PSI FLS Fuzzy Logik Systeme GmbHHaken bei Führungslinien „Folie in Ursprungszustand Start >...
Transcript of PSI FLS Fuzzy Logik Systeme GmbHHaken bei Führungslinien „Folie in Ursprungszustand Start >...
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSI FLS Fuzzy Logik Systeme GmbHSystems with built in intelligence.
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Staff Planning & Scheduling
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.2
PSIpepStaff Planning&Scheduling
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Typical challenges in planning of manpower
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.3
Please ensure that you keep all accounts balanced.
Why not shift some guys from Section A to do the task?
What happens if we go from 3 to 2 shifts?
Paul works according to the new contract contrary to John and Jill.
Can we deliver our orders on time?
Can Mr. Anderson take next week off?
How many temps will we need during peak?
Ms. Julie called in sick. Who can take over her shift?
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Your companion for the full planning cycle
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.4
Continuous
forecasts
Sales department
Continuous scheduling
Production / Logistics
Workload balancing
Rescheduling
Budget planning
Controlling
Simultaneous planning
• Fast reaction times
• Short planning cycles
PSIpep_en.lnkPSIpep_en.lnkpepdemo_q.lnkpepdemo_q.lnk
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Strategic budget and capacity planning
Determination of demand by averaged productivitiesHead-related capacity planning (absence rates, temporary worker demand)Holiday planning (visualization of bottlenecks)Demand oriented shift scenarios (flex-time trends, comparison of scenarios)Continuous and sustainable verification of KPIs (productivity, costs, working times)
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.5
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Operational staff scheduling & monitoring
Individual scheduling and organisation of worktimeConsideration of staff qualification profilesIntegration of rescheduling rules and prioritiesIdentification of capacity bottlenecksReporting and visualization (workload)Release of shift schedules (print, online)Staff-related rescheduling (shifts, tasks)
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.6
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Innovative technology
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.7
PSIpepStaff Planning&Scheduling
Resource based planning
• Budgets, capacities and staff qualification profiles
• Shifts and productivities• Detailed (re)scheduling
Integration
• HR systems• PSIpenta, ERP systems• PSIwms, WMS systems• Time management systems
Database• Oracle
User-friendly GUI
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSIpep – Your benefits
PSI FLS Fuzzy Logik Systeme GmbH - Systems with built in intelligence.8
process transparency
less temporary workers
standardized planning
cost savingsstrategic and operational
balanced working schedules
bottleneck detection
interactive planning
shift and working time models
-
Haken bei Führungslinien
„Folie in Ursprungszustand
Start > (Folien)
PSI FLS Fuzzy Logik Systeme GmbHSystems with built in intelligence.