Rab Mso (Contoh Jadi Versi Excel 1)
Transcript of Rab Mso (Contoh Jadi Versi Excel 1)
MENU UTAMAR.A.B MANDIRI SEMI OTOMATIS
UNTUK TENDER GEDUNG SKALA KECIL
17 LANGKAH MENGERJAKAN SURAT PENAWARAN DAN RAB UNTUK TENDER GEDUNG SKALA KECIL :
KERJAKAN SESUAI URUTAN LANGKAH-LANGKAH DI BAWAH INI !
1. ISI FORM ID
5. MENGERJAKAN ANALISA HARGA SATUAN (ISI KODE BAHAN/ NAMA KEBUTUHAN DAN INDEX JUGA FORM ISIAN LAINNYA YG DIPERLUKAN) --> ANALISA JADI
2. MENGERJAKAN BILL OF QUANTITY (ISI JENIS PEKERJAAN VOLUME DAN SATUANNYA) --> BILL OF QUANTITY BELUM JADI
4. PRINT KODE BAHAN DAN TENAGA UNTUK DILIHAT SAAT MENGETIK KODE BAHAN DAN TENAGA
6. ISI HARGA SATUAN BAHAN --> HARGA SATUAN BAHAN JADI
8. MENGERJAKAN SCHEDULE ( ISI JANGKA WAKTU PELAKSANAAN DAN PEMELIHARAAN KEMUDIAN ISI JADWAL TIAP ITEM PEKERJAAN :MULAI MINGGU KE BERAPA & BERAPA MINGGU. ATAU BIARKAN KOSONG JIKA MENGIKUTI JADWAL OTOMATIS)
9. MENGATUR KURVA S (TEMPATKAN KURSOR PADA AREA KURVA LALU KLIK KANAN PILIH SELECT DATA DAN PASTIKAN DATA BERISIKAN (='SCHEDULE JADI'!$F$232:$M$232) JIKA WAKTU PELAKSANAAN 8 MINGGU, (='SCHEDULE JADI'!$F$232:$O$232) JIKA WAKTU PELAKSANAAN 10 MINGGU, (='SCHEDULE JADI'!$F$232:$Q$232) JIKA WAKTU PELAKSANAAN 12 MINGGU DAN (='SCHEDULE JADI'!$F$232:$U$232 )JIKA WAKTU PELAKSANAAN 16 MINGGU), KEMUDIAN HIDE KOLOM-KOLOM YG TIDAK TERPAKAI--> SCHEDULE JADI
11. MENGISI DATA PERSONIL --> PERSONIL JADI
10. MENGERJAKAN SURAT PENAWARAN --> SURAT PENAWARAN JADI
12. MENGISI DATA PERALATAN UTAMA --> DATA PERALATAN UTAMA JADI
13. MENGERJAKAN METODE PELAKSANAAN --> METODE PELAKSANAAN JADI
14. TKDN JADI
15. INSERT KOP, TTD & STEMPEL DIREKTUR LALU ATUR BATAS AREA PRINT UNTUK YG 'JADI' SAJA (TAB HIJAU)
7. MENGERJAKAN BILL OF QUANTITY (ISI KODE ANALISA / HARGA MANUAL) --> BILL OF QUANTITY JADI
3. MENGISI KODE BAHAN DAN TENAGA
15. INSERT KOP, TTD & STEMPEL DIREKTUR LALU ATUR BATAS AREA PRINT UNTUK YG 'JADI' SAJA (TAB HIJAU)
16. SILAHKAN HIDE SHEETUNTUK TAB WARNA KUNING (SILAHKAN MENUJU LINK MENU DI ATAS YG TIDAK ADA KATA 'JADI')
17. TERAKHIR SILAHKAN HIDE SHEET MENU KEMUDIAN SAVE AS PDF (OPTION: ENTIRE WORKBOOK)
MENU UTAMAR.A.B MANDIRI SEMI OTOMATIS
UNTUK TENDER GEDUNG SKALA KECIL
17 LANGKAH MENGERJAKAN SURAT PENAWARAN DAN RAB UNTUK TENDER GEDUNG SKALA KECIL :
KERJAKAN SESUAI URUTAN LANGKAH-LANGKAH DI BAWAH INI !
1. ISI FORM ID
5. MENGERJAKAN ANALISA HARGA SATUAN (ISI KODE BAHAN/ NAMA KEBUTUHAN DAN INDEX JUGA FORM ISIAN LAINNYA YG DIPERLUKAN) --> ANALISA JADI
2. MENGERJAKAN BILL OF QUANTITY (ISI JENIS PEKERJAAN VOLUME DAN SATUANNYA) --> BILL OF QUANTITY BELUM JADI
4. PRINT KODE BAHAN DAN TENAGA UNTUK DILIHAT SAAT MENGETIK KODE BAHAN DAN TENAGA
6. ISI HARGA SATUAN BAHAN --> HARGA SATUAN BAHAN JADI
8. MENGERJAKAN SCHEDULE ( ISI JANGKA WAKTU PELAKSANAAN DAN PEMELIHARAAN KEMUDIAN ISI JADWAL TIAP ITEM PEKERJAAN :MULAI MINGGU KE BERAPA & BERAPA MINGGU. ATAU BIARKAN KOSONG JIKA MENGIKUTI JADWAL OTOMATIS)
9. MENGATUR KURVA S (TEMPATKAN KURSOR PADA AREA KURVA LALU KLIK KANAN PILIH SELECT DATA DAN PASTIKAN DATA BERISIKAN (='SCHEDULE JADI'!$F$232:$M$232) JIKA WAKTU PELAKSANAAN 8 MINGGU, (='SCHEDULE JADI'!$F$232:$O$232) JIKA WAKTU PELAKSANAAN 10 MINGGU, (='SCHEDULE JADI'!$F$232:$Q$232) JIKA WAKTU PELAKSANAAN 12 MINGGU DAN (='SCHEDULE JADI'!$F$232:$U$232 )JIKA WAKTU PELAKSANAAN 16 MINGGU), KEMUDIAN HIDE KOLOM-KOLOM YG TIDAK TERPAKAI--> SCHEDULE JADI
11. MENGISI DATA PERSONIL --> PERSONIL JADI
10. MENGERJAKAN SURAT PENAWARAN --> SURAT PENAWARAN JADI
12. MENGISI DATA PERALATAN UTAMA --> DATA PERALATAN UTAMA JADI
13. MENGERJAKAN METODE PELAKSANAAN --> METODE PELAKSANAAN JADI
14. TKDN JADI
15. INSERT KOP, TTD & STEMPEL DIREKTUR LALU ATUR BATAS AREA PRINT UNTUK YG 'JADI' SAJA (TAB HIJAU)
7. MENGERJAKAN BILL OF QUANTITY (ISI KODE ANALISA / HARGA MANUAL) --> BILL OF QUANTITY JADI
3. MENGISI KODE BAHAN DAN TENAGA
15. INSERT KOP, TTD & STEMPEL DIREKTUR LALU ATUR BATAS AREA PRINT UNTUK YG 'JADI' SAJA (TAB HIJAU)
16. SILAHKAN HIDE SHEETUNTUK TAB WARNA KUNING (SILAHKAN MENUJU LINK MENU DI ATAS YG TIDAK ADA KATA 'JADI')
17. TERAKHIR SILAHKAN HIDE SHEET MENU KEMUDIAN SAVE AS PDF (OPTION: ENTIRE WORKBOOK)
SILAHKAN DIISI KOTAK YG BERWARNA
FORM DI BAWAH INI DIISI SEBELUM ANDA MENGERJAKAN RAB MANDIRI ANDA1 TANGGAL : Namakota/kabupaten, 04 Oktober 2014
2 NAMA CV : CV. ORIGINAL MITRA TEKNIK
3 NAMA DIREKTUR : DIO A. HEMAWAN, ST
4 ALAMAT : Jl. Diponegoro No. 17 Namakota/kabupaten, Namapropinsi
5 NO TELP : 08111111111
6 NAMA PROGRAM : PENDIDIKAN MENENGAH
7 NAMA KEGIATAN : Perencanaan Teknis Pembangunan Ruang Kelas
8 SUMBER DANA : APBD
9 TAHUN ANGGARAN : 2014
10 LOKASI : SMPN I SUKAMAJU KECAMATAN SUKAJAYAKab. Namakota/kabupaten
11NAMA PEKERJAAN : PEMBANGUNAN RUANG KELAS
12 JANGKA WAKTU PELAKSANAAN : 75
13 JANGKA WAKTU PEMELIHARAAN : 180
14 HPS : Rp 600,000,000.00
15 PENAWARAN ANDA : Rp 584,761,000.00
16 PENAWARAN ANDA TURUN : 2.540
17 PENAWARAN ANDA DIBUAT TURUN :
- Simpan dengan SAVE AS agar file RAB MSO MASTER Anda tetap dalam keadaan kosong untuk digunakan mengerjakan RAB lainnya- Jika dalam menyimpan muncul pop up (kotak dialog) klik OK- Kadang terjadi dalam menyimpan butuh proses agak lama, harap tunggu hingga proses penyimpanan selesai- Jika pekerjaan RAB Anda sudah selesai harap di hide baris-baris atau kolom-kolom yang tidak digunakan- Hal-hal lainnya bisa Anda sesuaikan sendiri
FORM DI BAWAH INI DIISI SETELAH ANDA SELESAI MENGERJAKAN RAB MANDIRI ANDA
FORM DI BAWAH INI DIISI SEBELUM ANDA MENGERJAKAN RAB MANDIRI ANDANamakota/kabupaten, 04 Oktober 2014
CV. ORIGINAL MITRA TEKNIK
DIO A. HEMAWAN, ST
Jl. Diponegoro No. 17 Namakota/kabupaten, Namapropinsi
08111111111
PENDIDIKAN MENENGAH
Perencanaan Teknis Pembangunan Ruang Kelas
APBD
2014
SMPN I SUKAMAJU KECAMATAN SUKAJAYAKab. Namakota/kabupaten
PEMBANGUNAN RUANG KELAS
HARI ATAU 10 MINGGU
HARI
Rp 600,000,000.00
Rp 584,761,000.00
%
%
- Simpan dengan SAVE AS agar file RAB MSO MASTER Anda tetap dalam keadaan kosong untuk digunakan mengerjakan RAB lainnya- Jika dalam menyimpan muncul pop up (kotak dialog) klik OK- Kadang terjadi dalam menyimpan butuh proses agak lama, harap tunggu hingga proses penyimpanan selesai- Jika pekerjaan RAB Anda sudah selesai harap di hide baris-baris atau kolom-kolom yang tidak digunakan- Hal-hal lainnya bisa Anda sesuaikan sendiri
FORM DI BAWAH INI DIISI SETELAH ANDA SELESAI MENGERJAKAN RAB MANDIRI ANDA
KEMBALI KE MENU UTAMA
K O P
Nomor : 002/OMT/IX/2014 Namakota/kabupaten, 04 Oktober 2014Lampiran : 1 ( Satu ) Berkas.
Kepada Yth :Kelompok Kerja IULP Kabupaten Kotadi- N A M A K A B U P A T E N
Perihal : Penawaran Pekerjaan PEMBANGUNAN RUANG KELAS
PEMBANGUNAN RUANG KELAS
sebesar : Rp 584,761,000.00 { # Lima Ratus Delapan Puluh Empat Juta Tujuh Ratus Enam Puluh Satu Ribu Rupiah # }
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan :
1. Daftar Kuantitas dan Harga2. Dokumen penawaran teknis terdiri dari :
a.Metode Pelaksanaan;b. Jadwal Waktu Pelaksanaan;c. Daftar Personil Inti;d. Jenis, kapasitas, komposisi, dan jumlah peralatan utama minimal yang dibutuhkan;e.Spesifikasi Teknis
3. Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN)Isian Pra RK3K
4. Hasil Pemindaian (scan Sertifikast Keterampilan (SKT) bagi Penanggungjawan Teknis (PJT)
CV. ORIGINAL MITRA TEKNIK
Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen Pengadaan nomor: 050/260.XVIII.1/POKJA-I/ULP-BJN/VIII/2014 tanggal 25 September 2014 dan setelah kami pelajari dengan saksama Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan [serta adendum Dokumen Pengadaan], dengan ini kami mengajukan penawaran untuk pekerjaan :
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk melaksanakan pekerjaan tersebut.
Penawaran ini berlaku sejak batas akhir pemasukan Dokumen Penawaran sampai dengan tanggal 01 Nopember 2014.
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang tercantum dalam Dokumen Pengadaan.
DIO A. HEMAWAN, STDirektur
K O P
Namakota/kabupaten, 04 Oktober 2014
PEMBANGUNAN RUANG KELAS
PEMBANGUNAN RUANG KELAS
{ # Lima Ratus Delapan Puluh Empat Juta Tujuh Ratus Enam Puluh Satu Ribu Rupiah # }
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan :
Hasil Pemindaian (scan Sertifikast Keterampilan (SKT) bagi Penanggungjawan Teknis (PJT)
CV. ORIGINAL MITRA TEKNIK
Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen Pengadaan nomor: 050/260.XVIII.1/POKJA-I/ULP-BJN/VIII/2014 tanggal 25 September 2014 dan setelah kami pelajari dengan saksama Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan [serta adendum
, dengan ini kami mengajukan penawaran untuk pekerjaan :
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk melaksanakan pekerjaan tersebut.
Penawaran ini berlaku sejak batas akhir pemasukan Dokumen Penawaran sampai dengan tanggal 01 Nopember
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang tercantum dalam Dokumen Pengadaan.
DIO A. HEMAWAN, STDirektur
REKAPITULASIBILL OF QUANTITY
Nama Program : PENDIDIKAN MENENGAHNama Kegiatan : Perencanaan Teknis Pembangunan Ruang Kelas
Jenis Pekerjaan : PEMBANGUNAN RUANG KELAS
Sumber Dana : APBDTahun Anggaran : 2014Lokasi : SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten
NO. JENIS PEKERJAAN HARGA SATUANA PEKERJAAN PERSIAPAN DAN TANAH I PEKERJAAN PERSIAPAN Rp 1,950,000.00 II PEKERJAAN TANAH Rp 2,928,076.80 B PEKERJAAN STRUKTUR I PEKERJAAN PONDASI STRUKTUR Rp 3,757,531.31 II PEKERJAAN BETON STRUKTUR Rp 90,520,031.92 III PEKERJAAN PEMBESIAN Rp 126,461,639.18 IV PEKERJAAN BEGESTING Rp 59,451,871.89 V PEKERJAAN DINDING Rp 49,678,411.30 VI PEKERJAAN RANGKA ATAP Rp 90,892,787.77 VII PEKERJAAN KUSEN, PINTU, JENDELA & BV Rp 34,947,284.43 C PEKERJAAN ARSITEKTUR I PEKERJAAN KERAMIK Rp 41,089,120.66 II PEKERJAAN CAT Rp 14,991,354.65 D PEKERJAAN M/E I PEKERJAAN ELEKTRIKAL Rp 8,927,190.00 E PEKERJAAN TANGGA BETON Rp 6,005,669.12
JUMLAH Rp 531,600,969.03 PPN 10 % Rp 53,160,096.90 JUMLAH TOTAL Rp 584,761,065.93 DIBULATKAN Rp 584,761,000.00
Terbilang :
{ # Lima Ratus Delapan Puluh Empat Juta Tujuh Ratus Enam Puluh Satu Ribu
Rupiah # }
BILL OF QUANTITY
NAMA PROGRAM : PENDIDIKAN MENENGAH
NAMA KEGIATAN : Perencanaan Teknis Pembangunan Ruang Kelas
TAHUN ANGGARAH : 2014
LOKASI : SMPN I SUKAMAJU KECAMATAN SUKAJAYA
PERINCIAN SUB PEKERJAAN
NO JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
(1) (2) (3) (4) (5)
A PEKERJAAN PERSIAPAN DAN TANAH
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.000 Ls Rp 300,000.00 Rp 300,000.00 ###
2 Pembongkaran Atap 1.000 Ls Rp 1,250,000.00 Rp 1,250,000.00 ###
3 Papan Nama Proyek 1.000 Ls Rp 400,000.00 Rp 400,000.00 ###
JUMLAH Rp 1,950,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi Poer 41.280 m3 Rp 43,175.00 Rp 1,782,264.00
2 Bongkar dan Galian Sloof Lama 20.640 m3 Rp 43,175.00 Rp 891,132.00
3 Urugan Pasir Bawah Poer, tebal 5 cm 2.640 m3 Rp 96,470.00 Rp 254,680.80
JUMLAH Rp 2,928,076.80
B PEKERJAAN STRUKTUR
I PEKERJAAN PONDASI STRUKTUR
1 Pengeboran Strauss pile Dia 25 cm - 300 Cm 56.000 ttk Rp 48,683.25 Rp 2,726,262.00
2 Pengeboran Strauss pile Dia 25 cm - 200 Cm 5.000 ttk Rp 32,455.50 Rp 162,277.50
3 Lantai Rabbat Beton Mutu B0, tebal 5 cm 1.110 m3 Rp 782,875.50 Rp 868,991.81
JUMLAH Rp 3,757,531.31
II PEKERJAAN BETON STRUKTUR
LANTAI I
1 Beton Strauss pile Ø 30-3.00 m, K 175 Kg/Cm2 10.880 m3 Rp 913,882.20 Rp 9,943,038.34
2 Beton Strauss pile Ø 30-1.50 m, K 175 Kg/Cm2 0.530 m3 Rp 913,882.20 Rp 484,357.57
3 Beton Poer Besar 0,60 x 1,40 x 0,20 m, K.175 Kg/cm2 7.060 m3 Rp 913,882.20 Rp 6,452,008.33
4 Beton Poer Kecil 0,60 x 0,60 x 0,20 m, K.175 Kg/cm2 0.540 m3 Rp 913,882.20 Rp 493,496.39
5 Beton Sloof Penyambungan S1, 20x40 cm, K 175 Kg/cm2 2.240 m3 Rp 913,882.20 Rp 2,047,096.13
6 Beton Sloof Teras S2, 15x20 cm, K 175 Kg/cm2 1.200 m3 Rp 913,882.20 Rp 1,096,658.64
7 Beton Kolom Baru Struktur K1 15x40 cm, K 175 Kg/cm2 6.300 m3 Rp 913,882.20 Rp 5,757,457.86
8 Beton Kolom Tambahan 15x10 cm, K 175 Kg/cm2 1.580 m3 Rp 913,882.20 Rp 1,443,933.88
9 Beton Balok Struktur B1 25x50 cm, K 175 Kg/cm2 6.000 m3 Rp 913,882.20 Rp 5,483,293.20
10 Beton Balok Struktur B2 20x45 cm, K 175 Kg/cm2 14.220 m3 Rp 913,882.20 Rp 12,995,404.88
11 Beton Balok Struktur B3 15x20 cm, K 175 Kg/cm2 0.810 m3 Rp 913,882.20 Rp 740,244.58
12 Beton Struktur Listplank 10x40 cm, K.175 Kg/cm2 1.220 m3 Rp 913,882.20 Rp 1,114,936.28
13 Beton Struktur Plat Lantai tebal 12 cm, K.175 Kg/cm2 31.750 m3 Rp 913,882.20 Rp 29,015,759.85
14 Beton Balok Latai, 12x15 cm, K.175 Kg/cm2 1.540 m3 Rp 913,882.20 Rp 1,407,378.59
LANTAI II
1 Beton Kolom Baru Struktur K1 20x30 cm, K 175 Kg/cm2 6.300 m3 Rp 913,882.20 Rp 5,757,457.86
2 Beton Balok Latai, 12x15 cm, K 175 Kg/cm2 1.540 m3 Rp 913,882.20 Rp 1,407,378.59
3 Beton Ring Balok, 15x20 cm, K 175 Kg/cm2 2.560 m3 Rp 913,882.20 Rp 2,339,538.43
4 Beton Konsol dan Gewel, 15x20 cm, K 175 Kg/cm2 2.780 m3 Rp 913,882.20 Rp 2,540,592.52
JUMLAH Rp 90,520,031.92
NO JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
III PEKERJAAN PEMBESIAN
LANTAI I
1 Beton Strauss pile Ø 30-3.00 m 318.148 Kg Rp 16,253.88 Rp 5,171,139.41
2 Beton Strauss pile Ø 30-1.50 m 15.494 Kg Rp 16,253.88 Rp 251,837.62
3 Beton Poer Besar 595.015 Kg Rp 16,253.88 Rp 9,671,302.41
4 Beton Poer Kecil 32.256 Kg Rp 16,253.88 Rp 524,285.15
5 Beton Sloof Penyambungan S1 157.791 Kg Rp 16,253.88 Rp 2,564,715.98
6 Beton Sloof S2 90.953 Kg Rp 16,253.88 Rp 1,478,339.15
7 Beton Kolom Baru Struktur K1 631.130 Kg Rp 16,253.88 Rp 10,258,311.28
8 Beton Kolom Tambahan 286.700 Kg Rp 16,253.88 Rp 4,659,987.40
9 Beton Balok Struktur B1 829.570 Kg Rp 16,253.88 Rp 13,483,731.23
10 Beton Balok Struktur B2 1,171.340 Kg Rp 16,253.88 Rp 19,038,819.80
11 Beton Balok Struktur B3 103.110 Kg Rp 16,253.88 Rp 1,675,937.57
12 Beton Struktur Listplank 79.630 Kg Rp 16,253.88 Rp 1,294,296.46
13 Beton Struktur Plat Lantai 2,113.170 Kg Rp 16,253.88 Rp 34,347,211.60
14 Beton Balok Latai 154.230 Kg Rp 16,253.88 Rp 2,506,835.91
LANTAI II
1 Beton Kolom Baru Struktur K1 631.130 m3 Rp 16,253.88 Rp 10,258,311.28
2 Beton Balok Latai 175.000 m3 Rp 16,253.88 Rp 2,844,429.00
3 Beton Ring Balok 238.160 m3 Rp 16,253.88 Rp 3,871,024.06
4 Beton Konsol dan Gewel 157.570 Kg Rp 16,253.88 Rp 2,561,123.87
JUMLAH Rp 126,461,639.18
IV PEKERJAAN BEGESTING
LANTAI I
1 Beton Poer Besar 0,60 x 1,40 x 0,20 56.000 m2 Rp 119,501.25 Rp 6,692,070.00
2 Beton Poer Kecil 0,60 x 0,60 x 0,20 12.000 m2 Rp 119,501.25 Rp 1,434,015.00
3 Beton Sloof Penyambungan S1, 20x40 cm 22.400 m2 Rp 119,501.25 Rp 2,676,828.00
4 Beton Sloof Teras S2, 15x20 cm 2.000 m2 Rp 119,501.25 Rp 239,002.50
5 Beton Kolom Baru Struktur K1 15x40 cm 19.600 m2 Rp 119,501.25 Rp 2,342,224.50
6 Beton Kolom Tambahan 15x10 cm 5.600 m2 Rp 119,501.25 Rp 669,207.00
7 Beton Balok Struktur B1 25x50 cm 36.000 m2 Rp 119,501.25 Rp 4,302,045.00
8 Beton Balok Struktur B2 20x45 cm 75.600 m2 Rp 119,501.25 Rp 9,034,294.50
9 Beton Balok Struktur B3 15x20 cm 12.150 m2 Rp 119,501.25 Rp 1,451,940.19
10 Beton Struktur Listplank 10x40 cm 12.240 m2 Rp 119,501.25 Rp 1,462,695.30
11 Beton Struktur Plat Lantai tebal 12 cm 128.510 m2 Rp 119,501.25 Rp 15,357,105.64
12 Beton Balok Latai, 12x15 cm 17.080 m2 Rp 119,501.25 Rp 2,041,081.35
LANTAI II
1 Beton Kolom Baru Struktur K1 20x30 cm 18.670 m2 Rp 119,501.25 Rp 2,231,088.34
2 Beton Balok Latai, 12x15 cm 25.620 m2 Rp 119,501.25 Rp 3,061,622.03
3 Beton Ring Balok, 15x20 cm 17.080 m2 Rp 119,501.25 Rp 2,041,081.35
4 Beton Konsol dan Gewel, 15x20 cm 36.950 m2 Rp 119,501.25 Rp 4,415,571.19
JUMLAH Rp 59,451,871.89
V PEKERJAAN DINDING
1 Pasang Dinding Bata 1Pc : 6Ps Tambahan 50 cm Lantai I 34.160 m2 Rp 94,651.70 Rp 3,233,302.07
2 Pasang Dinding Bata 1Pc : 6Ps Lantai II + Gewel 231.810 m2 Rp 94,651.70 Rp 21,941,210.58
3 Pasang Dinding Bata Trasram 1Pc : 3Ps Lantai I + II 15.730 m2 Rp 102,472.70 Rp 1,611,895.57
4 Plesteran Dinding Trasram 1Pc : 3Ps Lantai II 31.460 m2 Rp 43,824.11 Rp 1,378,706.50
5 Plesteran Dinding 1Pc : 6Ps Lantai I + II 522.830 m2 Rp 39,318.51 Rp 20,556,896.58
6 Pasangan Bata Berongga 2.000 Unit Rp 200,000.00 Rp 400,000.00 ###
7 Benangan Sudut Dinding dan Kolom 222.560 m1 Rp 2,500.00 Rp 556,400.00 ###
NO JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
JUMLAH Rp 49,678,411.30
NO JENIS PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA
VI PEKERJAAN RANGKA ATAP
1 Pasang Kuda-2 kayu bangkirai, 6x12 cm (kelas II) 0.780 m3 Rp 9,980,080.00 Rp 7,784,462.40
2 Pasang Kuda-2 kayu bahan lama 0.780 m3 Rp 1,510,080.00 Rp 1,177,862.40
3 Pasang Nok gording kayu bangkirai , 6x12 cm (kelas II) 0.778 m3 Rp 10,741,087.50 Rp 8,356,566.08
4 Pasang Nok gording kayu bahan lama 0.778 m3 Rp 2,271,087.50 Rp 1,766,906.08
5 Pasang Usuk dan Reng kayu Kruing 109.890 m2 Rp 368,472.50 Rp 40,491,443.03
6 Pasang Usuk dan Reng kayu bahan lama 187.110 m2 Rp 17,352.50 Rp 3,246,826.28
7 Pasang Papan Reuter 5.800 m2 Rp 350,000.00 Rp 2,030,000.00 ###
8 Pasang Listplank Woodplank 76.000 m1 Rp 65,450.00 Rp 4,974,200.00
9 Pasang Papan Kompres 22.000 m1 Rp 72,957.50 Rp 1,605,065.00
10 Pasang Genteng Beton 297.000 m2 Rp 56,391.50 Rp 16,748,275.50
11 Pasang Bubungan Genteng Beton 29.000 m1 Rp 93,489.00 Rp 2,711,181.00
JUMLAH Rp 90,892,787.77
VII PEKERJAAN KUSEN, PINTU, JENDELA & BV
1 Kusen Alumunium Colour P2 3.000 Unit Rp 6,705,466.03 Rp 20,116,398.09
2 Kusen Alumunium Colour J2 9.000 Unit Rp 1,127,097.78 Rp 10,143,880.02
3 Kusen Alumunium Colour J3 6.000 Unit Rp 781,167.72 Rp 4,687,006.32
JUMLAH Rp 34,947,284.43
C PEKERJAAN ARSITEKTUR
I PEKERJAAN KERAMIK
1 Pasang Keramik Lantai 40x40 Cm Dalam Gedung + Baduk 208.420 m2 Rp 147,899.63 Rp 30,825,241.09
2 Pasang Keramik Lantai 30x30 Cm Lantai I 20.000 m2 Rp 148,513.75 Rp 2,970,275.00
3 Pasang Keramik Lantai 40x40 Cm Teras Warna 48.600 m2 Rp 147,899.63 Rp 7,187,922.07
4 Pasang Keramik Sudut 4.500 m1 Rp 23,485.00 Rp 105,682.50
JUMLAH Rp 41,089,120.66
II PEKERJAAN CAT
1 Cat Dinding Exterior (Weathershield) 138.570 m2 Rp 45,903.28 Rp 6,360,816.82
2 Cat Dinding Interior 421.140 m2 Rp 20,493.28 Rp 8,630,537.83
JUMLAH Rp 14,991,354.65
D PEKERJAAN M/E
I PEKERJAAN ELEKTRIKAL
1 Pasang Instalasi Listrik dan stop kontak 26.000 Rp 145,475.00 Rp 3,782,350.00
2 Lampu V Shape Mirror TL 2x18 W/54 9.000 Ttk Rp 97,900.00 Rp 881,100.00
3 Pasang Down Light IDL 108/A White + Lampu PLC 82, 18 W 3.000 bh Rp 74,800.00 Rp 224,400.00
4 Pasang Saklar Engkel Push On Off Cream A107 8.000 bh Rp 51,700.00 Rp 413,600.00
5 Pasang Saklar Seri Push On Off Cream A108 6.000 bh Rp 57,475.00 Rp 344,850.00
6 Pasang Stop Kontak 6100/6122, 240 9.000 bh Rp 55,165.00 Rp 496,485.00
7 Pasang Presto + MCB MG 2x6 Amp 2.000 bh Rp 142,202.50 Rp 284,405.00
8 Penyambungan ke Instalasi Terdekat 1.000 Unit Rp 2,500,000.00 Rp 2,500,000.00 ###
Ls JUMLAH Rp 8,927,190.00
E PEKERJAAN TANGGA BETON
1 Pasang Dinding Bata 1 Pc : 6 Ps 22.000 Rp 94,651.70 Rp 2,082,337.40
2 Plesteran Dinding 1 Pc : 6 Ps 44.000 m2 Rp 39,318.51 Rp 1,730,014.44
3 Plat Beton Tangga Tebal 20 cm ( Termasuk Plat Injak ) 2.400 m2 Rp 913,882.20 Rp 2,193,317.28
m3 JUMLAH Rp 6,005,669.12
JUMLAH TOTAL Rp 531,600,969.03
ANALISA HARGA SATUAN
NO. KEBUTUHAN SATUAN INDEKS HARGA BAHAN HARGA SATUAN
1 1 TITIK GALIAN TANAH PENGEBORAN STROUSS PILE Ø 25-3.00 M
UPAH Pekerja org/hari 0.3000 @ Rp 50,000.00 Rp. 15,000.00
Tukang Batu org/hari 0.0300 @ Rp 65,000.00 Rp. 1,950.00
Kepala Tukang Batu org/hari 0.0030 @ Rp 67,500.00 Rp. 202.50
Mandor org/hari 0.0015 @ Rp 70,000.00 Rp. 105.00
BAHAN Alat Bantu Set 0.3000 @ Rp 90,000.00 Rp. 27,000.00
PROFIT 10% Rp. 4,425.75
JUMLAH Rp. 48,683.25
2 1 TITIK GALIAN TANAH PENGEBORAN STROUSS PILE Ø 25-2.00 M
UPAH Pekerja org/hari 0.2000 @ Rp 50,000.00 Rp. 10,000.00
Tukang Batu org/hari 0.0200 @ Rp 65,000.00 Rp. 1,300.00
Kepala Tukang Batu org/hari 0.0020 @ Rp 67,500.00 Rp. 135.00
Mandor org/hari 0.0010 @ Rp 70,000.00 Rp. 70.00
BAHAN Alat Bantu Set 0.2000 @ Rp 90,000.00 Rp. 18,000.00
PROFIT 10% Rp. 2,950.50
JUMLAH Rp. 32,455.50
3 1 M3 Galian Tanah Biasa < 1 M Manual
UPAH Pekerja org/hari 0.7500 @ Rp 50,000.00 Rp. 37,500.00
Mandor org/hari 0.0250 @ Rp 70,000.00 Rp. 1,750.00
PROFIT 10% Rp. 3,925.00
JUMLAH Rp. 43,175.00
4 1 M3 Urugan Pasir
UPAH Pekerja org/hari 0.3000 @ Rp 50,000.00 Rp. 15,000.00
Mandor org/hari 0.0100 @ Rp 70,000.00 Rp. 700.00
BAHAN Pasir Urug / Puk M3 1.2000 @ Rp 60,000.00 Rp. 72,000.00
PROFIT 10% Rp. 8,770.00
JUMLAH Rp. 96,470.00
5 1 M3 Pembuatan Beton Lantai Kerja
UPAH Pekerja org/hari 1.3200 @ Rp 50,000.00 Rp. 66,000.00
Tukang Batu org/hari 0.2200 @ Rp 65,000.00 Rp. 14,300.00
Kepala Tukang Batu org/hari 0.0220 @ Rp 67,500.00 Rp. 1,485.00
Mandor org/hari 0.1320 @ Rp 70,000.00 Rp. 9,240.00
BAHAN Kerikil Beton 1-2 Cm Pecah Mesin M3 0.7400 @ Rp 250,000.00 Rp. 185,000.00
Pasir Cor M3 0.6210 @ Rp 130,000.00 Rp. 80,730.00
Semen Pc Kg 247.0000 @ Rp 1,350.00 Rp. 333,450.00
Air Ltr 215.0000 @ Rp 100.00 Rp. 21,500.00
PROFIT 10% Rp. 71,170.50
JUMLAH Rp. 782,875.50
6 1 M3 Pembuatan Beton K.175 Kg/Cm2
UPAH Pekerja org/hari 1.6500 @ Rp 50,000.00 Rp. 82,500.00
Tukang Batu org/hari 0.2750 @ Rp 65,000.00 Rp. 17,875.00
Kepala Tukang Batu org/hari 0.0280 @ Rp 67,500.00 Rp. 1,890.00
Mandor org/hari 0.0830 @ Rp 70,000.00 Rp. 5,810.00
BAHAN Kerikil Beton 1-2 Cm Pecah Mesin M3 0.7622 @ Rp 250,000.00 Rp. 190,550.00
Pasir Cor M3 0.5429 @ Rp 130,000.00 Rp. 70,577.00
Semen Pc Kg 326.0000 @ Rp 1,350.00 Rp. 440,100.00
Air Ltr 215.0000 @ Rp 100.00 Rp. 21,500.00
PROFIT 10% Rp. 83,080.20
JUMLAH Rp. 913,882.20
7 10 Kg Pekerjaan Pembesian Polos Dan Ulir
UPAH Pekerja org/hari 0.0700 @ Rp 50,000.00 Rp. 3,500.00
Tukang Besi org/hari 0.0700 @ Rp 65,000.00 Rp. 4,550.00
Kepala Tukang Besi org/hari 0.0070 @ Rp 67,500.00 Rp. 472.50
Mandor org/hari 0.0070 @ Rp 70,000.00 Rp. 490.00
BAHAN Besi Beton Ulir Dan Polos Sni Kg 10.5000 @ Rp 13,000.00 Rp. 136,500.00
Kawat Beton / Bendrat Kg 0.1500 @ Rp 15,000.00 Rp. 2,250.00
PROFIT 10% Rp. 14,776.25
JUMLAH Rp. 162,538.75
8 1 Kg Pekerjaan Pembesian Polos Dan Ulir 0.1000 @ Rp 162,538.75 Rp. 16,253.88
PROFIT 10% Rp. (0.00)
JUMLAH Rp. 16,253.88
9 1 M2 Pekerjaan Bekisting Beton Biasa Dg Multipleks 12 Mm (Pemakaian Ke 3)
UPAH Pekerja org/hari 0.5000 @ Rp 50,000.00 Rp. 25,000.00
Tukang Kayu org/hari 0.2500 @ Rp 65,000.00 Rp. 16,250.00
Kepala Tukang Kayu org/hari 0.0250 @ Rp 67,500.00 Rp. 1,687.50
Mandor org/hari 0.0500 @ Rp 70,000.00 Rp. 3,500.00
BAHAN Multipleks 6 Mm 1,2 X 2,4 M Lbr 0.2100 @ Rp 90,000.00 Rp. 18,900.00
Kayu Usuk Meranti M3 0.0113 @ Rp 3,500,000.00 Rp. 39,550.00
Paku Biasa Usuk Kg 0.2500 @ Rp 13,000.00 Rp. 3,250.00
Oli Bekas Ltr 0.2000 @ Rp 2,500.00 Rp. 500.00
PROFIT 10% Rp. 10,863.75
JUMLAH Rp. 119,501.25
10 1 M1 Pekerjaan Pemasangan Kusen Allumunium Coklat
UPAH Pekerja org/hari 0.0430 @ Rp 50,000.00 Rp. 2,150.00
Tukang Aluminium org/hari 0.0430 @ Rp 65,000.00 Rp. 2,795.00
Kepala Tukang Aluminium org/hari 0.0043 @ Rp 67,500.00 Rp. 290.25
Mandor org/hari 0.0021 @ Rp 70,000.00 Rp. 147.00
BAHAN Alumunium Casment M1 1.1000 @ Rp 95,000.00 Rp. 104,500.00
Sekrup Fixer Dan Peralatan Bh 2.0000 @ Rp 2,500.00 Rp. 5,000.00
Sealent Kg 0.0600 @ Rp 63,000.00 Rp. 3,780.00
PROFIT 10% Rp. 11,866.23
JUMLAH Rp. 130,528.47
11 1 Unit Pekerjaan Pemasangan Pintu Tipe P2
KUSEN CASEMENT M1 5.8000 @ Rp 130,528.48 Rp. 757,065.16
PASANG PINTU M2 2.9960 @ Rp 1,820,938.63 Rp. 5,455,532.12
BAHAN Kunci Paloma Set 1.0000 @ Rp 150,000.00 Rp. 150,000.00
Engsel Pintu Kuningan Asli Set 6.0000 @ Rp 35,000.00 Rp. 210,000.00
Grendel Jendela Kuningan Bh 1.0000 @ Rp 17,000.00 Rp. 17,000.00
Kaca Rayband Tebal 5 Mm M2 0.4125 @ Rp 85,000.00 Rp. 35,062.50
Door Stop Bh 2.0000 @ Rp 18,000.00 Rp. 36,000.00
PROFIT 10% Rp. 44,806.25
JUMLAH Rp. 6,705,466.03
12 1 Unit Pekerjaan Pemasangan Jendela Tipe J2
KUSEN CASEMENT M1 7.6200 @ Rp 130,528.48 Rp. 994,626.98
BAHAN Kaca Rayband Tebal 5 Mm M2 1.4168 @ Rp 85,000.00 Rp. 120,428.00
PROFIT 10% Rp. 12,042.80
JUMLAH Rp. 1,127,097.78
13 1 Unit Pekerjaan Pemasangan Jendela Tipe J3
KUSEN CASEMENT M1 5.1000 @ Rp 130,528.48 Rp. 665,695.22
BAHAN Kaca Rayband Tebal 5 Mm M2 1.2350 @ Rp 85,000.00 Rp. 104,975.00
PROFIT 10% Rp. 10,497.50
JUMLAH Rp. 781,167.72
14 1 M2 Pekerjaan Pemasangan Pintu Alumunium Strip Coklat Lebar 8 Cm
UPAH Pekerja org/hari 0.0850 @ Rp 50,000.00 Rp. 4,250.00
Tukang Aluminium org/hari 0.0850 @ Rp 65,000.00 Rp. 5,525.00
Kepala Tukang Aluminium org/hari 0.0085 @ Rp 67,500.00 Rp. 573.75
Mandor org/hari 0.0042 @ Rp 70,000.00 Rp. 294.00
BAHAN Alumunium Casment M1 4.1000 @ Rp 95,000.00 Rp. 389,500.00
Alumunium Strip M1 14.6000 @ Rp 85,000.00 Rp. 1,241,000.00
Kaca Es M2 0.1782 @ Rp 80,000.00 Rp. 14,256.00
PROFIT 10% Rp. 165,539.88
JUMLAH Rp. 1,820,938.63
15 1 M2 Pasangan Bata Merah Tebal 1/2 Campuran 1 Pc : 3 Ps
UPAH Pekerja org/hari 0.3000 @ Rp 50,000.00 Rp. 15,000.00
Tukang Batu org/hari 0.1000 @ Rp 65,000.00 Rp. 6,500.00
Kepala Tukang Batu org/hari 0.0100 @ Rp 67,500.00 Rp. 675.00
Mandor org/hari 0.0150 @ Rp 70,000.00 Rp. 1,050.00
BAHAN Bata Merah Bh 70.0000 @ Rp 660.00 Rp. 46,200.00
Pasir Pasang M3 0.0400 @ Rp 110,000.00 Rp. 4,400.00
Semen Pc Kg 14.3200 @ Rp 1,350.00 Rp. 19,332.00
PROFIT 10% Rp. 9,315.70
JUMLAH Rp. 102,472.70
16 1 M2 Pasangan Bata Merah Tebal 1 Campuran 1 Pc : 6 Ps
UPAH Pekerja org/hari 0.3000 @ Rp 50,000.00 Rp. 15,000.00
Tukang Batu org/hari 0.1000 @ Rp 65,000.00 Rp. 6,500.00
Kepala Tukang Batu org/hari 0.0100 @ Rp 67,500.00 Rp. 675.00
Mandor org/hari 0.0150 @ Rp 70,000.00 Rp. 1,050.00
BAHAN Bata Merah Bh 70.0000 @ Rp 660.00 Rp. 46,200.00
Pasir Pasang M3 0.0490 @ Rp 110,000.00 Rp. 5,390.00
Semen Pc Kg 8.3200 @ Rp 1,350.00 Rp. 11,232.00
PROFIT 10% Rp. 8,604.70
JUMLAH Rp. 94,651.70
17 1 M2 Plesteran Tebal 1,5 Cm Campuran 1 Pc : 3 Ps
UPAH Pekerja org/hari 0.3000 @ Rp 50,000.00 Rp. 15,000.00
Tukang Batu org/hari 0.1500 @ Rp 65,000.00 Rp. 9,750.00
Kepala Tukang Batu org/hari 0.0150 @ Rp 67,500.00 Rp. 1,012.50
Mandor org/hari 0.0150 @ Rp 70,000.00 Rp. 1,050.00
BAHAN Pasir Pasang M3 0.0230 @ Rp 110,000.00 Rp. 2,530.00
Semen Pc Kg 7.7760 @ Rp 1,350.00 Rp. 10,497.60
PROFIT 10% Rp. 3,984.01
JUMLAH Rp. 43,824.11
18 1 M2 Plesteran Tebal 1,5 Cm Campuran 1 Pc : 6 Ps
UPAH Pekerja org/hari 0.3000 @ Rp 50,000.00 Rp. 15,000.00
Tukang Batu org/hari 0.1500 @ Rp 65,000.00 Rp. 9,750.00
Kepala Tukang Batu org/hari 0.0150 @ Rp 67,500.00 Rp. 1,012.50
Mandor org/hari 0.0150 @ Rp 70,000.00 Rp. 1,050.00
BAHAN Pasir Pasang M3 0.0270 @ Rp 110,000.00 Rp. 2,970.00
Semen Pc Kg 4.4160 @ Rp 1,350.00 Rp. 5,961.60
PROFIT 10% Rp. 3,574.41
JUMLAH Rp. 39,318.51
19 1 M2 Pekerjaan Pasangan Keramik 30X30 Cm
UPAH Pekerja org/hari 0.7000 @ Rp 50,000.00 Rp. 35,000.00
Tukang Batu org/hari 0.3500 @ Rp 65,000.00 Rp. 22,750.00
Kepala Tukang Batu org/hari 0.0350 @ Rp 67,500.00 Rp. 2,362.50
Mandor org/hari 0.0350 @ Rp 70,000.00 Rp. 2,450.00
BAHAN Keramik 30X30 Cm Lantai Warna Putih/Motif M2 11.8700 @ Rp 4,296.55 Rp. 51,000.00
Semen Warna Kg 1.5000 @ Rp 2,000.00 Rp. 3,000.00
Pasir Pasang M3 0.0450 @ Rp 110,000.00 Rp. 4,950.00
Semen Pc Kg 10.0000 @ Rp 1,350.00 Rp. 13,500.00
PROFIT 10% Rp. 13,501.25
JUMLAH Rp. 148,513.75
20 1 M2 Pekerjaan Pasangan Keramik 40X40 Cm Polos
UPAH Pekerja org/hari 0.7000 @ Rp 50,000.00 Rp. 35,000.00
Tukang Batu org/hari 0.3500 @ Rp 65,000.00 Rp. 22,750.00
Kepala Tukang Batu org/hari 0.0350 @ Rp 67,500.00 Rp. 2,362.50
Mandor org/hari 0.0350 @ Rp 70,000.00 Rp. 2,450.00
BAHAN Keramik 40X40 Cm Lantai Warna Putih/Motif M2 6.4740 @ Rp 7,791.43 Rp. 50,441.71
Semen Warna Kg 1.5000 @ Rp 2,000.00 Rp. 3,000.00
Pasir Pasang M3 0.0450 @ Rp 110,000.00 Rp. 4,950.00
Semen Pc Kg 10.0000 @ Rp 1,350.00 Rp. 13,500.00
PROFIT 10% Rp. 13,445.42
JUMLAH Rp. 147,899.63
21 1 M1 Pekerjaan Pasangan Keramik Sudut (Kuku Macan)
UPAH Pekerja org/hari 0.0500 @ Rp 50,000.00 Rp. 2,500.00
Tukang Batu org/hari 0.0500 @ Rp 65,000.00 Rp. 3,250.00
Kepala Tukang Batu org/hari 0.0050 @ Rp 67,500.00 Rp. 337.50
Mandor org/hari 0.0025 @ Rp 70,000.00 Rp. 175.00
BAHAN Keramik Sponing (Kuku Macan) Bh 11.0000 @ Rp 1,200.00 Rp. 13,200.00
Semen Warna Kg 0.1000 @ Rp 2,000.00 Rp. 200.00
Semen Pc Kg 1.2500 @ Rp 1,350.00 Rp. 1,687.50
PROFIT 10% Rp. 2,135.00
JUMLAH Rp. 23,485.00
22 1 M2 Pasang Genteng Beton Polos
UPAH Pekerja org/hari 0.2000 @ Rp 50,000.00 Rp. 10,000.00
Tukang Kayu org/hari 0.1000 @ Rp 65,000.00 Rp. 6,500.00
Kepala Tukang Kayu org/hari 0.0100 @ Rp 67,500.00 Rp. 675.00
Mandor org/hari 0.0100 @ Rp 70,000.00 Rp. 700.00
BAHAN Genteng Beton Bh 11.0000 @ Rp 3,000.00 Rp. 33,000.00
Paku Biasa Usuk Kg 0.0300 @ Rp 13,000.00 Rp. 390.00
PROFIT 10% Rp. 5,126.50
JUMLAH Rp. 56,391.50
23 1 M2 Pasang Genteng Bubungan Beton
UPAH Pekerja org/hari 0.4000 @ Rp 50,000.00 Rp. 20,000.00
Tukang Kayu org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Kayu org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0020 @ Rp 70,000.00 Rp. 140.00
BAHAN Genteng Bubungan Beton Bh 3.5000 @ Rp 8,500.00 Rp. 29,750.00
Pasir Pasang M3 0.0320 @ Rp 110,000.00 Rp. 3,520.00
Semen Pc Kg 10.8000 @ Rp 1,350.00 Rp. 14,580.00
Paku Biasa Usuk Kg 0.0500 @ Rp 13,000.00 Rp. 650.00
Semen Warna Kg 1.0000 @ Rp 2,000.00 Rp. 2,000.00
PROFIT 10% Rp. 8,499.00
JUMLAH Rp. 93,489.00
24 1 M3 Pekerjaan Pembuatan Dan Pemasangan Kuda-Kuda Kayu Bangkirai
UPAH Pekerja org/hari 4.0000 @ Rp 50,000.00 Rp. 200,000.00
Tukang Kayu org/hari 12.0000 @ Rp 65,000.00 Rp. 780,000.00
Kepala Tukang Kayu org/hari 1.2000 @ Rp 67,500.00 Rp. 81,000.00
Mandor org/hari 0.2000 @ Rp 70,000.00 Rp. 14,000.00
BAHAN Kayu Bangkirai Balok M3 1.1000 @ Rp 7,000,000.00 Rp. 7,700,000.00
Besi Strip Kg 15.0000 @ Rp 15,000.00 Rp. 225,000.00
Paku Biasa Usuk Kg 5.6000 @ Rp 13,000.00 Rp. 72,800.00
PROFIT 10% Rp. 907,280.00
JUMLAH Rp. 9,980,080.00
25 1 M3 Pekerjaan Pembuatan Dan Pemasangan Kuda-Kuda Kayu Bangkirai Bahan Lama
UPAH Pekerja org/hari 4.0000 @ Rp 50,000.00 Rp. 200,000.00
Tukang Kayu org/hari 12.0000 @ Rp 65,000.00 Rp. 780,000.00
Kepala Tukang Kayu org/hari 1.2000 @ Rp 67,500.00 Rp. 81,000.00
Mandor org/hari 0.2000 @ Rp 70,000.00 Rp. 14,000.00
BAHAN Besi Strip Kg 15.0000 @ Rp 15,000.00 Rp. 225,000.00
Paku Biasa Usuk Kg 5.6000 @ Rp 13,000.00 Rp. 72,800.00
PROFIT 10% Rp. 137,280.00
JUMLAH Rp. 1,510,080.00
26 1 M3 Pekerjaan Pembuatan Dan Pemasangan Gording Kayu Bangkirai
UPAH Pekerja org/hari 6.7000 @ Rp 50,000.00 Rp. 335,000.00
Tukang Kayu org/hari 20.1000 @ Rp 65,000.00 Rp. 1,306,500.00
Kepala Tukang Kayu org/hari 2.0100 @ Rp 67,500.00 Rp. 135,675.00
Mandor org/hari 0.3350 @ Rp 70,000.00 Rp. 23,450.00
BAHAN Kayu Bangkirai Balok M3 1.1000 @ Rp 7,000,000.00 Rp. 7,700,000.00
Besi Strip Kg 15.0000 @ Rp 15,000.00 Rp. 225,000.00
Paku Biasa Usuk Kg 3.0000 @ Rp 13,000.00 Rp. 39,000.00
PROFIT 10% Rp. 976,462.50
JUMLAH Rp. 10,741,087.50
27 1 M3 Pekerjaan Pembuatan Dan Pemasangan Gording Kayu Bahan Lama
UPAH Pekerja org/hari 6.7000 @ Rp 50,000.00 Rp. 335,000.00
Tukang Kayu org/hari 20.1000 @ Rp 65,000.00 Rp. 1,306,500.00
Kepala Tukang Kayu org/hari 2.0100 @ Rp 67,500.00 Rp. 135,675.00
Mandor org/hari 0.3350 @ Rp 70,000.00 Rp. 23,450.00
BAHAN Besi Strip Kg 15.0000 @ Rp 15,000.00 Rp. 225,000.00
Paku Biasa Usuk Kg 3.0000 @ Rp 13,000.00 Rp. 39,000.00
PROFIT 10% Rp. 206,462.50
JUMLAH Rp. 2,271,087.50
28 1 M2 Pekerjaan Pemasangan Usuk Dan Reng Genteng Glazuur Topaz Natural
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Kayu org/hari 0.1000 @ Rp 65,000.00 Rp. 6,500.00
Kepala Tukang Kayu org/hari 0.0100 @ Rp 67,500.00 Rp. 675.00
Mandor org/hari 0.0050 @ Rp 70,000.00 Rp. 350.00
BAHAN Kayu Bangkirai Balok M3 0.0096 @ Rp 7,000,000.00 Rp. 67,200.00
Kayu Bangkirai Balok M3 0.0360 @ Rp 7,000,000.00 Rp. 252,000.00
Paku Biasa Usuk Kg 0.2500 @ Rp 13,000.00 Rp. 3,250.00
PROFIT 10% Rp. 33,497.50
JUMLAH Rp. 368,472.50
29 1 M2 Pekerjaan Pemasangan Usuk Dan Reng Bahan Lama
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Kayu org/hari 0.1000 @ Rp 65,000.00 Rp. 6,500.00
Kepala Tukang Kayu org/hari 0.0100 @ Rp 67,500.00 Rp. 675.00
Mandor org/hari 0.0050 @ Rp 70,000.00 Rp. 350.00
BAHAN Paku Biasa Usuk Kg 0.2500 @ Rp 13,000.00 Rp. 3,250.00
PROFIT 10% Rp. 1,577.50
JUMLAH Rp. 17,352.50
30 1 M1 Pekerjaan Pemasangan Listplank (Woodplank)
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Kayu org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Kayu org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0050 @ Rp 70,000.00 Rp. 350.00
BAHAN Wood Plank M1 1.1000 @ Rp 35,000.00 Rp. 38,500.00
Paku Biasa Usuk Kg 0.1000 @ Rp 13,000.00 Rp. 1,300.00
PROFIT 10% Rp. 5,950.00
JUMLAH Rp. 65,450.00
31 1 M1 Pekerjaan Pemasangan Papan Kompres
UPAH Pekerja org/hari 0.0500 @ Rp 50,000.00 Rp. 2,500.00
Tukang Kayu org/hari 0.1000 @ Rp 65,000.00 Rp. 6,500.00
Kepala Tukang Kayu org/hari 0.0100 @ Rp 67,500.00 Rp. 675.00
Mandor org/hari 0.0050 @ Rp 70,000.00 Rp. 350.00
BAHAN Kayu Papan M1 1.1000 @ Rp 50,000.00 Rp. 55,000.00
Paku Biasa Usuk Kg 0.1000 @ Rp 13,000.00 Rp. 1,300.00
PROFIT 10% Rp. 6,632.50
JUMLAH Rp. 72,957.50
32 1 Bh Pekerjaan Pemasangan Engsel Pintu 4"
UPAH Pekerja org/hari 0.0150 @ Rp 50,000.00 Rp. 750.00
Tukang Kayu org/hari 0.1500 @ Rp 65,000.00 Rp. 9,750.00
Kepala Tukang Kayu org/hari 0.0150 @ Rp 67,500.00 Rp. 1,012.50
Mandor org/hari 0.0008 @ Rp 70,000.00 Rp. 56.00
BAHAN Engsel Pintu Kuningan Asli Set 1.0000 @ Rp 35,000.00 Rp. 35,000.00
PROFIT 10% Rp. 4,656.85
JUMLAH Rp. 51,225.35
33 1 M2 Pekerjaan Pengecatan Dinding Interior
UPAH Pekerja org/hari 0.0200 @ Rp 50,000.00 Rp. 1,000.00
Tukang Cat org/hari 0.0630 @ Rp 65,000.00 Rp. 4,095.00
Kepala Tukang Cat org/hari 0.0063 @ Rp 67,500.00 Rp. 425.25
Mandor org/hari 0.0030 @ Rp 70,000.00 Rp. 210.00
BAHAN Plamir Tembok Kg 0.1000 @ Rp 21,000.00 Rp. 2,100.00
Cat Dasar/Penutup Dinding Interior Kg 0.1000 @ Rp 30,000.00 Rp. 3,000.00
Cat Dasar/Penutup Dinding Interior Kg 0.2600 @ Rp 30,000.00 Rp. 7,800.00
PROFIT 10% Rp. 1,863.03
JUMLAH Rp. 20,493.28
34 1 M2 Pekerjaan Pengecatan Dinding Exterior (Weathershield)
UPAH Pekerja org/hari 0.0200 @ Rp 50,000.00 Rp. 1,000.00
Tukang Cat org/hari 0.0630 @ Rp 65,000.00 Rp. 4,095.00
Kepala Tukang Cat org/hari 0.0063 @ Rp 67,500.00 Rp. 425.25
Mandor org/hari 0.0030 @ Rp 70,000.00 Rp. 210.00
BAHAN Cat Dasar/Penutup Weathershield/Eksterior Kg 0.1000 @ Rp 100,000.00 Rp. 10,000.00
Cat Dasar/Penutup Weathershield/Eksterior Kg 0.2600 @ Rp 100,000.00 Rp. 26,000.00
PROFIT 10% Rp. 4,173.03
JUMLAH Rp. 45,903.28
35 1 M1 Pasang Instalasi Titik Lampu 3 X 1,5 Mm2
UPAH Pekerja org/hari 0.2000 @ Rp 50,000.00 Rp. 10,000.00
Tukang Listrik org/hari 0.4000 @ Rp 65,000.00 Rp. 26,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Kabel Nym Eterna 3X1,5 Mm M1 12.0000 @ Rp 6,500.00 Rp. 78,000.00
Pipa Tanam Pvc 5/8" Ljr 1.1000 @ Rp 8,000.00 Rp. 8,800.00
Spiral M1 0.7500 @ Rp 4,000.00 Rp. 3,000.00
PERALATAN DAN KELENGKAPAN Ls 0.2000 @ Rp 18,500.00 Rp. 3,700.00
PROFIT 10% Rp. 13,225.00
JUMLAH Rp. 145,475.00
36 1 Bh Pasang Lampu V Shape Mirror Tl 2X18 W/54 Lengkap
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Listrik org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Lampu V Shape Mirror Tl 2X18 W'/54 Lengkap Bh 1.0000 @ Rp 65,000.00 Rp. 65,000.00
PERALATAN DAN KELENGKAPAN Ls 0.0500 @ Rp 65,000.00 Rp. 3,250.00
PROFIT 10% Rp. 8,900.00
JUMLAH Rp. 97,900.00
37 1 Bh Pasang Down Light 6" + Fl 13 Watt Phillips
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Listrik org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Down Light 6"+Fl13W Phillips Bh 1.0000 @ Rp 45,000.00 Rp. 45,000.00
PERALATAN DAN KELENGKAPAN Ls 0.0500 @ Rp 45,000.00 Rp. 2,250.00
PROFIT 10% Rp. 6,800.00
JUMLAH Rp. 74,800.00
38 1 Bh Pasang Saklar Tunggal
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Listrik org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Saklar Tunggal Bh 1.0000 @ Rp 25,000.00 Rp. 25,000.00
PERALATAN DAN KELENGKAPAN Ls 0.0500 @ Rp 25,000.00 Rp. 1,250.00
PROFIT 10% Rp. 4,700.00
JUMLAH Rp. 51,700.00
39 1 Bh Pasang Saklar Ganda
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Listrik org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Saklar Ganda Bh 1.0000 @ Rp 30,000.00 Rp. 30,000.00
PERALATAN DAN KELENGKAPAN Ls 0.0500 @ Rp 30,000.00 Rp. 1,500.00
PROFIT 10% Rp. 5,225.00
JUMLAH Rp. 57,475.00
40 1 Bh Pasang Stop Kontak
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Listrik org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Stop Kontak Bh 1.0000 @ Rp 28,000.00 Rp. 28,000.00
PERALATAN DAN KELENGKAPAN Ls 0.0500 @ Rp 28,000.00 Rp. 1,400.00
PROFIT 10% Rp. 5,015.00
JUMLAH Rp. 55,165.00
41 1 Bh Pasang Presto
UPAH Pekerja org/hari 0.1000 @ Rp 50,000.00 Rp. 5,000.00
Tukang Listrik org/hari 0.2000 @ Rp 65,000.00 Rp. 13,000.00
Kepala Tukang Listrik org/hari 0.0200 @ Rp 67,500.00 Rp. 1,350.00
Mandor org/hari 0.0200 @ Rp 70,000.00 Rp. 1,400.00
BAHAN Presto Bh 1.0000 @ Rp 25,000.00 Rp. 25,000.00
Mcb 6 Amp Bh 1.0000 @ Rp 65,000.00 Rp. 65,000.00
Kabel Nya 2,5 Mm M1 2.5000 @ Rp 5,500.00 Rp. 13,750.00
PERALATAN DAN KELENGKAPAN Ls 0.0500 @ Rp 95,500.00 Rp. 4,775.00
PROFIT 10% Rp. 12,927.50
JUMLAH Rp. 142,202.50
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KODE NO. NAMA BARANG / BAHAN / TENAGA SATUAN
0 TENAGA 1 1 Tukang kayu org/hari Rp 65,000.00
2 2 Kepala tukang kayu org/hari Rp 67,500.00
3 3 Tukang batu org/hari Rp 65,000.00
4 4 Kepala tukang batu org/hari Rp 67,500.00
5 5 Tukang besi org/hari Rp 65,000.00
6 6 Kepala tukang besi org/hari Rp 67,500.00
7 7 Tukang las org/hari
8 8 Kepala tukang las org/hari
9 9 Tukang cat org/hari Rp 65,000.00
10 10 Kepala tukang cat org/hari Rp 67,500.00
11 11 Tukang plitur org/hari
12 12 Kepala tukang plitur org/hari
13 13 Tukang bor org/hari
14 14 Kepala tukang bor org/hari
15 15 Tukang listrik org/hari Rp 65,000.00
16 16 Kepala tukang listrik org/hari Rp 67,500.00
17 17 Tukang kapur org/hari
18 18 Pekerja org/hari Rp 50,000.00
19 19 Mandor org/hari Rp 70,000.00
20 20 Pengawas / Ahli Teknik org/hari
21 21 Ahli ukur org/hari
22 22 Asisten ahli ukur org/hari
23 23 Sopir org/hari
24 24 Masinis org/hari
25 25 Kernet / pembantu sopir org/hari
26 26 Mekanik terlatih org/hari
27 27 Operator tak terlatih org/hari
28 28 Operator terlatih org/hari
29 29 Operator semi terlatih org/hari
30 30 Butuh terlatih org/hari
31 31 Buruh semi terlatih org/hari
32 32 Buruh tak terlatih org/hari
33 33 Tukang gali org/hari
34 34 Juru godog aspal org/hari
35 35 Penjaga org/hari
36 36 Penyemprot org/hari
37 37 Tukang Sungging org/hari
38 38 Kepala Tukang Sungging org/hari
39 39 Tukang Ukir org/hari
40 40 Kepala Tukang Ukir org/hari
41 41 Tukang Prodo org/hari
42 42 Kepala Tukang Prodo org/hari
43 43 Tukang Gambar org/hari
44 44 Tukang Grouting org/hari
45 45 Kepala tukang Grouting org/hari
46 46 Operator mesin sondir org/hari
HARGA SATUAN
ASLI
47 47 Tukang Aluminium org/hari Rp 65,000.00
48 48 Kepala Tukang Aluminium org/hari Rp 67,500.00
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100 BAHAN/ MATERIAL 101 1 Kerikil Beton 1-2 cm pecah mesin M3 Rp 250,000.00
102 2 Kerikil Beton 1-2 cm pecah mesin Kg
103 3 Alat Bantu Set Rp 90,000.00
104 4 Bata Merah Bh Rp 660.00
105 5 Pasir Urug / Puk M3 Rp 60,000.00
106 6 Pasir Pasang M3 Rp 110,000.00
107 7 Pasir Cor M3 Rp 130,000.00
108 8 Semen PC Zak
109 9 Semen PC Kg Rp 1,350.00
110 10 Semen Warna Kg Rp 2,000.00
111 11 Air Ltr Rp 100.00
112 12 Pipa tanam PVC 5/8" Ljr Rp 8,000.00
113 13 Kabel NYM Eterna 3x1,5 mm M1 Rp 6,500.00
114 14 MCB MG 6 Amp Bh
115 15 Multipleks 6 mm 1,2 x 2,4 m Lbr Rp 90,000.00
116 16 Calsiboard Lbr
117 17 Kayu cetakan sejenis sengon M3
118 18 Kayu Bangkirai Balok M3 Rp 7,000,000.00
119 19 Kayu Bangkirai Papan M3
120 20 Kayu Usuk Meranti M3 Rp 3,500,000.00
121 21 Kayu Perancah M3
122 22 Papan Kompres M2
123 23 Besi Beton ulir dan polos SNI Kg Rp 13,000.00
124 24 Kawat Beton / bendrat Kg Rp 15,000.00
125 25 Genteng Beton Bh Rp 3,000.00
126 26 Genteng Bubungan Beton Bh Rp 8,500.00
127 27 Wood Plank M1 Rp 35,000.00
128 28 Seng Talang Datar Lebar 40 cm M1
129 29 Keramik Dinding 25x40 cm KW1 M2
130 30 Keramik List 7x20 cm Bh
131 31 Keramik Sponing (kuku macan) Bh Rp 1,200.00
132 32 Cat Meni Kg
133 33 Cat Dasar/penutup Dinding Interior Kg Rp 30,000.00
134 34 Cat dasar/penutup Weathershield/Eksterior Kg Rp 100,000.00
135 35 Plamir Tembok Kg Rp 21,000.00
136 36 Plamir Kayu Kg
137 37 Plamir Besi Kg
138 38 Oli Bekas Ltr Rp 2,500.00
139 39 Kertas Gosok Lbr
140 40 Cat Kayu Kg
141 41 Minyak Cat Liter
142 42 Kuas ukuran 3-4 Dim Bh
143 43 Dempul Kg
144 44 Kapek Bh
145 45 Lem Kayu Kg
146 46 Engsel Pintu Kuningan Asli Set Rp 35,000.00
147 47 Engsel Jendela Set
148 48 Grendel Jendela Kuningan Bh Rp 17,000.00
149 49 Hak Angin Kecil Bh
150 50 Handle Jendela Bh
151 51 Kunci tanam Antik Bh
152 52 Kunci Paloma Set Rp 150,000.00
153 53 Kunci Tanam Tanggung Bh
154 54 Kaca Polos Tebal 5 mm M2
155 55 Kaca Rayband Tebal 5 mm M2 Rp 85,000.00
156 56 Paku Biasa Usuk Kg Rp 13,000.00
157 57 Paku Biasa Reng Kg
158 58 Paku Seng Kg
159 59 Alumunium 38x38-0,2 mm M1
160 60 Alumunium 38x18-0,2 mm M1
161 61 Sekrup Fixer dan peralatan Bh Rp 2,500.00
162 62 Alumunium Colour 45x100-1 mm M1
163 63 Alumunium Colour 35x80-t =3 mm M1
164 64 Alumunium Strip Colour lebar 8 cm, t=1.3 mm M1
165 65 Karet M1
166 66 Sealent Kg Rp 63,000.00
167 67 Spiral M1 Rp 4,000.00
168 68 Grendel Pintu Bh
169 69 Door Stop Bh Rp 18,000.00
170 70 Grendel Tanam Espanyolet Set
171 71 Keramik 40x40 cm Lantai Warna Putih/Motif M2 Rp 7,791.43
172 72 Keramik 30x30 cm Lantai Warna Putih/Motif M2 Rp 4,296.55
173 73 Bambu Batang
174 74 Lampu V Shape Mirror TL 2x18 W'/54 Lengkap Bh Rp 65,000.00
175 75 Down Light 6"+FL13W Phillips Bh Rp 45,000.00
176 76 Saklar Tunggal Bh Rp 25,000.00
177 77 Saklar Ganda Bh Rp 30,000.00
178 78 Stop Kontak Bh Rp 28,000.00
179 79 Presto Bh Rp 25,000.00
180 80 MCB 6 Amp Bh Rp 65,000.00
181 81 Kabel NYA 2,5 mm M1 Rp 5,500.00
182 82 Alumunium Casment M1 Rp 95,000.00
183 83 Alumunium Strip M1 Rp 85,000.00
184 84 Kaca Es M2 Rp 80,000.00
185 85 Besi Strip Kg Rp 15,000.00
186 86 Kayu Papan M1 Rp 50,000.00
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299300 ALAT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
REKAPITULASI KEBUTUHAN TENAGA DAN BAHAN/ MATERIAL PROYEK :PEMBANGUNAN RUANG KELAS
1 Tukang kayu 256.9706 org/hari Rp 65,000.00 Rp 16,703,089.00 2 Kepala tukang kayu 25.6971 org/hari Rp 67,500.00 Rp 1,734,551.55 3 Tukang batu 247.2185 org/hari Rp 65,000.00 Rp 16,069,199.25 4 Kepala tukang batu 24.7726 org/hari Rp 67,500.00 Rp 1,672,148.47 5 Tukang besi 54.4628 org/hari Rp 65,000.00 Rp 3,540,080.64 6 Kepala tukang besi 5.4463 org/hari Rp 67,500.00 Rp 367,623.76 7 Tukang cat 35.2617 org/hari Rp 65,000.00 Rp 2,292,012.45 8 Kepala tukang cat 3.5262 org/hari Rp 67,500.00 Rp 238,016.68 9 Tukang listrik 17.8000 org/hari Rp 65,000.00 Rp 1,157,000.00
10 Kepala tukang listrik 1.2600 org/hari Rp 67,500.00 Rp 85,050.00 11 Pekerja 1,153.7748 org/hari Rp 50,000.00 Rp 57,688,739.95 12 Mandor 72.8463 org/hari Rp 70,000.00 Rp 5,099,241.39 13 Tukang Aluminium 5.7769 org/hari Rp 65,000.00 Rp 375,499.80 14 Kepala Tukang Aluminium 0.5777 org/hari Rp 67,500.00 Rp 38,994.21 15 Kerikil Beton 1-2 cm pecah mesin 78.1466 M3 Rp 250,000.00 Rp 19,536,647.50 16 Alat Bantu 17.8000 Set Rp 90,000.00 Rp 1,602,000.00 17 Bata Merah 21,259.0000 Bh Rp 660.00 Rp 14,030,940.00 18 Pasir Urug / Puk 3.1680 M3 Rp 60,000.00 Rp 190,080.00 19 Pasir Pasang 44.1616 M3 Rp 110,000.00 Rp 4,857,778.20 20 Pasir Cor 55.7665 M3 Rp 130,000.00 Rp 7,249,646.95 21 Semen PC 41,804.8132 Kg Rp 1,350.00 Rp 56,436,497.87 22 Semen Warna 444.9800 Kg Rp 2,000.00 Rp 889,960.00 23 Air 22,050.4000 Ltr Rp 100.00 Rp 2,205,040.00 24 Pipa tanam PVC 5/8" 28.6000 Ljr Rp 8,000.00 Rp 228,800.00 25 Kabel NYM Eterna 3x1,5 mm 312.0000 M1 Rp 6,500.00 Rp 2,028,000.00 26 Multipleks 6 mm 1,2 x 2,4 m 104.4750 Lbr Rp 90,000.00 Rp 9,402,750.00 27 Kayu Bangkirai Balok 6.7248 M3 Rp 7,000,000.00 Rp 47,073,488.00 28 Kayu Usuk Meranti 5.6218 M3 Rp 3,500,000.00 Rp 19,676,125.00 29 Besi Beton ulir dan polos SNI 8,169.4169 Kg Rp 13,000.00 Rp 106,202,419.05 30 Kawat Beton / bendrat 116.7060 Kg Rp 15,000.00 Rp 1,750,589.33 31 Genteng Beton 3,267.0000 Bh Rp 3,000.00 Rp 9,801,000.00 32 Genteng Bubungan Beton 101.5000 Bh Rp 8,500.00 Rp 862,750.00 33 Wood Plank 83.6000 M1 Rp 35,000.00 Rp 2,926,000.00 34 Keramik Sponing (kuku macan) 49.5000 Bh Rp 1,200.00 Rp 59,400.00 35 Cat Dasar/penutup Dinding Interior 151.6104 Kg Rp 30,000.00 Rp 4,548,312.00 36 Cat dasar/penutup Weathershield/Eksterior 49.8852 Kg Rp 100,000.00 Rp 4,988,520.00 37 Plamir Tembok 42.1140 Kg Rp 21,000.00 Rp 884,394.00 38 Oli Bekas 99.5000 Ltr Rp 2,500.00 Rp 248,750.00 39 Engsel Pintu Kuningan Asli 18.0000 Set Rp 35,000.00 Rp 630,000.00 40 Grendel Jendela Kuningan 3.0000 Bh Rp 17,000.00 Rp 51,000.00 41 Kunci Paloma 3.0000 Set Rp 150,000.00 Rp 450,000.00 42 Kaca Rayband Tebal 5 mm 21.3987 M2 Rp 85,000.00 Rp 1,818,889.50 43 Paku Biasa Usuk 232.1890 Kg Rp 13,000.00 Rp 3,018,457.00 44 Sekrup Fixer dan peralatan 233.1600 Bh Rp 2,500.00 Rp 582,900.00 45 Sealent 6.9948 Kg Rp 63,000.00 Rp 440,672.40 46 Spiral 19.5000 M1 Rp 4,000.00 Rp 78,000.00 47 Door Stop 6.0000 Bh Rp 18,000.00 Rp 108,000.00 48 Keramik 40x40 cm Lantai Warna Putih/Motif 1,663.9475 M2 Rp 7,791.43 Rp 12,964,529.36 49 Keramik 30x30 cm Lantai Warna Putih/Motif 237.4000 M2 Rp 4,296.55 Rp 1,020,000.00 50 Lampu V Shape Mirror TL 2x18 W'/54 Lengkap 9.0000 Bh Rp 65,000.00 Rp 585,000.00 51 Down Light 6"+FL13W Phillips 3.0000 Bh Rp 45,000.00 Rp 135,000.00 52 Saklar Tunggal 8.0000 Bh Rp 25,000.00 Rp 200,000.00 53 Saklar Ganda 6.0000 Bh Rp 30,000.00 Rp 180,000.00 54 Stop Kontak 9.0000 Bh Rp 28,000.00 Rp 252,000.00 55 Presto 2.0000 Bh Rp 25,000.00 Rp 50,000.00 56 MCB 6 Amp 2.0000 Bh Rp 65,000.00 Rp 130,000.00 57 Kabel NYA 2,5 mm 5.0000 M1 Rp 5,500.00 Rp 27,500.00 58 Alumunium Casment 165.0888 M1 Rp 95,000.00 Rp 15,683,436.00 59 Alumunium Strip 131.2248 M1 Rp 85,000.00 Rp 11,154,108.00 60 Kaca Es 1.6017 M2 Rp 80,000.00 Rp 128,132.93 61 Besi Strip 46.7400 Kg Rp 15,000.00 Rp 701,100.00 62 Kayu Papan 24.2000 M1 Rp 50,000.00 Rp 1,210,000.00 63 Pembersihan Lokasi 1.0000 Ls Rp 300,000.00 Rp 300,000.00 64 Pembongkaran Atap 1.0000 Ls Rp 1,250,000.00 Rp 1,250,000.00 65 Papan Nama Proyek 1.0000 Ls Rp 400,000.00 Rp 400,000.00 66 Pasangan Bata Berongga 2.0000 Unit Rp 200,000.00 Rp 400,000.00 67 Benangan Sudut Dinding dan Kolom 222.5600 m1 Rp 2,500.00 Rp 556,400.00
NO NAMA BARANG / BAHAN / TENAGA INDEX SATUAN HARGA SATUANTOTAL BIAYA
DIKELUARKAN
68 Pasang Papan Reuter 5.8000 m2 Rp 350,000.00 Rp 2,030,000.00 69 Penyambungan ke Instalasi Terdekat 1.0000 Unit Rp 2,500,000.00 Rp 2,500,000.00 70 PERALATAN DAN KELENGKAPAN 5.2000 Ls Rp 18,500.00 Rp 96,200.00 71 PERALATAN DAN KELENGKAPAN 0.4500 Ls Rp 65,000.00 Rp 29,250.00 72 PERALATAN DAN KELENGKAPAN 0.1500 Ls Rp 45,000.00 Rp 6,750.00 73 PERALATAN DAN KELENGKAPAN 0.4000 Ls Rp 25,000.00 Rp 10,000.00 74 PERALATAN DAN KELENGKAPAN 0.3000 Ls Rp 30,000.00 Rp 9,000.00 75 PERALATAN DAN KELENGKAPAN 0.4500 Ls Rp 28,000.00 Rp 12,600.00 76 PERALATAN DAN KELENGKAPAN 0.1000 Ls Rp 95,500.00 Rp 9,550.00
SUB TOTAL Rp 483,949,610.23
PROFIT 10 % (KECUALI LS DI RAB) Rp 47,651,321.02 JUMLAH Rp 531,600,931.25
PPN 10 % Rp 53,160,093.13 TOTAL JUMLAH Rp 584,761,000.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN
TENAGA
1 Tukang kayu org/hari Rp 65,000.00
2 Kepala tukang kayu org/hari Rp 67,500.00
3 Tukang batu org/hari Rp 65,000.00
4 Kepala tukang batu org/hari Rp 67,500.00
5 Tukang besi org/hari Rp 65,000.00
6 Kepala tukang besi org/hari Rp 67,500.00
7 Tukang cat org/hari Rp 65,000.00
8 Kepala tukang cat org/hari Rp 67,500.00
9 Tukang listrik org/hari Rp 65,000.00
10 Kepala tukang listrik org/hari Rp 67,500.00
11 Pekerja org/hari Rp 50,000.00
12 Mandor org/hari Rp 70,000.00
13 Tukang Aluminium org/hari Rp 65,000.00
14 Kepala Tukang Aluminium org/hari Rp 67,500.00
BAHAN/ MATERIAL
1 Kerikil Beton 1-2 cm pecah mesin M3 Rp 250,000.00
2 Alat Bantu Set Rp 90,000.00
3 Bata Merah Bh Rp 660.00
4 Pasir Urug / Puk M3 Rp 60,000.00
5 Pasir Pasang M3 Rp 110,000.00
6 Pasir Cor M3 Rp 130,000.00
7 Semen PC Kg Rp 1,350.00
8 Semen Warna Kg Rp 2,000.00
9 Air Ltr Rp 100.00
10 Pipa tanam PVC 5/8" Ljr Rp 8,000.00
11 Kabel NYM Eterna 3x1,5 mm M1 Rp 6,500.00
12 Multipleks 6 mm 1,2 x 2,4 m Lbr Rp 90,000.00
13 Kayu Bangkirai Balok M3 Rp 7,000,000.00
14 Kayu Usuk Meranti M3 Rp 3,500,000.00
15 Besi Beton ulir dan polos SNI Kg Rp 13,000.00
16 Kawat Beton / bendrat Kg Rp 15,000.00
17 Genteng Beton Bh Rp 3,000.00
18 Genteng Bubungan Beton Bh Rp 8,500.00
19 Wood Plank M1 Rp 35,000.00
20 Keramik Sponing (kuku macan) Bh Rp 1,200.00
21 Cat Dasar/penutup Dinding Interior Kg Rp 30,000.00
22 Cat dasar/penutup Weathershield/Eksterior Kg Rp 100,000.00
23 Plamir Tembok Kg Rp 21,000.00
24 Oli Bekas Ltr Rp 2,500.00
25 Engsel Pintu Kuningan Asli Set Rp 35,000.00
26 Grendel Jendela Kuningan Bh Rp 17,000.00
27 Kunci Paloma Set Rp 150,000.00
28 Kaca Rayband Tebal 5 mm M2 Rp 85,000.00
29 Paku Biasa Usuk Kg Rp 13,000.00
30 Sekrup Fixer dan peralatan Bh Rp 2,500.00
31 Sealent Kg Rp 63,000.00
32 Spiral M1 Rp 4,000.00
33 Door Stop Bh Rp 18,000.00
34 Keramik 40x40 cm Lantai Warna Putih/Motif M2 Rp 7,791.43
35 Keramik 30x30 cm Lantai Warna Putih/Motif M2 Rp 4,296.55
36 Lampu V Shape Mirror TL 2x18 W'/54 Lengkap Bh Rp 65,000.00
37 Down Light 6"+FL13W Phillips Bh Rp 45,000.00
38 Saklar Tunggal Bh Rp 25,000.00
39 Saklar Ganda Bh Rp 30,000.00
40 Stop Kontak Bh Rp 28,000.00
41 Presto Bh Rp 25,000.00
42 MCB 6 Amp Bh Rp 65,000.00
43 Kabel NYA 2,5 mm M1 Rp 5,500.00
44 Alumunium Casment M1 Rp 95,000.00
45 Alumunium Strip M1 Rp 85,000.00
46 Kaca Es M2 Rp 80,000.00
47 Besi Strip Kg Rp 15,000.00
48 Kayu Papan M1 Rp 50,000.00
DAFTAR PERSONIL INTI
NAMA PERUSAHAAN : CV. ORIGINAL MITRA TEKNIKALAMAT : Jl. Diponegoro No. 17 Namakota/kabupaten, NamapropinsiKEGIATAN : Perencanaan Teknis Pembangunan Ruang KelasPEKERJAAN : PEMBANGUNAN RUANG KELASLOKASI : SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten
No. Nama Tempat / Tanggal Lahir Jabatan Pendidikan No. Ijazah No. SKT/SKA
1 DIO HEMAWAN, ST Bojonegoro 03 Maret 1975 Pen Jawab Tehnik S-1 153202317 5 005632-13/ASTTI/SKT/IV/2014005633-13/ASTTI/SKT/IV/2014
2 SUJOKO Tuban 18 Agustus 1979 Pelaksana S T M 04 OB on 0011356 4 -
3 SUSILO PRIO Nganjuk 12 Juli 1982 Logistik S M K 04 Mk 0196239 4 -
4 SUSI SUSIATI Tukungagung 21 Januari 1990 Admisnitrasi S M K DN-05 Mk 0380159 3 -
5 REVAN ALVINO Jember 19 Juni 1989 Keuangan S M A 04 OB og 0628494 4 -
Namakota/kabupaten, 04 Oktober 2014CV. ORIGINAL MITRA TEKNIK
DIO A. HEMAWAN, STDirektur
Pengalaman Kerja (Tahun)
DAFTAR PERALATAN UTAMA YANG DIGUNAKAN
NAMA PERUSAHAAN : CV. ORIGINAL MITRA TEKNIKALAMAT : Jl. Diponegoro No. 17 Namakota/kabupaten, NamapropinsiKEGIATAN : Perencanaan Teknis Pembangunan Ruang KelasPEKERJAAN : PEMBANGUNAN RUANG KELASLOKASI : SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten
No. Jenis Peralatan Jumlah Kapasitas Kondisi Lokasi Sekarang Bukti Kepemilikan
1 Truck 1 5 M3 Mitshubisi 2008 Baik Basecamp Sewa
2 Stamper 2 - Kubota 2003 Baik Basecamp Milik Sendiri
3 Beton Molen 4 0,5 M3 Dong Feng 2003 Baik Basecamp Milik Sendiri
4 Sepeda Motor 1 - Honda 1997 Baik Basecamp Milik Sendiri
5 Pompa Air 4 4 PK Kubota 2003 Baik Basecamp Milik Sendiri
6 Vibrator 1 - Honda 2003 Baik Basecamp Milik Sendiri
7 Mesin Gilas 1 - - 2008 Baik Basecamp Sewa
Namakota/kabupaten, 04 Oktober 2014CV. ORIGINAL MITRA TEKNIK
DIO A. HEMAWAN, STDirektur
Merek dan Type
Tahun Pembuatan
A PEKERJAAN PERSIAPAN DAN TANAH1 Pembersihan Lokasi 0.056 1 12 Pembongkaran Atap 0.235 1 13 Papan Nama Proyek 0.075 1 11 Galian Tanah Pondasi Poer 0.335 1 12 Bongkar dan Galian Sloof Lama 0.168 1 13 Urugan Pasir Bawah Poer, tebal 5 cm 0.048 1 1B PEKERJAAN STRUKTUR1 Pengeboran Strauss pile Dia 25 cm - 300 Cm 0.513 1 12 Pengeboran Strauss pile Dia 25 cm - 200 Cm 0.031 1 13 Lantai Rabbat Beton Mutu B0, tebal 5 cm 0.163 1 1II PEKERJAAN BETON STRUKTUR1 Beton Strauss pile Ø 30-3.00 m, K 175 Kg/Cm2 1.870 1 12 Beton Strauss pile Ø 30-1.50 m, K 175 Kg/Cm2 0.091 1 13 Beton Poer Besar 0,60 x 1,40 x 0,20 m, K.175 Kg/cm2 1.214 1 14 Beton Poer Kecil 0,60 x 0,60 x 0,20 m, K.175 Kg/cm2 0.093 1 15 Beton Sloof Penyambungan S1, 20x40 cm, K 175 Kg/cm2 0.385 2 16 Beton Sloof Teras S2, 15x20 cm, K 175 Kg/cm2 0.206 2 17 Beton Kolom Baru Struktur K1 15x40 cm, K 175 Kg/cm2 1.083 2 18 Beton Kolom Tambahan 15x10 cm, K 175 Kg/cm2 0.272 2 19 Beton Balok Struktur B1 25x50 cm, K 175 Kg/cm2 1.031 3 1
10 Beton Balok Struktur B2 20x45 cm, K 175 Kg/cm2 2.445 3 111 Beton Balok Struktur B3 15x20 cm, K 175 Kg/cm2 0.139 3 112 Beton Struktur Listplank 10x40 cm, K.175 Kg/cm2 0.210 3 113 Beton Struktur Plat Lantai tebal 12 cm, K.175 Kg/cm2 5.458 4 214 Beton Balok Latai, 12x15 cm, K.175 Kg/cm2 0.265 4 11 Beton Kolom Baru Struktur K1 20x30 cm, K 175 Kg/cm2 1.083 5 12 Beton Balok Latai, 12x15 cm, K 175 Kg/cm2 0.265 5 13 Beton Ring Balok, 15x20 cm, K 175 Kg/cm2 0.440 5 14 Beton Konsol dan Gewel, 15x20 cm, K 175 Kg/cm2 0.478 5 1
III PEKERJAAN PEMBESIAN1 Beton Strauss pile Ø 30-3.00 m 0.973 5 12 Beton Strauss pile Ø 30-1.50 m 0.047 5 13 Beton Poer Besar 1.819 5 14 Beton Poer Kecil 0.099 5 15 Beton Sloof Penyambungan S1 0.482 5 16 Beton Sloof S2 0.278 5 17 Beton Kolom Baru Struktur K1 1.930 5 18 Beton Kolom Tambahan 0.877 5 19 Beton Balok Struktur B1 2.536 6 4
10 Beton Balok Struktur B2 3.581 6 211 Beton Balok Struktur B3 0.315 6 112 Beton Struktur Listplank 0.243 6 113 Beton Struktur Plat Lantai 6.461 6 214 Beton Balok Latai 0.472 6 11 Beton Kolom Baru Struktur K1 1.930 6 12 Beton Balok Latai 0.535 6 13 Beton Ring Balok 0.728 6 14 Beton Konsol dan Gewel 0.482 6 1
IV PEKERJAAN BEGESTING1 Beton Poer Besar 0,60 x 1,40 x 0,20 1.259 7 12 Beton Poer Kecil 0,60 x 0,60 x 0,20 0.270 7 13 Beton Sloof Penyambungan S1, 20x40 cm 0.504 7 14 Beton Sloof Teras S2, 15x20 cm 0.045 7 15 Beton Kolom Baru Struktur K1 15x40 cm 0.441 7 16 Beton Kolom Tambahan 15x10 cm 0.126 7 1
7 Beton Balok Struktur B1 25x50 cm 0.809 7 18 Beton Balok Struktur B2 20x45 cm 1.699 7 19 Beton Balok Struktur B3 15x20 cm 0.273 7 1
10 Beton Struktur Listplank 10x40 cm 0.275 7 111 Beton Struktur Plat Lantai tebal 12 cm 2.889 7 112 Beton Balok Latai, 12x15 cm 0.384 7 11 Beton Kolom Baru Struktur K1 20x30 cm 0.420 7 12 Beton Balok Latai, 12x15 cm 0.576 7 13 Beton Ring Balok, 15x20 cm 0.384 7 14 Beton Konsol dan Gewel, 15x20 cm 0.831 7 11 Pasang Dinding Bata 1Pc : 6Ps Tambahan 50 cm Lantai I 0.608 7 12 Pasang Dinding Bata 1Pc : 6Ps Lantai II + Gewel 4.127 7 13 Pasang Dinding Bata Trasram 1Pc : 3Ps Lantai I + II 0.303 7 14 Plesteran Dinding Trasram 1Pc : 3Ps Lantai II 0.259 7 15 Plesteran Dinding 1Pc : 6Ps Lantai I + II 3.867 7 16 Pasangan Bata Berongga 0.075 7 17 Benangan Sudut Dinding dan Kolom 0.105 7 11 Pasang Kuda-2 kayu bangkirai, 6x12 cm (kelas II) 1.464 8 12 Pasang Kuda-2 kayu bahan lama 0.222 8 13 Pasang Nok gording kayu bangkirai , 6x12 cm (kelas II) 1.572 8 14 Pasang Nok gording kayu bahan lama 0.332 8 15 Pasang Usuk dan Reng kayu Kruing 7.617 8 26 Pasang Usuk dan Reng kayu bahan lama 0.611 8 17 Pasang Papan Reuter 0.382 8 18 Pasang Listplank Woodplank 0.936 8 19 Pasang Papan Kompres 0.302 8 1
10 Pasang Genteng Beton 3.151 8 211 Pasang Bubungan Genteng Beton 0.510 8 11 Kusen Alumunium Colour P2 3.784 8 22 Kusen Alumunium Colour J2 1.908 9 23 Kusen Alumunium Colour J3 0.882 9 1C PEKERJAAN ARSITEKTUR1 Pasang Keramik Lantai 40x40 Cm Dalam Gedung + Badukan 5.799 9 22 Pasang Keramik Lantai 30x30 Cm Lantai I 0.559 9 13 Pasang Keramik Lantai 40x40 Cm Teras Warna 1.352 9 14 Pasang Keramik Sudut 0.020 9 11 Cat Dinding Exterior (Weathershield) 1.197 10 12 Cat Dinding Interior 1.623 10 1D PEKERJAAN M/E1 Pasang Instalasi Listrik dan stop kontak 0.712 10 12 Lampu V Shape Mirror TL 2x18 W/54 0.166 10 13 Pasang Down Light IDL 108/A White + Lampu PLC 82, 18 Watt 0.042 10 14 Pasang Saklar Engkel Push On Off Cream A107 0.078 10 15 Pasang Saklar Seri Push On Off Cream A108 0.065 10 16 Pasang Stop Kontak 6100/6122, 240 0.093 10 17 Pasang Presto + MCB MG 2x6 Amp 0.053 10 18 Penyambungan ke Instalasi Terdekat 0.470 10 11 Pasang Dinding Bata 1 Pc : 6 Ps 0.392 10 12 Plesteran Dinding 1 Pc : 6 Ps 0.325 10 13 Plat Beton Tangga Tebal 20 cm ( Termasuk Plat Injak ) 0.413 10 1
100.00
99.000
1 TARGET PELAKSANAAN
2 JML. KOMULATIF PELAKSANAAN 0
1010
1.925
JADWAL PELAKSANAAN PEKERJAAN
NAMA PROGRAM : PENDIDIKAN MENENGAH WAKTU PELAKSANAAN 75 HARINAMA KEGIATAN : Perencanaan Teknis Pembangunan Ruang Kelas WAKTU PEMELIHARAAN 180 HARILOKASI : SMPN I SUKAMAJU KECAMATAN SUKAJAYA
Kab. Namakota/kabupaten
NO. URAIAN PEKERJAAN
JANGKA WAKTU PELAKSANAAN
BOBOT (%)
JANGKA WAKTU PEMELIHARAAN
KETERANGANMINGGU / PERIODE KE - BULAN/PERIODE KE-
1 2 3 4 5 6 7 8 9 10 I II III IV V VIA PEKERJAAN PERSIAPAN DAN TANAH
1 Pembersihan Lokasi 0.056 0.056 100%2 Pembongkaran Atap 0.235 0.235
3 Papan Nama Proyek 0.075 0.075
1 Galian Tanah Pondasi Poer 0.335 0.335
2 Bongkar dan Galian Sloof Lama 0.168 0.168
3 Urugan Pasir Bawah Poer, tebal 5 cm 0.048 0.048
B PEKERJAAN STRUKTUR
1 Pengeboran Strauss pile Dia 25 cm - 300 Cm 0.513 0.513
2 Pengeboran Strauss pile Dia 25 cm - 200 Cm 0.031 0.031
3 Lantai Rabbat Beton Mutu B0, tebal 5 cm 0.163 0.163
II PEKERJAAN BETON STRUKTUR
1 Beton Strauss pile Ø 30-3.00 m, K 175 Kg/Cm2 1.870 1.870
2 Beton Strauss pile Ø 30-1.50 m, K 175 Kg/Cm2 0.091 0.091
3 Beton Poer Besar 0,60 x 1,40 x 0,20 m, K.175 Kg/cm2 1.214 1.214
4 Beton Poer Kecil 0,60 x 0,60 x 0,20 m, K.175 Kg/cm2 0.093 0.093
5 Beton Sloof Penyambungan S1, 20x40 cm, K 175 Kg/cm2 0.385 0.385
6 Beton Sloof Teras S2, 15x20 cm, K 175 Kg/cm2 0.206 0.206
7 Beton Kolom Baru Struktur K1 15x40 cm, K 175 Kg/cm2 1.083 1.083
8 Beton Kolom Tambahan 15x10 cm, K 175 Kg/cm2 0.272 0.272
9 Beton Balok Struktur B1 25x50 cm, K 175 Kg/cm2 1.031 1.031
10 Beton Balok Struktur B2 20x45 cm, K 175 Kg/cm2 2.445 2.445
11 Beton Balok Struktur B3 15x20 cm, K 175 Kg/cm2 0.139 0.139
12 Beton Struktur Listplank 10x40 cm, K.175 Kg/cm2 0.210 0.210
13 Beton Struktur Plat Lantai tebal 12 cm, K.175 Kg/cm2 5.458 4.930 0.528
14 Beton Balok Latai, 12x15 cm, K.175 Kg/cm2 0.265 0.265
1 Beton Kolom Baru Struktur K1 20x30 cm, K 175 Kg/cm2 1.083 1.083
2 Beton Balok Latai, 12x15 cm, K 175 Kg/cm2 0.265 0.265
3 Beton Ring Balok, 15x20 cm, K 175 Kg/cm2 0.440 0.440
4 Beton Konsol dan Gewel, 15x20 cm, K 175 Kg/cm2 0.478 0.478
III PEKERJAAN PEMBESIAN
1 Beton Strauss pile Ø 30-3.00 m 0.973 0.973
2 Beton Strauss pile Ø 30-1.50 m 0.047 0.047
3 Beton Poer Besar 1.819 1.819
4 Beton Poer Kecil 0.099 0.099
5 Beton Sloof Penyambungan S1 0.482 0.482
6 Beton Sloof S2 0.278 0.278
7 Beton Kolom Baru Struktur K1 1.930 1.930
8 Beton Kolom Tambahan 0.877 0.877
9 Beton Balok Struktur B1 2.536 0.837 0.837 0.837 0.026
10 Beton Balok Struktur B2 3.581 1.882 1.700
11 Beton Balok Struktur B3 0.315 0.315
12 Beton Struktur Listplank 0.243 0.243
13 Beton Struktur Plat Lantai 6.461 4.762 1.700
14 Beton Balok Latai 0.472 0.472
1 Beton Kolom Baru Struktur K1 1.930 1.930
2 Beton Balok Latai 0.535 0.535
3 Beton Ring Balok 0.728 0.728
4 Beton Konsol dan Gewel 0.482 0.482
IV PEKERJAAN BEGESTING
1 Beton Poer Besar 0,60 x 1,40 x 0,20 1.259 1.259
2 Beton Poer Kecil 0,60 x 0,60 x 0,20 0.270 0.270
3 Beton Sloof Penyambungan S1, 20x40 cm 0.504 0.504
4 Beton Sloof Teras S2, 15x20 cm 0.045 0.045
5 Beton Kolom Baru Struktur K1 15x40 cm 0.441 0.441 50%6 Beton Kolom Tambahan 15x10 cm 0.126 0.126
7 Beton Balok Struktur B1 25x50 cm 0.809 0.809
8 Beton Balok Struktur B2 20x45 cm 1.699 1.699
9 Beton Balok Struktur B3 15x20 cm 0.273 0.273
10 Beton Struktur Listplank 10x40 cm 0.275 0.275
11 Beton Struktur Plat Lantai tebal 12 cm 2.889 2.889
12 Beton Balok Latai, 12x15 cm 0.384 0.384
1 Beton Kolom Baru Struktur K1 20x30 cm 0.420 0.420
2 Beton Balok Latai, 12x15 cm 0.576 0.576
3 Beton Ring Balok, 15x20 cm 0.384 0.384
4 Beton Konsol dan Gewel, 15x20 cm 0.831 0.831
1 Pasang Dinding Bata 1Pc : 6Ps Tambahan 50 cm Lantai I 0.608 0.608
2 Pasang Dinding Bata 1Pc : 6Ps Lantai II + Gewel 4.127 4.127
3 Pasang Dinding Bata Trasram 1Pc : 3Ps Lantai I + II 0.303 0.303
4 Plesteran Dinding Trasram 1Pc : 3Ps Lantai II 0.259 0.259
5 Plesteran Dinding 1Pc : 6Ps Lantai I + II 3.867 3.867
6 Pasangan Bata Berongga 0.075 0.075
7 Benangan Sudut Dinding dan Kolom 0.105 0.105
1 Pasang Kuda-2 kayu bangkirai, 6x12 cm (kelas II) 1.464 1.464
2 Pasang Kuda-2 kayu bahan lama 0.222 0.222
3 Pasang Nok gording kayu bangkirai , 6x12 cm (kelas II) 1.572 1.572
4 Pasang Nok gording kayu bahan lama 0.332 0.332
5 Pasang Usuk dan Reng kayu Kruing 7.617 7.514 0.103
6 Pasang Usuk dan Reng kayu bahan lama 0.611 0.611
7 Pasang Papan Reuter 0.382 0.382
8 Pasang Listplank Woodplank 0.936 0.936
9 Pasang Papan Kompres 0.302 0.302
10 Pasang Genteng Beton 3.151 3.048 0.103
11 Pasang Bubungan Genteng Beton 0.510 0.510
1 Kusen Alumunium Colour P2 3.784 3.681 0.103
2 Kusen Alumunium Colour J2 1.908 1.779 0.130
3 Kusen Alumunium Colour J3 0.882 0.882
C PEKERJAAN ARSITEKTUR
1 Pasang Keramik Lantai 40x40 Cm Dalam Gedung + Badukan 5.799 5.669 0.130
2 Pasang Keramik Lantai 30x30 Cm Lantai I 0.559 0.559
3 Pasang Keramik Lantai 40x40 Cm Teras Warna 1.352 1.352
4 Pasang Keramik Sudut 0.020 0.020
1 Cat Dinding Exterior (Weathershield) 1.197 1.197
2 Cat Dinding Interior 1.623 1.623
D PEKERJAAN M/E
1 Pasang Instalasi Listrik dan stop kontak 0.712 0.712
2 Lampu V Shape Mirror TL 2x18 W/54 0.166 0.166
3 Pasang Down Light IDL 108/A White + Lampu PLC 82, 18 Watt 0.042 0.042
4 Pasang Saklar Engkel Push On Off Cream A107 0.078 0.078
5 Pasang Saklar Seri Push On Off Cream A108 0.065 0.065
6 Pasang Stop Kontak 6100/6122, 240 0.093 0.093
7 Pasang Presto + MCB MG 2x6 Amp 0.053 0.053
8 Penyambungan ke Instalasi Terdekat 0.470 0.470
1 Pasang Dinding Bata 1 Pc : 6 Ps 0.392 0.392
2 Plesteran Dinding 1 Pc : 6 Ps 0.325 0.325
3 Plat Beton Tangga Tebal 20 cm ( Termasuk Plat Injak ) 0.413 0.413 0%
1 TARGET PELAKSANAAN 4.892 1.946 3.825 5.195 9.299 12.185 24.765 21.410 10.594 5.888
2 JML. KOMULATIF PELAKSANAAN 0.000 4.892 6.839 10.664 15.858 25.157 37.342 62.107 83.517 94.112 100.000
Namakota/kabupaten, 04 Oktober 2014
CV. ORIGINAL MITRA TEKNIK
DIO A. HEMAWAN, ST
Direktur
BOBOT (%)
METODEPELAKSANAAN PEKERJAAN :
PEMBANGUNAN RUANG KELAS
PENDAHULUAN
MAKSUD DAN TUJUAN
METODE PENYELESAIAN PEKERJAAN UTAMA
A PEKERJAAN PERSIAPAN DAN TANAH
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
B PEKERJAAN STRUKTUR
I PEKERJAAN PONDASI STRUKTUR
II PEKERJAAN BETON STRUKTUR
III PEKERJAAN PEMBESIAN
Berkenaan dengan Kegiatan Pembangunan Ruang Kelas Baru SMP N 1 Purwosari Kec. Purwosari Kab. Bojonegoro, maka kami selaku kontraktor pelaksana ingin ikut berpartisipasi dengan mengajukan metode pelaksanaan pekerjaan tersebut diatas yang di dalamnya memuat sistematika dan konsepsi dasar pelaksanaan dengan tetap memperhatikan kesatuan (unity) dan keselarasan harmoni tanpa menimbulkan dampak terhadap lingkungan sekitarnya.
Metode pelaksanaan ini sebagai pedoman yang berisikan kerangka dasar pekerjaan pelaksanaan yang memuat informasi sebagai masukan serta beberapa ketentuan mengenai sasaran, kriteria, batasan dan keluaran (out put) yang dituntut dari garis besar proses yang harus dipenuhi, diperhatikan dan diterjemahkan lebih lanjut agar kontraktor pelaksana dapat melaksanakan tugas dan tanggung jawabnya dengan baik sehingga pengaturan, pengembangan dan peningkatan tugas (sinkronisasi koordinatif) dapat terselenggara sesuai dengan waktu yang telah direncanakan/ditentukan.
Sebelum melaksanakan pekerjaan terlebih dahulu akan kita lakukan pembersihan lokasi. pembongkaran sekaligus pasang bouwplank dan uitset, dan juga melakukan mobilisasi alat.
Setelah persiapan selesai selanjutnya kita akan melakukan galian tanah untuk pondasi, sloof dan saluran dan melakukan urugan pasir.
Sebelum melaksanakan pekerjaan beton, terlebih dahulu kita lakukan pengeboran strous pile untuk pondasi dan juga menyiapkan lantai kerja.
Setelah pekerjaan pondasi struktur dan perakitan besi maupun begesting selesai selanjutnya kita melakukan pengecoran beton struktur.
Perakitan besi kita lakukan sebelum pengecoran beton kita lakukan. Perakitan kita laksanakan sesuai dengan syarat tehnis dan gambar yang ada.
IV PEKERJAAN BEGESTING
V PEKERJAAN DINDING
VI PEKERJAAN RANGKA ATAP
VII PEKERJAAN KUSEN, PINTU, JENDELA & BV
C PEKERJAAN ARSITEKTUR
I PEKERJAAN KERAMIK
II PEKERJAAN CAT
D PEKERJAAN M/EI PEKERJAAN ELEKTRIKAL
E PEKERJAAN TANGGA BETONI PEKERJAAN TANGGA BETON
PENUTUP
Namakota/kabupaten, 04 Oktober 2014Pemimpin
CV. ORIGINAL MITRA TEKNIK
Pekerjaan begesting kita pasang sesuai dengan kebutuhan yang ada, untuk pondasi, sloof maupun balok.
Setelah pekerjaan pondasi struktur dan kita lakukan pengecoran sloof selesai, selanjutnya kita akan melakukan pekerjaan pasangan dinding bata yang kita lengkapi dengan plesteran acian dan benangan.
Setelah pekerjaan pasangan dinding selesai selanjutnya kita melakukan pekerjaan rangka atap, dimana kita akan memasang kuda-kuda kayu, nok gording, usuk dan menggunakan bahan baru dan juga lama, listplank, genteng dan bubungan genteng.
Sambil berjalan pekerjaan pasangan, kita akan memasang kusen, baik pintu maupun jendela dan setelah pasangan selesai selanjutnya kita pasang daun pintu dan juga jendela.
Setelah kita rabat selanjutnya kita pasang keramik dan kita sesuaikan ukurannya dan warnanya untuk masing-masing ruangan, untuk lantai.
Setelah pekerjaan dinding dan plafond selesai kita akan melaksanakan pengecatan, baik interior maupun eksterior.
Pekerjaan ini kita laksanakan dengan terlebih dahulu memasang instalasi listrik, baru kemudian kita pasang stop kontak, saklar maupun lampu. Dan juga kita akan melakukan penyambungan instalasi terdekat.
Pekerjaan tangga beton kita lakukan dengan melakukan pemasangan dinding bata, termasuk plesteran dan plat beton tangga.
Sehubungan dengan terbatasnya waktu pelaksanaan yang ditetapkan, maka efektifitas dan efisiensi dalam penyusunan program dan pelaksanaan pekerjaan menjadi hal utama yang perlu mendapatkan perhatian utama sehingga dapat mencapai hasil karya yang lebih optimal
Demikian uraian singkat kami yang merupakan pendekatan dalam pencapaian hasil karya pelaksanaan secara sistematika berdasarkan pengalaman kami selama ini dalam menangani pelaksanaan pembangunan proyek fisik pemerintahan.
DIO A. HEMAWAN, STDirektur
REKAPITULASI PERHITUNGAN TKDN
Penyedia Jasa : CV. ORIGINAL MITRA TEKNIKAlamat : Jl. Diponegoro No. 17 Namakota/kabupaten, NamapropinsiPaket : PEMBANGUNAN RUANG KELAS
Uraian Pekerjaan
Nilai Gabungan Barang/Jasa (Rp.) TKDN
DN LNTotal
Gabungan %Ribu Rp. % KDN
(1) (2) (3) (4) (5) (7) (8)
BarangI. Material Langsung 279,090,508.74 - 279,090,508.74 52.50% 52.50% 52.50%
( Bahan baku )II. Peralatan ( Barang 93,030,169.58 - 93,030,169.58 17.50% 17.50% 17.50%
jadi )A. Sub Total Barang 372,120,678.32 - 372,120,678.32 70.00% 70.00% 70.00%
JasaIII. Manajemen Proyek 23,922,043.61 - 23,922,043.61 4.50% 4.50% 4.50%
dan PerekayasaanIV. Alat Kerja / Fasilitas 39,870,072.68 - 39,870,072.68 7.50% 7.50% 7.50%
KerjaV. Konstruksi dan 79,740,145.35 - 79,740,145.35 15.00% 15.00% 15.00%
FabrikasiVI. Jasa Umum 15,948,029.07 - 15,948,029.07 3.00% 3.00% 3.00%B. Sub Total Jasa 159,480,290.71 - 159,480,290.71 30.00% 30.00% 30.00%
C. TOTAL Biaya ( A + 531,600,969.03 - 531,600,969.03 100.00% 100.00% 100.00%B )
Namakota/kabupaten, 04 Oktober 2014Pemimpin
CV. ORIGINAL MITRA TEKNIK
DIO A. HEMAWAN, STDirektur
Barang/Jasa %