Project of Satellite Communication Earth Station in the Kingdom of Saudi Arabia
description
Transcript of Project of Satellite Communication Earth Station in the Kingdom of Saudi Arabia
Project of Satellite Communication Earth Station inthe Kingdom of Saudi Arabia
KIYOSHI SAYAMOTO
AGENDA
My Career History Satellite Communication Network Satellite Communication Earth Station
Complex Project of Satellite Communication Earth
Station in Saudi Arabia Project Management
Figure 1My Career History
36 years started in April 1974 and ended in March 2010 as an employee of Mitsubishi Electric Corporation, Tokyo, Japan
Over 60 countries where I have been Contribution to International Communities with Satellite Communication
systems all the times.
Figure 2Satellite Communication Network (Conceptual)
Saudi Arabia
Taiwan Japan USA
Figure 3-1Images of Satellite
Figure 3-2Three Satellites Illuminate the whole globe
Figure 3-3Satellite Communication Earth Station Complex in Yamaguchi,
Japan
Figure 3-4Satellite Communication Earth Station in
Malaysia (1984)
Figure 3-5Satellite Communication Earth Station in
New Zealand (1985)
Figure 3-6Conceptual
Satellite Communication Earth Station ComplexSaudi Arabia (1978 – 1982)
Figure 3-7- (1)Block Diagram of Earth Station
HPA Up Converter MOD
LNA DownConverter DEM
Multiplexer&
Demultiplexer
Feeder
Antenna (32 meter in diameter)
Inter-National
SwitchingCenter(ISC)
Figure 3-7 (2)High Power Amplifier (2kw)
Figure 3-7 (3)Antenna Structure & Low Noise Amplifier
Figure 3-7 (4)Up & Down Converter
Figure 3-7 (5)Modulator & Demodulator
Figure 3-7 (6)Multiplexer Equipment
Figure 4Locations of Business Bases in Saudi Arabia
Head Quarter in
Riyadh
BranchIn Dammam
Branch inTaif
Figure 4-1My Challenge : What is Saudi Arabia?
ClimateDaytime Temperature:
50 degree CelsiusReligion
IslamLanguage
Arabic
SAYAMOTOClimate: Temperate Zone (4 seasons)
Language: JapaneseReligion: Buddhism
Challenge Challenge Challenge
Figure 4-2Estimated Project Scale of Saudi Arabian Satellite Communication Earth Station
Contract US$100M
SatelliteCommunication
EquipmentUS$60M
Installation &On-site testing
US$5M
Operation & maintenanceUS$5M
Civil WorkUS$30M
Contract Terms & Condition Completion: 12 months
(Global standard of the same scale of project: 18 months)
Figure 4-3 Implementation Schedule of Project (Conceptual)
Month - 1 1 2 3 4 5 6 7 8 9 10 11 12 13 - 18
Contract Evet ▲ ▼ ▼ ▼ ▼ ▲
A. Hardware1) Antenna Mech
△ ▽2) Electronics Equipment
△ ▽3) Installation materials △ △ ▽
B. Documentation1) Training Manual ▽ ▽
2) O & M Manual ▽
3) Installation Drawing ▽
C. Civil Work ▽
On- Site Work △ ▽
EDC PDR FDR Factory Training OJT Completion
Design
Design
Design
Manufacturing
Manufacturing
Manufacturing
Construction of Building
Installation & Testing
Design
Ocean & Inland Transport
Ocean & Inland Transport
Air Transport
Air Transport
O & M
Figure 4-4 Interrelationship between My Responsibilities and My Obligations in Saudi Arabia
Government of Saudi Arabia, Mitsubishi Electric & Its Stakeholder
SAYAMOTO (1978 – 1982)
Representative,Mitsubishi Electric, JapanFor Saudi Arabia Satellite
Earth Station Project
General Manager,Electronic Div.
Mitsubishi Electric Saudi Arabia,
Japanese Employees in factory and sub-contractors
and etc.Local Employees
Figure 4-5-(1)Shipment of Equipment from Factory
Figure 4-5-(2)Preparation for Loading on Break Bulk Vessels
Figure 4-5-(3)Loading Cargoes
Figure 4-5-(4)Loading Cargoes
Figure 4-5-(5)Cargoes inside a Break Bulk Vessel
Figure 4-5 (6)Discharging cargoes from the vessel and loading them on a trailer
Figure 4-5-(7)Map of Asian Continent (Cargoes on board for 45 days)
Figure 4-5-(8)Locations of Business Bases in Saudi Arabia
Riyadh
Dammam
Taif
Figure 4-5-(9)Truckload transporting from Dammam seaport to construction site
in Riyadh (375 Km)
Figure 4-5-(10)Scenery of Saudi Arabian Dessert
Figure 4-5-(11)Scenery of Saudi Arabian Dessert
Figure 4-5-(12)Scene of Roadside in Highway
Figure 4-5-(13)Typical Scenery of Saudi Arabian Dessert
Figure 4-5-(14)Image of Construction Site for Riyadh Satellite Earth Station Complex
Figure 4-5-(15)Landscape of Construction Site (Conceptual)
Figure 4-5-(16)Unloading of Mechanical Structure by Crane
Figure 4-5-(17)Construction of Building to house Communication Equipment
Figure 4-5-(18)Construction of Access Road on site
Figure 4-5-(19)Mechanical Installation of Antenna Structure and Electronic Equipment
Figure 4-5-(20)Microwave Link between Satellite Communication Earth Station and
International Telephone Center
Figure 4-5-(21)Network Control Center
Figure 5-1Major Element of Project Management
Project
Procurement
Manufactur-ing
Transport & Logistics
On-site Installation & Testing
Finance & Human
Resource
Figure 5-2Leadership in Project Management
Leadership In
Management
Contract Negotiation & Project Liaison
Managementof
ImplementationSchedule
Operation Policy
Budget Control
Figure 5-3Business Plan Format
45
Figure 5-4Analysis on Better than Break-Even Value over Opportunity
Profit & Loss
Balance Sheet(Strength of Asset)
Return of Investment (ROI)
IndividualBusiness
Company Business
TimeMoney