PROYECTO BULUBULU TECNOLOGIA MODERNA RENOVADA INCA DE ECUADOR MEDICO CIRUJANO CMP Nº 38402 JOSE BONIFACIO DE SOUZA LEITE CUADROS

Transcript of Proyecto bulubulu tecnologia moderna inca

Page 1: Proyecto bulubulu tecnologia moderna inca

PROYECTO BULUBULU TECNOLOGIA

MODERNA RENOVADA INCA DE ECUADOR

MEDICO CIRUJANO CMP Nº 38402JOSE BONIFACIO DE SOUZA LEITE CUADROS

Page 2: Proyecto bulubulu tecnologia moderna inca

PROYECTO BULUBULU TECNOLOGIA MODERNA RENOVADA INCA DE ECUADOR EL PROYECTO BULUBULU ESTA BASADO EN UN 70% EN LA TECNOLOGIA INCA ANTIGUA PREHISPANICA DE RIOS Y TRASVASES DE

RIOS ARTIFICIALES ADEMAS DE CANALES INCAS SUBTERRANEOS FALSOS PARA LUCHAR CONTRA EL FENOMENO DEL NIÑO AMBIENTAL CADA 20 AÑOS. QUE ECUADOR SIEMPRE CUIDO, MANTUVO, REPARO, ESTUDIO Y PROTEGIO Y UN 30% EN TECNOLOGIA MODERNA RENOVADA INCA EN USAR ESTRUCTURAS DE CENTRALES HIDROELECTRICAS, HORMIGON ARMADO, ZAPATAS DE CIMENTACION PROFUNDA Y COLUMNAS DE HORMIGON CON FIERROS Y EMBALSES GIGANTES DE AGUA.

TIENE VARIAS REQUISITOS QUE SON: 1) LOS RIOS DEBEN TENER MURALLAS DE HORMIGON ARMADO CON FIERROS CON COLUMNAS Y ZAPATAS DE CIMENTACION PROFUNDA DE FIERRO CADA 15 METROS DE DISTANCIA O MENOS. 2) LAS AGUAS DEBEN CORRER EN FORMAS ESCALONADAS EN PELDAÑOS Y CON EMBALSE PARA QUE NO VAYA MUY RAPIDO A TODA VELOCIDAD AL MAR Y TUMBANDO Y DESTRUYENDO TODO LO QUE ESTA EN SU CAMINO Y SE DESBORDE EN LA CIUDAD. 3) LOS PILARES DE LOS PUENTES FUERTES Y ARMADOS DE FIERRO MEJOR CON CARRILES DEL TREN DE FIERROS GRUESOS BIEN ANCLADOS EN CONTRA DEL FLUJO DEL AGUA LEJOS DEL BORDE DEL RIO PARA QUE EL PILAR NO SE DESTRUYA Y CON MURO DE CONCRETO Y SU PILAR A 15 METROS DE PROFUNDIDAD DEL PISO O CARRETERA MINIMO.

TIENE COMPONENTES COMO 1) MUROS DE HORMIGON DE 2800 METROS (MTS) DE LONGITUD DE 7 A 13 MTS DE ALTURA CON 22 000 M3 DE HORMIGON. 2) DIQUES DE TIERRA CON PIEDRAS GIGANTES DE 12 000 MTS DE LONGITUD DE 4 A 8 MTS DE ALTURA. 3) DERIVADORA Y EMBALSE LAS MARAVILLAS CON ESPEJO DE AGUA DE 305 HECTAREAS CON UN EMBALSE DE 16 MILLONES DE M3 DE AGUA Y CAPACIDAD DE DERIVACION DE 600 M3 POR SEGUNDO.

EJECUCION PLANEADO EN 1 AÑO Y REALIZADO EN LA REALIDAD EN 3 AÑOS POR LA DIFICULTAD ES QUE TIENE TODO RIO.

RETIENE 16 MILLONES DE METROS CUBICOS DE AGUADE AGUA EXCEDENTE Y SIRVEN PARA 14 MILLONES DE M3 DE AGUA PARA RIEGO DE 20000 HECTAREAS EN EPOCA SECA Y 2 MILLONES DE METROS CUBICOS DE CAUDAL ECOLOGICO.

FUE HECHA POR LOS CONSORCIOS CAÑAR , NAJANRAL, UCUENCA EP- EMPRESA ACSAM LTDA A CARGO DE LA EMPRESA CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE POR UN VALOR DE 400 MILLONES DE DOLARES EN UN PLAN INICIAL APROXIMADAMENTE Y LUEGO COSTO REAL DE 1000 MILLONES DE DOLARES.

DERECHOS DE AUTOR: MEDICO CIRUJANO PERUANO BRASILEÑO JOSE BONIFACIO DE SOUZA LEITE CUADROS CMP Nº 38402 HUANCAYO JUNIN PERU 29 DE MARZO DEL 2017.

Page 3: Proyecto bulubulu tecnologia moderna inca

TECNOLOGIA MODERNA DO PROJETO RENOVADA BULUBULU INCA DO EQUADOR

O PROJETO É BASEADO BULUBULU 70% INCA TECNOLOGIA EM ANTÍGUA E TRASVASES PREHISPANIC RIO RIO DE CANAL PARA ALÉM ARTIFICIAL FALSIFICAÇÃO INCAS UNDERGROUND PARA COMBATER CRIANÇA FENÔMENO AMBIENTAL CADA 20 ANOS. EQUADOR CUIDADOS QUE SEMPRE MANTIDA, REPARADA ESTUDO PROTEGIDAS E 30% DA TECNOLOGIA MODERNA EM PLANTAS USO INCA RENOVADAS ESTRUTURAS HIDRELÉTRICAS, CONCRETO, FOOTINGS PROFUNDA E COLUNAS CONCRETO COM FERROS E RESERVATÓRIOS DE ÁGUA GIGANTES.

TEM CONDIÇÕES VÁRIOS QUE SÃO: 1) RIOS DEVE SER ARMADO COM PAREDES DE CONCRETO FIERROS COM COLUNAS E RODAPÉS PROFUNDAS CADA FIERRO 15 METROS OU MENOS. 2) MANEIRAS ÁGUA PARA CORRIDA COM INTERVEIO PASSOS E RESERVATÓRIO PARA NÃO IR MUITO RÁPIDO NO TUMBANDO RÁPIDO E MAR E DESTRUINDO TUDO ESTÁ EM SEU MEIO E NO ESTOURO CIDADE. 3) OS PILARES DA BRIDGES FORTE E ARMADO FIERRO MELHOR COM OS TRILHOS DO TREM FIERROS GROSSO BEM ANCORADAS CONTRA O FLUXO DE ÁGUA PARA LONGE DA BORDA DO RIO PARA O PILAR NÃO DESTRUIR E PAREDE DE CONCRETO E PILAR 15 METROS PAVIMENTOS PROFUNDIDADE OU RODOVIÁRIA MÍNIMA.

TEM COMO COMPONENTES 1) PAREDES DE BETÃO 2800 METROS (MTS) COMPRIMENTO 7 A 13 METROS DE ALTURA COM 22 000 M3 DE BETÃO. 2) PAREDES DE TERRA DE PEDRA GIGANTE 12000 MTS COMPRIMENTO 4 A 8 METROS DE ALTURA. 3) DESVIADOR RESERVATÓRIO E ESPELHO MARAVILH ÁGUA DO RESERVATÓRIO 305 HECTARES COM UM DE 16 MILHÕES DE M3 DE ÁGUA E CAPACIDADE DE DESCARGA DE 600 M3 POR SEGUNDO.

EXECUÇÃO POR 1 ANO PLANEJADO E REALIZADO EM REALIDADE EM 3 ANOS POR A DIFICULDADE É TUDO O QUE SE RIO.

RETÉM 16 BCM DE EXCEDENTE DE ÁGUA E SERVIR AGUADE 14 MILHÕES DE M3 DE ÁGUA DE IRRIGAÇÃO PARA 20.000 HECTARES EM ESTAÇÃO SECA E 2 BCM CAUDAL ECOLÓGICO.

FOI FEITO POR CAÑAR CONSÓRCIOS, NAJANRAL, UCUENCA EP- COMPANY ACSAM LTDA RESPONSÁVEL DA SOCIEDADE CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE WORTH 400 MILHÕES EM UM PLANO DE APROXIMADAMENTE INICIAL E ENTÃO CUSTO REAL DOS 1000 MILHÕES.

COPYRIGHT: CIRURGIÃO PERUANA BRASILEIRO JOSÉ BONIFÁCIO DE SOUZA LEITE CMP FOTOS PERU NO. 38402 HUANCAYO JUNIN 29 DE MARCO DE 2017.

Page 4: Proyecto bulubulu tecnologia moderna inca

PROJECT BULUBULU MODERN TECHNOLOGY RENOVATED INCA OF ECUADOR THE BULUBULU PROJECT IS BASED ON 70% IN INCA TECHNOLOGY ANCIENT PREHISPANIC OF RIVERS AND TRASVASES OF

ARTIFICIAL RIVERS IN ADDITION OF FALSE GROUND INCAS CHANNELS TO FIGHT AGAINST THE PHENOMENON OF THE ENVIRONMENTAL CHILD EVERY 20 YEARS. ECUADOR ALWAYS CARE, HELD, REPAIR, STUDY AND PROTECTION AND 30% IN RENEWED MODERN TECHNOLOGY INCA IN USING STRUCTURES OF HYDROELECTRIC CENTRAL, ARMED CONCRETE, DEEP FOUNDATION SHOULDERS AND CONCRETE COLUMNS WITH FIREWORKS AND GIANT WATER SHELTERS.

IT HAS SEVERAL REQUIREMENTS THAT ARE: 1) THE RIVERS SHOULD HAVE ARMED CONCRETE WALLS WITH FIREWORKS WITH COLUMNS AND FIERRO DEEP FOUNDATION SHOES EVERY 15 METERS DISTANCE OR LESS. 2) THE WATERS SHOULD RUN IN FORMS STEPPED IN PELDAÑOS AND WITH PACKAGE SO THAT IT DOES NOT GO VERY FAST AT ALL SPEEDS TO THE SEA AND TUMBANDO AND DESTRUYING EVERYTHING THAT IS ON ITS WAY AND EXPANDS IN THE CITY. 3) THE PILLARS OF THE STRONG AND ARMED BRIDGES OF FIERRO BETTER THROUGH THE TRAINS OF THROUGH FERROUS WAYS ANCHORED AGAINST THE FLOW OF THE WATER FROM THE EDGE OF THE RIVER SO THAT THE PILLAR IS NOT DESTROYED AND WITH A CONCRETE WALL AND ITS PILLAR TO 15 METERS OF DEPTH OF THE FLOOR OR MINIMUM ROAD.

HAS COMPONENTS LIKE 1) CONCRETE WALLS OF 2800 METERS (MTS) OF LENGTH OF 7 TO 13 MTS OF HEIGHT WITH 22 000 M3 OF CONCRETE. 2) EARTH CHAINS WITH GIANT STONES OF 12,000 MTS OF LENGTH OF 4 TO 8 MTS OF HEIGHT. 3) DERIVATIVE AND PACKAGING WONDERS WITH 305 HECTARE WATER MIRROR WITH A 16 MILLION M3 WATER CONTAINER AND 600 M3 DERIVATION CAPACITY PER SECOND.

EXECUTION PLANNED IN 1 YEAR AND CONDUCTED IN REALITY IN 3 YEARS FOR THE DIFFICULTY IS THAT HAS EVERY RIVER.

IT REMAINS 16 MILLION CUBIC METERS OF AGUADE OVERWATER AND SERVES FOR 14 MILLION M3 OF WATER FOR IRRIGATION OF 20000 HECTARES IN DRY TIME AND 2 MILLION CUBIC METERS OF ECOLOGICAL FLOW.

IT WAS MADE BY THE CONSORTIUMS CAÑAR, NAJANRAL, UCUENCA EP- EMPRESA ACSAM LTDA BY THE COMPANY CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE FOR A VALUE OF 400 MILLION DOLLARS IN AN INITIAL PLAN APPROXIMATELY AND THEN REAL COST OF 1000 MILLION DOLLARS.

COPYRIGHT: PERUVIAN PERUVIAN SURGICAL PHYSICIAN JOSE BONIFACIO DE SOUZA MILES PICTURES CMP Nº 38402 HUANCAYO JUNIN PERU MARCH 29, 2017.

Page 5: Proyecto bulubulu tecnologia moderna inca

MODERNE TEGNOLOGIE PROJEK HERNU BULUBULU INCA VAN ECUADOR DIE PROJEK IS BASED BULUBULU 70% INCA TEGNOLOGIE IN ANTIGUA EN TRASVASES PREHISPANIC RIVER RIVIERKANAAL BENEWENS

KUNSMATIGE FAKE INCA ONDERGRONDSE KIND ENVIRONMENTAL VERSKYNSEL VEG, ELKEEN 20 JAAR. ECUADOR SORG WAT ALTYD IN STAND GEHOU, HERSTEL, BESKERM STUDIE EN 30% IN DIE MODERNE TEGNOLOGIE IN GEBRUIK INCA HERNU STRUKTURE HIDRO-AANLEGTE, BETON, VOETSTUKKE DIEP EN BETONKOLOMME MET YSTER EN WATERRESERVOIRS REUSE.

DAAR IS VERSKEIE VOORWAARDES WAT: 1) RIVERS BEHOORT AAN BETONMURE FIERROS MET KOLOMME EN VOETSTUKKE DEEP ELKE FIERRO 15 METER OF MINDER GEWAPEN WEES. 2) WATER MANIERE OM IN HARDLOOP MET INGETREE STAPPE EN RESERVOIR NA NIE IN DIE VINNIGE EN DIE SEE TUMBANDO BAIE VINNIG GAAN EN DIE VERNIETIGING VAN ALLES IN JOU PAD EN IN DIE STAD OORLOOP. 3) DIE PILARE VAN 'N STERK BRIDGES EN GEWAPENDE FIERRO BETER MET RELINGS TREIN FIERROS DIK GOED GEANKER TEEN WATERVLOEI WEG VAN DIE RAND VAN DIE RIVIER AAN DIE PILAR NIE VERNIETIG NIE EN DIE MUUR VAN BETON EN PILAR 15 METER DIEPTE VLOER OF ROAD MINIMAAL.

HET AS KOMPONENTE 1) BETONMURE 2800 METER (MTS) LENGTE 7 TOT 13 METER HOOG MET 22 000 M3 BETON. 2) DIE AARDE MURE STONE GIANT 12000 MTS LENGTE 4 TOT 8 METER HOOG. 3) DIVERTER RESERVOIR EN SPIEËL WONDERLAND WATERRESERVOIR 305 HEKTAAR MET 'N 16 MILJOEN M3 WATER EN ONTSLAG KAPASITEIT VAN 600 M3 PER SEKONDE.

UITVOERING IN 1 JAAR BEPLAN EN VERWESENLIK IN WERKLIKHEID 3 JAAR DEUR DIE PROBLEEM IS ALMAL WAT HET RIO.

BEHOU 16 BCM VAN WATER SURPLUS EN BEDIEN AGUADE 14 MILJOEN M3 VAN BESPROEIINGSWATER AAN 20,000 HEKTAAR IN DROË SEISOEN EN 2 MILJARD KUBIEKE METER FLOW EKOLOGIESE.

DIT IS GEMAAK DEUR CANAR KONSORTIUMS, NAJANRAL, UCUENCA EP- MAATSKAPPY ACSAM LTDA IN BEHEER VAN DIE MAATSKAPPY CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE WORTH 400 MILJOEN IN 'N EERSTE GESKATTE PLAN EN DAN WERKLIKE KOSTE VAN 1000000000.

KOPIEREG: CHIRURG PERUAANSE BRASILIAANSE JOSE BONIFACIO DE SOUZA LEITE CMP PICTURES PERU NO. 38402 HUANCAYO JUNIN 29 MAART 2017.

Page 6: Proyecto bulubulu tecnologia moderna inca

الحديثة اإلكوادور BULUBULU INCA OF المتجدد PROJECT التكنولوجيا THE PROJECT يستند BULUBULU 70 ٪ INCA TECHNOLOGY و أنتيغوا RIVER RIVER الهسبانية TRASVASESفي

CHANNEL وهمية اصطناعية لقتال INCAS باألضافة األرض كل CHILD تحت بيئية . 20ظاهرة االكوادور عاماو محمية دراسة إصالح، دائما، حافظت التي النباتات 30الرعاية استخدام في الحديثة التقنية في ٪ INCA

مع الخرسانية واألعمدة عميقة المواطئ والخرسانة، الكهرومائية، الطاقة الهياكل IRONS المتجددالمياه .GIANTS وخزانات

          : وهي عدة شروط 1فقد ) RIVERS الخرسانية الحوائط مع المسلحة ينبغي األعمدة FIERROS بل معالمسلحة . DEEP EACH FIERRO 15 والقواعد أقل أو لتشغيل( 2مترا المياه سبل IN وخزان خطوات تدخلت مع

الذهاب . VERY FAST IN THE TUMBANDO FAST AND SEA لعدم تجاوز المدينة وفي طريقك في شيء كل وتدميرمسلحة( 3 و قوية الجسور دعائم FIERRO القضبان مع ضد TRAIN FIERROS أفضل الجذور راسخة سميكة

عن بعيدا المياه و EDGE OF THE RIVER TO THE PILAR تدفق الخرسانة من وجدار يدمر عمق PILAR 15لن مترأو األدنى ROAD األرض .الحد

HAS AS الخرسانية( 1مكونات متر 2800الجدران (MTS) ارتفاع مع 13-7الطول 22 000متر M3 منالترابية( 2الخرسانة. الجدران STONE GIANT 12000 MTS ارتفاع . 8إلى 4طول الخزان( 3أمتار كلبشة

الخزان MIRROR WONDERLANDو مع 305مياه مليون 16هكتار M3 من التصريف على والقدرة المياه 600من M3 الواحدة الثانية .في

EXECUTION IN 1 YEAR الواقع في تحققت والتي لها ما 3المخطط كل في الصعوبة وتكمن سنوات RIO.

           وتخدم 16يحتفظ الفائضة المياه من مكعب متر مليون 14مليار AGUADE M3 إلى الري مياه 20000منالجفاف موسم في مكعب 2هكتار متر مليار FLOW البيئية.

            اتحادات كنار شركة قبل من مصنوعة وهي ، NAJANRAL ، UCUENCA EP- COMPANY ACSAM LTDA IN CHARGE OF THE COMPANY CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE في 400بقيمة دوالر مليون AN PLAN

من ذلك بعد الحقيقية والتكلفة األولي دوالر 1000تقريبا مليون .

             : البرازيلي بيرو جراحة النشر سوزا JOSE حقوق دي رقم LEITE CMP PICTURES بونيفاسيو 38402بيرو2017مارس JUNIN 29 هوانكايو .

Page 7: Proyecto bulubulu tecnologia moderna inca

ALTTIKNULUJIA ALHADITHAT PROJECT ALMUTAJADDID BULUBULU INCA OF AL'IIKWADURTHE PROJECT YASTANID BULUBULU 70% INCA TECHNOLOGY FI 'ANTIGHUU WATRASVASES ALHISBANIAT RIVER RIVER CHANNEL BIAL'ADAFAT AISTINAEIAT WAHMIAT INCAS TAHT AL'ARD LLIQITAL CHILD ZAHIRATAN BIYIYATAN KL 20 EAMA. ALAKWADWR ALRRIEAYAT ALTY HAFAZAT DAYIMA, 'IISLAHA, DIRASAT MAHMIAT W 30% FI ALTTAQNIAT ALHADITHAT FI AISTIKHDAM ALNNABATAT INCA ALMUTAJADDID ALHAYAKIL ALTTAQAT ALKAHRUMAYIYATA, WALKHURSANAT, ALMAWATI EAMIQATAN WAL'AEMIDAT ALKHARSANIAT MAE IRONS WAKHIZANAT ALMIAH GIANTS.FIQD SHURUT EDT WAHI: 1) RIVERS BAL YANBAGHI ALMUSALLAHAT MAE ALHAWAYIT ALKHARSANIAT FIERROS MAE ALAEMDAT WALQAWAEID ALMUSALLAHAT DEEP EACH FIERRO 15 MITRAAN 'AW 'AQL. 2) SUBUL ALMIAH LITASHGHIL IN MAE TADAKHKHALAT KHATAWAT WAKHZAN LIEADAM ALDHDHAHAB VERY FAST IN THE TUMBANDO FAST AND SEA WATADMIR KL SHAY' FI TARIQIK WAFI ALMADINAT TAJAWAZ. 3) DAEAYIM ALJUSUR QAWIATAN W MUSALLAHAT FIERRO 'AFDAL MAE ALQUDBAN TRAIN FIERROS SAMIKAT RASIKHAT ALJUDHUR DIDD TADAFFUQ ALMIAH BEYDA EAN EDGE OF THE RIVER TO THE PILAR LAN YUDAMMAR WAJADAR MIN ALKHURSANAT WAPILAR 15 MITR EUMQ AL'ARD 'AW ROAD ALHADD AL'ADNAA.HAS AS MUKAWWINAT 1) ALJUDRAN ALKHARSANIAT 2800 MITR (MTS) ALTTAWL AIRTIFAE 7-13 MITR MAE 000 22 M3 MIN ALKHRSAN. 2) ALJUDRAN ALTTRABIAT STONE GIANT 12000 MTS TUL AIRTIFAE 4 'IILAA 8 'UMTAR. 3) KLABSHAT ALKHIZZAN WAMIRROR WONDERLAND MIAH ALKHIZZAN 305 HIKTAR MAE 16 MLYWN M3 MIN ALMIAH WALQUDRAT EALAA ALTTASRIF MIN 600 M3 FI ALTHTHANIAT ALWAHIDAT.EXECUTION IN 1 YEAR ALMUKHATTAT LAHA WALLATI TAHAQQAQAT FI ALWAQIE 3 SANAWAT WATAKMIN ALSSUEUBAT FI KL MA RIO.YAHTAFAZ 16 MILYAR MITR MUKAEEAB MIN ALMIAH ALFAYIDAT WATUKHDIM 14 MILYUN AGUADE M3 MIN MIAH ALRRI 'IILAA 20000 HIKTAR FI MAWSIM ALJIFAF 2 MILYAR MITR MUKAEEAB FLOW ALBIYIYAT.WAHI MISNUEAT MIN QIBAL SHARIKAT KUNNAR ATTIHADATI, NAJANRAL ، UCUENCA EP- COMPANY ACSAM LTDA IN CHARGE OF THE COMPANY CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE BIQIMAT 400 MILYUN DULAR FI AN PLAN TAQRIBAAN AL'AWWALI WALTTAKLIFAT ALHAQIQIAT BAED DHLK MIN 1000 MILYUN DULARIN.HIQUQ ALNNASHR: JIRAHAT BIRU ALBARAZILI JOSE BUNIFASIU DI SUZA LEITE CMP PICTURES BIRIW RAQM 38402 HUANKAYU JUNIN 29 MARIS 2017.

Page 8: Proyecto bulubulu tecnologia moderna inca

СОВРЕМЕННЫЕ ТЕХНОЛОГИИ ПРОЕКТ ОБНОВЛЕННОГО BULUBULU INCA ЭКВАДОРА ПРОЕКТ ОСНОВАН BULUBULU 70% INCA ТЕХНОЛОГИИ В АНТИГУА И TRASVASES ДОИСПАНСКИЙ RIVER RIVER КАНАЛА В

ДОПОЛНЕНИЕ ARTIFICIAL ПОДДЕЛЬНУЮ INCAS UNDERGROUND БОРОТЬСЯ ЗА ДЕТЬМИ ЭКОЛОГИЧЕСКОЙ ФЕНОМЕН КАЖДЫЕ 20 ЛЕТ. ЭКВАДОР CARE, ЧТО ВСЕГДА ПОДДЕРЖИВАЕТСЯ, РЕМОНТИРУЕТСЯ, ЗАЩИЩЕННОЕ ИЗУЧЕНИЕ И 30% В СОВРЕМЕННОЙ ТЕХНОЛОГИИ В USE INCA ВОЗОБНОВЛЯЕМЫХ КОНСТРУКЦИИ ГЭС, БЕТОН, ФУНДАМЕНТЫ ГЛУБОКИ И БЕТОННЫЕ КОЛОННЫ УТЮГОВ И ВОДОХРАНИЛИЩА ГИГАНТОВ.

ОН ИМЕЕТ НЕСКОЛЬКО УСЛОВИЙ, КОТОРЫЕ: 1) РЕК ДОЛЖЕН БЫТЬ ВООРУЖЕН С БЕТОННЫМИ СТЕНАМИ FIERROS С КОЛОННАМИ И ФУНДАМЕНТАМИ ГЛУБИННЫХ EACH FIERRO 15 МЕТРОВ ИЛИ МЕНЬШЕ. 2) ВОДНЫЕ ПУТИ БЕЖАТЬ В СТУПЕНЧАТОМ В ШАГЕ И ПЛАСТ НЕ ПОЙТИ ОЧЕНЬ БЫСТРО В БЫСТРО И МОРЕ TUMBANDO И РАЗРУШЕНИЕ ВСЕ В ВАШЕМ СПОСОБЕ И В ПЕРЕЛИВЕ ГОРОДА. 3) СТОЛБЫ СИЛЬНЫХ МОСТОВ И ВООРУЖЕННЫЙ FIERRO ЛУЧШЕЙ С РЕЛЬСАМИ ПОЕЗД FIERROS THICK ХОРОШО ЯКОРЬ ПРОТИВ ВОДЫ УТЕКАЕТ ОТ КРАЯ РЕКИ ДО ПИЛАР НЕ УНИЧТОЖИТЬ И СТЕНА БЕТОННОГО И PILAR 15 СЧЁТЧИКИ ГЛУБИНА ЭТАЖА ИЛИ ДОРОЖНЫЙ МИНИМАЛЕН.

ИМЕЕТ В КАЧЕСТВЕ КОМПОНЕНТОВ 1) БЕТОННЫХ СТЕН 2800 МЕТРОВ (МТС) ДЛИНА ОТ 7 ДО 13 МЕТРОВ С 22 000 М3 БЕТОНА. 2) ЗЕМЛЯ СТЕНЫ КАМЕНЬ GIANT 12000 МТС ДЛИНА 4 К 8 МЕТРОВ. 3) ОТВОДНОЙ ПЛАСТ И ЗЕРКАЛО ЧУД РЕЗЕРВУАР ДЛЯ ВОДЫ 305 ГА С 16 МЛН М3 ВОДЫ И РАЗРЯДНОЙ ЕМКОСТЬЮ 600 М3 В СЕКУНДУ.

ИСПОЛНЕНИЕ 1 ГОД ПЛАНОВАЯ И ПОНЯЛ В РЕАЛЬНОСТИ В 3 ЛЕТ ТРУДНОСТЬЮ ЕСТЬ ВСЕ, ЧТО ИМЕЕТ RIO.

СОХРАНЯЕТ 16 МЛРД КУБ ВОДЫ ИЗЛИШКОВ И SERVE МЛН AGUADE 14 М3 ПОЛИВНОЙ ВОДЫ ДО 20000 ГА В ЗАСУШЛИВЫЙ СЕЗОН И 2 МЛРД КУБ ПОТОК ЭКОТОКСИЛОГИЧЕСКАЯ.

ЭТО БЫЛО СДЕЛАНО КАНАРАМИ КОНСОРЦИУМОВ, NAJANRAL, UCUENCA КОМПАНИЯ ACSAM ЕРА LTDA В ГЛАВЕ КОМПАНИИ CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE СТОИТ 400 МЛН В ПЕРВОНАЧАЛЬНОМ ПЛАНЕ ПРИБЛ И ТОГДА РЕАЛЬНУЮ СТОИМОСТЬ 1000 МЛН.

COPYRIGHT: ХИРУРГ ПЕРУАНСКОГО BRAZILIAN JOSE BONIFACIO DE СУЗ LEITE CMP PICTURES ПЕРУ NO. 38402 УАНКАЙО ХУНИНОЙ 29 МАРТА 2017..

Page 9: Proyecto bulubulu tecnologia moderna inca

PROYECTO BULUBULU TECNOLOGIA MODERNA RENOVADA INCA DE ECUADOR EL PROYECTO BULUBULU ESTA BASADO EN UN 70% EN LA TECNOLOGIA INCA ANTIGUA PREHISPANICA DE RIOS Y TRASVASES DE

RIOS ARTIFICIALES ADEMAS DE CANALES INCAS SUBTERRANEOS FALSOS PARA LUCHAR CONTRA EL FENOMENO DEL NIÑO AMBIENTAL CADA 20 AÑOS. QUE ECUADOR SIEMPRE CUIDO, MANTUVO, REPARO, ESTUDIO Y PROTEGIO Y UN 30% EN TECNOLOGIA MODERNA RENOVADA INCA EN USAR ESTRUCTURAS DE CENTRALES HIDROELECTRICAS, HORMIGON ARMADO, ZAPATAS DE CIMENTACION PROFUNDA Y COLUMNAS DE HORMIGON CON FIERROS Y EMBALSES GIGANTES DE AGUA.

TIENE VARIAS REQUISITOS QUE SON: 1) LOS RIOS DEBEN TENER MURALLAS DE HORMIGON ARMADO CON FIERROS CON COLUMNAS Y ZAPATAS DE CIMENTACION PROFUNDA DE FIERRO CADA 15 METROS DE DISTANCIA O MENOS. 2) LAS AGUAS DEBEN CORRER EN FORMAS ESCALONADAS EN PELDAÑOS Y CON EMBALSE PARA QUE NO VAYA MUY RAPIDO A TODA VELOCIDAD AL MAR Y TUMBANDO Y DESTRUYENDO TODO LO QUE ESTA EN SU CAMINO Y SE DESBORDE EN LA CIUDAD. 3) LOS PILARES DE LOS PUENTES FUERTES Y ARMADOS DE FIERRO MEJOR CON CARRILES DEL TREN DE FIERROS GRUESOS BIEN ANCLADOS EN CONTRA DEL FLUJO DEL AGUA LEJOS DEL BORDE DEL RIO PARA QUE EL PILAR NO SE DESTRUYA Y CON MURO DE CONCRETO Y SU PILAR A 15 METROS DE PROFUNDIDAD DEL PISO O CARRETERA MINIMO.

TIENE COMPONENTES COMO 1) MUROS DE HORMIGON DE 2800 METROS (MTS) DE LONGITUD DE 7 A 13 MTS DE ALTURA CON 22 000 M3 DE HORMIGON. 2) DIQUES DE TIERRA CON PIEDRAS GIGANTES DE 12 000 MTS DE LONGITUD DE 4 A 8 MTS DE ALTURA. 3) DERIVADORA Y EMBALSE LAS MARAVILLAS CON ESPEJO DE AGUA DE 305 HECTAREAS CON UN EMBALSE DE 16 MILLONES DE M3 DE AGUA Y CAPACIDAD DE DERIVACION DE 600 M3 POR SEGUNDO.

EJECUCION PLANEADO EN 1 AÑO Y REALIZADO EN LA REALIDAD EN 3 AÑOS POR LA DIFICULTAD ES QUE TIENE TODO RIO.

RETIENE 16 MILLONES DE METROS CUBICOS DE AGUADE AGUA EXCEDENTE Y SIRVEN PARA 14 MILLONES DE M3 DE AGUA PARA RIEGO DE 20000 HECTAREAS EN EPOCA SECA Y 2 MILLONES DE METROS CUBICOS DE CAUDAL ECOLOGICO.

FUE HECHA POR LOS CONSORCIOS CAÑAR , NAJANRAL, UCUENCA EP- EMPRESA ACSAM LTDA A CARGO DE LA EMPRESA CHINA INTERNATIONAL WATER & ELECTRIC CORP CWE POR UN VALOR DE 400 MILLONES DE DOLARES EN UN PLAN INICIAL APROXIMADAMENTE Y LUEGO COSTO REAL DE 1000 MILLONES DE DOLARES.

DERECHOS DE AUTOR: MEDICO CIRUJANO PERUANO BRASILEÑO JOSE BONIFACIO DE SOUZA LEITE CUADROS CMP Nº 38402 HUANCAYO JUNIN PERU 29 DE MARZO DEL 2017.

Page 10: Proyecto bulubulu tecnologia moderna inca

現代科技項目重續 BULUBULU INCA 厄瓜多爾 該項目是基於 BULUBULU 70 % INCA 技術在安提瓜和 TRASVASES PREHISPANIC 河河道除人工 FAKE

INCAS 地下消除兒童環境現象每 20 年。厄瓜多爾關心始終保持,修復,保護,研究, 30 %的現代科技 IN USE INCA 重續結構水力發電廠,混凝土,地基深埋了熨斗和水庫巨人混凝土柱。 它有幾個條件,包括: 1 )河流應與列和地基深 EACH 菲耶羅 15 米少的混凝土牆壁 FIERROS 武裝。 2 )水道來運行與臨危受命的步驟和水庫不是很快走在快速海 TUMBANDO ,摧毀一切都在你的路,在城市的溢出。 3 )強橋和 ARMED 菲耶羅更好地與鋼軌 TRAIN FIERROS 厚的 PILLARS 以及錨定逆著水流 AWAY 從右到 PILAR 河的 EDGE 不破壞與混凝土壁與 PILAR 15 米的深度地板或道路微乎其微。 HAS AS 組分 1 )的混凝土牆 2800 米( MTS ) LENGTH 高與混凝土的 22000 立方米 7 至 13 米。

2 )土牆石巨人 12000 MTS LENGTH 高 4 至 8 米。 3 )轉向器儲層和 MIRROR WONDERLAND 水油藏305 公頃與水和 600 立方米每秒放電容量的 16000000 立方米。

行刑 1 年策劃並實現了現實,在 3 年來的困難是所有這些都 RIO 。 保持水分盈餘 16 億立方米,服務 AGUADE14000000 立方米灌溉用水的 20000 公頃旱季 2 億立方米的流量生態。 它是由 CANAR 財團, NAJANRAL , UCUENCA EP- 公司 ACSAM LTDA 在該公司中國水利電力對外公司 CWE WORTH 400 萬的初始 APPROX 計劃 CHARGE 和 1000 萬張,然後真正的成本製造。 版權所有:外科醫生秘魯巴西 JOSE BONIFACIO 德索薩 LEITE CMP PICTURES 秘魯號 38402 萬卡約胡寧 2017 年 3 月 29 日。

Page 11: Proyecto bulubulu tecnologia moderna inca

HOY INAUGURAMOS LOS DOS ÚLTIMOS MEGAPROYECTOS HÍDRICOS DE UN TOTAL DE 6 QUE HA EJECUTADO EL GOBIERNO DE LA REVOLUCIÓN CIUDADANA (CHONGÓN-SAN VICENTE, BULUBULU, CHONE, DAULE-VINCES, CAÑAR Y NARANJAL). EN ESTOS PROYECTOS

HEMOS INVERTIDO MÁS DE MIL MILLONES DE DÓLARES. CIUDADANA QUE HA CAMBIADO LA VIDA DE NUESTROS

CAMPESINOS, DE LOS MÁS POBRES. NO ENTIENDEN QUE LA REVOLUCIÓN SON USTEDES, QUE EL GASTO PÚBLICO SON USTEDES.

ESTOS PROYECTOS FUERON ESPERADOS DURANTE DÉCADAS POR LOS HABITANTES DE ESTE SECTOR, SOBRE TODO POR NUESTROS

CAMPESINOS Y PRODUCTORES AGRÍCOLAS. CON LOS NUEVOS MULTIPROPÓSITOS ABASTECEREMOS DE AGUA

PARA RIEGO A 200.000 HECTÁREAS APROXIMADAMENTE Y MITIGAREMOS LOS EFECTOS DE LAS INUNDACIONES DE 142.000

HECTÁREAS. SI TOMAMOS EN CUENTA QUE LO QUE EXISTÍA EN CONTROL DE INUNDACIONES PROTEGÍA 160.000 HECTÁREAS Y

NOSOTROS HEMOS INCORPORADO 142.000 HECTÁREAS, SIGNIFICA QUE EN NUEVE AÑOS DE REVOLUCIÓN CIUDADANA PRÁCTICAMENTE

HEMOS CONSTRUIDO EL 100% DE LO QUE SE HABÍA CONSTRUIDO EN TODA LA HISTORIA DE VIDA REPUBLICANA DEL PAÍS.

¡HASTA LA VICTORIA SIEMPRE, COMPATRIOTAS!

RAFAEL CORREA DELGADO

PRESIDENTE CONSTITUCIONAL DE LA REPÚBLICA

DEL ECUADOR LA TRONCAL, ENERO 12 DE 2016

Page 12: Proyecto bulubulu tecnologia moderna inca

HOJE, NÓS ABRIMOS OS ÚLTIMOS DOIS MEGAPROJETOS ÁGUA UM TOTAL DE 6 EXECUTOU O GOVERNO DA CIVIC REVOLUTION (CHONGÓN-SAN VICENTE, BULUBULU CHONE, DAULE-VINCES CANAR E NARANJAL). ESTES PROJECTOS

TEMOS INVESTIDO MAIS DE BILHÃO. CIVIC VIDA MUDOU NOSSO

AGRICULTORES DOS MAIS POBRES. ELES NÃO ENTENDEM QUE VOCÊ É A REVOLUÇÃO QUE A DESPESA PÚBLICA SÃO VOCÊ.

ESTES PROJECTOS FORAM ESPERADOS DURANTE DÉCADAS PELOS HABITANTES DESTE SECTOR, ESPECIALMENTE PARA OS NOSSOS

AGRICULTORES E DOS AGRICULTORES. COM NOVO CATER MULTIUSO ÁGUA

PARA IRRIGAÇÃO E APROXIMADAMENTE 200.000 HECTARES MITIGAREMOS OS EFEITOS DA INUNDAÇÃO 142.000

HECTARES. CONSIDERANDO QUE AS EXISTENTES NO CONTROLE DE INUNDAÇÕES E PROTEGIDO 160.000 HECTARES

CONSTITUÍDA 142.000 HECTARES QUE TEMOS, VOCÊ EM NOVE ANOS QUASE CIVIC REVOLUÇÃO

NÓS CONSTRUÍMOS A 100% DO QUE TINHA SIDO CONSTRUÍDO AO LONGO DA HISTÓRIA PAÍS VIDA REPUBLICANA.

ATÉ A VITÓRIA SEMPRE COMPANHEIRO!

DELGADO RAFAEL CORREA

PRESIDENTE CONSTITUCIONAL DA REPÚBLICA

DEL EQUADOR BACKBONE, 12 DE JANEIRO 2016

Page 13: Proyecto bulubulu tecnologia moderna inca

TODAY WE INAUGURATE THE TWO LAST WATER MEGAPROJECTS OF A TOTAL OF 6 THAT THE GOVERNMENT OF THE CITIZEN REVOLUTION HAS EXECUTED (CHONGÓN-SAN VICENTE, BULUBULU, CHONE, DAULE-VINCES, CAÑAR AND NARANJAL). ON THESE PROJECTS

WE HAVE INVESTED MORE THAN ONE BILLION DOLLARS. CITIZEN WHO HAS CHANGED THE LIFE OF OURS

PEASANTS, OF THE POOREST. YOU DO NOT UNDERSTAND THAT THE REVOLUTION IS YOU, THAN THE PUBLIC EXPENDITURE YOU ARE.

THESE PROJECTS WERE EXPECTED DURING DECADES BY THE INHABITANTS OF THIS SECTOR, ESPECIALLY BY OURSELVES

PEASANTS AND AGRICULTURAL PRODUCERS. WITH THE NEW MULTIPROPOSES WE WILL SUPPLY WATER

FOR IRRIGATION TO 200,000 HECTARES APPROXIMATELY AND WE WILL MITIGATE THE EFFECTS OF FLOODS OF 142,000

HECTARES. IF WE TAKE INTO ACCOUNT THAT THAT EXISTED IN FLOOD CONTROL PROTECTED 160,000 HECTARES AND

WE HAVE INCORPORATED 142,000 HECTARES, MEANS THAT IN NINE YEARS OF CITIZEN REVOLUTION PRACTICALLY

WE HAVE BUILT 100% OF WHAT HAS BEEN BUILT IN THE WHOLE HISTORY OF REPUBLICAN LIFE IN THE COUNTRY.

TO THE VICTORY ALWAYS, COMPATRIOTAS!

RAFAEL CORREA DELGADO

CONSTITUTIONAL PRESIDENT OF THE REPUBLIC

OF THE ECUADOR LA TRONCAL, JANUARY 12, 2016

Page 14: Proyecto bulubulu tecnologia moderna inca

СЕГОДНЯ МЫ ОТКРЫВАЕМ ПОСЛЕДНИЕ ДВЕ ВОДНЫЕ МЕГАПРОЕКТЫ В ОБЩЕЙ СЛОЖНОСТИ 6 ВЫПОЛНИЛ ПРАВИТЕЛЬСТВО РЕВОЛЮЦИИ CIVIC (CHONGÓN-САН-ВИСЕНТЕ, BULUBULU CHONE, DAULE-VINCES CAÑAR И NARANJAL). ЭТИ ПРОЕКТЫ

МЫ ИНВЕСТИРОВАЛИ БОЛЕЕ МИЛЛИАРДА ДОЛЛАРОВ. CIVIC ЖИЗНЬ ИЗМЕНИЛАСЬ OUR

ФЕРМЕРЫ БЕДНЫХ. ОНИ НЕ ПОНИМАЮТ, ЧТО ВЫ РЕВОЛЮЦИЯ, ЧТО ГОСУДАРСТВЕННЫЕ РАСХОДЫ ВАС.

ЭТИ ПРОЕКТЫ, КАК ОЖИДАЕТСЯ, В ТЕЧЕНИЕ МНОГИХ ДЕСЯТИЛЕТИЙ ЖИТЕЛИ ЭТОГО СЕКТОРА, ОСОБЕННО ДЛЯ НАШИХ

ХОЗЯИН И ХОЗЯИН. С НОВЫМ WATER МНОГОЦЕЛЕВОГО КАТЕР

ДЛЯ ОРОШЕНИЯ И ОКОЛО 200 000 ГА MITIGAREMOS ЭФФЕКТОВ ЗАТОПЛЕНИЯ 142000

HECTARES. УЧИТЫВАЯ, ЧЕМ СУЩЕСТВУЮТ В НАВОДНЕНИЯХ И ЗАЩИЩАЕМЫЕ 160000 ГА

ВНЕСЕНЫ 142000 ГЕКТАРОВ МЫ, ВАС В ДЕВЯТЬ ЛЕТ ПОЧТИ CIVIC РЕВОЛЮЦИИ

МЫ ПОСТРОИЛИ 100% ТОГО, ЧТО БЫЛО ПОСТРОЕНО НА ПРОТЯЖЕНИИ ВСЕЙ ИСТОРИИ ДАЧНОЙ ЖИЗНИ РЕСПУБЛИКАНЦА.

НЕ ДО ПОБЕДЫ ВСЕГДА МОЛОДЕЦ!

DELGADO РАФАЕЛ КОРРЕЯ

КОНСТИТУЦИОННЫЙ ПРЕЗИДЕНТ РЕСПУБЛИКА

DEL ECUADOR МАГИСТРАЛЬНАЯ, 12 ЯНВАРЯ 2016

Page 15: Proyecto bulubulu tecnologia moderna inca

مجموعه ما المياه العمالقة المشروعات الماضيين نفتح حكومة 6اليوم نفذت REVOLUTION CIVIC (CHONGÓN-SAN VICENTE ، BULUBULU تشوني ، DAULE-VINCES و هذه .(NARANJALكنارالمشاريع

دوالر مليار من أكثر استثمرنا تغيرت CIVIC .لقد قد OUR الحياة . أن يفهمون ال هم أفقر من هم YOU ARE THE REVOLUTION المزارعين العام اإلنفاق .YOU أن

لدينا وخاصة القطاع، هذا سكان قبل من عقود خالل المشاريع هذه المتوقع من وكان . األغراض متعددة كارتر جديد مع والمزارعين WATER فالحين

وحوالي 200للري هكتار ،000 MITIGAREMOS الفيضانات 142000آثاروبالنظر. والمحمية THAN هكتار الفيضانات على السيطرة في 160موجودة هكتار ،000

142000أدرجت HECTARES WE HAVE ، YOU تقريبا سنوات تسع CIVIC REVOLUTION منذالتاريخ 100بنينا مر على بنيت قد ما من ٪ COUNTRY الحياة REPUBLICAN.

!الزمالء VICTORY ALWAYS حتىDELGADO كوريا رافائيل

لجمهورية الدستوري الرئيس DEL يناير الفقري، العمود 12 2016االكوادور TH

Page 16: Proyecto bulubulu tecnologia moderna inca

ALYAWM NAFTAH ALMADIAYN ALMASHRUEAT ALEIMLAQAT ALMIAH MA MAJMUEUH 6 NAFFADHAT HUKUMAT REVOLUTION CIVIC (CHONGON-SAN VICENTE ، BULUBULU TASHAWNY, DAULE-VINCES KANNAR WANARANJAL). HADHIH ALMASHARIELAQAD ASTATHMARNA 'AKTHAR MIN MLYAR DULARA. CIVIC ALHAYAT QAD TAGHAYARAT OURALMUZARIEIN MIN 'AFQIR. HUM LA YAFHIMUN 'ANN YOU ARE THE REVOLUTION 'ANN AL'IINFAQ ALEAMM HUM YOU.WAKAN MIN ALMTWQE HADHIH ALMASHARIE KHILAL EUQUD MIN QIBAL SUKKAN HDHA ALQITAEI, WAKHASSATAN LADAYNAFALAHIN WALMAZARIEIN. MAE JADID KARTIR MUTAEADDIDAT AL'AGHRAD WATERLILLRRI WAHAWALI 200,000 HIKTAR MITIGAREMOS ATHAR ALFAYADANAT 142000HKTAR. WABIALNNAZAR THAN MAWJUDATAN FI ALSSAYTARAT EALAA ALFAYADANAT WALMAHMIAT 160,000 HIKTAR'UDRIJAT 142000 HECTARES WE HAVE ، YOU MUNDH TISE SANAWAT TAQRIBAAN CIVIC REVOLUTIONBANAYNA 100% MIN MA QAD BUNIAT EALAA MARR ALTTARIKH COUNTRY ALHAYAT REPUBLICAN.HATTA VICTORY ALWAYS ALZZAMALA'!DELGADO RAFAYIYL KURIAALRRAYIYS ALDSTWRY LIJUMHURIADEL ALAKWADWR ALEUMUWWUD ALFAQRI, YANAYIR 2016 12TH

Page 17: Proyecto bulubulu tecnologia moderna inca

今天我們打開最後兩個水大型項目總共 6 執行了 REVOLUTION CIVIC ( Chongón- 聖維森特, Bulubulu Chone , Daule- 賓塞斯 CANAR 而納蘭哈爾)政府。這些項目我們已經投資超過億元。公民生活已經改變了我們最貧窮的農民。他們不明白,你是公眾消費 ARE YOU革命。這些項目幾十年來這個部門的居民中預計,特別是對我們農民和農民。新水多用卡特用於灌溉和大約 200000 公頃 MITIGAREMOS驅 142000 的影響公頃。考慮到超過現有防汛受保護 160000 公頃INCORPORATED 142000 HECTARES 我們有,你是九年來 ALMOST CIVIC REVOLUTION我們建立的是什麼已經在歷史的鄉村生活共和黨建成了 100 %。,直到取得勝利總是人!德爾加多拉斐爾 · 科雷亞共和國憲法總統 厄瓜多爾骨幹, 1 月 12 日 2016

Page 18: Proyecto bulubulu tecnologia moderna inca
Page 19: Proyecto bulubulu tecnologia moderna inca
Page 20: Proyecto bulubulu tecnologia moderna inca
Page 21: Proyecto bulubulu tecnologia moderna inca
Page 22: Proyecto bulubulu tecnologia moderna inca
Page 23: Proyecto bulubulu tecnologia moderna inca
Page 24: Proyecto bulubulu tecnologia moderna inca
Page 25: Proyecto bulubulu tecnologia moderna inca
Page 26: Proyecto bulubulu tecnologia moderna inca
Page 27: Proyecto bulubulu tecnologia moderna inca
Page 28: Proyecto bulubulu tecnologia moderna inca
Page 29: Proyecto bulubulu tecnologia moderna inca
Page 30: Proyecto bulubulu tecnologia moderna inca
Page 31: Proyecto bulubulu tecnologia moderna inca
Page 32: Proyecto bulubulu tecnologia moderna inca
Page 33: Proyecto bulubulu tecnologia moderna inca
Page 34: Proyecto bulubulu tecnologia moderna inca
Page 35: Proyecto bulubulu tecnologia moderna inca
Page 36: Proyecto bulubulu tecnologia moderna inca
Page 37: Proyecto bulubulu tecnologia moderna inca
Page 38: Proyecto bulubulu tecnologia moderna inca
Page 39: Proyecto bulubulu tecnologia moderna inca
Page 40: Proyecto bulubulu tecnologia moderna inca
Page 41: Proyecto bulubulu tecnologia moderna inca
Page 42: Proyecto bulubulu tecnologia moderna inca
Page 43: Proyecto bulubulu tecnologia moderna inca
Page 44: Proyecto bulubulu tecnologia moderna inca
Page 45: Proyecto bulubulu tecnologia moderna inca
Page 46: Proyecto bulubulu tecnologia moderna inca
Page 47: Proyecto bulubulu tecnologia moderna inca
Page 48: Proyecto bulubulu tecnologia moderna inca

FIN

Page 49: Proyecto bulubulu tecnologia moderna inca
Page 50: Proyecto bulubulu tecnologia moderna inca
Page 51: Proyecto bulubulu tecnologia moderna inca
Page 52: Proyecto bulubulu tecnologia moderna inca
Page 53: Proyecto bulubulu tecnologia moderna inca
Page 54: Proyecto bulubulu tecnologia moderna inca
Page 55: Proyecto bulubulu tecnologia moderna inca
Page 56: Proyecto bulubulu tecnologia moderna inca
Page 57: Proyecto bulubulu tecnologia moderna inca
Page 58: Proyecto bulubulu tecnologia moderna inca
Page 59: Proyecto bulubulu tecnologia moderna inca
Page 60: Proyecto bulubulu tecnologia moderna inca
Page 61: Proyecto bulubulu tecnologia moderna inca
Page 62: Proyecto bulubulu tecnologia moderna inca
Page 63: Proyecto bulubulu tecnologia moderna inca
Page 64: Proyecto bulubulu tecnologia moderna inca
Page 65: Proyecto bulubulu tecnologia moderna inca
Page 66: Proyecto bulubulu tecnologia moderna inca
Page 67: Proyecto bulubulu tecnologia moderna inca
Page 68: Proyecto bulubulu tecnologia moderna inca
Page 69: Proyecto bulubulu tecnologia moderna inca
Page 70: Proyecto bulubulu tecnologia moderna inca
Page 71: Proyecto bulubulu tecnologia moderna inca
Page 72: Proyecto bulubulu tecnologia moderna inca
Page 73: Proyecto bulubulu tecnologia moderna inca
Page 74: Proyecto bulubulu tecnologia moderna inca
Page 75: Proyecto bulubulu tecnologia moderna inca
Page 76: Proyecto bulubulu tecnologia moderna inca
Page 77: Proyecto bulubulu tecnologia moderna inca
Page 78: Proyecto bulubulu tecnologia moderna inca
Page 79: Proyecto bulubulu tecnologia moderna inca
Page 80: Proyecto bulubulu tecnologia moderna inca
Page 81: Proyecto bulubulu tecnologia moderna inca
Page 82: Proyecto bulubulu tecnologia moderna inca
Page 83: Proyecto bulubulu tecnologia moderna inca
Page 84: Proyecto bulubulu tecnologia moderna inca
Page 85: Proyecto bulubulu tecnologia moderna inca
Page 86: Proyecto bulubulu tecnologia moderna inca
Page 87: Proyecto bulubulu tecnologia moderna inca
Page 88: Proyecto bulubulu tecnologia moderna inca
Page 89: Proyecto bulubulu tecnologia moderna inca
Page 90: Proyecto bulubulu tecnologia moderna inca
Page 91: Proyecto bulubulu tecnologia moderna inca
Page 92: Proyecto bulubulu tecnologia moderna inca
Page 93: Proyecto bulubulu tecnologia moderna inca
Page 94: Proyecto bulubulu tecnologia moderna inca
Page 95: Proyecto bulubulu tecnologia moderna inca
Page 96: Proyecto bulubulu tecnologia moderna inca
Page 97: Proyecto bulubulu tecnologia moderna inca
Page 98: Proyecto bulubulu tecnologia moderna inca
Page 99: Proyecto bulubulu tecnologia moderna inca
Page 100: Proyecto bulubulu tecnologia moderna inca
Page 101: Proyecto bulubulu tecnologia moderna inca
Page 102: Proyecto bulubulu tecnologia moderna inca
Page 103: Proyecto bulubulu tecnologia moderna inca
Page 104: Proyecto bulubulu tecnologia moderna inca
Page 105: Proyecto bulubulu tecnologia moderna inca
Page 106: Proyecto bulubulu tecnologia moderna inca
Page 107: Proyecto bulubulu tecnologia moderna inca
Page 108: Proyecto bulubulu tecnologia moderna inca
Page 109: Proyecto bulubulu tecnologia moderna inca
Page 110: Proyecto bulubulu tecnologia moderna inca
Page 111: Proyecto bulubulu tecnologia moderna inca
Page 112: Proyecto bulubulu tecnologia moderna inca
Page 113: Proyecto bulubulu tecnologia moderna inca
Page 114: Proyecto bulubulu tecnologia moderna inca

Sistema de control de inundaciones “Bulubulu” se inauguró ayerPublicado el 22 Abr 2015Por : Pierina AbadTag: Bulubulu, Sistema de control de inundacionesEl Proyecto de Control de Inundaciones Bulubulu, fue inaugurado el día de ayer por el presidente Rafael Correa. Este sistema, está ubicado entre las provincias del Guayas y Cañar y tiene como fin evitar las inundaciones producto del desbordamiento del río Bulubulu.La obra tuvo un costo de 57 millones de dólares y estuvo a cargo de la empresa china Gezhouba Group, y se trata de un muro de 2.800 metros de longitud y 13 metros de altura, además de la derivadora Las Maravillas, cuyas compuertas pueden llegar a controlar hasta 600 metros cúbicos de agua por segundo, que luego será almacenada para riegos de cultivos en temporadas de sequía.Los 65 mil habitantes de El Triunfo, Voluntad de Dios, La Troncal, Playa Seca, El Piedrero, Las Maravillas, Manuel de J. Calle y Cochancay se benficiarán con esta obra.Un puente de 180 metros de longitud que une a La Troncal con El Triunfo, fue construido para acortar las distancias entre estos cantones. Walter Solís, secretario del Agua, indicó que el próximo proyecto a finalizarse es el multipropósito Chone. Hasta ahora, estas obras tendrían un valor de $ 1.000 millones. (I)FUENTE: http://www.ecuadortimes.net/es/2015/04/22/sistema-de-control-de-inundaciones-bulubulu-se-inauguro-ayer/

Page 115: Proyecto bulubulu tecnologia moderna inca

SISTEMA DE CONTROLE DE INUNDAÇÃO "BULUBULU" ABRIU ONTEMPOSTADO EM 22 DE ABRIL DE 2015POR: PIERINA ABADTAG: BULUBULU, SISTEMA DE CONTROLE DE INUNDAÇÕESO PROJETO BULUBULU CONTROLE DE ENCHENTES, FOI INAUGURADA ONTEM PELO PRESIDENTE RAFAEL CORREA. ESTE SISTEMA ESTÁ LOCALIZADO ENTRE AS PROVÍNCIAS DE GUAYAS E CAÑAR E VISA EVITAR ESTOURO PRODUTO BULUBULU INUNDAÇÃO DO RIO.A OBRA TEVE UM CUSTO DE 57 MILHÕES DE DÓLARES E FICOU A CARGO DA EMPRESA CHINESA GEZHOUBA GROUP, E É UMA PAREDE DE 2.800 METROS DE COMPRIMENTO E 13 METROS DE ALTURA, ALÉM DO DESVIO DE LAS MARAVILLAS, CUJAS PORTAS PODEM CHEGAR CONTROLE DE ATÉ 600 METROS CÚBICOS DE ÁGUA POR SEGUNDO, O QUE É, EM SEGUIDA, ARMAZENADOS PARA REGAR AS CULTURAS EM PERÍODOS DE SECA.65 MIL HABITANTES DE EL TRIUNFO, A VONTADE DE DEUS, THE CORE, PLAYA SECA, EL PIEDRERO, LAS MARAVILLAS, MANUEL DE J. RUA E COCHANCAY É BENFICIARÁN COM ESTE TRABALHO.UMA PONTE DE 180 METROS DE COMPRIMENTO QUE LIGAM A COLUNA VERTEBRAL E COM TRIUMPH, FOI CONSTRUÍDO DE MODO A ENCURTAR A DISTÂNCIA ENTRE ESSES CANTOS. WALTER SOLÍS, SECRETÁRIO DE ÁGUA, DISSE QUE O PRÓXIMO PROJETO A SER COMPLETADO É O POLIVALENTE CHONE. ATÉ AGORA, ESTAS OBRAS SERIA DE US $ 1.000 MILHÕES. (I)FONTE: HTTP://WWW.ECUADORTIMES.NET/ES/2015/04/22/SISTEMA-DE-CONTROL-DE-INUNDACIONES-BULUBULU-SE-INAUGURO-AYER/

Page 116: Proyecto bulubulu tecnologia moderna inca

FLOOD CONTROL SYSTEM "BULUBULU" OPENED YESTERDAYPOSTED ON 22 APR 2015BY: PIERINA ABADTAG: BULUBULU, FLOOD CONTROL SYSTEMTHE BULUBULU FLOOD CONTROL PROJECT WAS INAUGURATED YESTERDAY BY PRESIDENT RAFAEL CORREA. THIS SYSTEM IS LOCATED BETWEEN THE PROVINCES OF GUAYAS AND CAÑAR AND IS INTENDED TO AVOID FLOODING CAUSED BY THE OVERFLOW OF THE BULUBULU RIVER.THE WORK COST $ 57 MILLION AND WAS HANDLED BY THE CHINESE COMPANY GEZHOUBA GROUP, AND IT IS A WALL OF 2,800 METERS IN LENGTH AND 13 METERS IN HEIGHT, IN ADDITION TO THE DRIER LAS MARAVILLAS, WHOSE GATES CAN REACH CONTROL UP TO 600 CUBIC METERS OF WATER PER SECOND, WHICH WILL THEN BE STORED FOR CROP IRRIGATION IN DROUGHT SEASONS.THE 65 THOUSAND INHABITANTS OF EL TRIUNFO, VOLUNTAD DE DIOS, LA TRONCAL, PLAYA SECA, EL PIEDRERO, LAS MARAVILLAS, MANUEL DE J. CALLE AND COCHANCAY WILL BENEFIT FROM THIS WORK.A BRIDGE OF 180 METERS IN LENGTH THAT CONNECTS LA TRONCAL WITH EL TRIUNFO, WAS BUILT TO SHORTEN THE DISTANCES BETWEEN THESE CANTONS. WALTER SOLIS, WATER SECRETARY, SAID THE NEXT PROJECT TO BE COMPLETED IS THE CHONE MULTIPURPOSE. SO FAR, THESE WORKS WOULD HAVE A VALUE OF $ 1 BILLION. (I)SOURCE: HTTP://WWW.ECUADORTIMES.NET/ES/2015/04/22/SYSTEM-OF-CONTROL-OF-INUNDATIONS-BULUBULU-SE-INAUGURO-AYER/

Page 117: Proyecto bulubulu tecnologia moderna inca

الفيضانات على السيطرة  "BULUBULU" نظام امس افتتحفي 2015أبريل 22أرسلت

آباد: بيرينا بقلمBULUBULU :العالمة ، الفيضانات على السيطرة ونظام

مشروع الفيضانات على .  BULUBULU للسيطرة هذا يقع كوريا رافائيل الرئيس أمس افتتح،المنتج تجاوز تجنب إلى ويهدف وكنار غواياس محافظتي بين فيضان  BULUBULU النظام

.األنهاربتكلفة العمل المجموعة، 57وكان قتشوبا صينية شركة عن المسؤول وكان دوالر، مليون

من جدار و 2800وهو فيغاس 13مترا كلبشة إلى باإلضافة مترا، MARAVILLAS يمكن ، التيإلى تصل السيطرة بوابات إلى تصل يتم 600أن ما وهو الثانية، في المياه من مكعب متر

الجفاف مواسم في المحاصيل لسقي .تخزينها BENFICIARÁN 65و شركة سيكا، باليا واألساسية، الله، إرادة تريونفو، إل نسمة ألفPIEDRERO ، MARAVILLAS والس ، دي  .J مانويل و  COCHANCAYشارع العمل هذا .مع

هذه 180جسر بين المسافات لتقصير شيد النصر، مع الفقري العمود إلى طويلة يربط مترااألغراض. متعدد هو ليستكمل القادم المشروع المياه وزيرة سوليس، والتر وقال الزوايا

المفيد. من يكون األعمال هذه فإن اآلن، وحتى مليون 1000تشوني $. (I)-HTTP://WWW.ECUADORTIMES.NET/ES/2015/04/22/SISTEMA-DE-CONTROL-DE :المصدرINUNDACIONES-BULUBULU-SE-INAUGURO-AYER/

Page 118: Proyecto bulubulu tecnologia moderna inca

NIZAM ALSSAYTARAT EALAA ALFAYADANAT "BULUBULU" AIFTATAH 'AMS'ARSALAT FI 22 'ABRIL 2015BQLM: BIRAYNA ABADALEALAMAT: BULUBULU, WANIZAM ALSSAYTARAT EALAA ALFAYADANATLILSSAYTARAT EALAA ALFAYADANAT MASHRUE BULUBULU AFTATAHA, 'AMS ALRRAYIYS RIAFAYIYL KURIA. YAQAE HDHA ALNNIZAM BAYN MUHAFAZATAY GHAWAYAS WAKUNAR WAYAHDIF 'IILAA TAJANNUB TAJAWUZ ALMUNTAJ BULUBULU FAYDAN AL'ANHAR.WAKAN ALEAMAL BITAKLFAT 57 MILYUN DULAR, WAKAN ALMASWUWL EAN SHARIKAT SINIAT QTSHWBA ALMJMUEAT, WAHU JDAR MIN 2800 MITRAAN W 13 MTRAAN, BIAL'IIDAFAT 'IILAA KALABSHAT FYGHAS MARAVILLAS, ALTY YMKN 'AN TASIL 'IILAA BAWABAT ALSSAYTARAT TASIL 'IILAA 600 MITR MUKAEEAB MIN ALMIAH FI ALTHTHANIATI, WAHU MA YATIMM TAKHZINUHA LISAQI ALMAHASIL FI MAWASIM ALJAFAF.WBENFICIARAN 65 'ALF NASAMAT 'IIL TARYUNFU, 'IIRADAT ALLLAH, WAL'ASASIATI, BILAYA SIKA, SHARIKAT PIEDRERO, WALAS MARAVILLAS, MANUIL DI J. SHARIE WACOCHANCAY MAE HDHA ALEAMAL.JISR 180 MITRAAN YARBIT TAWILATAN 'IILAA ALEUMUD ALFAQRI MAE ALNNUSR, SHAYD LITAQSIR ALMASAFAT BAYN HADHIH ALZZAWAYA. WAQAL WALTTAR SULIS, WAZIRAT ALMIAH ALMASHRUE ALQADIM LIASTAKMIL HU MUTAEADDID AL'AGHRAD TASHAWNI. WAHATTA ALANA, FA'INN HADHIH AL'AEMAL YAKUN MIN ALMUFID 1000 MILYUN $. (I)ALMUSDUR: HTTP://WWW.ECUADORTIMES.NET/ES/2015/04/22/SISTEMA-DE-CONTROL-DE-INUNDACIONES-BULUBULU-SE-INAUGURO-AYER/

Page 119: Proyecto bulubulu tecnologia moderna inca

СИСТЕМА УПРАВЛЕНИЯ FLOOD «BULUBULU» ОТКРЫЛАСЬ ВЧЕРАОПУБЛИКОВАНО 22 АПР 2015АВТОР: ПИРИНА АБАДМЕТКА: BULUBULU, СИСТЕМА БОРЬБЫ С НАВОДНЕНИЯМИКОНТРОЛЬ НАВОДНЕНИЙ BULUBULU ПРОЕКТ БЫЛ ОТКРЫТ ВЧЕРА ПРЕЗИДЕНТОМ РАФАЭЛЕМ КОРРЕА. ЭТА СИСТЕМА РАСПОЛОЖЕНА МЕЖДУ ПРОВИНЦИЯМИ ГУАЯСЛИ И КАНАРЫ И ЦЕЛЕЙ, ЧТОБЫ ИЗБЕЖАТЬ ПЕРЕПОЛНЕНИЙ ПРОДУКТА BULUBULU НАВОДНЕНИЯ РЕКИ.РАБОТА БЫЛА СТОИМОСТЬ 57 МИЛЛИОНОВ ДОЛЛАРОВ, И ВЕДАЛА КИТАЙСКУЮ КОМПАНИЮ GEZHOUBA GROUP, И СТЕНА 2800 МЕТРОВ В ДЛИНУ И 13 МЕТРОВ В ВЫСОТУ, В ДОПОЛНЕНИИ К ОТВОДЯЩИМ ЛАСАМ МАРАВИЛЬЯСЛИ, ЧЬИ ВОРОТА МОГУТ ДОСТИГАТЬ КОНТРОЛЬ ДО 600 КУБИЧЕСКИХ МЕТРОВ ВОДЫ В СЕКУНДУ, КОТОРЫЙ ЗАТЕМ ХРАНЯТСЯ ДЛЯ ПОЛИВА КУЛЬТУР В СУХИХ СЕЗОНАХ.65 ТЫСЯЧ ЖИТЕЛЕЙ ЭЛЬ-ТРИУНФО, ВОЛЕЙ БОГА, ЯДРО, PLAYA SECA, ЭЛЬ PIEDRERO, ЛАС МАРАВИЛЛАС, МАНУЭЛЬ ДЕ J. СТРИТ И COCHANCAY ЯВЛЯЕТСЯ BENFICIARÁN С ЭТОЙ РАБОТОЙ.МОСТА 180 МЕТРОВ, ССЫЛАЮЩИХСЯ НА ПОЗВОНОЧНИК С TRIUMPH, БЫЛ ПОСТРОЕН, ЧТОБЫ СОКРАТИТЬ РАССТОЯНИЕ МЕЖДУ ЭТИМИ УГЛАМИ. ВАЛЬТЕР СОЛИС, СЕКРЕТАРЬ ВОДЫ, ГОВОРИТ СЛЕДУЮЩИЙ ПРОЕКТ БУДЕТ ЗАВЕРШЕН ЯВЛЯЕТСЯ CHONE МНОГОЦЕЛЕВОЙ. ДО СИХ ПОР ЭТИ РАБОТЫ БУДУТ СТОИТЬ $ 1000 МЛН. (I)ИСТОЧНИК: HTTP://WWW.ECUADORTIMES.NET/ES/2015/04/22/SISTEMA-DE-CONTROL-DE-INUNDACIONES-BULUBULU-SE-INAUGURO-AYER/

Page 120: Proyecto bulubulu tecnologia moderna inca

防洪系統“ Bulubulu” 昨天開幕發布於 2015 年 4 月 22 日通過:皮耶里娜阿巴德標籤: Bulubulu ,防洪體系防洪工程 Bulubulu ,昨天由總統科雷亞宣誓就職。該系統位於瓜亞斯和 CANAR 和目標的省份之間,以避免產品溢出 Bulubulu 洪水河。這項工作有 57 萬美元的費用,並負責中國公司葛洲壩集團,並且是 2800 米長,高13 米的牆壁,除了分流拉斯維加斯的 Maravillas ,它的門可以達到控制高達 600 立方米的水每秒,然後將其存儲在旱季澆水作物。埃爾溫福,神的旨意,核心,塞卡海灘,薩爾瓦多 Piedrero ,拉斯維加斯的Maravillas ,曼努埃爾 ·J. 街和 Cochancay 65 萬居民被 benficiarán 這項工作。橋長 180 米的連接與凱旋骨幹,構建以縮短這些角之間的距離。沃爾特 · 索利斯,水的秘書,說要完成的下一個項目是 Chone 多用途。到目前為止,這些作品將價值1000 億 $ 。 ( I )來源: http://www.ecuadortimes.net/es/2015/04/22/sistema-de-control-de-inundaciones-bulubulu-se-inauguro-ayer/

Page 121: Proyecto bulubulu tecnologia moderna inca
Page 122: Proyecto bulubulu tecnologia moderna inca
Page 123: Proyecto bulubulu tecnologia moderna inca
Page 124: Proyecto bulubulu tecnologia moderna inca
Page 125: Proyecto bulubulu tecnologia moderna inca

Personería Montos de contratos Plazos

Consorcio Cañar USD $ 9,167,872.95 36 meses

Consorcio Naranjal USD $ 5,400,421.75 36 meses

Consorcio UCuenca EP – empresa ACSAM. Ltda. USD $ 768,885.07 90 días

Control de Inundaciones Los Ríos-Cañar-Naranjal y Bulu Bulu.SiguienteAnteriorDescripción de proyectoDesde el nacimiento de nuestra empresa pública universitaria, somos parte de dos proyectos emblemáticos del país, llevados adelante por la Secretaría Nacional del Agua SENAGUA, hoy EPA – EP los mismos que se encuentran contemplados dentro de los Mega Proyectos de esta Secretaría, como así los han denominado, y que se refieren al Control de Inundaciones del Río Cañar, Naranjal. A finales de este año se nos invitó por parte de La EPA EP a participar también en la fiscalización del proyecto control de inundaciones del Rio Bulu Bulu.Nuestra participación dentro de estas importantes obras que desarrolla el Gobierno Nacional, está en la Fiscalización de las mismas, a través de la conformación de Consorcios con las empresas privadas ACSAM Consultores Cía. Ltda. y Consultoría Técnica Cía. Ltda. con una participación mayoritaria de la empresa pública universitaria, consorcio que luego del proceso precontractual respectivo y la correspondiente adjudicación, suscribió los contratos con la SENAGUA en diciembre del año 2012 las dos primeros proyectos citados y en diciembre del 2014 la fiscalización de los contratos que se encuentran vigentes y ejecutándose hasta la actualidad.La construcción de estas inmensas obras que alcanzan un valor aproximado de $400,000,000.00 US está a cargo de la empresa de origen chino China International Water & Electric Corp. CWE.Los montos y el plazo de nuestros contratos de Fiscalización se resumen en el siguiente cuadro:

Page 126: Proyecto bulubulu tecnologia moderna inca

El personal de Dirección de los Proyectos que son parte de nuestros consorcios y están al servicio de la EPA EP en estos contratos, son profesionales de muy alto nivel, que han estado vinculados a la consultoría del país y a nuestra Universidad; así:

Contrato Director Subdirector

Fiscalización Control de Inundaciones Río Cañar Ing. Agustín Rengel Ing. Jorge León

Fiscalización Control de Inundaciones Río Naranjal Ing. Diego Torres Ing. Milton Palacio

Fiscalización Control de Inundaciones Rio Bulu Bulu Ing. Henry Páez

Contamos con oficinas en la ciudad de Guayaquil, así como en los cantones Naranjal y La Troncal y en los campamentos que se han montado por parte de la constructora, además se cuenta con inmuebles que brindan todo lo necesario para la residencia del personal que presta sus servicios.

Page 127: Proyecto bulubulu tecnologia moderna inca

FLOOD CONTROL LOS RÍOS-CAÑAR-NARANJAL AND BULU BULU.FOLLOWINGPREVIOUSPROJECT DESCRIPTIONSINCE THE BIRTH OF OUR PUBLIC UNIVERSITY COMPANY, WE ARE PART OF TWO EMBLEMATIC PROJECTS OF THE COUNTRY, CARRIED OUT BY THE NATIONAL SECRETARIAT OF WATER SENAGUA, TODAY EPA - EP THE SAME ONES THAT ARE CONTEMPLATED WITHIN THE MEGA PROJECTS OF THIS SECRETARIAT, AS WELL AS THE HAVE DENOMINATED, AND THAT THEY REFER TO THE CONTROL OF FLOODS OF THE CAÑAR RIVER, NARANJAL. AT THE END OF THIS YEAR WE WERE INVITED BY EPA EP TO ALSO PARTICIPATE IN THE CONTROL OF THE FLOOD CONTROL PROJECT OF THE BULU RIVER.OUR PARTICIPATION IN THESE IMPORTANT WORKS CARRIED OUT BY THE NATIONAL GOVERNMENT IS IN THE AUDIT OF THE SAME, THROUGH THE FORMATION OF CONSORTIUMS WITH THE PRIVATE COMPANIES ACSAM CONSULTORES CÍA. LTDA. AND TECHNICAL CONSULTING COMPANY. LTDA., WITH A MAJORITY STAKE IN THE PUBLIC UNIVERSITY COMPANY, A CONSORTIUM THAT, AFTER THE RESPECTIVE PRE-CONTRACTUAL PROCESS AND THE CORRESPONDING AWARD, SIGNED THE CONTRACTS WITH SENAGUA IN DECEMBER OF 2012, THE FIRST TWO PROJECTS MENTIONED, AND IN DECEMBER 2014, WHICH ARE IN FORCE AND RUNNING UNTIL THE PRESENT.THE CONSTRUCTION OF THESE HUGE WORKS THAT REACH AN APPROXIMATE VALUE OF $ 400,000,000.00 US IS IN CHARGE OF THE CHINESE COMPANY CHINA INTERNATIONAL WATER & ELECTRIC CORP. CWE.THE AMOUNTS AND THE TERM OF OUR AUDIT CONTRACTS ARE SUMMARIZED IN THE FOLLOWING TABLE:

Page 128: Proyecto bulubulu tecnologia moderna inca

Contrato Director Subdirector

Fiscalización Control de Inundaciones Río Cañar Ing. Agustín Rengel Ing. Jorge León

Fiscalización Control de Inundaciones Río Naranjal Ing. Diego Torres Ing. Milton Palacio

Fiscalización Control de Inundaciones Rio Bulu Bulu Ing. Henry Páez

The Project Management staff who are part of our consortiums and are at the service of the EPA EP in these contracts, are professionals of very high level, who have been linked to the consultancy of the country and our University; so:

We have offices in the city of Guayaquil, as well as in the cantons Naranjal and La Troncal and in the camps that have been set up by the construction company, in addition there are properties that provide everything necessary for the residence of the personnel who provide their services.

Page 129: Proyecto bulubulu tecnologia moderna inca
Page 130: Proyecto bulubulu tecnologia moderna inca
Page 131: Proyecto bulubulu tecnologia moderna inca
Page 132: Proyecto bulubulu tecnologia moderna inca
Page 133: Proyecto bulubulu tecnologia moderna inca
Page 134: Proyecto bulubulu tecnologia moderna inca
Page 135: Proyecto bulubulu tecnologia moderna inca
Page 136: Proyecto bulubulu tecnologia moderna inca
Page 137: Proyecto bulubulu tecnologia moderna inca
Page 138: Proyecto bulubulu tecnologia moderna inca
Page 139: Proyecto bulubulu tecnologia moderna inca

SISTEMA BULUBULUDescripción de proyecto•El Proyecto “CONSTRUCCIÓN DE LAS OBRAS DE CONTROL DE INUNDACIONES DEL RÍO BULU BULU”, se encuentra en ejecución, teniendo a la fecha un avance económico del 51,41% y un avance físico del 55% El valor faltante por plantillarse hasta la terminación del contrato de construcción es de USD$ 31.390.480,64, valor en el cual no están incluidos los costos de operación y mantenimiento del Proyecto.•De acuerdo con los diseños, el sistema está conformado por los siguientes componentes principales:a) Derivadora Las Maravillas:Conformada por un canal con control de compuertas en el río y un vertedero de caída libre hacia el reservorio de retención temporal.Canal con compuertas en el río Bulu BuluEl caudal máximo en el río, para el período de diseño de 50 años, en el lugar de la derivadora es de 600 m3/s, de los cuales mediante el sistema de control proyectado se permitirá un paso máximo de 250 m3/s hacia el río. La parte de la estructura que da hacia el río será de hormigón y de sección rectangular, dotada de ranuras para colocar tablones de cierre para facilitar las actividades de mantenimiento.Adicionalmente a los tablones de cierre se colocará un sistema de tres compuertas de tipo radial, con accionamiento mecánico a base de aire comprimido.  Su función es la de elevar el nivel hacia aguas arriba con el fin de enviar el flujo de caudales hacia el embalse de retención temporal cuando los flujos en el río superen los 250 m3/s y mantener el caudal del río en este valor cuando los caudales del río sean superiores a 250 m3/s.b) Vertedero de caída libre sin compuertas hacia el reservorio de Las MaravillasEl caudal máximo en el río, para el periodo de diseño de 50 años, en el lugar de la derivadora es de 600 m3/s, de los cuales mediante el sistema de control proyectado se permitirá un paso máximo de 350 m3/s hacia el canal de ingreso al embalse Las Maravillas.El vertedero de caída libre será de tipo Creager, ajustado al perfil de la lámina vertiente, que se complementa con un cuenco disipador de energía desarrollado a partir de los ensayos de modelos físicos de los vertederos tipo SAF (Saint Anthony Falls) y Tipo III del USBR (United States Bureau of Reclamation).c) Diques de confinamiento del embalse Las Maravillas:Los diques de confinamiento del agua dentro del reservorio están colocados a los tres costados del reservorio, debido a que hacia el cuarto costado existe la Colina de Las Maravillas, ubicada en la parte posterior a La Troncal, que no requiere de diques.Los diques a construir tendrán alturas de entre 0 y 8 m, creciendo su tamaño conforme se adentran hacia el reservorio. Estos diques estarán protegidos con enrocados en la cara que se encuentra en contacto con el agua, los cuales en la zona más baja tendrán un espesor mayor con objeto de proteger de mejor manera el dique de la erosión que produce el ingreso de los primeros caudales hacia el reservorio. A medida que se incrementa la altura y al haberse distribuido el agua en toda la parte baja del embalse, el efecto erosivo se reduce y el enrocado no necesita una protección tan alta por lo que se reduce el espesor como el calibre de las rocas del mismo.El tramo de dique perimetral ubicado en la zona norte del embalse (paralelo al río) se lo ha separado del dique de protección existente en el río, el cual también será protegido con enrocado, con la finalidad de obtener una mayor seguridad.En el cuadro siguiente se muestran las características y los datos geométricos más importantes de los diques de confinamiento del embalse

Page 140: Proyecto bulubulu tecnologia moderna inca

Dimensiones principales delDique Perimetral de Confinamiento del

EmbalseDescripción Unidad CantidadLongitud total de dique de confinamiento m 5350.00

Altura de dique m 2.00 a 8.00Volumen de material requerido para dique m3 2,000,000.00

Ancho de corona de dique m 6.80Ancho de calzada m 5.00Nivel de cierre del embalse msnm 67.50Nivel de aguas máximas extraordinarias msnm 66.80

Nivel de aguas normales de regulación msnm 66.00

Nivel de aguas de reserva msnm 61.00Nivel de aguas muertas msnm 60.00

Page 141: Proyecto bulubulu tecnologia moderna inca

d) Estructura de descarga:El caudal de diseño para esta estructura es de 40 m3/s, valor obtenido de tal manera que el reservorio sea capaz de laminar los picos, no solo de la crecida máxima de diseño, sino también de todas las posibles crecidas subsiguientes.El embalse tendrá una estructura de descarga que consta de los siguientes elementos:•Cajón de entrada•Ductos•Cajón de salida•Canal de desfoguee) Las obras de protección previstas en el río Bulu Bulu consisten en diques longitudinales ubicados en la orilla izquierda del río y servirán para proteger a la población asentada a lo largo de la vía Azogues-Guayaquil, en la zona comprendida entre Cochancay y la Troncal.Las estructuras propuestas consisten en diques longitudinales de hormigón de una longitud aproximada de 2681 metros, cimentados por debajo de los niveles del cauce actual en 2 m de profundidad, lo que determina alturas promedio de 10 m.Se ha ubicado los diques de hormigón desde su inicio en la montaña arriba de la población de Cochancay (690761.7 E, 9727147.1 N), hasta la salida al cauce normal aguas abajo de las colinas (689454.6 E, 9727147.1 N) que interrumpen el paso del río.Las obras de control de torrentes a construirse entre Cochancay y Las Maravillas, consisten en un muro de hormigón para la protección de la población de Cochancay, en la parte más estrecha, y diques de tierra de confinamiento longitudinal del río, protegidos con enrocado casi a todo su largo, hasta Las Maravillas.A partir de la terminación del muro de hormigón se inician los diques de tierra, los mismos que tienen un ancho de corona de 5.80 m con inclinaciones de talud 3H:1V hacia el lado del agua y de 2H:1V hacia el lado externo, que será protegido con capa vegetal.  Los diques serán carrozables por lo que se ha dispuesto una capa de rodadura de 4 m de ancho.

Page 142: Proyecto bulubulu tecnologia moderna inca

La longitud total de diques de tierra en la margen izquierda del río Bulu Bulu es de 6500 m, con un promedio de altura de 3.50 m hasta la derivadora.El empate entre la derivadora y la montaña en la margen derecha tiene una longitud de 1260 m con diques protegidos hacia el lado del río con enrocado, como consta en los planos de detalle.Los diques que no pertenecen al embalse en el lado derecho del río Bulu Bulu, aguas abajo de la derivadora tienen una longitud de 1247 m.f) PuentesLa estructura derivadora para el embalse Las Maravillas tendrá un puente vehicular, que permitirá la circulación hacia el embalse para las fases de operación y mantenimiento de toda la estructura y en especial de las compuertas.El puente tendrá un ancho de 7.20 m de calzada y dos aceras de 0.60 m, con una baranda de protección de 0.90 m de altura. La luz del puente es de 200 mg) CaminosEn el cuadro siguiente se presenta un resumen que muestra la longitud de los caminos de acceso a construirse así como el número de rampas de enlace de caminos existentes a los diques proyectados, tal como se indican a continuación:

Page 143: Proyecto bulubulu tecnologia moderna inca

Descripción Longitud

Longitud camino de acceso a derivadora Bulu Bulu 900 m

Ancho camino de acceso a derivadora Bulu Bulu 7.20 m

Longitud camino de acceso al presedimentador 700 m

Ancho camino de acceso al presedimentador 7.20 m

Longitud de diques carrozables 19600 mAncho de diques carrozables 4.00-5.00Rampas o accesos de caminos existentes a diques 9 u

Page 144: Proyecto bulubulu tecnologia moderna inca

 h) Obras compensatoriasEn la zona de Cochancay y Las Maravillas existen dos sistemas de riego de importancia que de cierta manera serán intervenidos por el proyecto. Con el fin de impedir la interrupción del funcionamiento de esos sistemas se han dispuesto ductos cajón de hormigón armado de las siguientes características:Dimensiones y características principales de los ductos cajón dispuestos para impedir

la interrupción del funcionamiento de canales de riego.

Page 145: Proyecto bulubulu tecnologia moderna inca

Descripción Afección Corrección Longitud  (m)

Canal de Riego Estero Huaquillas Dique Derivadora Ducto

Cajón1.50×1.30 m 28

Canal de Riego Estero Huaquillas

Dique acceso puente Derivadora

Ducto Cajón1.50×1.30 m 92

Canal de Riego Estero Huaquillas

Zona de Inundación Embalse

Ducto Cajón1.00×1.00 m 130

Canal de Riego río Bulu BuluSector Cochancay

Dique protección río Bulu Bulu

Ducto Cajón1.50×1.30 m 28

Page 146: Proyecto bulubulu tecnologia moderna inca

i) Pavimentación del camino La Troncal – derivadora Bulu Bulu: Se ha considerado la estructuración del pavimento mediante la escarificación y compactación de 20 cm de la estructura existente, subyaciendo a una capa de 15 cm de sub-base granular, a una capa de 15 cm de base granular y a una capa asfáltica de 3 pulgadas.Las estructuras para el riego están conformadas por los siguientes elementos:•Cajón de entrada, ductos, cajón de salida y canal de salidaj) Sistema SCADAEl sistema SCADA es el sistema responsable de la automatización del proyecto de control de inundaciones. El sistema consiste de los siguientes subsistemas:•Un HMI (Human-Machine Interface)•Un computador que ejerce la función de supervisión, adquiriendo o recopilando los datos del proceso y controla o envía comandos al proceso.•Unidades terminales remotas RTUs (Remote Terminal Units) que conectan a los sensores del proceso y convierten las señales de los sensores en datos digitales para ser enviados al sistema de supervisión.•Controladores lógicos programables PLCs (Programmable Logic Controller)•Sistema de comunicaciones que conecta al sistema de supervisión con las unidades remotas terminales o RTUs.Este sistema es complementado con una serie de pantallas para la visualización de datos, información y vigilancia.Estaciones remotasLos sitios con automatización donde se localizarán las estaciones remotas del sistema SCADA son:Cuenca del río Bulu Bulu:•Estación derivadora de caudal Las Maravillas•Estación de válvulas del embalse Las Maravillas•Derivadora M.J. Calle

Page 147: Proyecto bulubulu tecnologia moderna inca

BULUBULU SYSTEMProject DescriptionThe project "CONSTRUCTION OF FLOOD CONTROL WORKS OF THE BULU BULU RIVER", is currently underway, having an economic advance of 51.41% and a physical advance of 55%. The missing value for planting until the end of Construction contract is USD $ 31,390,480.64, value in which the costs of operation and maintenance of the Project are not included.According to the designs, the system consists of the following main components:A) Derivadora Las Maravillas:Conformed by a channel with damper control in the river and a freefall dump to the temporary holding reservoir.Canal with floodgates on the Bulu RiverThe maximum flow in the river for the design period of 50 years at the location of the diverter is 600 m3 / s, of which a maximum step of 250 m3 / s through the projected control system River. The part of the structure facing the river will be concrete and rectangular in shape, provided with slots to place closing planks to facilitate maintenance activities.In addition to the closing planks, a system of three gates of radial type, with mechanical drive based on compressed air will be placed. Its function is to raise the level upstream in order to send the flow of flows to the temporary retention reservoir when the flows in the river exceed 250 m3 / s and maintain the river flow in this value when the flows of the river Exceed 250 m3 / s.B) Freefall dump without gates to the reservoir of Las MaravillasThe maximum flow in the river for the design period of 50 years at the location of the diverter is 600 m3 / s, of which by means of the projected control system a maximum passage of 350 m3 / s Channel of entrance to the reservoir Las Maravillas.The free-fall weir will be of Creager type, adjusted to the profile of the slope, which is complemented by an energy dissipating bowl developed from the physical model tests of SAF (Saint Anthony Falls) and Type III USBR (United States Bureau of Reclamation).C) Dams of confinement of the reservoir Las Maravillas:The water containment dikes inside the reservoir are placed on the three sides of the reservoir, due to the fact that towards the fourth side there is the Las Maravillas Hill, located on the back of the Troncal, which does not require dikes.The dikes to be built will have heights between 0 and 8 m, increasing their size as they enter the reservoir. These dikes will be protected with sanded on the face that is in contact with the water, which in the lower zone will have a greater thickness in order to better protect the dam from the erosion that produces the entrance of the first flows towards The reservoir. As the height increases and the water has been distributed throughout the lower part of the reservoir, the erosive effect is reduced and the casting does not need such a high protection, which reduces the thickness and the caliber of the rocks .The section of the perimeter dam located in the northern part of the dam (parallel to the river) has been separated from the existing protection dam in the river, which will also be protected with grounding, in order to obtain greater safety.The following table shows the most important features and geometric data of the reservoir containment dikes

Page 148: Proyecto bulubulu tecnologia moderna inca

D) Discharge structure:The design flow for this structure is 40 m3 / s, a value obtained in such a way that the reservoir is able to laminate the peaks, not only of the maximum design flood, but also of all subsequent floods.The reservoir shall have a discharge structure consisting of the following elements:Input DrawerDuctsOutput DrawerDefrost channelE) The protection works planned in the Bulu Bulu River consist of longitudinal dikes located on the left bank of the river and will serve to protect the settled population along the route Azogues-Guayaquil, in the area between Cochancay and the Trunk .The proposed structures consist of longitudinal concrete dikes of a length of approximately 2681 meters, cemented below the levels of the current channel at 2 m depth, which determines average heights of 10 m.Concrete dams have been located from the top of the mountain above the town of Cochancay (690761.7 E, 9727147.1 N), up to the outlet to the normal stream downstream of the hills (689454.6 E, 9727147.1 N) that interrupt the passage of the River.The torrent control works to be built between Cochancay and Las Maravillas consist of a concrete wall for the protection of the population of Cochancay, in the narrowest part, and land embankments of longitudinal confinement of the river, protected with almost All his length, to Las Maravillas.From the completion of the concrete wall, the earth dykes begin, the same ones having a crown width of 5.80 m with inclinations of 3H: 1V slope towards the water side and 2H: 1V towards the external side, which Will be protected with vegetal cover. The dykes will be carabassed so that a layer of rolling of 4 m of width has been arranged.

Page 149: Proyecto bulubulu tecnologia moderna inca

The total length of landfalls on the left bank of the Bulu Bulu River is 6500 m, with a mean height of 3.50 m to the bypass.The tie between the diverter and the mountain on the right bank has a length of 1260 m with dykes protected towards the side of the river with casting, as it appears in the detail planes.The levees that do not belong to the reservoir on the right side of the Bulu Bulu river, downstream of the diverter have a length of 1247 m.F) BridgesThe diversion structure for the Las Maravillas reservoir will have a vehicular bridge, which will allow the circulation to the reservoir for the phases of operation and maintenance of the entire structure and especially of the floodgates.The bridge will have a width of 7.20 m of roadway and two sidewalks of 0.60 m, with a guardrail of protection of 0.90 m of height. The bridge light is 200 mG) RoadsThe following table presents a summary showing the length of the access roads to be constructed as well as the number of existing roadway ramps to the projected dikes, as follows:

Page 150: Proyecto bulubulu tecnologia moderna inca

(H) Compensatory worksIn the area of Cochancay and Las Maravillas there are two irrigation systems of importance that in a certain way will be intervened by the project. In order to prevent the interruption of the operation of these systems, there have been arranged drainage ducts of reinforced concrete of the following characteristics:Dimensions and main characteristics of the drainage ducts arranged to prevent the interruption of the operation of irrigation channels.

Page 151: Proyecto bulubulu tecnologia moderna inca

I) Paving of the road The Bulu Bulge Trunking: The structure of the pavement has been considered by scarification and compaction of 20 cm of the existing structure, underlining a 15 cm layer of granular sub-base, to a layer of 15 Cm of granular base and a layer of asphalt of 3 inches.The structures for the irrigation are conformed by the following elements:Drawer, ducts, outlet drawer and outlet channelJ) SCADA systemThe SCADA system is the system responsible for the automation of the flood control project. The system consists of the following subsystems:An HMI (Human-Machine Interface)A computer that exercises the supervision function, acquiring or collecting the process data and controls or sends commands to the process.Remote Terminal Units (RTUs) that connect process sensors and convert sensor signals into digital data to be sent to the monitoring system.Programmable logic controllers PLCs (Programmable Logic Controller)Communications system that connects the monitoring system to remote terminal units or RTUs.This system is complemented by a series of screens for data visualization, information and surveillance.Remote stationsThe sites with automation where the remote stations of the SCADA system will be located are:Bulu Bulu River Basin:Flow Distributing Station Las MaravillasValve station of the reservoir Las MaravillasDerivadora M.J. Street

Page 152: Proyecto bulubulu tecnologia moderna inca

SISTEMA BULUBULU.SIGUIENTEANTERIORDESCRIPCIÓN DE PROYECTO•EL PROYECTO “CONSTRUCCIÓN DE LAS OBRAS DE CONTROL DE INUNDACIONES DEL RÍO BULU BULU”, SE ENCUENTRA EN EJECUCIÓN, TENIENDO A LA FECHA UN AVANCE ECONÓMICO DEL 51,41% Y UN AVANCE FÍSICO DEL 55% EL VALOR FALTANTE POR PLANTILLARSE HASTA LA TERMINACIÓN DEL CONTRATO DE CONSTRUCCIÓN ES DE USD$ 31.390.480,64, VALOR EN EL CUAL NO ESTÁN INCLUIDOS LOS COSTOS DE OPERACIÓN Y MANTENIMIENTO DEL PROYECTO.•DE ACUERDO CON LOS DISEÑOS, EL SISTEMA ESTÁ CONFORMADO POR LOS SIGUIENTES COMPONENTES PRINCIPALES:A) DERIVADORA LAS MARAVILLAS:CONFORMADA POR UN CANAL CON CONTROL DE COMPUERTAS EN EL RÍO Y UN VERTEDERO DE CAÍDA LIBRE HACIA EL RESERVORIO DE RETENCIÓN TEMPORAL.CANAL CON COMPUERTAS EN EL RÍO BULUBULUEL CAUDAL MÁXIMO EN EL RÍO, PARA EL PERÍODO DE DISEÑO DE 50 AÑOS, EN EL LUGAR DE LA DERIVADORA ES DE 600 M3/S, DE LOS CUALES MEDIANTE EL SISTEMA DE CONTROL PROYECTADO SE PERMITIRÁ UN PASO MÁXIMO DE 250 M3/S HACIA EL RÍO. LA PARTE DE LA ESTRUCTURA QUE DA HACIA EL RÍO SERÁ DE HORMIGÓN Y DE SECCIÓN RECTANGULAR, DOTADA DE RANURAS PARA COLOCAR TABLONES DE CIERRE PARA FACILITAR LAS ACTIVIDADES DE MANTENIMIENTO.ADICIONALMENTE A LOS TABLONES DE CIERRE SE COLOCARÁ UN SISTEMA DE TRES COMPUERTAS DE TIPO RADIAL, CON ACCIONAMIENTO MECÁNICO A BASE DE AIRE COMPRIMIDO.  SU FUNCIÓN ES LA DE ELEVAR EL NIVEL HACIA AGUAS ARRIBA CON EL FIN DE ENVIAR EL FLUJO DE CAUDALES HACIA EL EMBALSE DE RETENCIÓN TEMPORAL CUANDO LOS FLUJOS EN EL RÍO SUPEREN LOS 250 M3/S Y MANTENER EL CAUDAL DEL RÍO EN ESTE VALOR CUANDO LOS CAUDALES DEL RÍO SEAN SUPERIORES A 250 M3/S.B) VERTEDERO DE CAÍDA LIBRE SIN COMPUERTAS HACIA EL RESERVORIO DE LAS MARAVILLASEL CAUDAL MÁXIMO EN EL RÍO, PARA EL PERIODO DE DISEÑO DE 50 AÑOS, EN EL LUGAR DE LA DERIVADORA ES DE 600 M3/S, DE LOS CUALES MEDIANTE EL SISTEMA DE CONTROL PROYECTADO SE PERMITIRÁ UN PASO MÁXIMO DE 350 M3/S HACIA EL CANAL DE INGRESO AL EMBALSE LAS MARAVILLAS.EL VERTEDERO DE CAÍDA LIBRE SERÁ DE TIPO CREAGER, AJUSTADO AL PERFIL DE LA LÁMINA VERTIENTE, QUE SE COMPLEMENTA CON UN CUENCO DISIPADOR DE ENERGÍA DESARROLLADO A PARTIR DE LOS ENSAYOS DE MODELOS FÍSICOS DE LOS VERTEDEROS TIPO SAF (SAINT ANTHONY FALLS) Y TIPO III DEL USBR (UNITEDSTATES BUREAU OF RECLAMATION).C) DIQUES DE CONFINAMIENTO DEL EMBALSE LAS MARAVILLAS:LOS DIQUES DE CONFINAMIENTO DEL AGUA DENTRO DEL RESERVORIO ESTÁN COLOCADOS A LOS TRES COSTADOS DEL RESERVORIO, DEBIDO A QUE HACIA EL CUARTO COSTADO EXISTE LA COLINA DE LAS MARAVILLAS, UBICADA EN LA PARTE POSTERIOR A LA TRONCAL, QUE NO REQUIERE DE DIQUES.LOS DIQUES A CONSTRUIR TENDRÁN ALTURAS DE ENTRE 0 Y 8 M, CRECIENDO SU TAMAÑO CONFORME SE ADENTRAN HACIA EL RESERVORIO. ESTOS DIQUES ESTARÁN PROTEGIDOS CON ENROCADOS EN LA CARA QUE SE ENCUENTRA EN CONTACTO CON EL AGUA, LOS CUALES EN LA ZONA MÁS BAJA TENDRÁN UN ESPESOR MAYOR CON OBJETO DE PROTEGER DE MEJOR MANERA EL DIQUE DE LA EROSIÓN QUE PRODUCE EL INGRESO DE LOS PRIMEROS CAUDALES HACIA EL RESERVORIO. A MEDIDA QUE SE INCREMENTA LA ALTURA Y AL HABERSE DISTRIBUIDO EL AGUA EN TODA LA PARTE BAJA DEL EMBALSE, EL EFECTO EROSIVO SE REDUCE Y EL ENROCADO NO NECESITA UNA PROTECCIÓN TAN ALTA POR LO QUE SE REDUCE EL ESPESOR COMO EL CALIBRE DE LAS ROCAS DEL MISMO.EL TRAMO DE DIQUE PERIMETRAL UBICADO EN LA ZONA NORTE DEL EMBALSE (PARALELO AL R ÍO) SE LO HA SEPARADO DEL DIQUE DE PROTECCIÓN EXISTENTE EN EL RÍO, EL CUAL TAMBIÉN SERÁ PROTEGIDO CON ENROCADO, CON LA FINALIDAD DE OBTENER UNA MAYOR SEGURIDAD.

Page 153: Proyecto bulubulu tecnologia moderna inca

En el cuadro siguiente se muestran las características y los datos geométricos más importantes de los diques de confinamiento del embalseDimensiones principales delDique Perimetral de Confinamiento del Embalsed) Estructura de descarga:El caudal de diseño para esta estructura es de 40 m3/s, valor obtenido de tal manera que el reservorio sea capaz de laminar los picos, no solo de la crecida máxima de diseño, sino también de todas las posibles crecidas subsiguientes.El embalse tendrá una estructura de descarga que consta de los siguientes elementos:•Cajón de entrada•Ductos•Cajón de salida•Canal de desfoguee) Las obras de protección previstas en el río BuluBulu consisten en diques longitudinales ubicados en la orilla izquierda del río y servirán para proteger a la población asentada a lo largo de la vía Azogues-Guayaquil, en la zona comprendida entre Cochancay y la Troncal.Las estructuras propuestas consisten en diques longitudinales de hormigón de una longitud aproximada de 2681 metros, cimentados por debajo de los niveles del cauce actual en 2 m de profundidad, lo que determina alturas promedio de 10 m.Se ha ubicado los diques de hormigón desde su inicio en la montaña arriba de la población de Cochancay (690761.7 E, 9727147.1 N), hasta la salida al cauce normal aguas abajo de las colinas (689454.6 E, 9727147.1 N) que interrumpen el paso del río.

Page 154: Proyecto bulubulu tecnologia moderna inca

Descripción Unidad Cantidad

Longitud total de dique de confinamiento m 5350.00

Altura de dique m 2.00 a 8.00

Volumen de material requerido para dique m3 2,000,000.00

Ancho de corona de dique m 6.80

Ancho de calzada m 5.00

Nivel de cierre del embalse msnm 67.50

Nivel de aguas máximas extraordinarias msnm 66.80

Nivel de aguas normales de regulación msnm 66.00

Nivel de aguas de reserva msnm 61.00

Nivel de aguas muertas msnm 60.00

Page 155: Proyecto bulubulu tecnologia moderna inca

Las obras de control de torrentes a construirse entre Cochancay y Las Maravillas, consisten en un muro de hormigón para la protección de la población de Cochancay, en la parte más estrecha, y diques de tierra de confinamiento longitudinal del río, protegidos con enrocado casi a todo su largo, hasta Las Maravillas.A partir de la terminación del muro de hormigón se inician los diques de tierra, los mismos que tienen un ancho de corona de 5.80 m con inclinaciones de talud 3H:1V hacia el lado del agua y de 2H:1V hacia el lado externo, que será protegido con capa vegetal.  Los diques serán carrozables por lo que se ha dispuesto una capa de rodadura de 4 m de ancho.La longitud total de diques de tierra en la margen izquierda del río BuluBulu es de 6500 m, con un promedio de altura de 3.50 m hasta la derivadora.El empate entre la derivadora y la montaña en la margen derecha tiene una longitud de 1260 m con diques protegidos hacia el lado del río con enrocado, como consta en los planos de detalle.Los diques que no pertenecen al embalse en el lado derecho del río BuluBulu, aguas abajo de la derivadora tienen una longitud de 1247 m.f) PuentesLa estructura derivadora para el embalse Las Maravillas tendrá un puente vehicular, que permitirá la circulación hacia el embalse para las fases de operación y mantenimiento de toda la estructura y en especial de las compuertas.El puente tendrá un ancho de 7.20 m de calzada y dos aceras de 0.60 m, con una baranda de protección de 0.90 m de altura. La luz del puente es de 200 mg) CaminosEn el cuadro siguiente se presenta un resumen que muestra la longitud de los caminos de acceso a construirse as í como el número de rampas de enlace de caminos existentes a los diques proyectados, tal como se indican a continuación:

Page 156: Proyecto bulubulu tecnologia moderna inca

Descripción Longitud

Longitud camino de acceso a derivadoraBuluBulu 900 m

Ancho camino de acceso a derivadoraBuluBulu 7.20 m

Longitud camino de acceso al presedimentador 700 m

Ancho camino de acceso al presedimentador 7.20 m

Longitud de diques carrozables 19600 m

Ancho de diques carrozables 4.00-5.00

Rampas o accesos de caminos existentes a diques 9 u

h) Obras compensatorias

Page 157: Proyecto bulubulu tecnologia moderna inca

Descripción Afección Corrección Longitud  (m)

Canal de Riego Estero Huaquillas

Dique Derivadora

Ducto Cajón1.50×1.30 m

28

Canal de Riego Estero Huaquillas

Dique acceso puente Derivadora

Ducto Cajón1.50×1.30 m

92

Canal de Riego Estero Huaquillas

Zona de Inundación Embalse

Ducto Cajón1.00×1.00 m

130

Canal de Riego río BuluBuluSectorCochancay

Dique protección río BuluBulu

Ducto Cajón1.50×1.30 m

28

En la zona de Cochancay y Las Maravillas existen dos sistemas de riego de importancia que de cierta manera serán intervenidos por el proyecto. Con el fin de impedir la interrupción del funcionamiento de esos sistemas se han

dispuesto ductos cajón de hormigón armado de las siguientes características:Dimensiones y características principales de los ductos cajón dispuestos para impedir la interrupción del

funcionamiento de canales de riego.

Page 158: Proyecto bulubulu tecnologia moderna inca

i) Pavimentación del camino La Troncal – derivadoraBuluBulu: Se ha considerado la estructuración del pavimento mediante la escarificación y compactación de 20 cm de la estructura existente, subyaciendo a una capa de 15 cm de sub-base granular, a una capa de 15 cm de base granular y a una capa asfáltica de 3 pulgadas.Las estructuras para el riego están conformadas por los siguientes elementos:•Cajón de entrada, ductos, cajón de salida y canal de salidaj) Sistema SCADAEl sistema SCADA es el sistema responsable de la automatización del proyecto de control de inundaciones. El sistema consiste de los siguientes subsistemas:•Un HMI (Human-Machine Interface)•Un computador que ejerce la función de supervisión, adquiriendo o recopilando los datos del proceso y controla o envía comandos al proceso.•Unidades terminales remotas RTUs (Remote Terminal Units) que conectan a los sensores del proceso y convierten las señales de los sensores en datos digitales para ser enviados al sistema de supervisión.•Controladores lógicos programables PLCs (ProgrammableLogicController)•Sistema de comunicaciones que conecta al sistema de supervisión con las unidades remotas terminales o RTUs.Este sistema es complementado con una serie de pantallas para la visualización de datos, información y vigilancia.Estaciones remotasLos sitios con automatización donde se localizarán las estaciones remotas del sistema SCADA son:

Page 159: Proyecto bulubulu tecnologia moderna inca

Cuenca del río BuluBulu:•Estación derivadora de caudal Las Maravillas•Estación de válvulas del embalse Las Maravillas•Derivadora M.J. CalleDetalles de proyectoCLIENTE SENAGUAFECHA Enero 7, 2013ETIQUETAS PROYECTOSProyectos relacionadoshttp://ucuencaep.com.ec/portfolio-item/sistema-bulu-bulu/

Page 160: Proyecto bulubulu tecnologia moderna inca
Page 161: Proyecto bulubulu tecnologia moderna inca

CORREA INAUGURA PROYECTO HÍDRICO BULUBULUPUBLICADO EL MARTES 21 DE ABRIL DE 2015 EN POLÍTICALA TRONCAL (GUAYAS), 21 ABR 2015.- EL PRESIDENTE RAFAEL CORREA INAUGURÓ EL SISTEMA DE CONTROL DE INUNDACIONES BULUBULU, MEGAPROYECTO QUE BENEFICIARÁ A MÁS DE 65 MIL HABITANTES DE LAS LOCALIDADES UBICADAS EN LOS LÍMITES ENTRE LAS PROVINCIAS DE GUAYAS Y CAÑAR. EN LA MESA PRINCIPAL ESTUVIERON PRESENTES EL GOBERNADOR DEL CAÑAR, JUAN CÁRDENAS; EL SECRETARIO NACIONAL DEL AGUA, WALTER SOLIS; EL MINISTRO COORDINADOR DE SECTORES ESTRATÉGICOS, RAFAEL POVEDA Y EL GOBERNADOR DEL GUAYAS, ROLANDO PANCHANA. FOTO: EDUARDO SANTILLÁN / PRESIDENCIA DE LA REPUBLICAESTE DÍA MARTES, EL PRESIDENTE RAFAEL CORREA INAUGURÓ EL MEGAPROYECTO HÍDRICO BULUBULU.PUBLICIDADEL SISTEMA ESTÁ COMPUESTO POR UN MURO DE HORMIGÓN DE 2.800 METROS DE LONGITUD QUE PROTEGE A COMUNIDADES DE LAS PROVINCIAS DE GUAYAS Y CAÑAR. LA ALTURA DE ESTA ESTRUCTURA VARÍA DE SIETE A 13 METROS Y ESTÁ UBICADA EN EL MARGEN IZQUIERDO DEL RÍO BULUBULU.OTRO COMPONENTE ES LA DERIVADORA LAS MARAVILLAS, SISTEMA QUE CONSTA DE TRES COMPUERTAS QUE PERMITEN CONTROLAR HASTA 600 M3/SEG DE AGUA DEL REFERIDO RÍO BULUBULU, CAUDAL QUE ES ALMACENADO EN UN EMBALSE DE 305 HECTÁREAS CON CAPACIDAD PARA 16 MILLONES DE M3, DE LOS CUALES 14 MILLONES PODRÁN SER UTILIZADOS PARA EL RIEGO DE 2.000 HECTÁREAS DE CULTIVO, EN ÉPOCA SECA.ADICIONALMENTE, SE CONSTRUYERON MÁS DE 20.000 METROS DE DIQUES DE PROTECCIÓN DE ROCA Y TIERRA ARCILLOSA, QUE RODEAN TODA LA EXTENSIÓN DEL PROYECTO HÍDRICO, DESDE COCHANCAY HASTA EL SECTOR DENOMINADO LAS MARAVILLAS.ESTA MEGAOBRA, CONSTRUIDA CON UN PRESUPUESTO DE 55 MILLONES DE DÓLARES, TAMBIÉN FACILITÓ LA EDIFICACIÓN DE UN PUENTE DE 180 METROS DE LARGO QUE UNE A LOS CANTONES LA TRONCAL Y EL TRIUNFO, LO QUE FACILITARÁ EL TRANSPORTE DE PRODUCTOS EN MENOR TIEMPO. ADEMÁS, SE MEJORARON CINCO KILÓMETROS DE CAMINOS RURALES.LA EMPRESA PÚBLICA DEL AGUA CONSIDERA QUE EL PROYECTO BULUBULU APORTA A LA POLÍTICA GUBERNAMENTAL DEL CAMBIO DE LA MATRIZ PRODUCTIVA, DEBIDO A QUE POTENCIARÁ LA PRODUCCIÓN DE CAÑA DE AZÚCAR, MATERIA PRIMA PARA LA ELABORACIÓN DE COMBUSTIBLES LIMPIOS COMO EL ETANOL.EL SISTEMA DE CONTROL DE INUNDACIONES BENEFICIA A MÁS DE 65.000 PERSONAS DEDICADAS A LA AGRICULTURA Y PROTEGE UN TOTAL DE 46.000 HECTÁREAS, INDICA UN INFORME DE LA EMPRESA PÚBLICA DEL AGUA.ESTE ES EL SEGUNDO MEGAPROYECTO HÍDRICO DE LOS MÁS DE 16 QUE TIENE PROYECTADO CONSTRUIR EL GOBIERNO NACIONAL CON UNA INVERSIÓN DE 2.500 MILLONES DE DÓLARES, SEGÚN INDICÓ WALTER SOLÍS, TITULAR DE LA SECRETARÍA DEL AGUA. ENTRE LAS OTRAS OBRAS ESTÁN EL TRASVASE CHONGÓN-SAN VICENTE EN LA PROVINCIA DE SANTA ELENA (YA EN FUNCIONAMIENTO), PROYECTO DAUVÍN (GUAYAS-LOS RÍOS), MULTIPROPÓSITO CHONE (MANABÍ), PROYECTO DE LA CUENCA BAJA DEL RÍO GUAYAS, QUE TIENEN AVANCES IMPORTANTES EN SU CONSTRUCCIÓN.

Page 162: Proyecto bulubulu tecnologia moderna inca

PROJETO ÁGUA CORREIA ABRE BULUBULUPUBLICADO TERÇA-FEIRA 21 DE ABRIL, 2015 EM POLÍTICATRONCO (GUAYAS), 21 ABR 2015.- PRESIDENTE RAFAEL CORREA SISTEMA INAUGUROU O CONTROLE DE ENCHENTES BULUBULU,MEGAPROJETO VAI BENEFICIAR MAIS DE 65 MIL HABITANTES DAS LOCALIDADES NA FRONTEIRA ENTRE AS PROVÍNCIAS DE GUAYAS E CAÑAR.NA MESA PRINCIPAL APRESENTAM O GOVERNADOR DO CAÑAR, JUAN CÁRDENAS; SECRETÁRIO NACIONAL DE ÁGUA, WALTER SOLIS; MINISTROSETORES ESTRATÉGICOS COORDENADORA, RAFAEL POVEDA EO GOVERNADOR DE GUAYAS, ROLANDO PANCHANA. FOTO: EDUARDO SANTILLÁN / PRESIDÊNCIA DA REPÚBLICANESTA TERÇA-FEIRA, O PRESIDENTE RAFAEL CORREA ABERTO DE ÁGUA BULUBULU MEGAPROJETO.PUBLICIDADEO SISTEMA CONSISTE EM UMA PAREDE DE CONCRETO 2.800 METROS DE COMPRIMENTO PROTEGE COMUNIDADES PROVÍNCIAS DE GUAYAS E CAÑAR. A ALTURA DESTA ESTRUTURA VARIA DE SETE A 13 METROS E ESTÁ SITUADO NA MARGEM ESQUERDA DO RIO BULUBULU.OUTRO COMPONENTE É O DESVIADOR MARAVILHAS, SISTEMA QUE COMPREENDE TRÊS FECHADURAS QUE CONTROLAR ATÉ 600 M3 / SEG RIO ÁGUA ENCAMINHAMENTO BULUBULU, QUE É ARMAZENADO FLUXO EM UM RESERVATÓRIO DE 305 HECTARES, COM CAPACIDADE PARA 16 MILHÕES DE M3, DOS QUAIS 14 MILHÕES PODERIAM SER USADOS PARA IRRIGAR 2.000 HECTARES DE CULTURAS, NA ESTAÇÃO SECA.ALÉM DISSO, ELES CONSTRUÍRAM MAIS DE 20.000 METROS DE DIQUES DE ROCHA E TERRA ARGILOSA EM TORNO DO EXTENSÃO DE PROJETO DE ÁGUA DE COCHANCAY CONHECIDO AO PAÍS DAS MARAVILHAS SETOR.ESTE MEGA-PROJETO, CONSTRUÍDO COM UM ORÇAMENTO DE 55 MILHÕES, TAMBÉM FACILITOU A CONSTRUÇÃO DE UMA PONTE DE 180 METROS DE COMPRIMENTO QUE LIGA O TRONCO CANTÕES E TRIUNFO, O QUE FACILITAR O TRANSPORTE DE EM MENOS TEMPO. TAMBÉM MELHOROU A CINCO QUILÓMETROS É ESTRADAS RURAIS.SOCIEDADE ÁGUA PÚBLICA ACREDITA QUE O BULUBULU PROJETO TRAZ PARA MUDAR A POLÍTICA GOVERNO MATRIZ PRODUTIVA PORQUE CANA PRODUÇÃO IMPULSO AÇÚCAR, MATÉRIAS-PRIMAS PARA O DESENVOLVIMENTO DE COMBUSTÍVEIS LIMPOS COMO O ETANOL.O CONTROLE INUNDAÇÃO BENEFÍCIOS DO SISTEMA MAIS DE 65.000 PESSOAS DEDICADAS À AGRICULTURA E PROTEGE UM TOTAL DE 46.000 HECTARES, DE ACORDO COM UM PÚBLICO DE ÁGUA RELATÓRIO DE EMPRESA.ESTA É A SEGUNDA ÁGUA MEGA-PROJECTO HÁ MAIS DE 16 TENDO PROJETADO PARA CONSTRUIR O GOVERNO, COM UM INVESTIMENTO DE 2.500 MILHÕES, INFORMOU TITULAR WALTER SOLÍSSECRETARIA DE ÁGUA. OUTROS TRABALHOS ESTÃO ENTRE OS TRANSFERÊNCIA CHONGÓN-SAN VICENTE NA PROVÍNCIA DE SANTA ELENA (JÁ EM OPERAÇÃO), DAUVIN PROJECT (GUAYAS-RIOS), POLIVALENTEESMERALDAS (MANABI), PROJECTO BAIXA GUAYAS BACIA RIO, QUE SÃO IMPORTANTES AVANÇOS NA SUA CONSTRUÇÃO.

Page 163: Proyecto bulubulu tecnologia moderna inca

CORREA INAUGURATES BULUBULU WATER PROJECTPUBLISHED ON TUESDAY APRIL 21, 2015 IN POLITICSLA TRONCAL (GUAYAS), 21 APR 2015.- PRESIDENT RAFAEL CORREA INAUGURATED THE BULUBULU FLOOD CONTROL SYSTEM,MEGAPROJECT THAT WILL BENEFIT MORE THAN 65,000 INHABITANTS OF THE LOCATIONS LOCATED IN THE LIMITS BETWEEN THE PROVINCES OF GUAYAS AND CAÑAR.IN THE MAIN TABLE WERE PRESENT THE GOVERNOR OF CAÑAR, JUAN CÁRDENAS; THE NATIONAL SECRETARY OF WATER, WALTER SOLIS; THE MINISTERCOORDINATOR OF STRATEGIC SECTORS, RAFAEL POVEDA AND THE GOVERNOR OF GUAYAS, ROLANDO PANCHANA. PHOTO: EDUARDO SANTILLÁN / PRESIDENCY OF THE REPUBLICTHIS TUESDAY, PRESIDENT RAFAEL CORREA INAUGURATED THE BULUBULU WATER MEGAPROJECT.ADVERTISINGTHE SYSTEM IS COMPOSED BY A CONCRETE WALL OF 2,800 METERS OF LENGTH PROTECTING COMMUNITIES OF THE PROVINCES OF GUAYAS AND CAÑAR. THE HEIGHT OF THIS STRUCTURE WOULD BE SEVEN TO 13 METERS AND IS LOCATED IN THE LEFT MARGIN OF THE BULUBULU RIVER.ANOTHER COMPONENT IS THE WONDERS DERIVATIVE, SYSTEM THAT CONSISTS OF THREE COMPUTERS THAT ALLOW TO CONTROL UP TO 600 M3 / SEG OF WATER OF THE REFERRED RIVER BULUBULU, FLOW THAT IS STORED IN A PACK OF 305 HECTARES WITH CAPACITY FOR 16 MILLION M3, OF WHICH 14 MILLION MAY BE USED FOR IRRIGATION OF 2,000 HECTARES OF CULTIVATION, IN A DRY TIME.ADDITIONALLY, MORE THAN 20,000 METERS OF ROCK PROTECTION DIAMONDS AND ARCILLOSA LAND, WHICH SURROUND THE EXTENSION OF THE WATER PROJECT, FROM COCHANCAY TO THE SECTOR DESIGNED WONDERS.THIS MEGAOBRA, BUILT WITH A BUDGET OF 55 MILLION DOLLARS, ALSO FACILITED THE BUILDING OF A 180 METER LONG BRIDGE THAT LINKS THE CANTONES THE TRONCAL AND THE TRIUMPH, WHICH WILL FACILITATE THE TRANSPORT OF PRODUCTS IN LESS TIME. IN ADDITION, FIVE KILOMETERS OF RURAL WAYS WERE IMPROVED.THE PUBLIC WATER COMPANY CONSIDERS THAT THE BULUBULU PROJECT CONTRIBUTES TO THE GOVERNMENTAL POLICY OF THE CHANGE OF THE PRODUCTIVE MATRIX, BECAUSE IT WILL PUT THE PRODUCTION OF SUGAR CANE, RAW MATERIAL FOR THE DEVELOPMENT OF CLEAN FUELS LIKE ETHANOL.THE FLOOD CONTROL SYSTEM BENEFITS OVER 65,000 PEOPLE DEDICATED TO AGRICULTURE AND PROTECTS A TOTAL OF 46,000 HECTARES, INDICATES A REPORT FROM THE PUBLIC WATER COMPANY.THIS IS THE SECOND WATER MEGAPROGY OF THE OVER 16 THAT HAS PROJECTED TO BUILD THE NATIONAL GOVERNMENT WITH AN INVESTMENT OF 2.500 MILLION DOLLARS, AS WALTER SOLÍS INDICATED, HOLDEROF THE WATER SECRETARIAT. BETWEEN THE OTHER WORKS ARE THE TRANSFER CHONGÓN-SAN VICENTE IN THE PROVINCE OF SANTA ELENA (ALREADY IN OPERATION), PROJECT DAUVÍN (GUAYAS-LOS RÍOS), MULTIPROPOSITOCHONE (MANABÍ), PROJECT OF THE LOWER BASIN OF THE GUAYAS RIVER, WHICH HAVE IMPORTANT ADVANCES IN THEIR CONSTRUCTION.

Page 164: Proyecto bulubulu tecnologia moderna inca

BELT PROJECT WATER يفتتح Bulubuluالثالثاء يوم نشره السياسة 2015أبريل 21تم في

) ( ¼¼، غواياس 21جذعي ABR 2015.- الفيضانات مكافحة افتتح نظام كوريا رافائيل ،Bulubulu الرئيسمن أكثر استفادة عمالق مشروع وكنار 65سوف غواياس محافظتي بين الحدود على المحليات من نسمة ألف .

. . وزير سوليس والتر للمياه، الوطني األمين كاردناس خوان كنار، محافظ يقدمونه رئيس طاولة علىاالستراتيجية COORDINATOR القطاعات ، و بوفيدا : GOVERNORرافائيل . إدواردو صور بانشانا روالندو غواياس،

الجمهورية / رئاسة سانتيالنكوريا رافائيل الرئيس الثالثاء، عمالق OPENED WATER Bulubulu هذا .مشروع

اإلعالنخرساني جدار من النظام وكنار 2800ويتكون غواياس محافظات المجتمعات طويلة يحمي متر .

  إلى سبعة من يختلف الهيكل هذا األيسر 13ذروة الهامش في ويقع متر، RIVER Bulubulu.كلبشة هو آخر WONDERLAND عنصر ، تتحكم التي أقفال ثالثة تضم UP TO 600 M3 / SEG RIVER WATER نظام

REFERRAL Bulubulu ، تخزينها يتم FLOW والتي  من خزان على 305في القدرة مليون 16هكتار M3 ، للري 14منها استخدامها يمكن من 2000مليون هكتار

الجفاف موسم في .المحاصيل،من أكثر ببناء قاموا ذلك، إلى مدى 20000باإلضافة طيني المحيطة واألرض الصخور من السدود من متر

PROJECT WATER من Cochancay القطاع العجائب للبالد .المعروفةقدرها بميزانية بني الذي المشروع، العمالق من 55هذا جسر بناء سهلت كما بين 180مليون، يربط مترا TRUNK

و ،TRIUMPHالكانتونات  . الريفية الطرق هي كيلومترات خمسة أيضا تحسنت أقل وقت في نقل لتسهيل .ماذا

أن تعتقد العامة المياه سياسة Bulubulu PROJECT شركة حكومتهم تغيير الى قصب MATRIX يرتفع ألن اإلنتاجية،دفعة PRODUCTION السكر  النظيف الوقود لتنمية الالزمة الخام .اإليثانول AS المواد

الفيضانات مكافحة نظام من OVER 65،000 PEOPLE فوائد مجموع ويحمي للزراعة وفقا 46000المخصصة هكتار،العامة المياه منتجات .لتقرير

ثاني هو هذا الضخم WATER وقال باستثمار FOR MORE THAN 16 المشروع الحكومة لبناء المتوقعة 2500بعدحامل سوليس والتر مليون

بين .WATER أمانة من هي أخرى في ) TRANSFER Chongón-SAN VICENTE أعمال بالفعل إيلينا سانتا مقاطعة فيالعملية( ، DAUVIN PROJECT (غواياس-RIVERS) ، MULTIPURPOSE) مانابي ) ازميرالدا ، PROJECT BAJA بنائه في هامة إنجازات هي والتي نهر، حوض .غواياس

Page 165: Proyecto bulubulu tecnologia moderna inca

BELT PROJECT WATER YAFTATIH BULUBULUTAMM NASHARUH YAWM ALTHTHULATHA' 21 'ABRIL 2015 FI ALSSIASAJIDHEI (GHWAYAS), 21 ABR 2015.- ALRRAYIYS RIAFAYIYL KURIA NIZAM AIFTATAH MUKAFAHAT ALFAYADANAT BULUBULU،SAWF MASHRUE EIMLAQ AISTIFADAT 'AKTHAR MIN 65 'ALF NASAMAT MIN ALMUHALLIAT EALAA ALHUDUD BAYN MUHAFAZATAY GHAWAYAS WAKUNAR.EALAA TAWILAT RAYIYS YUQADDIMUNAH MUHAFIZ KANAR, KHWAN KARDNAS. AL'AMIN ALWATANI LILMIAHI, WALTTRR SULIS. WAZIRALQITAEAT AL'IISTRATIJIAT COORDINATOR, RAFAYYL BWFIDA WGOVERNOR GHWAYAS, RWLANDW BANSHANA. SWR: 'IIDWARDU SANTILAN / RIASAT ALJUMHURIAHADHA ALTHLATHA', ALRRAYIYS RAFAYIYL KURIA OPENED WATER BULUBULU MASHRUE EIMLAQ.AL'IIELANWAYATAKAWWAN ALNNIZAM MIN JADAR KHARSANI 2800 MITR YAHMI TAWILAT ALMUJTAMAEAT MUHAFAZAT GHAWAYAS WAKUNAR.DHRUT HDHA ALHAYKAL YAKHTALIF MIN SBET 'IILAA 13 MITRA, WAYAQAE FI ALHAMISH AL'AYSAR RIVER BULUBULU.EUNSUR AKHAR HU KALBUSHAT WONDERLAND, NIZAM TADUMM THLATHT 'AQFAL ALTY TTAHAKM UP TO 600 M3 / SEG RIVER WATER REFERRAL BULUBULU, WALLATI YTM TAKHZINIHA FLOWFI KHAZZAN MIN 305 HIKTAR ALQUDRAT EALAA 16 MLYWN M3, MINHA 14 MILYUN YUMKIN AISTIKHDAMUHA LLRRI 2000 HIKTAR MIN ALMHASYL, FI MAWSIM ALJIFAF.BIAL'IIDAFAT 'IILAA DHALIK, QAMUU BIBINA' 'AKTHAR MIN 20000 MITR MIN ALSSUDUD MIN ALSSUKHUR WAL'ARD ALMUHITAT TINI MADAA PROJECT WATER MIN COCHANCAY ALMAERUFAT LILBILAD ALEAJAYIB ALQITAE.HADHA ALEIMLAQ ALMUSHRUEA, ALDHY BANI BIMIZANIAT QADRUHA 55 MILYUNA, KAMA SAHALAT BINA' JISR MIN 180 MITRAAN YARBIT BAYN TRUNK ALKANITUNAT WATRIUMPH،MMADHA LITASHIL NUQIL FI WAQT 'AQIL. TAHASSANAT 'AYDAAN KHMST KILUMITRAT HI ALTTURUQ ALRRIFIAT.SHARIKAT ALMIAH ALEAMMAT TAETAQID 'ANN BULUBULU PROJECT YARTAFIE 'IILAA TAGHYIR HUKUMATAHUM SIASAT MATRIX AL'IINTAJIAT LI'ANN QISB ALSSKKAR PRODUCTION DUFEATAN,ALMAWAD ALKHAM ALLLAZIMAT LITANMIAT ALWAQUD ALNNAZIF AS AL'IITHANUL.FAWAYID NIZAM MUKAFAHAT ALFAYADANAT OVER 65،000 PEOPLE ALMUKHASSASAT LILZZARAEAT WAYAHMI MAJMUE MIN 46000 HUKTARI, WIFQAAN LITAQRIR MUNTAJAT ALMIAH ALEAMMATI.WAQAL HADHA HU THANI WATER ALMASHRUE ALDDAKHM FOR MORE THAN 16 BAED ALMUTAWAQQAEAT LIBINA' ALHUKUMAT BIAISTITHMAR 2500 MILYUN WALTTAR SULIS HAMIL'AMANAT WATER. 'AEMAL 'UKHRAA HI MIN BAYN TRANSFER CHONGON-SAN VICENTE FI MUQATAEAT SANTA 'IILINA (BALFEL FI ALEAMLIAT), DAUVIN PROJECT (GHWAYAS-RIVERS) ، MULTIPURPOSEAZMIRALDA (MANABY), PROJECT BAJA GHAWAYAS HAWD NAHRA, WALLATI HI 'IINJAZAT HAMMAT FI BINAYIHI.

Page 166: Proyecto bulubulu tecnologia moderna inca

ПОЯС WATER ПРОЕКТ ОТКРЫВАЕТ BulubuluРАЗМЕЩЕННЫЕ НА ВТОРНИК 21 апреля 2015 В ПОЛИТИКЕСтволовой (Guayas), 21 ABR 2015.- президент Рафаэль Корреа СИСТЕМА открыла НАВОДНЕНИЯ КОНТРОЛЬ Bulubulu,Мегапроект принесет пользу более 65 тысяч жителей населенных пунктов на границе провинций Гуаясли и Канары.В главе стола они представляют Губернатор Cañar, Хуан Карденас; НАЦИОНАЛЬНЫЙ СЕКРЕТАРЬ ВОДЫ, Уолтер Солис; МИНИСТРКООРДИНАТОР стратегические секторы, Рафаел Поведа И ГУБЕРНАТОР Гуайас, Роландо Панчана. Фото: Эдуардо Сантиллан / ПРЕЗИДЕНТСТВО РЕСПУБЛИКИЭТА вторник, президент Рафаэль Корреа ОТКРЫТ ВОДА Bulubulu мегапроект.РЕКЛАМАСистема состоит из бетонной стены 2,800 метров защищающим Сообщества провинции Гуаясли и Канары. Высота этой структуры варьируется от семи до 13 метров и расположена в левом поле RIVER Bulubulu.Другой компонентом является переключающими ЧУДАМИ, система содержит три замка, которые контролируют до 600 м3 / SEG речной воды Referral Bulubulu, хранящегося ПОТОК В водоеме 305 га с вместимостью 16 млн м3, из которых 14 млн могут быть использованы для орошения 2000 гектаров посевов, в сухой сезон.Кроме того, они построили более 20000 метров дамб рок и земли глинисто ОХВАТЫВАЮЩИХ МАСШТАБЫ ВОДЫ ОТ ПРОЕКТА Cochancay ИЗВЕСТНЫХ В СТРАНЕ ЧУДЕС СЕКТОР.Этот мега-проект, построенный с бюджетом в 55 миллионов человек, также способствовало строительство моста 180 метров длинной, которая связывает кантонов Магистральные и TRIUMPH, ЧТО СПОСОБСТВУЮЩАЯ ПЕРЕВОЗКА за меньшее время. ТАКЖЕ Улучшено ПЯТЬ КИЛОМЕТРОВ IS сельских дорог.PUBLIC WATER COMPANY СЧИТАЕТ, ЧТО Bulubulu ПРОЕКТ приводит к изменению правительственной политики MATRIX ПРОИЗВОДСТВЕННОГО ПОТОМУ PRODUCTION повышение сахарного тростника, Сырье для развития чистых видов топлива, как этанол.Потопа СИСТЕМА УПРАВЛЕНИЯ ПРЕИМУЩЕСТВА НАД 65000 людей, преданных ЗЕМЛЕДЕЛИИ и защищает в общей сложности 46000 га, согласно отчету ENTERPRISE водоснабжения.Это второй мега-проект водой более 16 с ПРОГНОЗИРУЕТСЯ ПОСТРОИТЬ правительству инвестиции в размере 2500 миллионов, сказал Уолтер Солис ДЕРЖАТЕЛЬСЕКРЕТАРиАТ ВОДЫ. Прочие работы СРЕДИ ПЕРЕДАЧЕ Chongón-SAN VICENTE в провинции Санта-Элена (уже в эксплуатации), DAUVIN проекта (Гуайас-РЕК), многоцелевыеЭсмеролдас (Manabi), ПРОЕКТ BAJA Гуайас бассейн река, которые являются важным достижением в его строительстве.

Page 167: Proyecto bulubulu tecnologia moderna inca
Page 168: Proyecto bulubulu tecnologia moderna inca
Page 169: Proyecto bulubulu tecnologia moderna inca
Page 170: Proyecto bulubulu tecnologia moderna inca
Page 171: Proyecto bulubulu tecnologia moderna inca
Page 172: Proyecto bulubulu tecnologia moderna inca
Page 173: Proyecto bulubulu tecnologia moderna inca
Page 174: Proyecto bulubulu tecnologia moderna inca
Page 175: Proyecto bulubulu tecnologia moderna inca
Page 176: Proyecto bulubulu tecnologia moderna inca
Page 177: Proyecto bulubulu tecnologia moderna inca

BULUBULU

Page 178: Proyecto bulubulu tecnologia moderna inca
Page 179: Proyecto bulubulu tecnologia moderna inca
Page 180: Proyecto bulubulu tecnologia moderna inca
Page 181: Proyecto bulubulu tecnologia moderna inca
Page 182: Proyecto bulubulu tecnologia moderna inca

ZAPATA DE VIGAUNA COLUMNA DECIMENTACION EN EL MURO PERIMETRICO PARA CANALIZAR UN RIOALT 350 O 400 CMANCHO 3 MTLARGO 8 MT O 10 MT CON FIERROS DE 8/8

SUELO O CARRETERA DEL RIO

6 o 8 MTS

3.5 MT O 4 MT

2 MT O MEJOR 4 MT

10 MT

10 MTS

10 MT

3 MT

3 MTS

COLUMNA DE 300 CM POR 300 CM CADA 6 METROS DE DISTANCIA CON FIERROS DE 8/8

0.6 M

T AN

CHO

COLUMNA DE CIMENTACION Y COLUMNA DE ZAPATA CON FIERROS DE 8/8 PARA CANALIZAR UN RIO

Page 183: Proyecto bulubulu tecnologia moderna inca

SUELO O VEREDA

CIMIENTO DEL MURO PERIMETRAL DE CONSTRUCCION DE MUROS DE LADRILLO DEL CANAL DEL RIO HECHO DE CONCRETO DE CICLOPIA OSEA HORMIGON CEMENTO Y PIEDRAS GRANDES

CIMIENTO DEL PERIMETRO DEL CANAL DEL RIO DE LA CONSTRUCCION DE CONCRETO ARMADO CON FIERROS DE 8/8

COLUMNA DEL MURO PERIMETRAL DE L MALECON DE L CANAL DEL RIO

COLUMNA DEL MURO PERIMETRAL DEL CANAL DEL RIO

6 MT

CIMIENTO DEL MURO PERIMETRAL DIVISORIO DEL CANAL DEL RIO ES DE 80 A 100 CENTIMETROS Y ALTURA MINIMA 5 A 7 METROS PARA UN ATALON CONTRA LAS OLAS DEL MAR

10 MT 10 MT

VIGA COLUMNA PERIMETRICA PARALELA DEL CANAL DEL RIO 180 CM X 180 CM X 10 MTS DE LARGO O VIGA DE CIMENTACION SI SUELO ES MALO, BORDE DEL MAR EN EL ATALON

VIGA COLUMNA PERIMETRICA PARALELA DEL CANAL DEL RIO B 180 CM X 180 CM X 10 MT LARGO O VIGA DE CIMENTACION SI SUELO ES MALO, BORDE DE RIO O COMO EN ICA

Page 184: Proyecto bulubulu tecnologia moderna inca

SUELO O VEREDA

6 MT

COLUMNA DEL MURO PERIMETRAL DE L CANAL DEL RIO

COLUMNA DEL MURO PERIMETRAL DEL CANAL DEL RIO

CIMIENTO DEL MURO PERIMETRAL DIVISORIO DEL CANAL DEL RIO ES DE 80 A 100 CENTIMETROS Y ALTURA MINIMA 5 A 7 METROS PARA UN RESERVORIO DE AGUA GIGANTE

CIMIENTO DEL PERIMETRO DEL MALECON DE COSTA DE LA CONSTRUCCION DE CONCRETO ARMADO CON FIERROS DE 8/8

CIMIENTO DEL MURO PERIMETRAL DE CONSTRUCCION DE MUROS DE AMALLADO HORMIGON CONCRETO CON FIERROS 8/8 FIERROS ANCHO 120 CM DEL CANAL DEL RIO MODERNO HECHO DE CONCRETO DE HORMIGON ARMADO CON FIERROS 8/8 O 1 PULGADA

VIGA COLUMNA PERIMETRICA PARALELA DEL CANAL DEL RIO 180 CM X 180 CM X 10 MTS DE LARGO O VIGA DE CIMENTACION SI SUELO ES MALO, BORDE DEL MAR

VIGA COLUMNA PERIMETRICA PARALELA DEL CANAL DEL RIO B 180 CM X 180 CM X 10 MT LARGO O VIGA DE CIMENTACION SI SUELO ES MALO, BORDE DE RIO O COMO EN ICA

Page 185: Proyecto bulubulu tecnologia moderna inca

SUELO O VEREDA

6 MT

ORILLA DEL MAR DE ARENA FINA

COLUMNA DEL MURO PERIMETRAL DEL CANAL DEL RIO

MURO DE CONCRETO CON FIERRO ARMADOS DE 1 A 2 PULGADAS DE GROSOR DE 2 A 3 METROS DE ANCHO

CORTE DEL MURO PERIMETRO DEL CANAL DEL RIO DE LA CONSTRUCCION DE CONCRETO ARMADO CON FIERROS DE 8/8

CIMIENTO DEL MURO PERIMETRAL DE CONSTRUCCION DE MUROS DE AMALLADO HORMIGON CONCRETO CON FIERROS 8/8 FIERROS ANCHO 5 METROS CANAL DEL RIO EN SIERRA O COSTA MODERNO HECHO DE CONCRETO DE HORMIGON CICLOPEO CON FIERROS 8/8 O 1 PULGADA

VIGA COLUMNA PERIMETRICA PARALELA DEL CANAL DEL RIO 180 CM X 180 CM X 10 MTS DE LARGO O VIGA DE CIMENTACION SI SUELO ES MALO, BORDE DEL MAR DE MAYOR TAMAÑO DEBE SER

VIGA COLUMNA PERIMETRICA PARALELA DEL CANAL DEL RIO B 180 CM X 180 CM X 10 MT LARGO O VIGA DE CIMENTACION SI SUELO ES MALO, BORDE DE RIO O COMO EN ICA

MURO PERIMETRAL DE CONCRETO CICLOPEO PIEDRAS CON CEMENTO4 o 5 METROS DE ANCHO

ARENA DEL MAR LUEGO DEL MURO DEL CANAL DEBAJOMAR

Page 186: Proyecto bulubulu tecnologia moderna inca
Page 187: Proyecto bulubulu tecnologia moderna inca
Page 188: Proyecto bulubulu tecnologia moderna inca
Page 189: Proyecto bulubulu tecnologia moderna inca
Page 190: Proyecto bulubulu tecnologia moderna inca
Page 191: Proyecto bulubulu tecnologia moderna inca
Page 192: Proyecto bulubulu tecnologia moderna inca
Page 193: Proyecto bulubulu tecnologia moderna inca
Page 194: Proyecto bulubulu tecnologia moderna inca
Page 195: Proyecto bulubulu tecnologia moderna inca

INAUGURACIÓN PROYECTO CONTROL DE INUNDACIONES DEL RÍO BULUBULU, GUAYAS - CAÑAR, 21 ABRIL 2015 by Presidencia de la República del Ecuador, onFlickr

Page 196: Proyecto bulubulu tecnologia moderna inca

INAUGURACIÓN PROYECTO CONTROL DE INUNDACIONES DEL RÍO BULUBULU, GUAYAS - CAÑAR, 21 ABRIL 2015 by Presidencia de la República del Ecuador, onFlickr

Page 197: Proyecto bulubulu tecnologia moderna inca

INAUGURACIÓN PROYECTO CONTROL DE INUNDACIONES DEL RÍO BULUBULU, GUAYAS - CAÑAR, 21 ABRIL 2015 by Presidencia de la República del Ecuador, onFlickr

Page 198: Proyecto bulubulu tecnologia moderna inca
Page 199: Proyecto bulubulu tecnologia moderna inca

INAUGURACIÓN PROYECTO CONTROL DE INUNDACIONES DEL RÍO BULUBULU, GUAYAS - CAÑAR, 21 ABRIL 2015 by Presidencia de la República del Ecuador, onFlickr

Page 200: Proyecto bulubulu tecnologia moderna inca

INAUGURACIÓN PROYECTO CONTROL DE INUNDACIONES DEL RÍO BULUBULU, GUAYAS - CAÑAR, 21 ABRIL 2015 by Presidencia de la República del Ecuador, onFlickr

Page 202: Proyecto bulubulu tecnologia moderna inca

INAUGURACIÓN PROYECTO CONTROL DE INUNDACIONES DEL RÍO BULUBULU, GUAYAS - CAÑAR, 21 ABRIL 2015 by Presidencia de la República del Ecuador, onFlickr

Page 203: Proyecto bulubulu tecnologia moderna inca

VICEPRESIDENTE VERIFICÓ FUNCIONAMIENTO DEL PROYECTO CONTROL DE INUNDACIONES BULUBULU by Secretaría Agua Ecuador, onFlickr

Page 206: Proyecto bulubulu tecnologia moderna inca
Page 207: Proyecto bulubulu tecnologia moderna inca
Page 210: Proyecto bulubulu tecnologia moderna inca
Page 211: Proyecto bulubulu tecnologia moderna inca
Page 212: Proyecto bulubulu tecnologia moderna inca
Page 214: Proyecto bulubulu tecnologia moderna inca
Page 215: Proyecto bulubulu tecnologia moderna inca
Page 216: Proyecto bulubulu tecnologia moderna inca
Page 217: Proyecto bulubulu tecnologia moderna inca
Page 218: Proyecto bulubulu tecnologia moderna inca
Page 219: Proyecto bulubulu tecnologia moderna inca

Proyecto Cañar.SiguienteAnteriorDescripción de proyectoLa “CONSTRUCCIÓN DE LAS OBRAS DE CONTROL DE INUNDACIONES CAÑAR”, implica:Este proyecto fundamenta la ingeniería hidráulica para el control de inundaciones que se da en épocas invernales de la costa ecuatoriana afectando directamente a la infraestructura vial de estas regiones, a las actividades agropecuarias, produciendo grandes impactos por las pérdidas económicas para el sector productivo y el propio Estado y fundamentalmente genera problemas de orden social  y económicos  a los habitantes y muchas de las veces con las pérdidas de vidas humanas en las diferentes comunidades de las zonas bajas.En proyecto en su concepción ingenieril permite que los efectos causantes de los problemas por las inundaciones se atenúen y en lo posible se eliminen los daños estacionales que se producen; a través de la ingeniería de obras hidráulicas, viales, puentes desvíos de cause, dragado de lechos azolvados de las cuencas intervenidas.Entonces indicaremos las diferentes unidades establecidas en el diseño de la ingeniería de estos proyectos, como se va mitigando con las diferentes obras que se están construyendo y fiscalizando; como son: derivación del caudal de excesos a través de un solo bypass denominado Cañar. El sistema Cañar está concebido de forma que el caudal máximo que pueda pasar por el sector de Puerto Inca sea 1000 m3/s durante una crecida máxima correspondiente a un período de retorno de 50 años, es decir disminuir el caudal esperado en el sitio de control (Puerto Inca), que de acuerdo al estudio hidrológico asciende a 2100 m3/s. Para lograr este objetivo todos los caudales en exceso de 1000 m3/s serán derivados por el bypass Cañar y transportados hacia la descarga en el estero Soledad Grande. Esto significa 1100 m3/s en exceso en crecida máxima; el resto del caudal fluirá por el cauce del rio que también se interviene con la limpieza correspondiente, dando así mayor capacidad de flujo.

Page 220: Proyecto bulubulu tecnologia moderna inca

El Bypass Cañar Tiene varios componentes que son:•Estructura de derivación•Primer tramo del Canal Bypass de sección en forma de doble trapecio (Tramo Derivadora Cañar – Sedimentador La Lagartera.•Sedimentador La Lagartera con estructuras de control para riego•Estructura de control de nivel a la salida del sedimentador•Segundo tramo del Canal Bypass de sección en forma de doble trapecio (Tramo Sedimentador La Lagartera – Descarga en el estero Soledad Grande)•Zona de expansión a la salida del Bypass a la descarga en el estero Soledad GrandeEn la siguiente figura se esquematiza las obras contempladas en el Sistema Cañar:

Page 221: Proyecto bulubulu tecnologia moderna inca
Page 222: Proyecto bulubulu tecnologia moderna inca

Obras de Protección en Ríos y Control de TorrentesObras de protección en ríosLa protección del río Cañar y sus afluentes se la realizó a través de diques dispuestos a lo largo de las orillas de los diferentes cauces, comprobando que su capacidad hidráulica sea la adecuada. Se debe tener presente que las dimensiones de los diques de protección del río Cañar contemplan la extracción de los 1100m3/s a través del bypass Cañar. Control de torrentesLas obras de control de torrentes han sido establecidas a través de diques longitudinales con protección de enrocado para los ríos Cañar (desde el puente de Zhucay hasta derivadora Cañar), Patul y Norcay, donde las velocidades del flujo en el cauce así lo requieren. Estación de Bombeo de Puerto Inca (Sector Isla de las Mercedes) Esta estación de bombeo se vuelve necesaria ya que en Puerto Inca en el área comprendida entre la carretera Boliche Puerto Inca, el estero Estrella, el estero Trovador y el río Cañar (Isla de la Mercedes) se forma una zona que no tiene salida de desagüe natural de unas 200 Ha aproximadamente. Estructuras de drenajeComo estructuras y elementos que se utilizan para manejar los drenajes naturales que serán modificados por la construcción del bypass Cañar y encauzamientos del río Cañar y sus afluentes, se ha definido la utilización de alcantarillas, zanjas de drenaje y sifones, aparte de los puentes. Las zanjas de drenaje en lo posible se han diseñado paralelas a los diques, mientras que las alcantarillas conectarán las zanjas de drenaje con los diferentes cauces atravesando los diques. PuentesLos puentes que serán sustituidos en el sistema Cañar son los siguientes: Zhucay, Indiana y Puerto Inca, cuyas características hidráulicas actuales son insuficientes.Además se vio la necesidad de construir tres puentes nuevos: uno sobre el río Norcay y dos sobre el bypass Cañar.(Fuente: Pliegos para RÉGIMEN ESPECIAL PARA LA CONTRATACIÓN DE LOS SERVICIOS DE CONSULTORÍA PARA LA FISCALIZACIÓN DE LA CONSTRUCCIÓN DE OBRAS DEL PROYECTO CONTROL DE INUNDACIONES “CAÑAR””, elaborados por la SENAGUA)

Page 223: Proyecto bulubulu tecnologia moderna inca
Page 224: Proyecto bulubulu tecnologia moderna inca
Page 225: Proyecto bulubulu tecnologia moderna inca
Page 226: Proyecto bulubulu tecnologia moderna inca

Project Cañar.FollowingPreviousProject DescriptionThe "CONSTRUCTION OF THE FLOOD CONTROL WORKS OF CAÑAR", implies:This project is based on hydraulic engineering for the control of floods that occurs in winter times of the Ecuadorian coast, directly affecting the road infrastructure of these regions, to agricultural activities, producing great impacts by the economic losses for the productive sector and the own State and fundamentally generates problems of social and economic order to the inhabitants and many of the times with the loss of human life in the different communities of the low zones.In project in its engineering design allows the effects causing the problems by the floods to be attenuated and, as far as possible, eliminate the seasonal damages that occur; Through the engineering of hydraulic works, vials, causeway diversions bridges, dredging of azide beds of intervened basins.Then we will indicate the different units established in the engineering design of these projects, as it is mitigated with the different works that are being constructed and inspected; Such as: derivation of excess flow through a single bypass called Cañar. The Cañar system is designed so that the maximum flow that can pass through the Inca Port sector is 1000 m3 / s during a maximum flood corresponding to a return period of 50 years, ie to decrease the expected flow rate at the control site (Puerto Inca), which according to the hydrological study amounts to 2100 m3 / s. To achieve this objective all flows in excess of 1000 m3 / s will be derived by the Cañar bypass and transported to the discharge in the Soledad Grande estuary. This means 1100 m3 / s in excess at maximum flood; The rest of the flow will flow through the channel of the river that also intervenes with the corresponding cleaning, thus giving greater flow capacity.

Page 227: Proyecto bulubulu tecnologia moderna inca

The Bypass Cañar It has several components that are:Bypass StructureFirst section of the section bypass channel in the form of a double trapezoidal section (Cañar - La Lagartera).Sedimentador La Lagartera with control structures for irrigationLevel control structure at the sedimentation outletSecond Section of the Bypass Channel in the form of a double trapezoidal section (Sedimentador La Lagartera - Discharge in the Soledad Grande estuary)Expansion zone at the exit of the Bypass to the discharge in the Soledad Grande estuaryThe following figure outlines the works contemplated in the Cañar System:

Page 228: Proyecto bulubulu tecnologia moderna inca

River Protection Works and Torrent ControlRiver protection worksThe protection of the Cañar river and its tributaries was done through dikes arranged along the banks of the different channels, checking that its hydraulic capacity is adequate. It should be borne in mind that the dimensions of the Cañar river dams provide for the extraction of 1100m3 / s through the Cañar bypass.Torrent controlThe torrent control works have been established through longitudinal dikes with protection of the Cañar river (from the Zhucay bridge to Cañar drift), Patul and Norcay, where flow velocities in the channel require it.Pumping Station of Puerto Inca (Sector Isla de las Mercedes)This pumping station becomes necessary because in Puerto Inca in the area between the Boliche Puerto Inca highway, the Estrella estuary, the Trovador estuary and the Cañar river (Isla de la Mercedes) an area is formed that has no drainage outlet Natural of about 200 Ha.Drainage structuresAs structures and elements used to manage the natural drainage that will be modified by the construction of the Cañar bypass and channeling of the Cañar River and its tributaries, the use of sewers, drainage ditches and siphons has been defined, apart from the bridges. Drainage trenches where possible have been designed parallel to the dikes, while the sewers will connect the drainage ditches with the different channels through the dikes.BridgesThe bridges that will be replaced in the Cañar system are the following: Zhucay, Indiana and Puerto Inca, whose current hydraulic characteristics are insufficient.There was also the need to build three new bridges: one on the Norcay River and two on the Cañar bypass.(Source: SPECIAL SCHEDULE FOR THE CONTRACTING OF THE CONSULTING SERVICES FOR THE SUPERVISION OF THE CONSTRUCTION OF WORKS OF THE "CAÑAR" FLOOD CONTROL PROJECT, prepared by SENAGUA)

Page 229: Proyecto bulubulu tecnologia moderna inca

كنار .مشروعالتاليسابق

المشروع وصف " يعني " كنار الفيضانات مكافحة البناء أعمال :في

التي االكوادوري الساحل الشتاء أوقات في تحدث التي الفيضانات على للسيطرة الهيدروليكية الهندسة المشروع هذا ويستنداالقتصادية الخسائر عن كبيرة تأثيرات وتنتج الزراعية، األنشطة إلى المناطق، هذه في للطرق التحتية البنية مباشر بشكل تؤثرالحياة فقدان مع عديدة ومرات النظام للشعب واالقتصادية االجتماعية المشاكل يولد وأساسا الدولة والنفس اإلنتاجي للقطاع

المنخفضة المناطق في المختلفة المجتمعات .فيتحدث التي الموسمية األضرار تخفيف وربما الفيضانات للمشاكل المسببة اآلثار الهندسي التصميم مشروعها في يسمح أنه

سرير التجريف التسريب، تسبب والجسور الطرق وأعمال الهيدروليكية، الهندسة خالل من عليها؛ من  azolvados والقضاءالحراسة .أحواض

يجري التي المختلفة األعمال مع التخفيف هو كما المشاريع، لهذه الهندسي تصميم مجال في مختلفة وحدات إلى تشير ثم . : . الحد أن ذلك كنار نظام تصميم تم كنار يسمى واحد تجاوز خالل من فائض تدفق تحويل ذلك في بما هم والتفتيش بناؤها

اإلنكا بويرتو المنطقة عبر تمر أن يمكن التي لتدفق 1000األقصى  M3 /  عودة فترة مع المقابلة الفيضانات أقصى بحد 50ثانية ) إلى ) يصل هيدرولوجية لدراسة وفقا والتي ، اإلنكا بورتو السيطرة الموقع في المتوقع المعدل تخفيض أي 2100عاما،  M3 / 

ما. التدفقات جميع غراندي سوليداد المصب في التصريف إلى ونقلها كنار تجاوز من تستمد سوف الهدف هذا ولتحقيق ثانيةعلى 1000يزيد  M3 /  يعني. وهذا 1100ثانية  M3 /  . من تدفق تدفق من والباقي الفيضانات األقصى الحد في الزيادة في ثانية

سيولتها من أكبر قدر توفير المناسب التطهير هكذا مع أيضا تشارك التي النهر قاع .خالل

Page 230: Proyecto bulubulu tecnologia moderna inca

هي عناصر عدة لها كنار :تجاوزتحويل هيكلالقسم ) شكل على االلتفافية قناة قسم المزدوجة الترقوة عظام من األول كنار - DERIVADORA القسماجارتيرا ال .المستوطنين

للري اجارتيرا ال السيطرة المستوطنين هياكلالترسيب مخرج عند مستوى مراقبة هيكل

المستوطنين ) قسم القسم شكل على االلتفافية القناة مزدوجة تحميل شرائح من الثاني القسم) غراندي - سوليداد استيرو في تحميل واجارتيرا

كبير سوليداد مصب في لتصريف تجاوز من الخروج على التوسع منطقةويرد كنار نظام في المدرجة األعمال التالي الشكل :ويوضح

Page 231: Proyecto bulubulu tecnologia moderna inca

سيل ومراقبة األنهار في يعمل حمايةاألنهار على يعمل حماية

القدرة من والتحقق مختلفة، قنوات ضفاف طول على رتبت السدود خالل من وروافده نهر كنار الحماية وقدم . إزالة تفكر كنار نهر على السدود من األبعاد أن إلى اإلشارة وتجدر كافية غير 1100الهيدروليكية M3 / من ث

كنار تجاوز .خاللسيل على السيطرةحماية مع الطولية السدود خالل من سيل مراقبة أعمال تأسيس تم كنار RIPRAP وقد ) لألنهار جسر ZHUCAY من

(كنار DERIVADORA إلى ، PATUL وNORCAY حتى القناة في التدفق سرعات تتطلب .حيث) مرسيدس ) الس دي إيسال القطاع اإلنكا بويرتو ضخ محطة

الطريق بين الواقعة المنطقة في اإلنكا بويرتو لفي الالزمة الضخ محطة هذه ويتم BOLICHE تصبح اإلنكا، بويرتواستيرو النجوم، استيرو ( TROVADOR تشكيل منفذ ) تستنزف ال التي المنطقة النهر مرسيدس ال دي ايسال وكنار

حوالي من هكتار 200مواطن .الصحي الصرف هياكل

كنار االلتفافية بناء قبل من تعديلها سيتم التي الطبيعية المصارف إلدارة المستخدمة والعناصر الهياكل كما . تم الجسور عن النظر وبصرف ويمتص، التصريف قنوات القنوات، استخدام حددت وروافده، كنار نهر وتوجيهالصرف مجاري الخنادق أن حين في السدود، مع بالتوازي ذلك أمكن حيثما المياه تصريف قنوات تصميم

السدود خالل من المختلفة القنوات مع .التواصلالجسور

يلي كما هي الجسور كنار نظام في استبداله الخصائص ZHUCAY :وسيتم تكفي ال التي اإلنكا، وبويرتو واندياناالحالي .الهيدروليكية

: نهر فوق واحدة جديدة جسور ثالثة لبناء الحاجة كانت ذلك إلى كنار NORCAY وباإلضافة تجاوز على .واثنينالخدمات PLIEGOS :المصدر) لتوظيف خاص الفيضانات CONSULTING لنظام مكافحة التشييد أعمال على لإلشرافPROJECT " أعدت" " التي ، (SENAGUA كنار

Page 232: Proyecto bulubulu tecnologia moderna inca

MASHRUE KANAR.ALTTALISABIQWASAF ALMASHRUEFI "AEIMAL ALBINA' MUKAFAHAT ALFAYADANAT KANAR" YAENI:WAYASTAND HDHA ALMASHRUE ALHINDASAT ALHIDRULIKIAT LILSSAYTARAT EALAA ALFAYADANAT ALTY TAHDUTH FI 'AWQAT ALSHSHITA' ALSSAHIL AL'IIKWADURI ALTY TUATHTHIR BISHAKL MUBASHIR ALBINYAT ALTTAHTIAT LILTTARUQ FI HADHIH ALMANATIQI, 'IILAA AL'ANSHITAT ALZZIRAEIATI, WATUNTIJ TATHIRAT KABIRATAN EAN ALKHASAYIR ALAIQTISADIAT LILQITAE AL'IINTAJI WALNNAFS ALDDAWLAT WA'ASASAAN YULAD ALMASHAKIL ALAIJTIMAEIAT WALAIQTISADIAT LILSHSHAEB ALNNIZAM WAMARRAT EADIDAT MAE FIQDAN ALHAYAT FI ALMUJTAMAEAT ALMUKHTALIFAT FI ALMANATIQ ALMUNKHAFIDAT.'ANNAH YASMAH FI MASHRUEIHA ALTTASMIM ALHANDASI ALATHAR ALMUSABBIBAT LILMASHAKIL ALFAYADANAT WARUBBAMA TAKHFIF AL'ADRAR ALMAWSIMIAT ALTY TAHDUTH WALQADA' EALAYHA; MIN KHILAL ALHINDASAT ALHIDRULIKIATI, WA'AEMAL ALTTURUQ WALJUSWR TASABBAB ALTTASRIBI, ALTTAJRIF SARIR AZOLVADOS MIN 'AHWAD ALHARASATI.THUMM TUSHIR 'IILAA WAHADAT MUKHTALIFAT FI MAJAL TASMIM ALHANDASI LIHADHIH ALMASHARIIEI, KAMA HU ALTTAKHFIF MAE AL'AEMAL ALMUKHTALIFAT ALTY YAJRI BINAWUHA WALTTAFATISH. HUM BIMA FI DHILIKA: TAHWIL TADAFFUQ FAYID MIN KHILAL TAJAWUZ WAHID YUSAMMA KUNAR. TAMM TASMIM NIZAM KUNNAR DHLK 'ANN ALHADD AL'AQSAA LITADAFFUQ ALTY YMKN 'AN TAMURR EABR ALMINTAQAT BWYRTU AL'IINKA 1000 M3 / THANYT BIHADD 'AQSAA ALFAYADANAT ALMUQABILAT MAE FATRAT EAWDAT 50 EAMAAN, 'AY TAKHFID ALMAEADDAL ALMTWQE FI ALMAWQIE ALSSAYTARA (BWURTU AL'IINKA), WALLATI WIFQAAN LIDIRASAT HIDRULUJIAT YASIL 'IILAA 2100 M3 / THANIAT. WALITAHQIQ HDHA ALHADAF SAWF TASTAMIDD MIN TAJAWUZ KUNAR WANAQILAHA 'IILAA ALTTASRIF FI ALMASB SWLYDAD GHIRANDI JMYE ALTTADAFFUQAT MA YAZID EALAA 1000 M3 / THANYT. WAHADHA YAENI 1100 M3 / THANYT FI ALZZIADAT FI ALHADD AL'AQSAA ALFAYDANATA. WALBAQI MIN TADAFFUQ TADAFFUQ MIN KHILAL QAE ALNNAHR ALTY TUSHARIK 'AYDAAN MAE HKDHA ALTTATHIR ALMUNASIB TAWFIR QADR 'AKBAR MIN SUYULATIHA.

Page 233: Proyecto bulubulu tecnologia moderna inca

TAJAWUZ KUNNAR LAHA EDT EANASIR HY:HAYKAL TAHWILALQISM AL'AWWAL MIN EIZAM ALTTARQUAT ALMUZDAWIJAT QISM QANAT ALALTIFAFIAT EALAA SHAKL (ALQISM DERIVADORA KUNNAR - ALMUSTAWTININ LA AJJARTIRA.HAYAKIL ALMUSTAWTININ ALSSAYTARAT LA AJARTYRA LILRRIHAYKAL MURAQABAT MUSTAWAA EIND MUKHRIJ ALTTARSIBALQISM ALTHTHANI MIN SHARAYIH TAHMIL MAZDAWAJAT ALQNAT ALAILTIFAFIAT EALAA SHAKL ALQISM (QSIM ALMUSTAWTININ WAJARTYRA - TAHMIL FI ASTYRW SWLYDAD GHRANDY)MINTAQAT ALTTAWASSUE EALAA ALKHURUJ MIN TAJAWUZ LITASRIF FI MASABB SWLYDAD KABIRWAYUADDIH ALSHSHAKL ALTTALI AL'AEMAL ALMUDRAJAT FI NIZAM KANNAR WYRD:

Page 234: Proyecto bulubulu tecnologia moderna inca

HIMAYAT YAEMAL FI AL'ANHAR WAMURAQABAT SAYLHIMAYAT YAEMAL EALAA AL'ANHARWAQADDAM ALHIMAYAT KANNAR NAHR WARUAFIDUH MIN KHILAL ALSSUDUD RATTABAT EALAA TUL DIFAF QANAWAT MUKHTALIFAT, WALTTAHAQQUQ MIN ALQUDRAT ALHIDRULIKIAT GHYR KAFI. WATAJDUR AL'IISHARAT 'IILAA 'ANN AL'ABEAD MIN ALSSUDUD EALAA NAHR KANNAR TUFAKKIR 'IIZALAT 1100M3 / TH MIN KHILAL TAJAWUZ KANAR.ALSSAYTARAT EALAA SAYLWAQAD TAMM TASIS 'AEMAL MURAQABAT SAYL MIN KHILAL ALSSUDUD ALTTAWLIAT MAE HIMAYAT RIPRAP LILAINHAR KUNNAR (MN JISR ZHUCAY 'IILAA DERIVADORA KNAR), PATUL WANORCAY HAYTH TATATALLAB SARUEAT ALTTADAFFUQ FI ALQNAT HATTA.MAHATTAT DAKHKH BWIRTU AL'IINKA (ALQITAE 'IISLA DI LAS MRSYDS)TUSBIH HADHIH MAHATTAT ALDDKHKH ALLLAZIMAT LAFI BUIRTU AL'IINKA FI ALMINTAQAT ALWAQIEAT BAYN ALTTARIQ BOLICHE BUYRTW AL'IINKA, WAYUTIMM TASHKIL ASTYRU ALNNUJUM, ASTIRU TROVADOR WAKUNAR (AYSLA DI LA MRSYDS) ALNNAHR ALMINTAQAT ALTY LA TASTANZIF MANFADH MUATIN MIN HWALY 200 HIKTAR.HAYAKIL ALSSIRF ALSSHHIKAMA ALHIAKIL WALEANASIR ALMUSTAKHDAMAT LI'IIDARAT ALMASARIF ALTTABIEIAT ALTY SAYATIMM TAEDILIHA MIN QIBAL BINA' ALALTIFAFIAT KINNAR WATAWJIH NAHR KUNAR WARAWAFIDIHI, HADDADAT AISTIKHDAM ALQUNWATI, QANAWAT ALTTASRIF WAYAMTASSU, WABISARF ALNNAZAR EAN ALJUSWR. TAMM TASMIM QANAWAT TASRIF ALMIAH HAYTHUMA 'AMKAN DHLK BIALTTAWAZI MAE ALSSUDUD, FI HYN 'ANN ALKHANADIQ MAJARAY ALSSIRF ALTTAWASUL MAE ALQANAWAT ALMUKHTALIFAT MIN KHILAL ALSSUDUD.ALJUSURWASAYATIMM AISTIBDALIH FI NIZAM KUNAR ALJUSUR HI KAMA YALI: ZHUCAY WANDIANA WABUIRTU AL'IINKA, ALTY LA TAKFI ALKHASAYIS ALHIDRULIKIAT ALHALI.WABIAL'IIDAFAT 'IILAA DHLK KANAT ALHAJAT LIBINA' THLATHT JUSUR JADYDTA: WAHIDAT FAWQ NAHR NORCAY WAITHNAYN EALAA TAJAWUZ KANAR.(ALMUSDUR: PLIEGOS LINIZAM KHASS LITAWZIF ALKHADAMAT CONSULTING LIL'IISHRAF EALAA 'AEMAL ALTTASHYID MUKAFAHAT ALFAYADANAT PROJECT "KNAR" ", ALLATI 'UEIDDAT SENAGUA)

Page 235: Proyecto bulubulu tecnologia moderna inca

Проект Cañar.послепредыдущийОписание проекта«Строительные работы наводнений Канар» означает:Этот проект строит гидротехнический для борьбы с наводнениями, что происходит в зимнем время эквадорского побережья непосредственно затрагивающее дорожную инфраструктуру в этих регионах, сельскохозяйственную деятельность, производя большие последствия для экономических потерь в производственный сектор и самостоятельно государство и по существу порождает социальные и экономические проблемы людей порядка и много раз с потерей жизни в различных общинах в низинах.В своем проекте разработки инженерного позволяют причинные эффекты проблем затопления и, возможно, уменьшить сезонные повреждения, вызванные исключаются; через гидротехнику, дорожные работы, мосты вызывают диверсии, дноуглубительные кровати azolvados из конкурсных бассейнов.Затем показывают различные блоки, установленные в инженерном проектировании этих проектов, смягчаются с различной работой строятся и проверки; Они в том числе: отклоняющий поток избытка через один обход называется Cañar. Система Cañar разработана таким образом, что максимальный поток, который может пройти через район Пуэрто-Инк составляет 1000 м3 / с для соответствующего максимального паводка с периодом возврата 50 лет, т.е. снижая скорость ожидаемой на сайте управления (Пуэрто-Инк), которые в соответствии с гидрологическими исследованиями составляют 2100 м3 / с. Для достижения этой цели все потоки, превышающие 1000 м3 / сек будет получена с помощью байпаса Cañar и транспортировали в разряде в устье Соледад Гранде. Это означает, что 1100 м3 / с в избытке в максимальном наводнении; остальная часть потока будет проходить через русло реки, которая также участвует таким образом соответствующая очистка обеспечивает большую текучесть.

Page 236: Proyecto bulubulu tecnologia moderna inca

ОБХОД CAÑAR СОСТОИТ ИЗ НЕСКОЛЬКИХ КОМПОНЕНТОВ:СТРУКТУРА DIVERSIONПЕРВАЯ ЧАСТЬ ОБВОДНОГО КАНАЛА В ФОРМЕ СЕКЦИИ ДВОЙНЫХ ПОПЕРЕЧНЫХ РЫЧАГОВ (РАЗДЕЛ DERIVADORA CAÑAR - SETTLER LA LAGARTERA.СТРУКТУРЫ ОТСТОЙНИК LA LAGARTERA УПРАВЛЕНИЯ ДЛЯ ОРОШЕНИЯСТРУКТУРА КОНТРОЛЯ УРОВНЯ НА ВЫХОДЕ ИЗ ОТСТОЙНИКАВТОРАЯ ЧАСТЬ ОБВОДНОГО КАНАЛ В ФОРМЕ СЕЧЕНИЯ ДВОЙНЫХ РЫЧАГОВ (РАЗДЕЛ ОТСТОЙНИК LAGARTERA - СКАЧАТЬ В ESTERO СОЛЕДАД ГРАНДЕ)РАСШИРЕНИЕ ЗОНЫ НА ВЫХОДЕ ПЕРЕПУСКНОГО СБРОСОМ В УСТЬЕ СОЛЕДАД БОЛЬШОЙНА ПРИВЕДЕННОМ НИЖЕ РИСУНКЕ ПОКАЗАН РАБОТЫ, ВКЛЮЧЕННЫЕ В СИСТЕМЕ КАНАР ИЗЛОЖЕНЫ:

Page 237: Proyecto bulubulu tecnologia moderna inca

ЗАЩИТА РАБОТАЕТ В РЕКАХ И УПРАВЛЕНИЯ TORRENTЗАЩИТА РАБОТАЕТ НА РЕКАХЗАЩИТА CAÑAR РЕКА И ЕЕ ПРИТОКИ БЫЛИ СДЕЛАНЫ ЧЕРЕЗ ДАМБЫ, РАСПОЛОЖЕННЫЕ ВДОЛЬ БЕРЕГА РАЗЛИЧНЫХ КАНАЛОВ, ПРОВЕРКА ГИДРАВЛИЧЕСКУЮ МОЩНОСТИ АДЕКВАТНО. СЛЕДУЕТ ОТМЕТИТЬ, ЧТО РАЗМЕРЫ ДАМБ РЕКИ CAÑAR РАССМАТРИВАЮТ УДАЛЕНИЕ 1100M3 / С ЧЕРЕЗ БАЙПАС CAÑAR.УПРАВЛЕНИЕ TORRENTРЕГУЛИРУЮЩИЙ ПОТОК РАБОТЫ БЫЛИ УСТАНОВЛЕНЫ В ПРОДОЛЬНЫХ ДАМБАХ С ЗАЩИТОЙ КАМЕННОЙ НАБРОСКИ ДЛЯ РЕК КАНАР (ОТ МОСТА ZHUCAY К DERIVADORA КАНАР), PATUL И NORCAY, ГДЕ СКОРОСТЬ ПОТОКА В КАНАЛЕ ЭТОГО ТРЕБУЕТ.НАСОСНАЯ СТАНЦИЯ ПУЭРТО-ИНК (SECTOR ИСЛА-ДЕ-ЛАС-МЕРСЕДЕС)ЭТА НАСОСНАЯ СТАНЦИЯ СТАНОВИТСЯ НЕОБХОДИМОЙ, ПОСКОЛЬКУ В ПУЭРТО-ИНКЕ В РАЙОНЕ МЕЖДУ ДОРОГИМ BOLICHE ПУЭРТО ИНКОМ, РЕКА ЭСТЕРО ЗВЕЗДОЙ, ЭСТЕРО TROVADOR И CAÑAR (ИСЛА-ДЕ-ЛА-MERCEDES) ОБЛАСТЬЮ, КОТОРАЯ НЕ СЛИВАЕТ ВЫХОДА ФОРМИРУЮТСЯ УРОЖЕНЕЦ ОКОЛО 200 ГА.ДРЕНАЖНЫЕ СООРУЖЕНИЯКАК СТРУКТУР И ЭЛЕМЕНТОВ, ИСПОЛЬЗУЕМЫХ ДЛЯ УПРАВЛЕНИЯ ПРИРОДНЫМИ ВОДОСТОКИ, КОТОРЫЕ БУДУТ МОДИФИЦИРОВАНЫ ПУТЕМ СТРОИТЕЛЬСТВА ОБЪЕЗДНОЙ КАНАР И НАПРАВЛЕНИЯ РЕКИ КАНАР И ЕЕ ПРИТОКИ, ОН ОПРЕДЕЛИЛ ИСПОЛЬЗОВАНИЕ ВОДОВОДОВ, ДРЕНАЖНЫХ КАНАВ И СИФОНОВ, КРОМЕ МОСТОВ. ДРЕНАЖНЫЕ КАНАВЫ, ГДЕ ЭТО ВОЗМОЖНО РАЗРАБОТАНЫ ПАРАЛЛЕЛЬНО ДАМБЫ, А КАНАЛИЗАЦИОННЫЕ ДРЕНАЖНЫЕ КАНАВЫ СОЕДИНЯЮТСЯ С РАЗЛИЧНЫМИ КАНАЛАМИ ЧЕРЕЗ ДАМБУ.МОСТЫМОСТЫ БУДУТ ЗАМЕНЕНЫ В СИСТЕМЕ КАНАР ЗАКЛЮЧАЮТСЯ В СЛЕДУЮЩЕМ: ZHUCAY, ИНДИАНА И ПУЭРТО-ИНКА, КОТОРОЙ В НАСТОЯЩЕЕ ВРЕМЯ ГИДРАВЛИЧЕСКИЕ ХАРАКТЕРИСТИКИ ЯВЛЯЮТСЯ НЕДОСТАТОЧНЫМИ.КРОМЕ ТОГО, БЫЛА НЕОБХОДИМОСТЬ ПОСТРОИТЬ ТРИ НОВЫХ МОСТА: ОДИН ЧЕРЕЗ РЕКУ NORCAY И ДВА НА БАЙПАС КАНАР.(ИСТОЧНИК: PLIEGOS ДЛЯ СПЕЦИАЛЬНОГО РЕЖИМА ДЛЯ НАЙМА КОНСУЛЬТАЦИОННЫХ УСЛУГ ПО НАДЗОРУ СТРОИТЕЛЬНО-МОНТАЖНЫХ РАБОТЫ ПО КОНТРОЛЮ ЗА НАВОДНЕНИЯ ПРОЕКТА «CAÑAR»», ПОДГОТОВЛЕННЫЙ SENAGUA)

Page 238: Proyecto bulubulu tecnologia moderna inca

CANAR 項目。以下前項目簡介在“建築工程防洪 CANAR”意味著:此項目是為在冬季時間發生厄瓜多爾海岸直接影響這些地區的道路基礎設施,農業活動防洪水利工程,產生經濟損失大影響生產部門和自我國家,基本上產生,並與低地不同社區生命損失的人的社會和經濟問題訂購多次。在其工程設計項目允許的水浸問題的致病作用,並可能減輕發生消除季節性的損害 ;通過水利工程,道路工程,橋樑造成改道,疏浚 AZOLVADOS 的接管盆地的床。然後指示成立於這些項目的工程設計單位的不同,因為與各項工程正在興建和檢查減輕 ; 它們包括:通過名為 CANAR 一個旁路分流過剩的流動。該系統 CANAR被設計為使得可穿過波多黎各印加的區域中的最大流量為 1000 立方米 / 秒與 50 年一遇,也就是減少預期在控制網站的速率相應的最大洪水(波多黎各印加),根據水文研究這相當於 2100 立方米 / 秒。為了實現這個目標將通過旁路 CANAR導出並運送到排放到河口索萊達大超過 1000 米 3 / 秒的所有流。這意味著在過量在最大洪水 1100 立方米 / 秒 ; 該流的其餘部分將流過河床其也涉及由此適當清洗提供了更大的流動性。

Page 239: Proyecto bulubulu tecnologia moderna inca

旁路 CANAR 有幾個組成部分:導流結構沉降的 LA拉加爾特拉 - 旁路通道形截面雙叉骨(第 DERIVADORA CANAR 的第一部分。灌溉定居拉拉加爾特拉控制結構在澄清器的出口水平控制結構旁路通道形截面雙叉骨的第二部分(部分沉降器中拉加爾特拉 - 下載在特羅索萊達格蘭德)在旁路出口擴展區排放入江口大索萊達下圖顯示了包含在 CANAR系統的工程概述:

Page 240: Proyecto bulubulu tecnologia moderna inca

保護工作在河流和洪流控制保護工程對河流保護 CANAR 河及其支流通過沿不同渠道的銀行安排防洪堤取得,檢查液壓能力是足夠的。應當指出的是, CANAR河堤壩的尺寸通過旁通 CANAR考慮去除 1100 立方米 / 秒。洪流控制洪流控制工程已通過與河流 CANAR (從 ZHUCAY 的橋 DERIVADORA CANAR ), PATUL 和 NORCAY拋石保護,其中在所述通道的流動速度,從而需要縱向堤防建立。泵站印加港(部門島拉斯梅塞德斯)該泵站變得必要的,因為在印加港在亞博印加港路之間的區域,特羅星,特羅 TROVADOR 和 CANAR (島德拉奔馳)河不排水口區域形成大約 200 公頃的原生。排水結構由於結構和用於管理自然排水將由旁路 CANAR 的構造和竄 CANAR 及其支流被修改的元素,它定義的用途涵洞,排水溝和虹吸管,除了橋。排水溝在可能被設計平行於堤壩,而下水道排水溝渠通過所述堤壩的不同的信道連接。橋樑都將在 CANAR系統被替換的橋樑如下: ZHUCAY ,印第安納州和波多黎各印加,其目前的水力特性是不夠的。除了是建立三個新的橋樑需要:一個在 NORCAY 河和兩個旁路 CANAR 。(來源: PLIEGOS為特別制度諮詢服務,建設監督僱用 WORKS防洪 PROJECT“CANAR”“ ,由 SENAGUA 製備)

Page 241: Proyecto bulubulu tecnologia moderna inca

Sistema Naranjal.SiguienteAnteriorDescripción de proyectoLa fiscalización de las obras que constituyen el control de inundaciones del sistema Naranjal se describen a continuación.El control de inundaciones de la cuenca del Naranjal implica la rectificación y ampliación del cauce del río Naranjal, así como las obras de protección longitudinal necesarias de sus afluentes, como son los ríos Cañas, Jesús María, San Francisco, Gramalotal, Chacayacu y Bucay, además de la sustitución de los puentes que no tienen capacidad hidráulica, así como la construcción de puentes nuevos para la sustitución de los actuales, en caso de que estos tuvieran insuficiencia hidráulica En la Figura que se presenta a continuación, se muestra el Esquema Final del Sistema Naranjal:

Page 242: Proyecto bulubulu tecnologia moderna inca
Page 243: Proyecto bulubulu tecnologia moderna inca

El sistema para el Control de Inundaciones del río Naranjal está constituido por los siguientes componentes o estructuras:•Diques longitudinales en los ríos afluentes•Construcción de Puentes nuevos que sustituyan a los existentes•Ampliación del cauce del río Naranjal•Desvío del río Naranjal en el sector de Santa Rosa de Flandes.•Drenajes•Caminos(Fuente: Pliegos para RÉGIMEN ESPECIAL PARA LA CONTRATACIÓN DE LOS SERVICIOS DE CONSULTORÍA PARA LA FISCALIZACIÓN DE LA CONSTRUCCIÓN DE OBRAS DEL PROYECTO CONTROL DE INUNDACIONES  “ NARANJAL”, elaborados por la SENAGUA)

Page 244: Proyecto bulubulu tecnologia moderna inca
Page 245: Proyecto bulubulu tecnologia moderna inca

Orangery System.FollowingPreviousProject DescriptionThe inspection of the works that constitute the flood control of the Naranjal system are described below.The flood control of the Naranjal basin involves the rectification and extension of the Naranjal river bed, as well as the necessary longitudinal protection works of its tributaries, such as the Cañas, Jesús María, San Francisco, Gramalotal, Chacayacu and Bucay rivers, As well as the replacement of the bridges that do not have hydraulic capacity, as well as the construction of new bridges for the replacement of the current ones, in the case that these had hydraulic insufficiencyIn the Figure below, the Final Outline of the Naranjal System is shown:

Page 246: Proyecto bulubulu tecnologia moderna inca

The system for flood control of the Naranjal River is constituted by the following components or structures:Longitudinal levees in tributariesConstruction of new bridges to replace existing bridgesExpansion of the Naranjal riverbedDiversion of the Naranjal river in the sector of Santa Rosa de Flandes.DrainsRoads(Source: Specifications for SPECIAL SCHEME FOR THE CONTRACTING OF CONSULTANCY SERVICES FOR THE SUPERVISION OF THE CONSTRUCTION OF PROJECTS OF THE "NARANJAL" FLOOD CONTROL PROJECT, prepared by SENAGUA)

Page 247: Proyecto bulubulu tecnologia moderna inca

.Naranjal نظامالتاليسابق

المشروع وصفالفيضانات على السيطرة نظام تشكل التي األعمال مراجعة .أدناه Naranjal ويردالفيضانات على السيطرة  Naranjal حوض نهر وتمديد تعديل على وكذلك  Naranjal ينطوي المدرج

فرانسيسكو سان ماريا، يسوع كانياس، األنهار مثل روافده من طولية الالزمة الحماية أعمال ،Gramalotal ، Chacayacu وBucay جسور ، وبناء الهيدروليكية قدرة لديها الجسور استبدال إلى باإلضافة

الهيدروليكي الفشل كان هذه كانت إذا القائمة، محل لتحل جديدةالنظام ومخطط أدناه، الشكل  Naranjal عرض مبين هو :النهائي

Page 248: Proyecto bulubulu tecnologia moderna inca

نهر الفيضانات لمراقبة  Naranjal نظام التالية الهياكل أو المكونات من :يتكونروافد في الطولية السدود

القائمة محل لتحل جديدة جسور بناءنهر المدرج Naranjal تمديد

Naranjal  فالندرز دي روزا سانتا في النهر مجرى .تحويلالمصارفالطرق Pliegos :المصدر) الخدمات لتوظيف خاص  CONSULTING لنظام الفيضانات مكافحة التشييد أعمال على لإلشرافPROJECT "NARANJAL"  قبل (أعدت SENAGUA من

Page 249: Proyecto bulubulu tecnologia moderna inca

NIZAM NARANJAL.ALTTALISABIQWASAF ALMASHRUEWAYARADD MURAJAEAT AL'AEMAL ALTY TUSHAKKIL NIZAM ALSSAYTARAT EALAA ALFAYADANAT NARANJAL 'ADNAH.HAWD ALSSAYTARAT EALAA ALFAYADANAT NARANJAL YANTAWI EALAA TAEDIL WATAMDID NAHR NARANJAL ALMUDARRIJ WAKADHLIK 'AEMAL ALHIMAYAT ALLLAZIMAT TWLYTAN MIN RAWAFIDIH MITHL AL'ANHAR KANYAS, YASAWWAE MARYA, SAN FRANSISKW, GRAMALOTAL ،CHACAYACU WBUCAY, BIAL'IIDAFAT 'IILAA ASTIBDAL ALJUSUR LADAYHA QUDRAT ALHYDRULIKIT WABINA' JUSUR JADIDAT LITAHILL MAHALL ALQAYIMAT, 'IIDHA KANAT HADHIH KAN ALFASHAL ALHIDRULIKIEARD ALSHSHAKL 'ADNAH, WAMUKHATTAT ALNNIZAM NARANJAL ALNNIHAYIY HU MUBYN:

Page 250: Proyecto bulubulu tecnologia moderna inca

NIZAM LIMURAQABAT ALFAYADANAT NAHR NARANJAL YATAKAWWAN MIN ALMUKAWWINAT 'AW ALHAYAKIL ALTTALIT:ALSSUDUD ALTTULIAT FI RAWAFIDBINA' JUSUR JADIDAT LITUHILL MAHALL ALQAYIMATAMDID ALMUDARRIJ NAHR NARANJALNARANJAL TAHWIL MAJRAA ALNNAHR FI SANTA RUZANA DI FULANDRIZ.ALMASARIFALTTURUQ(ALMUSDUR: PLIEGOS LINIZAM KHASS LITAWZIF ALKHADAMAT CONSULTING LIL'IISHRAF EALAA 'AEMAL ALTTASHYID MUKAFAHAT ALFAYADANAT PROJECT "NARANJAL" MIN QIBAL SENAGUA 'AEDAT)

Page 251: Proyecto bulubulu tecnologia moderna inca

NARANJAL СИСТЕМА.ПОСЛЕПРЕДЫДУЩИЙОПИСАНИЕ ПРОЕКТАПРОВЕРКА РАБОТ, КОТОРЫЕ СОСТАВЛЯЮТ СИСТЕМУ УПРАВЛЕНИЯ NARANJAL НАВОДНЕНИЯ ОПИСАНЫ НИЖЕ.БОРЬБА С НАВОДНЕНИЯМИ БАССЕЙНА NARANJAL ВКЛЮЧАЕТ МОДИФИКАЦИЮ И РАСШИРЕНИЕ ВЗЛЕТНО-ПОСАДОЧНОЙ ПОЛОСЫ РЕКИ NARANJAL, А ТАКЖЕ РАБОТ, НЕОБХОДИМОЙ ПРОДОЛЬНОЙ ЗАЩИТЫ ЕЕ ПРИТОКОВ, ТАКИХ КАК РЕКИ CAÑAS, ИИСУС МАРИЯ, САН-ФРАНЦИСКО, GRAMALOTAL, CHACAYACU И BUCAY, ДОПОЛНЕНИЕ К ЗАМЕНЕ МОСТОВ ИМЕЕТ ГИДРАВЛИЧЕСКУЮ МОЩНОСТЬ И СТРОИТЕЛЬСТВО НОВЫХ МОСТОВ ДЛЯ ЗАМЕНЫ СУЩЕСТВУЮЩЕГО, ЕСЛИ ОНИ ИМЕЛИ ГИДРАВЛИЧЕСКОЕ РАЗРУШЕНИЕНА РИСУНКЕ ПРЕДСТАВЛЕНА НИЖЕ, ОКОНЧАТЕЛЬНАЯ КОНТУР СИСТЕМЫ NARANJAL ПОКАЗАННАЯ:

Page 252: Proyecto bulubulu tecnologia moderna inca

СИСТЕМА ДЛЯ УПРАВЛЕНИЯ НАВОДНЕНИЯМИ РЕКИ NARANJAL СОСТОИТ ИЗ СЛЕДУЮЩИХ КОМПОНЕНТОВ ИЛИ СТРУКТУР:ПРОДОЛЬНЫЕ ПЛОТИНЫ В ПРИТОКАХСТРОИТЕЛЬСТВО НОВЫХ МОСТОВ ВЗАМЕН СУЩЕСТВУЮЩЕГОРАСШИРЕНИЕ ВЗЛЕТНО-ПОСАДОЧНОЙ ПОЛОСЫ NARANJAL RIVERNARANJAL РЕКА ДИВЕРСИЯ В САНТА-РОСА-ДЕ ФЛАНДРИИ.ВОДОСТОКИДОРОГИ(ИСТОЧНИК: PLIEGOS ДЛЯ СПЕЦИАЛЬНОГО РЕЖИМА ДЛЯ НАЙМА КОНСУЛЬТАЦИОННЫХ УСЛУГ ПО НАДЗОРУ СТРОИТЕЛЬНО-МОНТАЖНЫХ РАБОТЫ ПО КОНТРОЛЮ ЗА НАВОДНЕНИЯ ПРОЕКТА «NARANJAL», ПОДГОТОВЛЕННЫЙ SENAGUA)