PURE-NET ANNUAL MEETING 2016 WORKING...
Transcript of PURE-NET ANNUAL MEETING 2016 WORKING...
![Page 1: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå](https://reader033.fdocument.pub/reader033/viewer/2022051723/5ab863ef7f8b9ad5338cc306/html5/thumbnails/1.jpg)
Forsideslide med bilde
Dette bildet kan ikke endres.
Ønsker du et annet bilde,
bruk forsideslide.
Forsideslideslide med bilde
Oslo 28.09.16 Morten Dybesland
PURE-NET ANNUAL
MEETING 2016
WORKING TABLE KPI
![Page 2: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå](https://reader033.fdocument.pub/reader033/viewer/2022051723/5ab863ef7f8b9ad5338cc306/html5/thumbnails/2.jpg)
Ønskes annen
bakgrunnsfarge
enn grå under
ikonene, velges
dette ved hjelp av
funksjonen format
background.
For å komme inn til
denne funksjonen
høyre klikker/ctr
klikker man på
bakgrunnen, velger
så format
background fra
menyen, videre
velger man fill –
solid – color. Der
velger man ønsket
farge fra Statsbygg
sin fargepallett
(øverste raden
med farger).
1-spalte ikonelement
• What
• When
• Where
• Why
• Preparations
CONTENT
![Page 3: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå](https://reader033.fdocument.pub/reader033/viewer/2022051723/5ab863ef7f8b9ad5338cc306/html5/thumbnails/3.jpg)
1-spalte layout
WORKING TABLE ON KEY PERFORMANCE INDICATORS
(KPI)
• At the annual conference in 2015
recommended to continue working
table on Key Performance Indicators
• Aim: To compare and learn from best
practise
• Statsbygg and OGRPA, Czech Republic
responsible as organizer and host
![Page 4: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå](https://reader033.fdocument.pub/reader033/viewer/2022051723/5ab863ef7f8b9ad5338cc306/html5/thumbnails/4.jpg)
Kun tittel
WT IN PRAGUE IN 2015 – AND 2017
![Page 5: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå](https://reader033.fdocument.pub/reader033/viewer/2022051723/5ab863ef7f8b9ad5338cc306/html5/thumbnails/5.jpg)
1-spalte layout
CONCLUSION 2015 AND BASE FOR FURTHER WORK KPIs we agreed to have a closer look at:
1. Square m/FTE
2. Maintenance cost/ Portfolio standard KPI
3. The maintenance rate
4. Profit or return to capital
5. Occupation rate
Key insights:
• Difficult to compare KPIs if the basic functioning of the organization is not taken into account
• Use knowledge from WT on Strategy as input for the further work with KPIs. Based on different business models we have in various countries.
![Page 6: PURE-NET ANNUAL MEETING 2016 WORKING …theworkplacenetwork.org/wp-content/uploads/2017/06/28.pdfPURE-NET ANNUAL MEETING 2016 WORKING TABLE KPI Ønskes annen bakgrunnsfarge enn grå](https://reader033.fdocument.pub/reader033/viewer/2022051723/5ab863ef7f8b9ad5338cc306/html5/thumbnails/6.jpg)
Tekat og valgt element
• Conduct survey among PuRE- net
members in advance of WT
(identified KPI’s and business-model)
• Use PuRE-net homepage to share KPI
PREPARATIONS