pipa

1 Pek. Penyambungan Pipa Ls 1,0000 -Rp

2 Alat Bantu Ls 1,0000 -Rp

III Pek. Urugan

1 Pek. Urugan Bekas Galian

1. Pekerja OH 0,0500 -Rp

2. Mandor OH 0,0050 -Rp

Pek. Pembersihan dan Ls 1,0000 -Rp

Pemadatan

Jumlah Harga Satuan -Rp

Jenis Pekerjaan : Pemasangan Pipa GIPSatuan Pembayaran : M'

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

I Pek. Galian Tanah

1. Pekerja OH 0,1690 -Rp

2. Mandor OH 0,0168 -Rp

II Pek. Penyambungan Pipa

1 Pek. Penyambungan Pipa Ls 1,0000 -Rp

2 Alat Bantu Ls 1,0000 -Rp

III Pek. Urugan

1 Pek. Urugan Bekas Galian

1. Pekerja OH 0,0370 -Rp

2. Mandor OH 0,0040 -Rp

Pek. Pembersihan dan Ls 1,0000 -Rp

Pemadatan

Jumlah Harga Satuan -Rp

ANALISA HARGA SATUAN

Page 7: RAB Proyek Pemipaan

Jenis Pekerjaan : Beton Tumbuk 1PC : 4PS : 6KRSatuan Pembayaran : M3

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 1,650 - -Rp

2 Tukang Beton OH 0,250 - -Rp

3 Kepala Tukang OH 0,025 - -Rp

4 Mandor OH 0,080 - -Rp

B. BAHAN

1 Semen Portland Kg 173,000 - -Rp

2 Pasir Pasang M3 0,570 - -Rp

3 Kerikil Ayak M3 0,870 - -Rp

Jumlah Harga Satuan -Rp

* Analisis SNI

Jenis Pekerjaan : Membuat Beton Bertulang (150 Kg Besi + Bekisting)Satuan Pembayaran : M3

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 5,6000 -Rp 2 Tukang Batu OH 0,3500 -Rp 3 Tukang Besi OH 1,0500 -Rp 4 Kepala Tukang OH 0,4000 -Rp 5 Mandor OH 0,1930 -Rp

B. BAHAN

1 Kayu terentang M3 0,2400 -Rp

2 Paku biasa 2" - 5" Kg 3,2000 -Rp 3 Minyak bekisting Lt 1,6000 -Rp 4 Besi beton polos Kg 150,0000 -Rp 5 Kawat beton Kg 2,2500 -Rp 6 Semen portland Kg 323,0000 -Rp 7 Pasir beton M

3 0,5200 -Rp 8 Koral beton M

3 0,7800 -Rp 9 Kayu borneo balok M

3 0,1600 -Rp

Jumlah Harga Satuan -Rp * Analisis SNI

Jenis Pekerjaan : Galian Tanah Biasa

Satuan Pembayaran : M3

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 0,400 - -Rp

2 Mandor OH 0,040 - -Rp

Jumlah Harga Satuan -Rp * Analisis SNI

Jenis Pekerjaan : Urugan TanahSatuan Pembayaran : M3

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 0,192 - -Rp

2 Mandor OH 0,019 - -Rp

Jumlah Harga Satuan -Rp * Analisis SNI

Page 8: RAB Proyek Pemipaan

Jenis Pekerjaan : Urugan PasirSatuan Pembayaran : M3

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 0,300 - -Rp

2 Mandor OH 0,010 - -Rp

B. BAHAN

1 Pasir Urug M3 1,200 - -Rp

Jumlah Harga Satuan -Rp * Analisis SNI

Jenis Pekerjaan : Pengetesan Jaringan PipaSatuan Pembayaran : M'

No. URAIAN SATUAN KOEFISIEN HARGA JUMLAH SATUAN ( Rp ) HARGA SATUAN ( Rp )

A. TENAGA

1 Pekerja OH 0,0017 -Rp

2 Operator OH 0,0006 -Rp

3 Mandor OH 0,0003 -Rp

4 Peralatan Lain - Lain Ls 0,0020 -Rp

B. BAHAN

1 Pompa Air dan Kompresor Bh 0,0020 -Rp

2 Bahan Bakar Bensin Ltr 0,0138 -Rp

3 Air Bersih M3 0,0441 -Rp

Jumlah Harga Satuan -Rp * Analisis SNI