Project of Satellite Communication Earth Station in the Kingdom of Saudi Arabia

46
Project of Satellite Communication Earth Station in the Kingdom of Saudi Arabia KIYOSHI SAYAMOTO

description

Project of Satellite Communication Earth Station in the Kingdom of Saudi Arabia. KIYOSHI SAYAMOTO. AGENDA. My Career History Satellite Communication Network Satellite Communication Earth Station Complex Project of S atellite Communication Earth Station in Saudi Arabia - PowerPoint PPT Presentation

Transcript of Project of Satellite Communication Earth Station in the Kingdom of Saudi Arabia

Page 1: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Project of Satellite Communication Earth Station inthe Kingdom of Saudi Arabia

       KIYOSHI SAYAMOTO

Page 2: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

AGENDA

My Career History Satellite Communication Network Satellite Communication Earth Station

Complex Project of Satellite Communication Earth

Station in Saudi Arabia Project Management

Page 3: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 1My Career History

36 years started in April 1974 and ended in March 2010 as an employee of Mitsubishi Electric Corporation, Tokyo, Japan

Over 60 countries where I have been Contribution to International Communities with Satellite Communication

systems all the times.

Page 4: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 2Satellite Communication Network (Conceptual)

Saudi Arabia

Taiwan Japan USA

Page 5: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-1Images of Satellite

Page 6: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-2Three Satellites Illuminate the whole globe

Page 7: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-3Satellite Communication Earth Station Complex in Yamaguchi,

Japan

Page 8: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-4Satellite Communication Earth Station in

Malaysia (1984)

Page 9: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-5Satellite Communication Earth Station in

New Zealand (1985)

Page 10: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-6Conceptual

Satellite Communication Earth Station ComplexSaudi Arabia (1978 – 1982)

Page 11: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-7- (1)Block Diagram of Earth Station

HPA Up Converter MOD

LNA DownConverter DEM

Multiplexer&

Demultiplexer

Feeder

Antenna (32 meter in diameter)

Inter-National

SwitchingCenter(ISC)

Page 12: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-7 (2)High Power Amplifier (2kw)

Page 13: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-7 (3)Antenna Structure & Low Noise Amplifier

Page 14: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-7 (4)Up & Down Converter

Page 15: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-7 (5)Modulator & Demodulator

Page 16: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 3-7 (6)Multiplexer Equipment

Page 17: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4Locations of Business Bases in Saudi Arabia

Head Quarter in

Riyadh

BranchIn Dammam

Branch inTaif

Page 18: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-1My Challenge : What is Saudi Arabia?

ClimateDaytime Temperature:

50 degree CelsiusReligion

IslamLanguage

Arabic

SAYAMOTOClimate: Temperate Zone (4 seasons)

Language: JapaneseReligion: Buddhism

Challenge Challenge Challenge

Page 19: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-2Estimated Project Scale of Saudi Arabian Satellite Communication Earth Station

Contract US$100M

SatelliteCommunication

EquipmentUS$60M

Installation &On-site testing

US$5M

Operation & maintenanceUS$5M

Civil WorkUS$30M

Contract Terms & Condition Completion: 12 months

(Global standard of the same scale of project: 18 months)

Page 20: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-3 Implementation Schedule of Project (Conceptual)

Month - 1 1 2 3 4 5 6 7 8 9 10 11 12 13 - 18

Contract Evet ▲ ▼ ▼ ▼ ▼ ▲

A. Hardware1) Antenna Mech

△ ▽2) Electronics Equipment

△ ▽3) Installation materials △ △ ▽

B. Documentation1) Training Manual ▽ ▽

2) O & M Manual ▽

3) Installation Drawing ▽

C. Civil Work ▽

On- Site Work △ ▽

EDC PDR FDR Factory Training OJT Completion

Design

Design

Design

Manufacturing

Manufacturing

Manufacturing

Construction of Building

Installation & Testing

Design

Ocean & Inland Transport

Ocean & Inland Transport

Air Transport

Air Transport

O & M

Page 21: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-4 Interrelationship between My Responsibilities and My Obligations in Saudi Arabia

Government of Saudi Arabia, Mitsubishi Electric & Its Stakeholder

SAYAMOTO (1978 – 1982)

Representative,Mitsubishi Electric, JapanFor Saudi Arabia Satellite

Earth Station Project

General Manager,Electronic Div.

Mitsubishi Electric Saudi Arabia,

Japanese Employees in factory and sub-contractors

and etc.Local Employees

Page 22: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(1)Shipment of Equipment from Factory

Page 23: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(2)Preparation for Loading on Break Bulk Vessels

Page 24: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(3)Loading Cargoes

Page 25: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(4)Loading Cargoes

Page 26: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(5)Cargoes inside a Break Bulk Vessel

Page 27: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5 (6)Discharging cargoes from the vessel and loading them on a trailer

Page 28: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(7)Map of Asian Continent (Cargoes on board for 45 days)

Page 29: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(8)Locations of Business Bases in Saudi Arabia

Riyadh

Dammam

Taif

Page 30: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(9)Truckload transporting from Dammam seaport to construction site

in Riyadh (375 Km)

Page 31: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(10)Scenery of Saudi Arabian Dessert

Page 33: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(12)Scene of Roadside in Highway

Page 35: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(14)Image of Construction Site for Riyadh Satellite Earth Station Complex

Page 36: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(15)Landscape of Construction Site (Conceptual)

Page 37: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(16)Unloading of Mechanical Structure by Crane

Page 38: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(17)Construction of Building to house Communication Equipment

Page 39: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(18)Construction of Access Road on site

Page 40: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(19)Mechanical Installation of Antenna Structure and Electronic Equipment

Page 41: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(20)Microwave Link between Satellite Communication Earth Station and

International Telephone Center

Page 42: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 4-5-(21)Network Control Center

Page 43: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 5-1Major Element of Project Management

Project

Procurement

Manufactur-ing

Transport & Logistics

On-site Installation & Testing

Finance & Human

Resource

Page 44: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 5-2Leadership in Project Management

Leadership In

Management

Contract Negotiation & Project Liaison

Managementof

ImplementationSchedule

Operation Policy

Budget Control

Page 45: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 5-3Business Plan Format

45

Page 46: Project of Satellite Communication  Earth Station in the Kingdom of Saudi Arabia

Figure 5-4Analysis on Better than Break-Even Value over Opportunity

Profit & Loss

Balance Sheet(Strength of Asset)

Return of Investment (ROI)

IndividualBusiness

Company Business

TimeMoney