Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ......
-
Upload
truonghanh -
Category
Documents
-
view
224 -
download
5
Transcript of Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ......
![Page 1: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/1.jpg)
Proposal for Extended EPON PMD
July, 2011
Jidong Xu, Zhiming Fu
ZTE Corporation
Bo Wang
China Telecom
![Page 2: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/2.jpg)
Agenda
Market Requirements
Power Budget Overview
Proposal for Extended EPON PMD
![Page 3: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/3.jpg)
Market Requirement 1: Long Distance EPON
Long distance EPON will help network evolution, and
reduce network levels and nodes High power budget EPON
CoreAccess Aggregation
• EPON
• 10G EPONEnterprise
Base
Station
HSI
IPTV
VoIP
BSC/RNC
aGW
CDN
SBC
BRAS/SR
Converged
Metro Aggregation
100km ---> more
20km – 100km or more802.3ah,802.3av : 0-20km
Long distance EPON: 0-20km/40km/60km
20km/40km –100km+
Switch
![Page 4: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/4.jpg)
Market Requirement 2: High split Ratio EPON
Trunk Line
FTTH
FTTO
FTTB+LAN
FTTB+WiFi
FTTB+DSL
FTTN
<100m
OLT
1:N
Splitter
BTS
eNB
EPON or 10G EPON
with very high split
ratio will save CAPEX
and OPEX
High Power Budget EPON
![Page 5: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/5.jpg)
Agenda
Market Requirements
Power Budget Overview
Proposal for Extended EPON PMD
![Page 6: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/6.jpg)
Current EPON Status
802.3ah and 802.3av support the PON distance up to 20km and maximum 1:32 split ratio only;
High split ratio 1:64 or 1:128 ONLY apply for very short distance;
In order to save CAPEX , Most carriers have deployed high power budget PX20 or PR(X)30 PON;
Carriers require high power budget to support long distance and high split ratio (1:256)@10km.
OLT
PMD
ONU
PMD
ONU
PMD
1:N
Splitter
802.3ah: PX10/PX20 power budget
19/23dB
10km/20km @ 1:32
802.3av: PR(X)10/ PR(X)20 / PR(X)30 power budget
20/24/29dB
10km/20km @ 1:32
![Page 7: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/7.jpg)
EPON with Extended PMD
Extended PMD of EPON has a lot of benefits
◦ Easy to support long distance up to 40 km without reach extended amplified box;
◦ Easy to support high split ratio 1:128 or more @ 20 km;
◦ For very short distance (inside 2km) , It can support very high split ratio 1:256;
◦ Saving CAPEX for Carriers.
OLT
PMD
ONU
PMD
ONU
PMD
1:N
Splitter
802.3ah: PX10/PX20 :: 19/23dB
802.3av: PR(X)10/PR(X)20/PR(X)30 : 20/24/29dB
40km @ 1:64
10km/20km @ 1:32
1:M
Splitter
802.3ah: PX30/PX40 …
802.3av: PR(X)40/PR(X)50….
Extended power budget : 29dB <–>39dB
ONU
PMD
![Page 8: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/8.jpg)
PON Engineering specification
Parameters. unit Value
Upstream optical fiber loss dB/km 0.4
Downstream optical fiber loss dB/km 0.3
Connector loss dB/pair 0.5
Maximum connector number - 7
1:16 Splitter loss dB 14
1:32 Splitter loss dB 17.4
1:64 splitter loss dB 20.3*
1:128 splitter loss dB 23.5*
1:256 splitter loss dB 27.0*
Transmitter and dispersion penalty (max) dB 2
* It is a typical average value
*
![Page 9: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/9.jpg)
The power budget requirements based on
engineering specification
In 802.3av, the maximum power budget of PR(x)30 is
29dB, and it can only support 1:32@20km or
1:64@10km under engineering specification.
Carriers require higher power budget to support long
distance PON (1:32@40km ) and very high split ratio
PON (1:256@10km)
Splitter
Ratio
5km 10km 20km 40km
US(dB) DS(dB) US(dB) DS(dB) US(dB) DS(dB) US(dB) DS(dB)
1x16 21.5 21 23.5 22.5 27.5 25.5 35.5 31.5
1x32 24.9 24.4 26.9 25.9 30.9 28.9 38.9 34.9
1x64 27.8 27.3 29.8 28.8 33.8 31.8 41.8 37.8
1x128 31 30.5 33 32 37 35 45 41
1x256 34.5 34 36.5 35.5 40.5 38.5 48.5 44.5
PR(X)30 support
Extended requirement
Future requirement
![Page 10: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/10.jpg)
Agenda
Market Requirements
Power Budget Overview
Proposal for Extended EPON PMD
![Page 11: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/11.jpg)
The Proposed new power budget classes
PX30/PX40 for 1G EPON
The new power budget classes will enable 1G EPON to reach longer distance(up to
40km or more)without RE box;
Good for rural area.
Items
Extended
Budget 1
Extended
Budget 2 UnitsPX30 PX40
Number of Fiber 1 -
Down stream line rate 1.25 GBd
Upstream line rate 1.25 GBd
Downstream Wavelength 1490 nm
Downstream Wavelength
tolerance±10 nm
Upstream wavelength 1310 nm
Upstream wavelength tolerance ±50 nm
Maximum Reach ≥20 ≥20 km
Maximum Channel insertion loss 28 33 dB
Minimum Channel insertion loss 10 18 dB
![Page 12: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/12.jpg)
The Proposed new power budget classes
PR(X)40 / PR(X)50 for 10G EPON
The new power budget classes PR(X)40 and PR(X)50 will support longer
distance( Up to 40km or more) ;
For short distance, it can support very high split ratio ODN, up to 1:256 or more
ItemsExtended Budget 1 Extended Budget 2
UnitsPRX40 PR40 PRX50 PR50
Number of Fiber 1 -
Down stream line rate 10.3125 GBd
Upstream line rate 1.25 10.3125 1.25 10.3125 GBd
Downstream Wavelength 1577 nm
Downstream Wavelength
tolerance-2~+3 nm
Co-existent Downstream
Wavelength1490 nm
Co-existent Downstream
Wavelength tolerance-10 ~+10 nm
Upstream wavelength 1310 1270 1310 1270 nm
Upstream wavelength tolerance ±50 ±10 ±50 ±10 nm
Maximum Reach ≥40 ≥40 km
Maximum Channel insertion loss 33 37 dB
Minimum Channel insertion loss 18 21 dB
![Page 13: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/13.jpg)
Summary
Current 802.3ah and 802.3av can only
supported up to 20km and 1:32 split ratio
EPON with higher Power budget can
support long distance and high split ratio
New Power budget class proposal:
EPON - PX30 / PX40
10G EPON - PR(X)40 / PR(X)50
![Page 14: Proposal for Extended EPON PMD - ieee802.orgZTE Corporation Bo Wang China Telecom. Agenda ... BSC/RNC aGW CDN SBC BRAS/SR Converged Metro Aggregation 100km ---> more 802.3ah,802.3av](https://reader030.fdocument.pub/reader030/viewer/2022020120/5ad1600c7f8b9a86158bfc37/html5/thumbnails/14.jpg)
Deliver the future-extended EPON for better life and greener earth
Thank You!