United Fiber System Ltd

PT KK Pulp Mill Project

Capacity : 1,500 adt/d BHKPLocation : East KalimantanIn Operation : since Nov 1999Raw Materials : Domestic & OverseasCurrent Conditions : Discontinuous operation due

to lack of working capitalConstruction by : Consortium of,

1. HA Simons, Canada 2. Beloit, USA 3. Ahlstrom, Finland

United Fiber System Ltd

PT KK Pulp Mill Project

Other facilities include:Housing Complex for EmployeesSeveral Jetties for both outgoing pulp & incoming materials (2 x 15,000 DWT)

Wood supplyFuel Oil

AirportMedical CenterSchoolsSports & Recreation

3

United Fiber System Ltd

PT KK Pulp Mill Project

OMA is a interim measure before final Acquisition

UFS to operate & manage the Mill

Monthly pulp production: at least 30,000 t

Sales Price : USD 500 per tonne

(approx. Industry average)

Manufacturing Costs: USD 220 – 300 per tonne

(approx. Industry average)

United Fiber System Ltd

PT KK Pulp Mill Project

Acquisition process takes 3 – 5months

Final price to determined after due diligence

Definitely much lower than a new mill

PT MBBM is USD 863m (without Chemical and Water

Effluent Treatment plants)

Advantages of time + immediate earnings

4

United Fiber System Ltd

PT KK Pulp Mill Project

United Fiber System Ltd

PT KK Pulp Mill Project

5

United Fiber System Ltd

PT KK Pulp Mill Project

United Fiber System Ltd

PT KK Pulp Mill Project

6

United Fiber System Ltd

PT KK Pulp Mill Project

United Fiber System Ltd

PT KK Pulp Mill Project

Bark production

7

United Fiber System Ltd

PT KK Pulp Mill Project

United Fiber System Ltd

PT KK Pulp Mill Project

8

United Fiber System Ltd

PT KK Pulp Mill Project

United Fiber System Ltd

PT MAL Wood Chip Mill

Project

9

United Fiber System Ltd

Wood Chip Mill Project

Capacity: 700,000 tonnes/yearProject duration: 12 monthsInvestment cost: USD 45 millionFinancing: CMEC & RZBMarket price : USD 120 per tonne (approx. Industry average)Manufacturing Costs: USD 65 per tonne (approx Industry average)Raw material supply: neighbouring plantations

United Fiber System Ltd

Wood Chip Mill Project

10

United Fiber System Ltd

Wood Chip Mill Project

United Fiber System Ltd

Wood Chip Mill Project

11

United Fiber System Ltd

Wood Chip Mill Project

United Fiber System Ltd

Key Messages

Excellent Business opportunity

Immediate returns

Reflected in second half results

UFS on track with

Wood Chip Mill

Operation of Kiani Kertas Mill