RAB Pembangunan Terminal LNG Di Bali

18

Click here to load reader

description

0000

Transcript of RAB Pembangunan Terminal LNG Di Bali

Page 1: RAB Pembangunan Terminal LNG Di Bali

UNIT RATE

Contractor Owner estimation (Rp.)

I (1) (2) (3) (4)

1.1

(1) l.s. 1.00 350,000,000

(2) l.s. 1.00 270,000,000

(3) l.s. 1.00 200,000,000

(4) l.s. 1.00 300,000,000

(5) l.s. 1.00 250,000,000

(6) l.s. 1.00 150,000,000

1.2 Offices and Facilities/ Amenities

(1) Establishment and Maintenance of Contractor's office l.s. 1.00 250,000,000

(2) Quality and Testing of Materials l.s. 1.00 150,000,000

(3) Engineer's Site offices amenities, LCD, Meeting R, internet conection l.s. 1.00 125,000,000

(4) l.s. 1.00 250,000,000

(5) Engineer's Vehicles + drivers ( 3 unit ) mth 18.00 22,500,000

(6) Engineer's Container box 40 ft for Site office no 1.00 65,000,000

(7) Engineer's Movable toilet as per specification no 1.00 35,000,000

(8) Engineer's Radio communication ( Handy Talky ) no 5.00 1,950,000

1.3 Establishment and Access/Amenities

(1) Temporary Fencing (maintenance area) mth 18.00 2,000,000

(2) mth 18.00 15,000,000

(3)

(1) Project Manager mth 18.00 30,000,000

(2) General Superintendent/Construction Manager/Site Manager mth 18.00 20,000,000

(3) QA/QC and Safety Manager mth 18.00 15,000,000

(4) Site Superintendent/Site Engineer mth 18.00 25,000,000

1.4 Maintenance of Engineer's Site Office(s) Facilities

(1) mth 18.00 15,000,000

(2) ls 1.00 300,000,000

(3) Electricity, Portable water, Communication, internet conection mth 18.00 35,000,000

(4) Office boy, servent ( min 2 personal ) mth 18.00 3,500,000

(5) Security for Engineer's site offices (min 6 personnel) mth 18.00 30,000,000

1.5 Provision of Insurances

(1) All the required insurances as stated in the Contract l.s. 1.00 3,000,000,000

1.6 Provision of Bonds/Security, Permits and Consents l.s. 1.00 1,750,000,000

1.7 Provision of "As Built drawing/ Manuals" l.s. 1.00 3,500,000,000

1.8 Demobilization the equipments

(1) Dredging equipment l.s. 1.00 350,000,000

(2) l.s. 1.00 270,000,000

1.9 Remove Facilities/ Amenities l.s. 1.00 50,000,000

1.10 l.s. 1.00 100,000,000

II DEMOLITION WORKS

2.1 Demolition and Removal from site

(1) l.s 1.00 50,000,000

(2) l.s 1.00 200,000,000

(3) l.s 1.00 130,000,000

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

No. Description UnitQUANTITY

GENERAL

Mobilization

Dredging equipment

Piling equipment

Service crane equipment

Batching plant equipment

Moulds and prestress equipment

Genset and lighting equipment

Establishment Owner's office amenities

Documentation

Establishment of Nominated Personnel

Maintenance

Establishing electricity for 50 kVA/ 3 phase/ 380 V/ 50 Hz

Piling equipment

Clean Up Site/ Soil Disposal removing/ etc.

Sub Total

Batching plant

Structures behind the building (sea side)

Pavement structure at the RF area including retaining wall

Page 2: RAB Pembangunan Terminal LNG Di Bali

2.2

(1) l.s 1.00 30,000,000

III PILING WORKS3.1

(1) kg 11,241,000.00 9,500

3.2

(1) m1 23,268 50,000

(2) m1 23,268 420,000

(3) no 1,393 2,000,000

(4) no 1,393 500,000

3.3 Pile Head Preparation

(1) no 546.00 100,000

3.4 Pile Dynamic Analyzer (PDA) test

(1) no 20.00 9,000,000

IV4.1

(1) m3 1,825.00 3,500,000

(2) m3 1,210.00 3,500,000

(3) m3 612.00 3,500,000

(4) m3 1,100.00 3,500,000

(5) m3 200.00 3,500,000

4.2

(1) m3 5,400.00 3,500,000

(2) m3 3,750.00 3,500,000

(3) m3 1,825.00 3,500,000

(4) m3 1,630.00 3,500,000

(5) m3 3,705.00 3,500,000

(6) pcs 175.00

Removal to store

Container box etc.

Sub Total

Supply of Piles

Steel pipe procurement 12.000 mm/ dia 1.000 mm / t = 20 mm

Handle, Pitch and Drive

Steel pipe handling

Steel pipe piling

Splicing

Cutting

Pile head preparation

Steel pipe piling

Sub Total

CONCRETE WORKS K-400 Concrete work on trestle

Trestle cross beam

Trestle precast stringger

Top deck plate

Trestle pipe concrete

Rivetment concrete

Concrete work on jetty head

Cross beam

Precast stringger

Top deck plate

Fender beam

After Tax

Jetty head pipe concrete

Rubber Fender

Sub Total

Before tax

VAT

Page 3: RAB Pembangunan Terminal LNG Di Bali

AMOUNT

(Rp.)

(5) = (3) x (4)

350,000,000

270,000,000

200,000,000

300,000,000

250,000,000

150,000,000

250,000,000

150,000,000

125,000,000

250,000,000

405,000,000

65,000,000

35,000,000

9,750,000

36,000,000

270,000,000

540,000,000

360,000,000

270,000,000

450,000,000

1,926,000,000

270,000,000

300,000,000

630,000,000

63,000,000

540,000,000

1,803,000,000

3,000,000,000

3,000,000,000

1,750,000,000

1,750,000,000

3,500,000,000

3,500,000,000

350,000,000

270,000,000

620,000,000

50,000,000

50,000,000

100,000,000

100,000,000

50,000,000

200,000,000

130,000,000

380,000,000

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

Sub Total

Page 4: RAB Pembangunan Terminal LNG Di Bali

30,000,000

30,000,000

106,789,500,000

106,789,500,000

1,163,400,000

9,772,560,000

2,786,000,000

696,500,000

14,418,460,000

54,600,000

54,600,000

180,000,000

180,000,000

6,387,500,000

4,235,000,000

2,142,000,000

3,850,000,000

700,000,000

17,314,500,000

18,900,000,000

13,125,000,000

6,387,500,000

5,705,000,000

12,967,500,000

57,085,000,000

Sub Total

Sub Total

After Tax

Sub Total

Before tax

VAT

Page 5: RAB Pembangunan Terminal LNG Di Bali

UNIT RATE AMOUNT

(Rp.) (Rp.)

(1) (3) (4) (5) (6) = (4) x (5) (7)

I

1.1

(1) l.s. 1.00 350,000,000 350,000,000

(2) l.s. 1.00 270,000,000 270,000,000

(3) l.s. 1.00 200,000,000 200,000,000

(4) l.s. 1.00 300,000,000 300,000,000

(5) l.s. 1.00 250,000,000 250,000,000

(6) l.s. 1.00 150,000,000 150,000,000

1,520,000,000

1.2 Offices and Facilities/ Amenities

(1) Establishment and Maintenance of Contractor's office l.s. 1.00 250,000,000 250,000,000

(2) Quality and Testing of Materials l.s. 1.00 150,000,000 150,000,000

(3) Engineer's Site offices amenities, LCD, Meeting R, internet conection l.s. 1.00 125,000,000 125,000,000

(4) l.s. 1.00 250,000,000 250,000,000

(5) Engineer's Vehicles + drivers ( 3 unit ) mth 18.00 22,500,000 405,000,000

(6) Engineer's Container box 40 ft for Site office no 1.00 65,000,000 65,000,000

(7) Engineer's Movable toilet as per specification no 1.00 35,000,000 35,000,000

(8) Engineer's Radio communication ( Handy Talky ) no 5.00 1,950,000 9,750,000

1,289,750,000

1.3 Establishment and Access/Amenities

(1) Temporary Fencing (maintenance area) mth 18.00 2,000,000 36,000,000

(2) mth 18.00 15,000,000 270,000,000

(3)

(1) Project Manager mth 18.00 30,000,000 540,000,000

(2) General Superintendent/Construction Manager/Site Manager mth 18.00 20,000,000 360,000,000

(3) QA/QC and Safety Manager mth 18.00 15,000,000 270,000,000

(4) Site Superintendent/Site Engineer mth 18.00 25,000,000 450,000,000

1,926,000,000

1.4 Maintenance of Engineer's Site Office(s) Facilities

(1) mth 18.00 15,000,000 270,000,000

(2) ls 1.00 300,000,000 300,000,000

(3) Electricity, Portable water, Communication, internet conection mth 18.00 35,000,000 630,000,000

(4) Office boy, servent ( min 2 personal ) mth 18.00 3,500,000 63,000,000

(5) Security for Engineer's site offices (min 6 personnel) mth 18.00 30,000,000 540,000,000

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

No. Description Unit

GENERAL

Mobilisasi

Dredging equipment

Piling equipment

Service crane equipment

Batching plant equipment

Moulds and prestress equipment

Genset and lighting equipment

Establishment Owner's office amenities

Documentation

Establishment of Nominated Personnel

Maintenance

Establishing electricity for 50 kVA/ 3 phase/ 380 V/ 50 Hz

QUANTITY

(2)

Page 6: RAB Pembangunan Terminal LNG Di Bali

1,803,000,000

1.5 Provision of Insurances

(1) All the required insurances as stated in the Contract l.s. 1.00 3,000,000,000 3,000,000,000

3,000,000,000

1.6 Provision of Bonds/Security, Permits and Consents l.s. 1.00 1,750,000,000 1,750,000,000

1,750,000,000

1.7 Provision of "As Built drawing/ Manuals" l.s. 1.00 3,500,000,000 3,500,000,000

3,500,000,000

1.8 Demobilization the equipments

(1) Dredging equipment l.s. 1.00 350,000,000 350,000,000

(2) l.s. 1.00 270,000,000 270,000,000

620,000,000

1.9 Remove Facilities/ Amenities l.s. 1.00 50,000,000 50,000,000

50,000,000

1.10 l.s. 1.00 100,000,000 100,000,000

100,000,000

15,558,750,000

II DEMOLITION WORKS

2.1 Demolition and Removal from site

(1) l.s 1.00 50,000,000 50,000,000

(2) l.s 1.00 200,000,000 200,000,000

(3) l.s 1.00 130,000,000 130,000,000

380,000,000

2.2

(1) l.s 1.00 30,000,000 30,000,000

30,000,000

410,000,000

III PILING WORKS3.1

(1) m1 34,350.00 500,000 17,175,000,000

17,175,000,000

3.2

(1) m1 27,480.00 100,000 2,748,000,000

(2) no 2,748 500,000 1,374,000,000

(3) no 1,393 500,000 696,500,000

4,818,500,000

3.3 Pile Head Preparation

(1) no 687.00 100,000 68,700,000

68,700,000

Piling equipment

Clean Up Site/ Soil Disposal removing/ etc.

Sub Total

Batching plant

Structures behind the building (sea side)

Pavement structure at the RF area including retaining wall

Removal to store

Handle, Pitch and Drive

piling

Conector

Cutting

Container box etc.

Sub Total

Supply of Piles

Spoon pile 30 m/ dia 1.0 m

Pile head preparation

Page 7: RAB Pembangunan Terminal LNG Di Bali

3.4 Pile Dynamic Analyzer (PDA) test

(1) no 20.00 9,000,000 180,000,000

180,000,000

22,242,200,000

IV4.1

(1) m3 6,360.00 5,000,000 31,800,000,000

(2) m3 310.00 5,000,000 1,550,000,000

(3) m3 1,687.50 5,000,000 8,437,500,000

(4) m3 1,100.00 5,000,000 5,500,000,000

(5) m3 620.00 5,000,000 3,100,000,000

50,387,500,000

4.2

(1) m3 19,812.00 5,000,000 99,060,000,000

(2) m3 1,968.00 5,000,000 9,840,000,000

(3) m3 4,950.00 5,000,000 24,750,000,000

(4) m3 1,630.00 5,000,000 8,150,000,000

(5) m3 3,705.00 5,000,000 18,525,000,000

160,325,000,000

4.3

(1) m3 86,328.30 5,000,000 431,641,500,000

431,641,500,000

4.4

(1) pcs 41.00 40,000,000 1,640,000,000

1,640,000,000

643,994,000,000

682,204,950,000

68,220,495,000

750,425,445,000

Menyetuji, Dibuat oleh:

Ketut Susanta, SH. Ir. Sjafei Amri. Dipl. E. Eng

Presiden Direktur Direktur Teknik

Singaraja, 26 Oktober 2013

Spoon pile piling

Sub Total

CONCRETE WORKS K-450

Fender concrete beam

Concrete work on trestle

Trestle cross beam

Joint

Top deck plate

Trestle pipe concrete

Rivetment concrete

Sub Total

Before tax

VAT

Concrete work on jetty head

Cross beam

Rivetment concrete

Top deck plate

After Tax

Rubber Fender

Rubber Fender AD1000

Breakwater

Breakwater 2877,61m + anchore pipe

Jetty head pipe concrete

Page 8: RAB Pembangunan Terminal LNG Di Bali
Page 9: RAB Pembangunan Terminal LNG Di Bali

UNIT RATE

Contractor Owner estimation (Rp.)

I (1) (2) (3) (4)

1.1

(1) l.s. 1.00 350,000,000

(2) l.s. 1.00 270,000,000

(3) l.s. 1.00 200,000,000

(4) l.s. 1.00 300,000,000

(5) l.s. 1.00 250,000,000

(6) l.s. 1.00 150,000,000

1.2 Offices and Facilities/ Amenities

(1) Establishment and Maintenance of Contractor's office l.s. 1.00 250,000,000

(2) Quality and Testing of Materials l.s. 1.00 150,000,000

(3) Engineer's Site offices amenities, LCD, Meeting R, internet conection l.s. 1.00 125,000,000

(4) l.s. 1.00 250,000,000

(5) Engineer's Vehicles + drivers ( 3 unit ) mth 18.00 22,500,000

(6) Engineer's Container box 40 ft for Site office no 1.00 65,000,000

(7) Engineer's Movable toilet as per specification no 1.00 35,000,000

(8) Engineer's Radio communication ( Handy Talky ) no 5.00 1,950,000

1.3 Establishment and Access/Amenities

(1) Temporary Fencing (maintenance area) mth 18.00 2,000,000

(2) mth 18.00 15,000,000

(3)

(1) Project Manager mth 18.00 30,000,000

(2) General Superintendent/Construction Manager/Site Manager mth 18.00 20,000,000

(3) QA/QC and Safety Manager mth 18.00 15,000,000

(4) Site Superintendent/Site Engineer mth 18.00 25,000,000

1.4 Maintenance of Engineer's Site Office(s) Facilities

(1) mth 18.00 15,000,000

(2) ls 1.00 300,000,000

(3) Electricity, Portable water, Communication, internet conection mth 18.00 35,000,000

(4) Office boy, servent ( min 2 personal ) mth 18.00 3,500,000

(5) Security for Engineer's site offices (min 6 personnel) mth 18.00 30,000,000

1.5 Provision of Insurances

(1) All the required insurances as stated in the Contract l.s. 1.00 3,000,000,000

1.6 Provision of Bonds/Security, Permits and Consents l.s. 1.00 1,750,000,000

1.7 Provision of "As Built drawing/ Manuals" l.s. 1.00 3,500,000,000

1.8 Demobilization the equipments

(1) Dredging equipment l.s. 1.00 350,000,000

(2) l.s. 1.00 270,000,000

1.9 Remove Facilities/ Amenities l.s. 1.00 50,000,000

1.10 l.s. 1.00 100,000,000

II DEMOLITION WORKS

2.1 Demolition and Removal from site

(1) l.s 1.00 50,000,000

(2) l.s 1.00 200,000,000

(3) l.s 1.00 130,000,000

Sub Total

Pavement structure at the RF area including retaining wall

Structures behind the building (sea side)

Clean Up Site/ Soil Disposal removing/ etc.

Genset and lighting equipment

Establishment Owner's office amenities

Establishment of Nominated Personnel

QUANTITYUnitDescription

Mobilization

Dredging equipment

Service crane equipment

Piling equipment

No.

GENERAL

Documentation

Batching plant equipment

Moulds and prestress equipment

Maintenance

Establishing electricity for 50 kVA/ 3 phase/ 380 V/ 50 Hz

Batching plant

Piling equipment

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

Page 10: RAB Pembangunan Terminal LNG Di Bali

2.2

(1) l.s 1.00 30,000,000

III PILING WORKS3.1

(1) kg 11,241,000.00 9,500

3.2

(1) m1 23,268 50,000

(2) m1 23,268 420,000

(3) no 1,393 2,000,000

(4) no 1,393 500,000

3.3 Pile Head Preparation

(1) no 546.00 100,000

3.4 Pile Dynamic Analyzer (PDA) test

(1) no 20.00 9,000,000

IV4.1

(1) m3 1,825.00 3,500,000

(2) m3 1,210.00 3,500,000

(3) m3 612.00 3,500,000

(4) m3 1,100.00 3,500,000

(5) m3 200.00 3,500,000

4.2

(1) m3 5,400.00 3,500,000

(2) m3 3,750.00 3,500,000

(3) m3 1,825.00 3,500,000

(4) m3 1,630.00 3,500,000

(5) m3 3,705.00 3,500,000

(6) pcs 175.00

VAT

After Tax

Rubber Fender

Sub Total

Sub Total

Sub Total

Before tax

CONCRETE WORKS K-400

Container box etc.

Steel pipe piling

Cutting

Handle, Pitch and Drive

Splicing

Supply of Piles

Steel pipe procurement 12.000 mm/ dia 1.000 mm / t = 20 mm

Concrete work on jetty head

Concrete work on trestle

Removal to store

Steel pipe handling

Trestle cross beam

Trestle precast stringger

Fender beam

Jetty head pipe concrete

Top deck plate

Rivetment concrete

Pile head preparation

Steel pipe piling

Cross beam

Precast stringger

Top deck plate

Trestle pipe concrete

Page 11: RAB Pembangunan Terminal LNG Di Bali

AMOUNT

(Rp.)

(5) = (3) x (4)

350,000,000

270,000,000

200,000,000

300,000,000

250,000,000

150,000,000

250,000,000

150,000,000

125,000,000

250,000,000

405,000,000

65,000,000

35,000,000

9,750,000

36,000,000

270,000,000

540,000,000

360,000,000

270,000,000

450,000,000

1,926,000,000

270,000,000

300,000,000

630,000,000

63,000,000

540,000,000

1,803,000,000

3,000,000,000

3,000,000,000

1,750,000,000

1,750,000,000

3,500,000,000

3,500,000,000

350,000,000

270,000,000

620,000,000

50,000,000

50,000,000

100,000,000

100,000,000

50,000,000

200,000,000

130,000,000

380,000,000

Sub Total

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

Page 12: RAB Pembangunan Terminal LNG Di Bali

30,000,000

30,000,000

106,789,500,000

106,789,500,000

1,163,400,000

9,772,560,000

2,786,000,000

696,500,000

14,418,460,000

54,600,000

54,600,000

180,000,000

180,000,000

6,387,500,000

4,235,000,000

2,142,000,000

3,850,000,000

700,000,000

17,314,500,000

18,900,000,000

13,125,000,000

6,387,500,000

5,705,000,000

12,967,500,000

57,085,000,000

VAT

After Tax

Sub Total

Sub Total

Sub Total

Before tax

Page 13: RAB Pembangunan Terminal LNG Di Bali

(1)

I

1.1

(1)

(2)

(3)

(4)

(5)

(6)

1.2 Offices and Facilities/ Amenities

(1) Establishment and Maintenance of Contractor's office

(2) Quality and Testing of Materials

(3) Engineer's Site offices amenities, LCD, Meeting R, internet conection

(4)

(5) Engineer's Vehicles + drivers ( 3 unit )

(6) Engineer's Container box 40 ft for Site office

(7) Engineer's Movable toilet as per specification

(8) Engineer's Radio communication ( Handy Talky )

1.3 Establishment and Access/Amenities

(1) Temporary Fencing (maintenance area)

(2)

(3)

(1) Project Manager

(2) General Superintendent/Construction Manager/Site Manager

(3) QA/QC and Safety Manager

(4) Site Superintendent/Site Engineer

1.4 Maintenance of Engineer's Site Office(s) Facilities

(1)

(2)

(3) Electricity, Portable water, Communication, internet conection

(4) Office boy, servent ( min 2 personal )

(5) Security for Engineer's site offices (min 6 personnel)

1.5 Provision of Insurances

(1) All the required insurances as stated in the Contract

1.6 Provision of Bonds/Security, Permits and Consents

1.7 Provision of "As Built drawing/ Manuals"

BILL OF QUANTITY

t, ml, mp, m

Establishing electricity for 50 kVA/ 3 phase/ 380 V/ 50 Hz

Moulds and prestress equipment

Genset and lighting equipment

Establishment Owner's office amenities

Documentation

Establishment of Nominated Personnel

Maintenance

GENERAL

Mobilisasi

Dredging equipment

Piling equipment

Service crane equipment

Batching plant equipment

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

No. Description

(2)

Page 14: RAB Pembangunan Terminal LNG Di Bali

1.8 Demobilization the equipments

(1) Dredging equipment

(2)

1.9 Remove Facilities/ Amenities

1.10

II DEMOLITION WORKS

2.1 Demolition and Removal from site

(1)

(2)

(3)

2.2

(1)

III PILING WORKS3.1

(1)

3.2

(1)

(2)

(3)

3.3 Pile Head Preparation

(1)

3.4 Pile Dynamic Analyzer (PDA) test

(1)

IV4.1

(1)

(2)

(3)

(4)

(5)

4.2

(1)

(2)

(3)

(4)

(5)

4.3

(1)

Fender concrete beam

Jetty head pipe concrete

Breakwater

Breakwater 2877,61m + anchore pipe

Rivetment concrete

Concrete work on jetty head

Cross beam

Rivetment concrete

Top deck plate

CONCRETE WORKS K-450 Concrete work on trestle

Trestle cross beam

Joint

Top deck plate

Trestle pipe concrete

Pile head preparation

Spoon pile piling

Spoon pile 30 m/ dia 1.0 m

Handle, Pitch and Drive

piling

Conector

Cutting

Removal to store

Container box etc.

Supply of Piles

Pavement structure at the RF area including retaining wall

Piling equipment

Clean Up Site/ Soil Disposal removing/ etc.

Batching plant

Structures behind the building (sea side)

Page 15: RAB Pembangunan Terminal LNG Di Bali

4.4

(1)

Menyetuji,

Ketut Susanta, SH.

Presiden Direktur

Singaraja, 26 Oktober 2013

Rubber Fender

Rubber Fender AD1000

Page 16: RAB Pembangunan Terminal LNG Di Bali

(3) (4) (5)

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

18.00 mth

1.00 no

1.00 no

5.00 no

18.00 mth

18.00 mth

18.00 mth

18.00 mth

18.00 mth

18.00 mth

18.00 mth

1.00 ls

18.00 mth

18.00 mth

18.00 mth

1.00 l.s.

1.00 l.s.

1.00 l.s.

BILL OF QUANTITY

EtcVolum

JETTY LNG RECEIVING TERMINAL - PATAS - SINGARAJA - BALI - INDONESIA

L, m2 N, bh

Page 17: RAB Pembangunan Terminal LNG Di Bali

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s.

1.00 l.s

1.00 l.s

1.00 l.s

1.00 l.s

34,350.00 m1

27,480.00 m1

2,748 no

1,393 no

687.00 no

20.00 no

6,360.00 m3

310.00 m3

1,687.50 m3

1,100.00 m3

620.00 m3

19,812.00 m3

1,968.00 m3

4,950.00 m3

1,630.00 m3

3,705.00 m3

86,328.30 m3

Page 18: RAB Pembangunan Terminal LNG Di Bali

41.00 pcs

Singaraja, 26 Oktober 2013