PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
01.00 TRABAJOS PRELIMINARES
01.01 DEMOLICION DE MUROS DE ABOBE 6,745.02 6,745.02 0.00 0.00
01.02 DEMOLICION DE CONCRETO CON EQUIPO 1,498.24 1,498.24 0.00 0.00
01.03 ALMACEN, OFICINA Y GUARDIANIA 3,583.20 3,583.20 0.00 0.00
01.04 SERVICIOS HIGIENICOS 800.00 800.00 0.00 0.00
01.05 CARTEL DE OBRA 1,542.48 1,542.48 0.00 0.00
02.00 BLOQUE 1
02.01.00 TRABAJOS PROVISIONALES
02.01.01 LIMPIEZA DEL TERRENO MANUAL 304.63 304.63 0.00 0.00
02.01.02 TRAZO Y REPLANTEO PRELIMINAR 687.93 687.93 0.00 0.00
02.02.00 MOVIMIENTO DE TIERRAS
P 1,207.20 1207.20 1,207.20
E 1207.20P 6,174.37 0.00
E 6,174.37 0.00P 2,769.52 715.87 715.87
E 2,053.66 715.87P 2,063.27 1332.32 1,332.32
E 730.96 0.00 1332.32
02.03.00 CONCRETO SIMPLE 0.00
02.03.01 SOLADOS 0.00
P 158.96 0.00 0.00
E 158.96 0.00 0.00
02.03.02 FALSA ZAPATA 0.00
02.03.02.01 FALSA ZAPATA,1:12+30% P.G. T.MAX=8" 12,546.92 12,546.92 0.00 0.00 0.00
02.03.03 CIMIENTOS CORRIDOS
P 3,765.04 117.93 117.93
E 3,647.11 117.93 0.00
02.03.04 SOBRECIMIENTOS 0.00P 1,811.05 856.94 856.94
E 954.12 253.07 603.87P 2,776.63 871.33 871.33
E 1,905.30 388.23 483.10
02.04 CONCRETO ARMADO
02.04.01 CONCRETO EN ZAPATAS
P 17,223.36 1346.32 1,346.32
E 15,877.04 0.00 1346.32
02.04.01.02 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS 6,970.04 6,970.04 0.00 0.00 0.00
02.04.02 CONCRETO EN VIGAS DE CONEXIN
02.04.02.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN 3,501.23 3,501.23 0.00 0.00 0.00
02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN 3,598.85 3,598.85 0.00 0.00 0.00
02.04.02.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN 8,547.98 8,547.98 0.00 0.00 0.00
02.04.03 CONCRETO EN COLUMNAS
02.04.03.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 11,649.63 11,649.63 0.00 0.00 0.00
02.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 12,720.56 12,720.56 0.00 0.00
02.04.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS 24,825.36 24,825.36 0.00 0.00 0.00
02.04.04 CONCRETO EN VIGAS
02.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS 9,982.51 9,982.51 0.00 0.00 0.00
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 16,857.33 16,857.33 0.00 0.00 0.00
P 28,082.18 6587.28 6,587.28
E 21,494.90 2,785.58 3801.70
02.04.05 CONCRETO EN LOSAS ALIGERADAS 0.00
02.04.05.01 CONCRETO f'c=210 kg/cm2 EN LOSAS ALIGERADAS 5,152.39 5,152.39 0.00 0.00 0.00
P 7,369.82 23.43 23.43
E 7,346.39 0.00 23.43
02.04.05.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN LOSAS ALIGERADAS 4,632.25 4,632.25 0.00 0.00 0.00
02.04.05.04 BLOQUE HUECO/CONCRETO 15X30X30 cm PARA TECHO ALIGERADO 3,688.38 3,688.38 0.00 0.00 0.00
02.04.06 CONCRETO EN LOSAS MACIZAS 0.00
02.04.06.01 CONCRETO f'c=210 kg/cm2 EN LOSAS MACIZAS 776.95 776.95 0.00 0.00 0.00
02.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS 463.21 463.21 0.00 0.00 0.00
02.04.06.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN LOSAS MACIZAS 527.23 527.23 0.00 0.00 0.00
02.04.07 CONCRETO EN ESCALERAS
02.04.07.01 CONCRETO f'c=210 kg/cm2 EN ESCALERAS 1,763.99 1,763.99 0.00 0.00 0.00
02.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS 2,356.75 2,356.75 0.00 0.00 0.00
02.04.07.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ESCALERAS 1,018.92 1,018.92 0.00 0.00 0.00
02.05 CUBIERTAS
02.05.01 COBERTURA DE TEJA DE ARCILLA 0.00
02.05.01.01 COBERTURA DE TEJA DE ARCILLA 19,742.66 - 19742.66 0.00 19742.66
P 42,630.20 42630.20 42,630.20
E - 34,104.15 8526.05
P 6,929.16 6929.16 6,929.16
E - 6,929.16 0.00
02.06 MUROS Y TABIQUES DE ALBAILERIA 0.00
P 25,902.81 10444.61 10,444.61
E 15,458.20 4,144.99 6299.62
02.07 REVOQUES , ENLUCIDOS Y DERRAMES 0.00
02.07.01 TARRAJEOS EN MUROS INTERIOR Y EXTERIOR 0.00
P 4,696.84 3013.90 3,013.90
E 1,682.94 3,013.90 0.00
P 5,592.73 827.33 827.33
E 4,765.40 827.33 0.00
P 5,616.98 1100.34 1,100.34
E 4,516.64 1,100.34 0.00
P 4,833.99 0.00 0.00
E 4,833.99 0.00 0.00
02.07.01.05 VESTIDURA DE DERRAMES (PUERTAS Y VENTANAS) 1,751.69 1,751.69 0.00 0.00 0.00
02.07.02 REVESTIMIENTO DE ESCALERAS 0.00
CONCRETO f'c=210 kg/cm2 EN ZAPATAS
02.04.04.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS
02.04.01.01
TARRAJEO EN VIGAS
02.07.01.03
02.07.01.02
02.05.01.03
02.04.05.02
CORREAS DE MADERA
TIJERAL TIPO I
02.07.01.01
02.06.01
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
02.07.01.04
TARRAJEO EN MUROS INTERIORES
TARRAJEO EN EXTERIORES
TARRAJEO EN COLUMNAS
MURO DE CABEZA e=0.25m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
02.05.01.02
02.02.02
EXCAVACION MASIVA CON MAQUINARIA
RELLENO COMPACTADO CON MATERIAL PROPIO
CONCRETO EN SOBRECIMIENTOS, MEZCLA 1:8 + 25% P.M.
02.03.04.02
02.02.01
02.02.03
02.03.03.01
02.03.03.01
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
CONCRETO EN CIMIENTO CORRIDO, MEZCLA C:H 1:10+30% PG
02.02.04
02.03.01.01 SOLADO PARA CIMENTACIN, MEZCLA C:H 1:12, e=0.05m.
ITEMS DESCRIPCION PARTIDAS
EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL
Formato 06
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
P 818.17 818.17 818.17
E - 0.00 818.17
02.08 CIELO RASOS 0.00P 19,444.70 19444.70 19,444.70
E - 13,653.71 5790.99
02.09.01 FALSO PISO 0.00
02.09.01.01 FALSO PISO 4,404.96 4,404.96 0.00 0.00 0.00
02.09 PISOS Y PAVIMENTOS 0.00
02.09.02 CONTRAPISO 0.00
P 4,404.51 4404.51 4,404.51
E - 0.00 4404.51
02.09.03 PISO 0.00
02.09.03.01 PISO MACHIHEMBRADO 41,346.77 - 41346.77 0.00 41346.77
P 1,756.33 1756.33 1,756.33
E - 0.00 1756.33
02.10 ZOCALOS Y CONTRAZOCALOS 0.00
02.10.01 CONTRAZOCALOS 0.00
02.10.01.01 CONTRAZOCALO DE MADERA 2,526.18 - 2526.18 0.00 2526.18
02.10.01.02 CONTRAZOCALO DE CEMENTO PULIDO 354.02 354.02 0.00 0.00 0.00
02.11 CARPINTERIA DE MADERA 0.00
02.11.01 PUERTAS DE UNA HOJA 0.00
P 2,821.75 2821.75 2,821.75
E - 0.00 2821.75
02.11.02 VENTANAS DE MADERA 0.00P 13,149.80 13149.80 13,149.80
E - 0.00 13149.80
02.12 CARPINTERIA METALICA 0.00P 2,343.44 2343.44 2,343.44
E - 0.00 2343.44
02.13 CERRAJERIA 0.00P 372.44 372.44 372.44
E - 0.00 372.44P 230.64 230.64 230.64
E - 0.00 230.64
02.14 VENTANAS, VIDRIOS Y SIMILARES 0.00
02.14.01 VENTANA VIDRIO SEMIDOBLE 10,283.83 - 10283.83 0.00 10283.83
02.15 PINTURAS 0.00
02.15.01 PINTURA LATEX 2 MANOS EN CIELO RASO 3,757.05 - 3757.05 0.00 3757.05
02.15.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES 1,789.60 - 1789.60 0.00 1789.60
02.15.03 PINTURA LATEX 2 MANOS EN MUROS INTERIORES 3,319.80 - 3319.80 0.00 3319.80
02.15.04 PINTURA LATEX 2 MANOS EN COLUMNAS 2,018.94 - 2018.94 0.00 2018.94
02.15.05 PINTURA LATEX 2 MANOS EN VIGAS 1,786.70 - 1786.70 0.00 1786.70
02.15.06 PINTURA LATEX 2 MANOS EN DERRAMES 1,654.12 - 1654.12 0.00 1654.12
02.15.07 PINTURA BARNIZ EN PUERTA DE MADERA 323.70 - 323.70 0.00 323.70
02.16 INSTALACIONES PLUVIALES 0.00
P 1,559.36 1559.36 1,559.36
E - 0.00 1559.36
P 1,066.80 1066.80 1,066.80
E - 0.00 1066.80
P 539.28 539.28 539.28
E - 0.00 539.28
P 1,368.84 1368.84 1,368.84
E - 1,368.84 0.00
02.17 INSTALACIONES ELECTRICAS
02.17.01 SALIDA DE CENTRO DE LUZ (TECHO) 783.20 - 783.20 783.20
02.17.02 INSTALACIN DE TOMACORRIENTES
02.17.02.01 INSTALACION DE TOMACORRIENTES 2,821.44 - 2821.44 2821.44
02.17.03 MONTAJE DE LUMINARIAS E INTERRUPTORES DE CONTROL
02.17.03.01 ARTEFACTO ADOSADO AL TECHO DOS LAMPARAS FLUORESCENTES 36 W 6,109.29 - 6109.29 6109.29
02.17.03.02 FLUORESCENTE COMPACTO C/SOQUET ADOSADO AL TECHO 3,324.86 - 3324.86 3324.86
02.17.03.03 INSTALACION DE INTERRUPTOR BAKELITA X 1 SWITCH 70.30 - 70.30 70.30
02.17.03.04 INSTALACION DE INTERRUPTOR BAKELITA X 2 SWITCH 214.05 - 214.05 214.05
02.17.04 INSTALACION DE TABLEROS DE CONTROL Y CAJAS DE PASO
02.17.04.01 INSTALACION DE TABLERO DIST. DE 24 POLOS 608.40 - 608.40 608.40
02.17.04.02 CAJA DE PASO METALICO PARA EMPOTRAR 223.52 - 223.52 223.52
02.17.05 INSTALACIN DE POZO PUESTA A TIERRA
02.17.05.01 INST. DE PUESTA A TIERRA INC/HOYO Y MATERIAL SISTEMA ELEC. 831.92 - 831.92 831.92
02.17.06 RED DE COMUNICACIONES O DE CORRIENTE DEBIL
02.17.06.01 INSTALACION DE RED DE LUCES DE EMERGENCIA
02.17.06.01.01 INSTALACION DE SALIDAS DE TOMAS DE EMERGENCIA (CONDUCTORES, DUCTOS Y CAJAS ) 613.35 - 613.35 613.35
02.17.06.01.02 INSTALACION DE LUCES DE EMERGENCIA 383.25 - 383.25 383.25
03.00 BLOQUE 2
03.01 TRABAJOS PROVISIONALES
03.01.01 LIMPIEZA DEL TERRENO MANUAL 453.20 453.20 0.00 0.00 0.00
P 1,023.43 3.33 3.33
E 1,020.10 3.33 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00
P 1,515.26 1418.52 1,418.52
E 96.74 0.00 1418.52
P 8,809.78 0.00 0.00
E 8,809.78 0.00 0.00
P 3,911.75 3654.48 3,654.48
E 257.27 3,252.25 402.23
P 2,725.14 2725.14 2,725.14
E 0.00 2725.14
03.03 CONCRETO SIMPLE 0.00
03.03.01 SOLADOS 0.00
03.03.01.01 SOLADO PARA CIMENTACIN, MEZCLA C:H 1:12, e=0.05m. 266.10 266.10 0.00 0.00 0.00
02.08.01
02.07.02.01 REVESTIMIENTO DE ESCALERAS
ENLUCIDO DE CIELO RASO CON YESO
02.09.02.01 CONTRAPISO DE e=2"
02.16.01 COLOCADO DE TUBERIA DE BAJADA PVC SAL DE 3" PARA LLUVIAS Y ACCESORIOS
02.09.03.02 PISO DE CEMENTO PULIDO
02.16.02 TUBERIA PVC SAL DE 3"
02.16.03 CODO PVC SAL 3" X 90
02.16.04 CANALETAS METLICAS
02.11.01.01 PUERTAS DE TABLERO REBAJADO
02.11.02.01 VENTANAS DE MADERA
02.12.01 BARANDA METALICA
02.13.01 CERRADURA (CHAPA DE PARCHE 3 GOLPES)PARA PUERTA DE MADERA
02.13.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x4"
03.01.02 TRAZO Y REPLANTEO PRELIMINAR
03.02.01 EXCAVACION MASIVA CON MAQUINARIA
03.02.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL
03.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO
03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
03.03.02 FALSA ZAPATA 0.00P 17,719.88 3174.66 3,174.66
E 14,545.22 3,175.07 -0.41
03.03.03 CIMIENTOS CORRIDOS 0.00P 5,446.01 5446.01 5,446.01
E - 5,446.01 0.00
03.03.04 SOBRECIMIENTOS 0.00P 3,345.29 3345.29 3,345.29
E - 1,978.09 1367.20P 4,718.07 4718.07 4,718.07
E - 3,751.87 966.20
03.04 CONCRETO ARMADO 0.00
03.04.01 CONCRETO EN ZAPATAS 0.00P 24,325.40 4919.25 4,919.25
E 19,406.15 4,588.65 330.61P 12,815.81 5874.19 5,874.19
E 6,941.62 2,434.74 3439.45
03.04.02 CONCRETO EN VIGAS DE CONEXIN 0.00
03.04.02.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN 5,058.66 5,058.66 0.00 0.00 0.00
03.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN 5,650.43 5,650.43 0.00 0.00 0.00
03.04.02.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN 13,602.75 13,602.75 0.00 0.00 0.00
03.04.03 CONCRETO EN COLUMNAS 0.00P 16,352.27 1051.53 1,051.53
E 15,300.73 1,051.53 0.00
03.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 17,587.94 17,587.94 0.00 0.00 0.00
03.04.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS 49,786.38 49,786.38 0.00 0.00 0.00
03.04.04 CONCRETO EN VIGAS 0.00P 14,442.95 1692.55 1,692.55
E 12,750.41 1,692.55 0.00P 24,414.02 3797.21 3,797.21
E 20,616.81 3,797.21 0.00P 40,305.16 14594.02 14,594.02
E 25,711.14 7,732.30 6861.72
03.04.05 CONCRETO EN LOSAS ALIGERADAS 0.00P 8,840.85 322.59 322.59
E 8,518.26 227.36 95.23P 12,642.77 1022.57 1,022.57
E 11,620.20 311.41 711.16P 7,348.56 0.00 0.00
E 7,348.56 0.00 0.00P 5,789.25 254.34 254.34
E 5,534.91 147.87 106.47
03.04.06 CONCRETO EN LOSAS MACIZAS 0.00P 776.95 776.95 776.95
E - 387.66 389.29
P 463.21 463.21 463.21
E - 250.40 212.81P 527.23 527.23 527.23
E - 527.23 0.00
03.04.07 CONCRETO EN ESCALERAS
P 1,763.99 1763.99 1,763.99
E - 1,763.99 0.00
P 2,356.75 2356.75 2,356.75
E - 2,356.75 0.00P 1,018.92 1018.92 1,018.92
E - 1,018.92 0.00
03.05 CUBIERTAS P
03.05.01 COBERTURA DE TEJA DE ARCILLA 29,720.99 - 29720.99 0.00 29720.99P 51,156.24 51156.24 51,156.24
E - 51,156.24 0.00P 10,940.92 10940.92 10,940.92
E - 10,940.92 0.00
03.06 MUROS Y TABIQUES DE ALBAILERIA 0.00P 31,159.64 31159.64 31,159.64
E - 21,989.52 9170.12
P 5,613.51 5613.51 5,613.51
E - 5,613.51 0.00
03.07 REVOQUES , ENLUCIDOS Y DERRAMES 0.00
03.07.01 TARRAJEOS EN MUROS INTERIOR Y EXTERIOR 0.00 0.00P 932.85 932.85 932.85
E - 906.32 26.54P 6,241.91 6241.91 6,241.91
E - 6,241.91 0.00
P 9,514.36 9514.36 9,514.36
E - 9,514.36 0.00P 7,875.69 7875.69 7,875.69
E - 7,875.69 0.00P 6,988.50 6988.50 6,988.50
E - 6,988.46 0.04P 3,629.38 3629.38 3,629.38
E - 1,473.92 2155.46
03.07.02 REVESTIMIENTO DE ESCALERAS 0.00P 545.44 545.44 545.44
E - 0.00 545.44
03.08 CIELO RASOS 0.00P 31,004.17 31004.17 31,004.17
E - 16,797.01 14207.17
03.09 PISOS Y PAVIMENTOS 0.00 0.00
03.09.01 FALSO PISO 0.00 0.00P 7,589.26 7589.26 7,589.26
03.08.01 ENLUCIDO DE CIELO RASO CON YESO
03.09.01.01 FALSO PISO
03.07.01.05 TARRAJEO EN VIGAS
03.07.01.06 VESTIDURA DE DERRAMES (PUERTAS Y VENTANAS)
03.07.02.01 REVESTIMIENTO DE ESCALERAS
03.06.01 MURO DE CABEZA e=0.25m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
03.06.02 MURO DE SOGA e=0.15m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
03.07.01.01 TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
03.07.01.02 TARRAJEO EN EXTERIORES
03.07.01.03 TARRAJEO EN MUROS INTERIORES
03.07.01.04 TARRAJEO EN COLUMNAS
03.04.06.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN LOSAS MACIZAS
03.04.07.01 CONCRETO f'c=210 kg/cm2 EN ESCALERAS
03.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
03.05.02 TIJERAL TIPO I
03.05.03 CORREAS DE MADERA
03.04.01.01 CONCRETO f'c=210 kg/cm2 EN ZAPATAS
03.04.01.02 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS
03.04.03.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS
03.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS
03.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
03.04.04.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS
03.04.05.01 CONCRETO f'c=210 kg/cm2 EN LOSAS ALIGERADAS
03.04.05.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN LOSAS ALIGERADAS
03.04.05.04 BLOQUE HUECO/CONCRETO 15X30X30 cm PARA TECHO ALIGERADO
03.04.06.01 CONCRETO f'c=210 kg/cm2 EN LOSAS MACIZAS
03.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS
03.03.02.01 FALSA ZAPATA,1:12+30% P.G. T.MAX=8"
03.03.03.01 CONCRETO EN CIMIENTO CORRIDO, MEZCLA C:H 1:10+30% PG
03.03.04.01 CONCRETO EN SOBRECIMIENTOS, MEZCLA 1:8 + 25% P.M.
03.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
03.04.07.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ESCALERAS
03.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
E - 0.00 7589.26
03.09.02 CONTRAPISO 0.00 0.00P 7,393.96 7393.96 7,393.96
E - 0.00 7393.96
03.09.03 PISO 0.00 0.00P 7,077.05 7077.05 7,077.05
E - 0.00 7077.05
03.09.03.02 PISO MACHIHEMBRADO 42,522.93 - 42522.93 0.00 42522.93P 2,992.46 2992.46 2,992.46
E - 0.00 2992.46
03.10 ZOCALOS Y CONTRAZOCALOS
03.10.01 CONTRAZOCALOS 0.00P 1,060.53 1060.53 1,060.53
E - 0.00 1060.53
03.10.01.02 CONTRAZOCALO DE MADERA 2,959.61 - 2959.61 0.00 2959.61P 641.52 641.52 641.52
E - 0.00 641.52
03.10.02 ZOCALOS 0.00 0.00P 3,129.03 3129.03 3,129.03
E - 0.00 3129.03
03.11 CARPINTERIA DE MADERA 0.00
03.11.01 PUERTAS DE UNA HOJA 0.00P 12,248.35 12248.35 12,248.35
E - 0.00 12248.35
03.11.02 VENTANAS DE MADERA 0.00P 30,966.26 30966.26 30,966.26
E - 0.00 30966.26
03.12 CARPINTERIA METALICA 0.00
03.12.01 BARANDA METALICA 6,249.74 - 6249.74 0.00 6249.74
03.13 CERRAJERIA 0.00P 1,582.87 1582.87 1,582.87
E - 0.00 1582.87
P 980.22 980.22 980.22
E - 0.00 980.22
03.14 VIDRIOS, CRISTALES Y SIMILARES 0.00
03.14.01 VENTANA VIDRIO SEMIDOBLE 16,647.81 - 16647.81 0.00 16647.81
03.15 PINTURAS 0.00
03.15.01 PINTURA LATEX 2 MANOS EN CIELO RASO 5,990.54 - 5990.54 0.00 5990.54
03.15.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES 2,378.31 - 2378.31 0.00 2378.31
03.15.03 PINTURA LATEX 2 MANOS EN MUROS INTERIORES 5,648.95 - 5648.95 0.00 5648.95
03.15.04 PINTURA LATEX 2 MANOS EN COLUMNAS 2,830.80 - 2830.80 0.00 2830.80
03.15.05 PINTURA LATEX 2 MANOS EN VIGAS 2,583.04 - 2583.04 0.00 2583.04
03.15.06 PINTURA LATEX 2 MANOS EN DERRAMES 3,427.21 - 3427.21 0.00 3427.21
03.15.07 PINTURA BARNIZ EN PUERTA DE MADERA 870.43 - 870.43 0.00 870.43
03.16 INSTALACIONES SANITARIAS 0.00
03.16.01 SALIDA PARA PUNTO DE DESAGE 0.00P 1,803.89 1803.89 1,803.89
E - 1,254.88 549.01P 820.26 820.26 820.26
E - 820.26 0.00
03.16.02 SISTEMA DE REDES DESAGE 0.00P 416.91 416.91 416.91
E - 416.91 0.00
P 433.96 433.96 433.96
E - 433.96 0.00P 707.98 707.98 707.98
E - 707.98 0.00P 1,682.14 1682.14 1,682.14
E - 0.00 1682.14
03.16.03 APARATOS Y ACCESORIOS SANITARIOS 0.00P 3,115.76 3115.76 3,115.76
E - 0.00 3115.76
P 352.00 352.00 352.00
E - 0.00 352.00P 497.19 497.19 497.19
E - 0.00 497.19
03.16.04 ACCESORIOS SANITARIOS 0.00P 406.88 406.88 406.88
E - 0.00 406.88
03.16.05 GRIFERIA 0.00P 264.64 264.64 264.64
E - 0.00 264.64
P 330.80 330.80 330.80
E - 0.00 330.80P 92.16 92.16 92.16
E - 0.00 92.16P 1,602.46 1602.46 1,602.46
E - 0.00 1602.46
P 1,094.80 1094.80 1,094.80
E - 0.00 1094.80
03.16.06 ACCESORIOS VARIOS 0.00P 136.74 136.74 136.74
E - 0.00 136.74P 165.13 165.13 165.13
E - 0.00 165.13P 376.01 376.01 376.01
E - 0.00 376.01
P 48.94 48.94 48.94
E - 48.94 0.00P 119.82 119.82 119.82
03.16.06.01 UNIONES YEE PVC SAL 4"x 4"
03.16.06.02 UNIONES YEE PVC SAL 4"x 2"
03.16.06.03 UNIONES YEE PVC SAL 2"x 2"
03.16.06.04 CODO PVC SAL 4" X 90
03.16.06.05 CODO PVC SAL 2" X 45
03.16.05.04 COLOCACION DE APARATOS SANITARIOS
03.16.05.02 JABONERA CON AGARRADERA
03.16.05.03
TUBERIA PVC SAL DE 3"
03.16.02.03 TUBERIA PVC SAL DE 4"
TOALLERA CON GANCHO
03.16.04.01 GRIFO PARA LAVADEROS DE UNA LLAVE
03.10.01.03 CONTRAZOCALO DE CEMENTO PULIDO
03.10.02.01 ZOCALO DE CERAMICO
03.11.01.01 PUERTAS DE TABLERO REBAJADO
03.11.02.01 VENTANAS DE MADERA
03.13.01 CERRADURA (CHAPA DE PARCHE 3 GOLPES)PARA PUERTA DE MADERA
03.13.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x4"
03.16.01.01 SALIDA DE DESAGUE CON TUB. PVC SAL DE 2"
03.16.01.02 SALIDA DE DESAGUE CON TUB. PVC SAL DE 4"
03.16.02.04 TUBERIA PVC SAL DE 6"
03.16.03.01 INODORO FLUXOMETRICO
03.16.03.02 LAVATORIO DE ACERO INOXIDABLE
03.16.03.03 URINARIO DE LOSA VITRIFICADA EN SS.HH. DE VARONES
03.16.05.01 PAPELERA LOSA VITRIFICADA C/BLANCO
03.16.02.01 TUBERIA PVC SAL DE 2"
03.16.02.02
03.09.01.01 FALSO PISO
03.09.02.01 CONTRAPISO DE e=2"
03.09.03.01 PISO DE CERAMICA NACIONAL ANTIDESLIZANTE
03.09.03.03 PISO DE CEMENTO PULIDO
03.10.01.01 CONTRAZOCALO RECTO CERAMICO H=0.10 m.
03.16.05.05 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
E - 99.85 19.97P 241.68 241.68 241.68
E - 0.00 241.68
P 57.36 57.36 57.36
E - 0.00 57.36P 50.36 50.36 50.36
E - 0.00 50.36
03.16.07 CAJAS DE INSPECCIN 0.00P 395.16 395.16 395.16
E - 0.00 395.16
03.16.08 VENTILACION 0.00 0.00P 109.20 109.20 109.20
E - 0.00 109.20P 870.80 870.80 870.80
E - 653.10 217.70
03.17 SISTEMA DE AGUA FRIA 0.00
03.17.01 SALIDA PARA PUNTO DE AGUA FRIA 0.00P 1,890.14 1890.14 1,890.14
E - 1,397.06 493.08
03.17.02 REDES DE DISTRIBUCIN Y MONTAJE 0.00P 691.11 691.11 691.11
E - 246.25 444.87P 513.12 513.12 513.12
E - 88.98 424.14P 65.67 65.67 65.67
E - 65.67 0.00
03.17.03 ACCESORIOS VARIOS 0.00P 227.80 227.80 227.80
E - 0.00 227.80P 306.66 306.66 306.66
E - 0.00 306.66
03.17.04 LLAVES Y VALVULAS 0.00P 167.37 167.37 167.37
E - 111.58 55.79
03.18 INSTALACIONES PLUVIALES 0.00P 1,949.20 1949.20 1,949.20
E - 0.00 1949.20P 1,421.13 1421.13 1,421.13
E - 0.00 1421.13P 674.10 674.10 674.10
E - 0.00 674.10
P 1,370.03 1370.03 1,370.03
E - 1,370.03 0.00
03.19 INSTALACIONES ELECTRICAS
03.19.01 SALIDA DE CENTRO DE LUZ (TECHO) 1,338.56 1338.56 1338.56
03.19.02 INSTALACIN DE TOMACORRIENTES
03.19.02.01 INSTALACION DE TOMACORRIENTES (SALIDAS) 8,817.00 8817.00 8817.00
03.19.03 MONTAJE DE LUMINARIAS E INTERRUPTORES DE CONTROL
03.19.03.01 ARTEFACTO ADOSADO AL TECHO DOS LAMPARAS FLUORESCENTES 36 W 13,144.23 13144.23 13144.23
03.19.03.02 FLUORESCENTE COMPACTO C/SOQUET ADOSADO AL TECHO 4,382.77 4382.77 4382.77
03.19.03.03 INSTALACION DE INTERRUPTOR BAKELITA X 1 SWITCH 210.90 210.90 210.90
03.19.03.04 INSTALACION DE INTERRUPTOR BAKELITA X 2 SWITCH 513.72 513.72 513.72
03.19.04 INSTALACION DE TABLEROS DE CONTROL Y CAJAS DE PASO
03.19.04.01 INSTALACION DE TABLERO DIST. DE 24 POLOS 1,216.80 1216.80 1216.80
03.19.04.02 CAJA DE PASO METALICO PARA EMPOTRAR 223.52 223.52 223.52
03.19.05 INSTALACIN DE POZO PUESTA A TIERRA
03.19.05.01 INST. DE PUESTA A TIERRA INC/HOYO Y MATERIAL SISTEMA ELEC. 831.92 831.92 831.92
03.19.06 RED DE COMUNICACIONES O DE CORRIENTE DEBIL
03.19.06.01 INSTALACION DE RED DE COMPUTO O DATA
03.19.06.01.01 INSTALACION DE SALIDAS DE COMPUTO/DATA (CONDUCTORES, DUCTOS Y CAJAS ) 5,548.69 5548.69 5548.69
03.19.06.01.01.01 INSTALACION DE SERVIDOR DE COMPUTO 2,582.95 2582.95 2582.95
03.19.06.02 INSTALACION DE RED DE LUCES DE EMERGENCIA
03.19.06.02.01 INSTALACION DE SALIDAS DE TOMAS DE EMERGENCIA (CONDUCTORES, DUCTOS Y CAJAS ) 2,330.73 2330.73 2330.73
03.19.06.02.02 INSTALACION DE LUCES DE EMERGENCIA 1,456.35 1456.35 1456.35
04.00 BLOQUE 3
04.01 TRABAJOS PROVISIONALES 0.00
04.01.01 LIMPIEZA DEL TERRENO MANUAL 573.63 573.63 0.00 0.00 0.00
04.01.02 TRAZO Y REPLANTEO PRELIMINAR 1,295.39 1,295.39 0.00 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS 0.00
04.02.01 EXCAVACION MASIVA CON MAQUINARIA 3,889.27 3,889.27 0.00 0.00 0.00
04.02.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL 13,695.32 13,695.32 0.00 0.00 0.00P 6,381.73 3131.83 3,131.83E 3,249.90 0.00 3131.83
04.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA E 5,854.65 5,854.65 0.00 0.00 0.00
04.03 CONCRETO SIMPLE 0.00
04.03.01 SOLADOS 0.00
04.03.01.01 SOLADO PARA CIMENTACIN, MEZCLA C:H 1:12, e=0.05m. 266.49 266.49 0.00 0.00 0.00
04.03.02 FALSA ZAPATA 0.00
04.03.02.01 FALSA ZAPATA,1:12+30% P.G. T.MAX=8" 28,909.30 28,909.30 0.00 0.00 0.00
04.03.03 CIMIENTOS CORRIDOS 0.00
04.03.03.01 CONCRETO EN CIMIENTO CORRIDO, MEZCLA C:H 1:10+30% PG 6,605.97 6,605.97 0.00 0.00 0.00
04.03.04 SOBRECIMIENTOS 0.00
04.03.04.01 CONCRETO EN SOBRECIMIENTOS, MEZCLA 1:8 + 25% P.M. 3,174.49 3,174.49 0.00 0.00 0.00P 4,871.10 651.66 651.66
E 4,219.44 0.00 651.66
04.04 CONCRETO ARMADO 0.00
04.04.01 CONCRETO EN ZAPATAS 0.00
04.04.01.01 CONCRETO f'c=210 kg/cm2 EN ZAPATAS 39,688.60 39,688.60 0.00 0.00 0.00
04.04.01.02 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS 12,717.95 12,717.95 0.00 0.00 0.00
03.17.02.01 TUBERIA PVC SAP C-10 DE 1/2" C/ ROSCA, INC. PRUEBA HIDRAULICA
03.17.02.02 TUBERIA PVC SAP C-10 DE 1" C/ ROSCA, INC. PRUEBA HIDRAULICA
03.17.02.03 TUBERIA PVC SAP C-10 DE 3/4" C/ ROSCA, INC. PRUEBA HIDRAULICA
03.17.03.01 TEE PVC-SAP 1/2"
03.17.03.02 CODO PVC SAP 1/2" x 90
03.17.04.01 VALVULA DE GLOBO DE 3/4"
03.16.08.01 SOMBRERO DE VENTILACIN PVC SAL 2"
03.16.08.02 SALIDA DE VENTILACION CON TUB. PVC DE 2"
03.17.01.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP DE 1/2" C/ ACCESORIOS
03.16.06.05 CODO PVC SAL 2" X 45
03.16.06.06 SUMIDERO DE BRONCE 2"
03.16.06.07 REGISTRO ROSCADO DE BRONCE 4"
03.16.06.08 REGISTRO ROSCADO DE BRONCE 2"
03.16.07.01 CAJA DE REGISTRO DE DESAGE
COLOCADO DE TUBERIA DE BAJADA PVC SAL DE 3" PARA LLUVIAS Y ACCESORIOS
03.18.02 TUBERIA PVC SAL DE 3"
03.18.03 CODO PVC SAL 3" X 90
03.18.04 CANALETAS METLICAS
04.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
03.18.01
04.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
04.04.02 CONCRETO EN VIGAS DE CONEXIN 0.00
04.04.02.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN 4,736.02 4,736.02 0.00 0.00 0.00
04.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN 6,942.72 6,942.72 0.00 0.00 0.00
04.04.02.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN 16,289.00 16,289.00 0.00 0.00 0.00
04.04.03 CONCRETO EN COLUMNAS 0.00
04.04.03.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 39,833.17 39,833.17 0.00 0.00 0.00
04.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 43,600.66 43,600.66 0.00 0.00 0.00P 60,660.39 4190.97 4,190.97
E 56,469.42 0.00 4190.97
04.04.04 CONCRETO EN VIGAS 0.00P 29,882.95 484.39 484.39
E 29,398.56 423.84 60.55P 48,433.49 799.17 799.17
E 47,634.32 557.00 242.16
P 72,019.43 1122.10 1,122.10
E 70,897.33 775.18 346.92
04.04.05 CONCRETO EN LOSAS ALIGERADAS 0.00
04.04.05.01 CONCRETO f'c=210 kg/cm2 EN LOSAS ALIGERADAS 19,395.08 19,395.08 0.00 0.00 0.00
04.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 28,104.80 28,104.80 0.00 0.00 0.00P 17,211.04 1385.12 1,385.12
E 15,825.92 0.00 1385.12P 13,531.50 2442.90 2,442.90
E 11,088.60 0.00 2442.90
04.04.06 CONCRETO EN LOSAS MACIZAS 0.00P 3,103.70 1551.85 1,551.85
E 1,551.85 0.00 1551.85
P 1,852.83 926.41 926.41
E 926.41 0.00 926.41
P 2,108.90 1054.45 1,054.45
E 1,054.45 0.00 1054.45
04.04.07 CONCRETO EN ESCALERAS 0.00
04.04.07.01 CONCRETO f'c=210 kg/cm2 EN ESCALERAS 5,501.89 5,501.89 0.00 0.00 0.00
04.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS 4,960.18 4,960.18 0.00 0.00 0.00
04.04.07.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ESCALERAS 1,018.92 1,018.92 0.00 0.00 0.00
04.05 CUBIERTAS 0.00
04.05.01 COBERTURA DE TEJA DE ARCILLA 0.00
04.05.01.01 COBERTURA DE TEJA DE ARCILLA 30,051.08 - 30051.08 0.00 30051.08P 63,945.30 63945.30 63,945.30
E - 63,945.30 0.00P 15,134.99 15134.99 15,134.99
E - 15,134.99 0.00
04.06 MUROS Y TABIQUES DE ALBAILERIA 0.00P 78,875.95 20268.84 20,268.84
E 58,607.11 0.00 20268.84
P 2,013.07 0.00 0.00
E 2,013.07 0.00 0.00
04.07 REVOQUES , ENLUCIDOS Y DERRAMES 0.00
04.07.01 TARRAJEOS EN MUROS INTERIOR Y EXTERIOR 0.00P 10,862.84 968.03 968.03
E 9,894.82 968.10 -0.07P 17,548.39 0.00 0.00
E 17,548.39 0.00 0.00
04.07.01.03 TARRAJEO EN COLUMNAS 15,918.48 15,918.48 0.00 0.00 0.00
04.07.01.04 TARRAJEO EN VIGAS 13,105.95 13,105.95 0.00 0.00 0.00
04.07.01.05 VESTIDURA DE DERRAMES (PUERTAS Y VENTANAS) 5,817.41 5,817.41 0.00 0.00 0.00
04.07.02 REVESTIMIENTO DE ESCALERAS 0.00P 545.44 545.44 545.44
E - 0.00 545.44
04.08 CIELO RASOS 0.00 0.00P 56,786.24 56786.24 56,786.24
E - 34,020.97 22765.26
04.09 PISOS Y PAVIMENTOS 0.00
04.09.01 FALSO PISO 0.00
04.09.01.01 FALSO PISO 8,575.14 8,575.14 0.00 0.00 0.00
04.09.02 CONTRAPISO 0.00P 16,453.63 16453.63 16,453.63
E - 0.00 16453.63
04.09.03 PISO 0.00
04.09.03.01 PISO MACHIHEMBRADO 114,610.36 - 114610.36 0.00 114610.36P 7,211.26 7211.26 7,211.26
E - 0.00 7211.26
04.10 ZOCALOS Y CONTRAZOCALOS 0.00
04.10.01 CONTRAZOCALO DE MADERA 7,266.43 7266.43 0.00 7266.43
04.10.02 CONTRAZOCALO DE CEMENTO PULIDO 1,446.19 1,446.19 0.00 0.00 0.00
04.11 CARPINTERIA DE MADERA 0.00
04.11.01 PUERTAS DE UNA HOJA 0.00P 9,593.94 - 9593.94 9,593.94
E 0.00 9593.94
04.11.02 VENTANAS DE MADERA 0.00 0.00P 52,097.11 52097.11 52,097.11
E - 0.00 52097.11
04.12 CARPINTERIA METALICA 0.00 0.00P 16,372.14 16372.14 16,372.14
E - 0.00 16372.14
04.13 CERRAJERIA 0.00 0.00P 1,303.54 1303.54 1,303.54
E - 0.00 1303.54P 807.24 807.24 807.24
E - 0.00 807.24
04.09.02.01 CONTRAPISO DE e=2"
04.09.03.02 PISO DE CEMENTO PULIDO
04.11.01.01 PUERTAS DE TABLERO REBAJADO
04.11.02.01 VENTANAS DE MADERA
04.12.01 BARANDA METALICA
04.13.01 CERRADURA (CHAPA DE PARCHE 3 GOLPES)PARA PUERTA DE MADERA
04.13.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x4"
04.06.02 MURO DE SOGA e=0.15m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
04.07.01.01 TARRAJEO EN EXTERIORES
04.07.01.02 TARRAJEO EN MUROS INTERIORES
04.06.01 MURO DE CABEZA e=0.25m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
04.07.02.01 REVESTIMIENTO DE ESCALERAS
04.08.01 ENLUCIDO DE CIELO RASO CON YESO
04.04.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS
04.04.04.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS
04.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
04.04.04.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS
04.04.05.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN LOSAS ALIGERADAS
04.04.05.04 BLOQUE HUECO/CONCRETO 15X30X30 cm PARA TECHO ALIGERADO
04.05.01.02 TIJERAL TIPO I
04.05.01.03 CORREAS DE MADERA
04.04.06.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN LOSAS MACIZAS
04.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS
04.04.06.01 CONCRETO f'c=210 kg/cm2 EN LOSAS MACIZAS
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
04.14 VIDRIOS, CRISTALES Y SIMILARES 0.00
04.14.01 VENTANA VIDRIO SEMIDOBLE 40,742.34 - 40742.34 0.00 40742.34
04.15 PINTURAS 0.00P 10,972.08 10972.08 10,972.08
E - 0.00 10972.08P 4,138.99 4138.99 4,138.99
E - 0.00 4138.99P 5,300.71 5300.71 5,300.71
E - 0.00 5300.71
P 10,176.88 10176.88 10,176.88
E - 0.00 10176.88
P 4,844.13 4844.13 4,844.13
E - 0.00 4844.13P 5,493.36 5493.36 5,493.36
E - 0.00 5493.36P 1,100.59 1100.59 1,100.59
E - 0.00 1100.59
04.16 INSTALACIONES PLUVIALES 0.00P 2,728.88 2728.88 2,728.88
E - 0.00 2728.88P 2,480.31 2480.31 2,480.31
E - 0.00 2480.31P 943.74 943.74 943.74
E - 0.00 943.74
P 2,515.68 2515.68 2,515.68
E - 2,515.68 0.00
04.17 INSTALACIONES ELECTRICAS
04.17.01 SALIDA DE CENTRO DE LUZ (TECHO) 2,363.84 2363.84 2363.84
04.17.02 INSTALACIN DE TOMACORRIENTES
04.17.02.01 INSTALACION DE TOMACORRIENTES 8,464.32 8464.32 8464.32
04.17.03 MONTAJE DE LUMINARIAS E INTERRUPTORES DE CONTROL
04.17.03.01 ARTEFACTO ADOSADO AL TECHO DOS LAMPARAS FLUORESCENTES 36 W 18,513.00 18513.00 18513.00
04.17.03.02 FLUORESCENTE COMPACTO C/SOQUET ADOSADO AL TECHO 9,974.58 9974.58 9974.58
04.17.03.03 INSTALACION DE INTERRUPTOR BAKELITA X 1 SWITCH 70.30 70.30 70.30
04.17.03.04 INSTALACION DE INTERRUPTOR BAKELITA X 2 SWITCH 899.01 899.01 899.01
04.17.04 INSTALACION DE TABLEROS DE CONTROL Y CAJAS DE PASO
04.17.04.01 INSTALACION DE TABLERO DIST. DE 24 POLOS 1,216.80 1216.80 1216.80
04.17.04.02 CAJA DE PASO METALICO PARA EMPOTRAR 335.28 335.28 335.28
04.17.05 INSTALACIN DE POZO PUESTA A TIERRA
04.17.05.01 INST. DE PUESTA A TIERRA INC/HOYO Y MATERIAL SISTEMA ELEC. 831.92 831.92 831.92
04.17.06 RED DE COMUNICACIONES O DE CORRIENTE DEBIL
04.17.06.01 INSTALACION DE RED DE LUCES DE EMERGENCIA
04.17.06.01.01 INSTALACION DE SALIDAS DE TOMAS DE EMERGENCIA (CONDUCTORES, DUCTOS Y CAJAS ) 1,962.72 1962.72 1962.72
04.17.06.01.02 INSTALACION DE LUCES DE EMERGENCIA 1,226.40 1226.40 1226.40
05.00 TALLER DE SOLDADURA 0.00
05.01 TRABAJOS PROVISIONALES 0.00
05.01.01 LIMPIEZA DEL TERRENO MANUAL 419.66 419.66 0.00 0.00 0.00
05.01.02 TRAZO Y REPLANTEO PRELIMINAR 947.68 947.68 0.00 0.00 0.00
05.02.00 MOVIMIENTO DE TIERRAS 0.00
05.02.01 EXCAVACION MASIVA CON MAQUINARIA 1,361.52 1,361.52 0.00 0.00 0.00
05.02.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL 3,029.04 3,029.04 0.00 0.00 0.00P 1,129.84 574.74 574.74
E 555.10 0.00 574.74
05.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 1,951.31 1,951.31 0.00 0.00 0.00
05.03.00 CONCRETO SIMPLE 0.00
05.03.01 FALSA ZAPATA 0.00
05.03.01.01 FALSA ZAPATA,1:12+30% P.G. T.MAX=8" 5,119.08 5,119.08 0.00 0.00 0.00
05.04 CONCRETO ARMADO 0.00
05.04.01 CONCRETO EN ZAPATAS 0.00
05.04.01.01 CONCRETO f'c=210 kg/cm2 EN ZAPATAS 7,026.36 7,026.36 0.00 0.00 0.00
05.04.01.02 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS 3,630.97 3,630.97 0.00 0.00 0.00
05.04.02 CONCRETO EN VIGAS DE CONEXIN 0.00
05.04.02.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN 2,788.24 2,788.24 0.00 0.00 0.00
05.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN 2,867.20 2,867.20 0.00 0.00 0.00
05.04.02.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN 5,996.34 5,996.34 0.00 0.00 0.00
05.04.03 CONCRETO EN COLUMNAS 0.00
05.04.03.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 3,830.73 3,830.73 0.00 0.00 0.00P 4,558.48 0.00 0.00
E 4,558.48 0.00 0.00
05.04.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS 16,489.90 16,489.90 0.00 0.00 0.00
05.04.04.00 CONCRETO EN VIGAS 0.00
05.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS 3,172.77 3,172.77 0.00 0.00 0.00P 4,755.75 0.00 0.00
E 4,755.75 0.00 0.00
05.04.04.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS 5,307.61 5,307.61 0.00 0.00 0.00
05.05 COBERTURA 0.00
05.05.01 COBERTURA CON TEJA CASTELLANA 0.00P 28,704.90 28704.90 28,704.90
E - 28,704.90 0.00
P 10,906.56 10906.56 10,906.56
E - 10,906.56 0.00
05.05.01.03 VIGA METLICA, VT-1 6,545.85 - 6545.85 0.00 6545.85
05.05.01.04 VIGA METLICA, VT-2 6,074.88 - 6074.88 0.00 6074.88
05.06 MUROS Y TABIQUES DE ALBAILERIA 0.00 0.00P 20,617.81 20617.81 20,617.81
E - 20,617.81 0.00P 798.58 798.58 798.58
E - 0.00 798.58
05.07 REVOQUES , ENLUCIDOS Y DERRAMES 0.00
04.16.01 COLOCADO DE TUBERIA DE BAJADA PVC SAL DE 3" PARA LLUVIAS Y ACCESORIOS
04.16.02 TUBERIA PVC SAL DE 3"
04.16.03 CODO PVC SAL 3" X 90
04.16.04 CANALETAS METLICAS
05.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO
05.05.01.01 TEJA CASTELLANA SOBRE TIJERALES METLICOS
05.05.01.02 TIJERAL METLICO - TALLER DE SOLDADURA
05.06.01 MURO DE CABEZA e=0.25m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
05.06.02 MURO DE SOGA e=0.15m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
04.15.01 PINTURA LATEX 2 MANOS EN CIELO RASO
04.15.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES
04.15.06 PINTURA LATEX 2 MANOS EN DERRAMES
04.15.07 PINTURA BARNIZ EN PUERTA DE MADERA
04.15.04 PINTURA LATEX 2 MANOS EN COLUMNAS
04.15.05 PINTURA LATEX 2 MANOS EN VIGAS
04.15.03 PINTURA LATEX 2 MANOS EN MUROS INTERIORES
05.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
05.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
05.07.01 TARRAJEOS EN MUROS INTERIOR Y EXTERIOR 0.00P 6,319.87 6319.87 6,319.87
E - 1,873.56 4446.30
P 3,977.14 3977.14 3,977.14
E - 2,336.20 1640.94P 1,880.12 1880.12 1,880.12
E - 351.33 1528.79P 2,069.09 2069.09 2,069.09
E - 1,050.68 1018.41
P 967.01 967.01 967.01
E - 129.50 837.51
05.08 PISOS Y PAVIMENTOS 0.00
05.08.01 FALSO PISO 0.00P 7,946.59 7946.59 7,946.59
E - 0.00 7946.59
05.08.02 PISO 0.00P 8,471.33 8471.33 8,471.33
E - 0.00 8471.33
05.09 ZOCALOS Y CONTRAZOCALOS 0.00P 457.78 457.78 457.78
E - 0.00 457.78
05.10 CARPINTERIA DE MADERA 0.00
05.10.01 PUERTAS DE UNA HOJA 0.00P 1,446.97 - 1446.97 1,446.97
E 0.00 1446.97
05.10.02 VENTANAS DE MADERA 0.00P 9,481.16 9481.16 9,481.16
E - 0.00 9481.16
05.11 CERRAJERIA 0.00P 93.11 93.11 93.11
E - 0.00 93.11P 57.66 57.66 57.66
E - 0.00 57.66
05.12 VIDRIOS, CRISTALES Y SIMILARES 0.00P 7,414.72 7414.72 6,750.31
E - 0.00 7414.72
05.13 PINTURAS 0.00
05.13.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES 2,408.01 - 2408.01 0.00 2408.01
05.13.02 PINTURA LATEX 2 MANOS EN MUROS INTERIORES 2,360.80 - 2360.80 0.00 2360.80
05.13.03 PINTURA LATEX 2 MANOS EN COLUMNAS 675.78 - 675.78 0.00 675.78
05.13.04 PINTURA LATEX 2 MANOS EN VIGAS 764.76 - 764.76 0.00 764.76
05.13.05 PINTURA LATEX 2 MANOS EN DERRAMES 913.14 - 913.14 0.00 913.14
05.13.06 PINTURA BARNIZ EN PUERTA DE MADERA 165.99 - 165.99 0.00 165.99
05.14 INSTALACIONES PLUVIALES 0.00P 779.68 779.68 779.68
E - 0.00 779.68
P 246.89 246.89 246.89
E - 0.00 246.89P 269.64 269.64 269.64
E - 0.00 269.64P 1,104.10 1104.10 1,104.10
E - 0.00 1104.10
05.15 INSTALACIONES ELECTRICAS
05.15.01 SALIDA DE CENTRO DE LUZ (TECHO) 270.56 270.56 270.56
05.15.02 INSTALACIN DE TOMACORRIENTES
05.15.02.01 INSTALACION DE TOMACORRIENTES 940.48 940.48 940.48
05.15.03 MONTAJE DE LUMINARIAS E INTERRUPTORES DE CONTROL
05.15.03.01 ARTEFACTO ADOSADO AL TECHO DOS LAMPARAS FLUORESCENTES 36 W 3,147.21 3147.21 3147.21
05.15.03.02 FLUORESCENTE COMPACTO C/SOQUET ADOSADO AL TECHO 302.26 302.26 302.26
05.15.03.03 INSTALACION DE INTERRUPTOR BAKELITA X 1 SWITCH 35.15 35.15 35.15
05.15.03.04 INSTALACION DE INTERRUPTOR BAKELITA X 2 SWITCH 128.43 128.43 128.43
05.15.04 INSTALACION DE TABLEROS DE CONTROL Y CAJAS DE PASO
05.15.04.01 INSTALACION DE TABLERO DIST. DE 24 POLOS 1,216.80 1216.80 1216.80
05.15.04.02 CAJA DE PASO METALICO PARA EMPOTRAR 111.76 111.76 111.76
05.15.05 RED DE COMUNICACIONES O DE CORRIENTE DEBIL
05.15.05.01 INSTALACION DE RED DE LUCES DE EMERGENCIA
05.15.05.01.01 INSTALACION DE SALIDAS DE TOMAS DE EMERGENCIA (CONDUCTORES, DUCTOS Y CAJAS ) 122.67 122.67 122.67
05.15.05.01.02 INSTALACION DE LUCES DE EMERGENCIA 76.65 76.65 76.65
06.00 TALLER DE GASFITERIA 0.00
06.01 TRABAJOS PROVISIONALES 0.00
06.01.01 LIMPIEZA DEL TERRENO MANUAL 419.66 419.66 0.00 0.00 0.00
06.01.02 TRAZO Y REPLANTEO PRELIMINAR 947.68 947.68 0.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS 0.00
06.02.01 EXCAVACION MASIVA CON MAQUINARIA 1,361.52 1,361.52 0.00 0.00 0.00
06.02.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL 3,029.04 3,029.04 0.00 0.00 0.00P 1,129.84 574.74 574.74
E 555.10 0.00 574.74
06.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 1,951.31 1,951.31 0.00 0.00 0.00
06.03 CONCRETO SIMPLE 0.00
06.03.01 FALSA ZAPATA 0.00
06.03.01.01 FALSA ZAPATA,1:12+30% P.G. T.MAX=8" 5,119.08 5,119.08 0.00 0.00 0.00
06.04 CONCRETO ARMADO 0.00
06.04.01 CONCRETO EN ZAPATAS 0.00
06.04.01.01 CONCRETO f'c=210 kg/cm2 EN ZAPATAS 7,026.36 7,026.36 0.00 0.00 0.00
06.04.01.02 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS 3,630.97 3,630.97 0.00 0.00 0.00
06.04.02 CONCRETO EN VIGAS DE CONEXIN 0.00
06.04.02.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN 2,788.24 2,788.24 0.00 0.00 0.00
06.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN 2,867.20 2,867.20 0.00 0.00 0.00
06.04.02.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN 5,996.34 5,996.34 0.00 0.00 0.00
06.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO
05.08.02.01 PISO DE CEMENTO PULIDO
05.07.01.03
05.07.01.02 TARRAJEO EN MUROS INTERIORES
05.11.01 CERRADURA (CHAPA DE PARCHE 3 GOLPES)PARA PUERTA DE MADERA
05.07.01.01 TARRAJEO EN EXTERIORES
BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x4"
05.12.01 VENTANA VIDRIO SEMIDOBLE
05.09.01 CONTRAZOCALO DE CEMENTO PULIDO
05.10.01.01 PUERTAS DE TABLERO REBAJADO
05.10.02.01 VENTANAS DE MADERA
TARRAJEO EN VIGAS
05.07.01.05 VESTIDURA DE DERRAMES (PUERTAS Y VENTANAS)
05.08.01.01 FALSO PISO
TARRAJEO EN COLUMNAS
05.07.01.04
05.14.01 COLOCADO DE TUBERIA DE BAJADA PVC SAL DE 3" PARA LLUVIAS Y ACCESORIOS
05.11.02
05.14.02 TUBERIA PVC SAL DE 3"
05.14.03 CODO PVC SAL 3" X 90
05.14.04 CANALETAS METLICAS
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
06.04.03 CONCRETO EN COLUMNAS 0.00
06.04.03.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 3,830.73 3,830.73 0.00 0.00 0.00
06.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 4,558.48 4,558.48 0.00 0.00 0.00P 16,489.90 0.00 0.00
E 16,489.90 0.00 0.00
06.04.04.00 CONCRETO EN VIGAS 0.00
06.04.04.01 CONCRETO f'c=210 kg/cm2 EN VIGAS 3,172.77 3,172.77 0.00 0.00 0.00
06.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 4,755.75 4,755.75 0.00 0.00 0.00P 5,307.61 0.00 0.00
E 5,307.61 0.00 0.00
06.05 COBERTURA 0.00
06.05.01 COBERTURA CON TEJA CASTELLANA 0.00P 28,704.90 28704.90 28,704.90
E - 28,704.90 0.00P 10,906.56 10906.56 10,906.56
E - 10,906.56 0.00
06.05.01.03 VIGA METLICA, VT-1 6,545.85 - 6545.85 0.00 6545.85
06.05.01.04 VIGA METLICA, VT-2 6,074.88 - 6074.88 0.00 6074.88
06.06 MUROS Y TABIQUES DE ALBAILERIA 0.00P 20,617.81 20617.81 20,617.81
E - 20,617.81 0.00
P 10,822.19 10822.19 10,822.19
E - 0.00 10822.19
06.07 REVOQUES , ENLUCIDOS Y DERRAMES 0.00
06.07.01 TARRAJEOS EN MUROS INTERIOR Y EXTERIOR 0.00P 6,319.87 6319.87 6,319.87
E - 0.00 6319.87
P 10,775.76 10775.76 10,775.76
E - 2,810.78 7964.98P 1,879.34 1879.34 1,879.34
E - 0.00 1879.34
P 2,069.09 2069.09 2,069.09
E - 443.77 1625.32P 1,025.82 1025.82 1,025.82
E - 0.00 1025.82
06.08 PISOS Y PAVIMENTOS 0.00
06.08.01 FALSO PISO 0.00
06.08.01.01 FALSO PISO 6,949.68 - 6949.68 0.00 6949.68
06.08.02 PISO 0.00
06.08.02.01 PISO DE CEMENTO PULIDO 7,408.59 - 7408.59 0.00 7408.59
06.09 ZOCALOS Y CONTRAZOCALOS 0.00
06.09.01 CONTRAZOCALO DE CEMENTO PULIDO 457.78 - 457.78 0.00 457.78
06.10 CARPINTERIA DE MADERA 0.00
06.10.01 PUERTAS DE UNA HOJA 0.00
06.10.01.01 PUERTAS DE TABLERO REBAJADO 2,136.00 - 2136.00 0.00 2136.00
06.10.02 VENTANAS DE MADERA 0.00
06.10.02.01 VENTANAS DE MADERA 9,481.16 - 9481.16 0.00 9481.16
06.11 CERRAJERIA 0.00
06.11.01 CERRADURA (CHAPA DE PARCHE 3 GOLPES)PARA PUERTA DE MADERA 186.22 - 186.22 0.00 186.22
06.11.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x4" 115.32 - 115.32 0.00 115.32
06.12 VIDRIOS, CRISTALES Y SIMILARES 0.00
06.12.01 VENTANA VIDRIO SEMIDOBLE 7,414.72 - 7414.72 0.00 7414.72
06.13 PINTURAS 0.00
06.13.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES 2,408.01 - 2408.01 0.00 2408.01
06.13.02 PINTURA LATEX 2 MANOS EN MUROS INTERIORES 6,396.41 - 6396.41 0.00 6396.41
06.13.03 PINTURA LATEX 2 MANOS EN COLUMNAS 675.50 - 675.50 0.00 675.50
06.13.04 PINTURA LATEX 2 MANOS EN VIGAS 764.76 - 764.76 0.00 764.76
06.13.05 PINTURA LATEX 2 MANOS EN DERRAMES 968.68 - 968.68 0.00 968.68
06.13.06 PINTURA BARNIZ EN PUERTA DE MADERA 245.04 - 245.04 0.00 245.04
06.14 INSTALACIONES SANITARIAS 0.00
06.14.01 SALIDA PARA PUNTO DE DESAGE 0.00P 1,333.31 1333.31 1,333.31
E - 0.00 1333.31P 2,324.07 2324.07 2,324.07
E - 0.00 2324.07
06.14.02 SISTEMA DE REDES DESAGE 0.00 0.00P 101.95 101.95 101.95
E - 0.00 101.95P 599.52 599.52 599.52
E - 0.00 599.52
P 1,359.80 1359.80 1,359.80
E - 0.00 1359.80
06.14.03 APARATOS Y ACCESORIOS SANITARIOS 0.00
06.14.03.01 INODORO FLUXOMETRICO 5,452.58 - 5452.58 0.00 5452.58
06.14.03.02 LAVATORIO DE ACERO INOXIDABLE 616.00 - 616.00 0.00 616.00
06.14.03.03 URINARIO DE LOSA VITRIFICADA EN SS.HH. DE VARONES 2,320.22 - 2320.22 0.00 2320.22
06.14.04 ACCESORIOS SANITARIOS 0.00
06.14.04.01 GRIFO PARA LAVADEROS DE UNA LLAVE 712.04 - 712.04 0.00 712.04
06.14.05 ACCESORIOS VARIOS 0.00 0.00
06.14.05.01 UNIONES YEE PVC SAL 2"x 2" 138.53 - 138.53 0.00 138.53
06.14.05.02 UNIONES YEE PVC SAL 6"x 2" 26.79 - 26.79 0.00 26.79
06.14.05.03 CODO PVC SAL 2" X 45 19.97 - 19.97 0.00 19.97
06.14.05.04 CODO PVC SAL 2" X 90 79.88 - 79.88 0.00 79.88
06.14.05.05 SUMIDERO DE BRONCE 2" 60.42 - 60.42 0.00 60.42
06.14.05.06 REGISTRO ROSCADO DE BRONCE 4" 57.36 - 57.36 0.00 57.36
06.14.05.07 REGISTRO ROSCADO DE BRONCE 2" 100.72 - 100.72 0.00 100.72
06.14.06 CAJAS DE INSPECCIN 0.00
06.14.06.01 CAJA DE REGISTRO DE DESAGE 395.16 - 395.16 0.00 395.16
06.15 SISTEMA DE AGUA FRIA 0.00
06.14.01.02 SALIDA DE DESAGUE CON TUB. PVC SAL DE 4"
06.04.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS
06.04.04.03
06.14.02.02 TUBERIA PVC SAL DE 4"
06.14.02.03 TUBERIA PVC SAL DE 6"
06.05.01.02 TIJERAL METLICO - TALLER DE GASFITERIA
06.06.01 MURO DE CABEZA e=0.25m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
06.06.02 MURO DE SOGA e=0.15m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
06.07.01.01 TARRAJEO EN EXTERIORES
06.07.01.02 TARRAJEO EN MUROS INTERIORES
06.07.01.03 TARRAJEO EN COLUMNAS
06.07.01.04 TARRAJEO EN VIGAS
06.07.01.05 VESTIDURA DE DERRAMES (PUERTAS Y VENTANAS)
06.14.01.01 SALIDA DE DESAGUE CON TUB. PVC SAL DE 2"
06.14.02.01 TUBERIA PVC SAL DE 2"
ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS
06.05.01.01 TEJA CASTELLANA SOBRE TIJERALES METLICOS
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
06.15.01 SALIDA PARA PUNTO DE AGUA FRIA 0.00
06.15.01.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP DE 1/2" C/ ACCESORIOS 1,397.06 - 1397.06 0.00 1397.06
06.15.02 REDES DE DISTRIBUCIN Y MONTAJE 0.00
06.15.02.01 TUBERIA PVC SAP C-10 DE 1/2" C/ ROSCA, INC. PRUEBA HIDRAULICA 988.23 - 988.23 0.00 988.23
06.15.02.02 TUBERIA PVC SAP C-10 DE 3/4" C/ ROSCA, INC. PRUEBA HIDRAULICA 28.43 - 28.43 0.00 28.43
06.15.03 ACCESORIOS VARIOS 0.00
06.15.03.01 TEE PVC-SAP 1/2" 148.07 - 148.07 0.00 148.07
06.15.03.02 CODO PVC SAP 1/2" x 90 314.73 - 314.73 0.00 314.73
06.15.04 LLAVES Y VALVULAS 0.00
06.15.04.01 VALVULA DE GLOBO DE 3/4" 55.79 - 55.79 0.00
06.15.04.02 VALVULA DE GLOBO DE 1/2" 863.43 - 863.43 0.00
06.16 INSTALACIONES PLUVIALES 0.00P 779.68 779.68 779.68
E - 0.00 779.68
P 246.89 246.89 246.89
E - 0.00 246.89P 269.64 269.64 269.64
E - 0.00 269.64
P 1,104.10 1104.10 1,104.10
E - 0.00 1104.10
06.17 INSTALACIONES ELECTRICAS
06.17.01 SALIDA DE CENTRO DE LUZ (TECHO) 441.44 441.44 441.44
06.17.02 INSTALACIN DE TOMACORRIENTES
06.17.02.01 INSTALACION DE TOMACORRIENTES 1,880.96 1880.96 1880.96
06.17.03 MONTAJE DE LUMINARIAS E INTERRUPTORES DE CONTROL
06.17.03.01 ARTEFACTO ADOSADO AL TECHO DOS LAMPARAS FLUORESCENTES 36 W 2,962.08 2962.08 2962.08
06.17.03.02 FLUORESCENTE COMPACTO C/SOQUET ADOSADO AL TECHO 2,266.95 2266.95 2266.95
06.17.03.03 INSTALACION DE INTERRUPTOR BAKELITA X 1 SWITCH 562.40 562.40 562.40
06.17.03.04 INSTALACION DE INTERRUPTOR BAKELITA X 2 SWITCH 85.62 85.62 85.62
06.17.04 INSTALACION DE TABLEROS DE CONTROL Y CAJAS DE PASO
06.17.04.01 INSTALACION DE TABLERO DIST. DE 24 POLOS 1,216.80 1216.80 1216.80
06.17.04.02 CAJA DE PASO METALICO PARA EMPOTRAR 111.76 111.76 111.76
06.17.05 RED DE COMUNICACIONES O DE CORRIENTE DEBIL
06.17.05.01 INSTALACION DE RED DE LUCES DE EMERGENCIA
06.17.05.01.01 INSTALACION DE SALIDAS DE TOMAS DE EMERGENCIA (CONDUCTORES, DUCTOS Y CAJAS ) 122.67 122.67 122.67
06.17.05.01.02 INSTALACION DE LUCES DE EMERGENCIA 76.65 76.65 76.65
07.00 INFRAESTRUCTURA COMPLEMENTARIA 0.00
07.01.00 PISCINA SEMIOLIMPICA 0.00
07.01.01.00 TRABAJOS PROVISIONALES 0.00
07.01.01.01 LIMPIEZA DEL TERRENO MANUAL 1,521.34 1,521.34 0.00 0.00 0.00
07.01.01.02 TRAZO Y REPLANTEO PRELIMINAR 3,435.55 3,435.55 0.00 0.00 0.00
07.01.02 MOVIMIENTO DE TIERRAS 0.00P 11,896.84 11896.84 11,896.84
E - 8,115.95 3780.89
07.01.02.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL 7,558.18 7,558.18 0.00 0.00 0.00P 2,869.01 1267.76 1,267.76
E 1,601.25 154.41 1113.35P 12,134.12 11472.92 11,472.92
E 661.20 9,097.79 2375.14
07.01.03 CONCRETO SIMPLE 0.00
07.01.03.01.00 FALSA ZAPATA 0.00
07.01.03.01.01 FALSA ZAPATA,1:12+30% P.G. T.MAX=8" 72,850.45 72,850.45 0.00 0.00 0.00
07.01.04 CONCRETO ARMADO 0.00
07.01.04.01 CONCRETO EN ZAPATAS 0.00
07.01.04.01.01 CONCRETO f'c=210 kg/cm2 EN ZAPATAS 17,840.75 17,840.75 0.00 0.00 0.00
07.01.04.01.02 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN ZAPATAS 8,801.45 8,801.45 0.00 0.00 0.00
07.01.04.02 CONCRETO EN VIGAS DE CONEXIN 0.00
07.01.04.02.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN 6,540.41 6,540.41 0.00 0.00 0.00
07.01.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN 5,923.84 5,923.84 0.00 0.00 0.00
07.01.04.02.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN 8,152.69 8,152.69 0.00 0.00 0.00
07.01.04.03 MURO Y BASE DE PISCINA 0.00P 74,656.92 74656.92 74,656.92
E - 0.00 74656.92P 15,605.76 15605.76 15,605.76
E - 0.00 15605.76
P 53,273.43 53273.43 53,273.43
E - 0.00 53273.43
07.01.04.04 CONCRETO EN COLUMNAS 0.00
07.01.04.04.01 CONCRETO f'c=210 kg/cm2 EN COLUMNAS 10,539.56 10,539.56 0.00 0.00 0.00
07.01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 7,869.38 7,869.38 0.00 0.00 0.00P 33,011.30 0.00 0.00
E 33,011.30 0.00 0.00
07.01.04.05 CONCRETO EN VIGAS 0.00 0.00P 5,832.89 0.00 0.00
E 5,832.89 0.00 0.00P 8,765.52 0.00 0.00
E 8,765.52 0.00 0.00
P 9,280.53 0.00 0.00
E 9,280.53 0.00 0.00
07.01.04.06 CONCRETO EN CAJAS DE SALTO 0.00
07.01.04.06.01 CONCRETO f'c=210 kg/cm2 EN CAJAS DE SALTO 492.47 - 492.47 0.00 492.47
07.01.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CAJAS DE SALTO 596.79 - 596.79 0.00 596.79
07.01.04.06.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN CAJAS DE SALTO 367.01 - 367.01 0.00 367.01
07.01.05 COBERTURA 0.00
07.01.05.01 COBERTURA CON POLICARBONATO 0.00
07.01.05.01.01 POLICARBONATO SOBRE TIJERALES METLICOS 241,216.84 - 241216.84 0.00 241216.84
07.01.05.01.02 TIJERAL METLICO - PISCINA 32,125.03 - 32125.03 0.00 32125.03
07.01.05.01.03 VIGA METLICA, VT-1 12,593.65 - 12593.65 0.00 12593.65
07.01.05.01.04 VIGA METLICA, VT-2 18,067.19 - 18067.19 0.00 18067.19
07.01.04.03.01 CONCRETO f'c=210 kg/cm2 EN VIGAS DE CONEXIN
06.16.01 COLOCADO DE TUBERIA DE BAJADA PVC SAL DE 3" PARA LLUVIAS Y ACCESORIOS
06.16.02 TUBERIA PVC SAL DE 3"
06.16.03 CODO PVC SAL 3" X 90
07.01.04.05.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS
07.01.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS DE CONEXIN
07.01.04.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN VIGAS DE CONEXIN
07.01.04.04.03 ACERO GRADO 60 DE REFUERZO fy=4,200 kg/cm2 EN COLUMNAS
07.01.04.05.01 CONCRETO f'c=210 kg/cm2 EN VIGAS
07.01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
06.16.04 CANALETAS METLICAS
07.01.02.01 EXCAVACION MASIVA CON MAQUINARIA
07.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO
07.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
07.01.05.02 COBERTURA CON TEJA CASTELLANA 0.00P 12,620.80 12620.80 12,620.80
E - 12,620.17 0.62
P 6,322.56 6322.56 6,322.56
E - 6,322.56 0.00
07.01.05.01.03 VIGA METLICA, VT-1 5,699.96 5699.96 5699.96
07.01.05.01.04 VIGA METLICA, VT-2 5,699.96 5699.96 5699.96
07.01.05.03 CIELORASO (DRYWALL) 0.00P 13,686.30 13686.30 13,686.30
E - 0.00 13686.30
07.01.06 MUROS Y TABIQUES DE ALBAILERIA 0.00P 35,455.45 35455.45 35,455.45
E - 29,120.48 6334.98P 13,017.14 13017.14 13,017.14
E - 2,836.12 10181.02
07.01.07 REVOQUES , ENLUCIDOS Y DERRAMES 0.00
07.01.07.01 TARRAJEOS EN MUROS INTERIOR Y EXTERIOR 0.00P 9,403.55 9403.55 9,403.55
E - 0.00 9403.55P 7,245.24 7245.24 7,245.24
E - 0.00 7245.24
P 5,211.51 5211.51 5,211.51
E - 0.00 5211.51P 3,957.81 3957.81 3,957.81
E - 0.00 3957.81
P 2,604.92 2604.92 2,604.92
E - 0.00 2604.92P 8,944.75 8944.75 8,944.75
E - 0.00 8944.75
07.01.08 PISOS Y PAVIMENTOS 0.00
07.01.08.01 FALSO PISO 0.00
07.01.08.01.01 FALSO PISO 1,571.36 - 1571.36 0.00 1571.36
07.01.08.02 PISO 0.00 0.00
P 3,317.89 - 3317.89 3,317.89 0.00
E
07.01.08.02.02 PISO MACHIHEMBRADO 3,447.29 - 3447.29 0.00 3447.29
07.01.08.02.03 PISO DE CERAMICA PARA PAREDES Y BASE INTERIOR DE PISCINA 31,417.63 - 31417.63 0.00 31417.63
07.01.09 ZOCALOS Y CONTRAZOCALOS 0.00
07.01.09.01 CONTRAZOCALO DE MADERA 527.51 - 527.51 0.00 527.51
07.01.10 ZOCALOS 0.00
07.01.10.01 ZOCALO DE CERAMICO 5,522.93 - 5522.93 0.00 5522.93
07.01.11 CARPINTERIA DE MADERA 0.00
07.01.11.01 PUERTAS DE UNA HOJA 0.00
07.01.11.01.01 PUERTAS DE TABLERO REBAJADO 7,756.52 - 7756.52 0.00 7756.52
07.01.11.02 VENTANAS DE MADERA 0.00
07.01.11.02.01 VENTANAS DE MADERA 20,428.55 - 20428.55 0.00 20428.55
07.01.12 CARPINTERIA METALICA 0.00
07.01.12.01 DIVISIONES METALICAS PARA SS.HH. (e=2.50mm.) 21,648.62 - 21648.62 0.00 21648.62
07.01.12.02 ESCALERA PREFABRICADA DE ACCESO A PISCINA CON SUJESORES METALICOS 1,200.00 - 1200.00 0.00 1200.00
07.01.12.03 BARANDA DE TUBO FG PARA PISCINA 954.96 - 954.96 0.00 954.96
07.01.12.04 PUERTA METALICA PARA SS.HH., VESTIDORES, DUCHAS 6,272.80 - 6272.80 0.00 6272.80
07.01.13 CERRAJERIA 0.00
07.01.13.01 CERRADURA (CHAPA DE PARCHE 3 GOLPES)PARA PUERTA DE MADERA 837.99 - 837.99 0.00 837.99
07.01.13.02 BISAGRAS CAPUCHINA ALUMINIZADA DE 4"x4" 518.94 - 518.94 0.00 518.94
07.01.14 VIDRIOS, CRISTALES Y SIMILARES 0.00
07.01.14.01 VENTANA VIDRIO SEMIDOBLE 15,977.31 - 15977.31 0.00 15977.31
07.01.15 PINTURAS 0.00
07.01.15.01 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES 3,582.96 - 3582.96 0.00 3582.96
07.01.15.02 PINTURA LATEX 2 MANOS EN MUROS INTERIORES 4,300.72 - 4300.72 0.00 4300.72
07.01.15.03 PINTURA LATEX 2 MANOS EN COLUMNAS 1,873.20 - 1873.20 0.00 1873.20
07.01.15.04 PINTURA LATEX 2 MANOS EN VIGAS 1,462.86 - 1462.86 0.00 1462.86
07.01.15.05 PINTURA LATEX 2 MANOS EN DERRAMES 2,459.82 - 2459.82 0.00 2459.82
07.01.15.06 PINTURA BARNIZ EN PUERTA DE MADERA 889.81 - 889.81 0.00 889.81
07.01.16 DIVISIONES DE CALLES Y LINEAS FLOTANTES 0.00 0.00
07.01.16.01 DIVISIONES DE CALLES Y LINEAS FLOTANTES 1,063.15 - 1063.15 0.00 1063.15
07.01.17 INSTALACIONES SANITARIAS 0.00
07.01.17.01 DRENAJE CON TUBERIA CRIBADA 0.00P 17,037.10 17037.10 17,037.10
E - 0.00 17037.10
P 2,912.01 2912.01 2,912.01
E - 13.94 2898.07P 1,128.27 1128.27 1,128.27
E - 0.00 1128.27
P 2,333.45 2333.45 2,333.45
E - 0.00 2333.45
07.01.17.02 SUMIDEROS 0.00 0.00P 1,822.04 1822.04 1,822.04
E - 0.00 1822.04
P 6,439.44 6439.44 6,439.44
E - 0.00 6439.44
07.01.17.03 SALIDA PARA PUNTO DE DESAGE 0.00 0.00P 1,254.88 1254.88 1,254.88
E - 1,254.88 0.00
P 956.97 956.97 956.97
E - 956.97 0.00
07.01.17.04 SISTEMA DE REDES DESAGE 0.00P 327.18 327.18 327.18
E - 327.18 0.00
P 350.52 350.52 350.52
PISO DE CERAMICA NACIONAL ANTIDESLIZANTE07.01.08.02.01
07.01.06.02 MURO DE SOGA e=0.15m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
07.01.17.01.04 COLOCACIN DE ACCESORIOS PARA DRENES
07.01.05.02.01 TEJA CASTELLANA SOBRE TIJERALES METLICOS
07.01.05.02.02 TIJERAL METLICO - AREA DE VESTUARIO
07.01.05.03.01 CIELORASO (DRYWALL)
07.01.06.01 MURO DE CABEZA e=0.25m CON LADRILLO DE 18 HUECOS DE 8x11.5x24cm
07.01.07.01.01 TARRAJEO EN EXTERIORES
07.01.07.01.02 TARRAJEO EN MUROS INTERIORES
07.01.07.01.03 TARRAJEO EN COLUMNAS
07.01.07.01.04 TARRAJEO EN VIGAS
07.01.07.01.05 VESTIDURA DE DERRAMES (PUERTAS Y VENTANAS)
07.01.07.01.06 TARRAJEO TIPO RAYADO PRIMARIO CON MORTERO 1:5 E IMPERMEABILIZANTE PARA MUROS
07.01.17.01.01 TUBO PERFORADO PVC SAP 8"
07.01.17.01.02 EXCAVACION Y RELLENO COMPACTADO DE TERRENO PARA GEODREN
07.01.17.01.03 CAMA DE GRAVA PARA TUBERIA DE GEODREN (E=0.10m.)
07.01.17.02.01 SUMIDERO INTERIOR PARA CANALES DE BORDE DE PISCINA (Prefabricado)
07.01.17.02.02 SUMIDERO EXTERIOR METALICO PARA EVACUACION DE AGUAS PLUVIALES
07.01.17.03.01 SALIDA DE DESAGUE CON TUB. PVC SAL DE 2"
07.01.17.03.02 SALIDA DE DESAGUE CON TUB. PVC SAL DE 4"
07.01.17.04.01 TUBERIA PVC SAL DE 2"
07.01.17.04.02 TUBERIA PVC SAL DE 3"
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
E - 342.90 7.62P 391.77 391.77 391.77
E - 391.77 0.00
P 201.61 201.61 201.61
E - 0.00 201.61P 3,015.49 3015.49 3,015.49
E - 0.00 3015.49
07.01.17.05 APARATOS Y ACCESORIOS SANITARIOS 0.00P 2,726.29 2726.29 2,726.29
E - 0.00 2726.29P 308.00 308.00 308.00
E - 0.00 308.00
P 497.19 497.19 497.19
E - 0.00 497.19P 314.92 314.92 314.92
E - 0.00 314.92
07.01.17.06 ACCESORIOS SANITARIOS 0.00P 356.02 356.02 356.02
E - 0.00 356.02P 231.56 231.56 231.56
E - 0.00 231.56
P 184.32 184.32 184.32
E - 0.00 184.32P 363.88 363.88 363.88
E - 0.00 363.88
P 1,771.14 1771.14 1,771.14
E - 0.00 1771.14P 1,587.46 1587.46 1,587.46
E - 0.00 1587.46
07.01.17.07 ACCESORIOS VARIOS 0.00 0.00P 159.53 159.53 159.53
E - 0.00 159.53P 259.49 259.49 259.49
E - 0.00 259.49
P 257.27 257.27 257.27
E - 0.00 257.27P 39.94 39.94 39.94
E - 0.00 39.94
P 48.94 48.94 48.94
E - 0.00 48.94P 281.96 281.96 281.96
E - 0.00 281.96
P 114.72 114.72 114.72
E - 0.00 114.72
07.01.17.08 CAJAS DE INSPECCIN 0.00P 197.58 197.58 197.58
E - 0.00 197.58
07.01.18 SISTEMA DE AGUA FRIA 0.00
07.01.18.01 SALIDA PARA PUNTO DE AGUA FRIA 0.00P 2,218.86 2218.86 2,218.86
E - 0.00 2218.86
07.01.18.02 REDES DE DISTRIBUCIN Y MONTAJE 0.00P 770.80 770.80 770.80
E - 0.00 770.80
P 32.90 32.90 32.90
E - 0.00 32.90P 311.92 311.92 311.92
E - 162.27 149.65
07.01.18.03 ACCESORIOS VARIOS 0.00P 250.58 250.58 250.58
E - 0.00 250.58P 411.57 411.57 411.57
E - 0.00 411.57
07.01.18.04 LLAVES Y VALVULAS 0.00P 55.79 55.79 55.79
E - 0.00 55.79P 81.79 81.79 81.79
E - 0.00 81.79
P 253.95 253.95 253.95
E - 0.00 253.95
07.01.19 INSTALACIONES PLUVIALES 0.00
07.01.19.01 COLOCADO DE TUBERIA DE BAJADA PVC SAL DE 3" PARA LLUVIAS Y ACCESORIOS 1,949.20 - 1949.20 0.00 1949.20
07.01.19.02 TUBERIA PVC SAL DE 3" 570.23 - 570.23 101.60 468.63
07.01.19.03 CODO PVC SAL 3" X 90 674.10 - 674.10 0.00 674.10
07.01.19.04 CANALETAS METLICAS 2,732.64 - 2732.64 0.00 2732.64
07.01.20 INSTALACIONES ELECTRICAS
07.01.20.01 SALIDA DE CENTRO DE LUZ (TECHO) 398.72 398.72 398.72
07.01.20.02 INSTALACIN DE TOMACORRIENTES
07.01.20.02.01 INSTALACION DE TOMACORRIENTES 1,763.40 1763.40 1763.40
07.01.20.03 MONTAJE DE LUMINARIAS E INTERRUPTORES DE CONTROL
07.01.20.03.01 LUMINARIA TIPO ESFERA OPALINA de 45 - 250W a 220 v 176.13 176.13 176.13
07.01.20.03.02 FLUORESCENTE COMPACTO C/SOQUET ADOSADO AL TECHO 1,813.56 1813.56 1813.56
07.01.20.03.03 REFLECTOR INDUSTRIAL ADOSADO AL TECHO 1,769.04 1769.04 1769.04
07.01.20.03.04 INSTALACION DE INTERRUPTOR BAKELITA X 1 SWITCH 105.45 105.45 105.45
07.01.20.03.05 INSTALACION DE INTERRUPTOR BAKELITA X 2 SWITCH 214.05 214.05 214.05
07.01.20.04 INSTALACION DE TABLEROS DE CONTROL Y CAJAS DE PASO
07.01.20.04.01 INSTALACION DE TABLERO DIST. DE 24 POLOS 608.40 608.40 608.40
07.01.20.04.02 CAJA DE PASO METALICO PARA EMPOTRAR 335.28 335.28 335.28
07.01.20.05 RED DE COMUNICACIONES O DE CORRIENTE DEBIL
07.01.20.05.01 INSTALACION DE RED DE LUCES DE EMERGENCIA
07.01.17.07.02 UNIONES YEE PVC SAL 4"x 2"
07.01.17.04.02 TUBERIA PVC SAL DE 3"
07.01.17.04.03 TUBERIA PVC SAL DE 4"
07.01.17.04.04 TUBERIA PVC SAL DE 6"
07.01.17.04.05 TUBERIA PVC SAL DE 10"
07.01.17.05.01 INODORO FLUXOMETRICO
07.01.17.05.02 LAVATORIO DE ACERO INOXIDABLE
07.01.17.05.03 URINARIO DE LOSA VITRIFICADA EN SS.HH. DE VARONES
VALVULA DE GLOBO DE 3/4"
07.01.18.04.02 VALVULA DE GLOBO DE 4"
07.01.18.04.03 VALVULA DE GLOBO DE 1/2"
07.01.17.06.03 TOALLERA CON GANCHO
07.01.17.06.04 JABONERA CON AGARRADERA
07.01.17.06.05 COLOCACION DE APARATOS SANITARIOS
07.01.17.06.06 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES
07.01.17.07.01 UNIONES YEE PVC SAL 4"x 4"
07.01.17.05.04 DUCHA
07.01.17.06.01 GRIFO PARA LAVADEROS DE UNA LLAVE
07.01.17.06.02 PAPELERA LOSA VITRIFICADA C/BLANCO
07.01.17.07.03 UNIONES YEE PVC SAL 2"x 2"
07.01.17.07.04 CODO PVC SAL 2" X 45
07.01.17.07.05 CODO PVC SAL 4" X 45
07.01.17.07.06 SUMIDERO DE BRONCE 2"
07.01.17.07.07 REGISTRO ROSCADO DE BRONCE 4"
07.01.17.08.01 CAJA DE REGISTRO DE DESAGE
07.01.18.01.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP DE 1/2" C/ ACCESORIOS
07.01.18.02.01 TUBERIA PVC SAP C-10 DE 1/2" C/ ROSCA, INC. PRUEBA HIDRAULICA
07.01.18.02.02 TUBERIA PVC SAP C-10 DE 3/4" C/ ROSCA, INC. PRUEBA HIDRAULICA
07.01.18.02.03 TUBERIA PVC SAP C-10 DE 4" C/ ROSCA, INC. PRUEBA HIDRAULICA
07.01.18.03.01 TEE PVC-SAP 1/2"
07.01.18.03.02 CODO PVC SAP 1/2" x 90
07.01.18.04.01
-
PROYECTO : MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION SECUNDARIA DE LA INSTITUCION EDUCATIVA HERMANOS AYAR, DISTRITO DE PARURO, PROVINCIA DE PARURO -CUSCO
ITEMS DESCRIPCION PARTIDAS
Conograma de Avance de Obra
VALORIZADO
HASTA 2014
S/.
PRESUPUESTO
S/.
SALDO
S/.
REPROGRAMACION JULIO 2015
07.01.20.05.01.01 INSTALACION DE SALIDAS DE TOMAS DE EMERGENCIA (CONDUCTORES, DUCTOS Y CAJAS ) 1,717.38 1717.38 1717.38
07.01.20.05.01.02 INSTALACION DE LUCES DE EMERGENCIA 1,073.10 1073.10 1073.10
07.02 LOSA DEPORTIVA 0.00
07.02.01 MOVIMIENTO DE TIERRAS 0.00
07.02.01.01 EXCAVACION MASIVA CON MAQUINARIA 1,150.20 - 1150.20 0.00 1150.20
07.02.01.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 1,289.34 - 1289.34 0.00 1289.34
07.02.02 CONCRETO SIMPLE 0.00 0.00
07.02.02.01 PAVIMENTO RIGIDO f'c=175 kg/cm2 46,111.20 - 46111.20 0.00 46111.20
07.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA 4,969.36 - 4969.36 0.00 4969.36
07.02.02.03 SELLADO DE JUNTAS DE DILATACIN 3,027.20 - 3027.20 0.00 3027.20
07.03 RAMPAS 0.00
07.03.01 MOVIMIENTO DE TIERRAS 0.00P 1,589.39 1589.39 1,589.39
E - 0.00 1589.39
P 421.96 421.96 421.96
E - 0.00 421.96
07.03.02 CONCRETO SIMPLE 0.00P 4,365.19 4365.19 4,365.19
E - 0.00 4365.19
P 3,199.59 3199.59 3,199.59
E - 0.00 3199.59
07.04 GRADERIAS 0.00
07.04.01 MOVIMIENTO DE TIERRAS 0.00
07.04.01.01 CORTE SUPERFICIAL MANUAL 1,618.80 - 1618.80 0.00 1618.80
07.04.01.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 429.78 - 429.78 0.00 429.78
07.04.02 CONCRETO SIMPLE 0.00 0.00
07.04.02.01 CONCRETO EN CIMIENTO CORRIDO, MEZCLA C:H 1:10+30% PG 10,388.16 - 10388.16 0.00 10388.16
07.04.02.02 CONCRETO f'c=175 kg/cm2 PARA GRADERIAS 39,002.39 - 39002.39 0.00 39002.39
07.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA GRADERIAS 7,295.92 - 7295.92 0.00 7295.92
07.05 ESCALINATAS 0.00
07.05.01 MOVIMIENTO DE TIERRAS 0.00P 4,772.76 4772.76 2,386.38
E - 0.00 4772.76
07.05.02 CONCRETO SIMPLE 0.00P 1,267.19 1267.19 633.59
E - 0.00 1267.19P 1,606.21 1606.21 803.10
E - 0.00 1606.21
P 2,649.57 2649.57 1,324.79
E - 0.00 2649.57
07.06 MURO DE CONTENCIN (CONCRETO ARMADO) 0.00
07.06.01 MOVIMIENTO DE TIERRAS 0.00P 793.48 0.00 0.00
E 793.48 0.00 0.00
07.06.01.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA 210.65 210.65 0.00 0.00 0.00
07.06.02 CONCRETO SIMPLE 0.00P 318.30 291.42 291.42
E 26.88 0.00 291.42
07.06.03 CONCRETO ARMADO 0.00P 8,432.46 1772.07 1,772.07
E 6,660.39 0.00 1772.07
07.06.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO DE CONTENCIN 5,994.40 5,994.40 0.00 0.00 0.00
07.06.03.03 ACERO GRADO 60 DE REFUERZO fy=4,200 EN MURO DE CONTENCIN 7,847.91 7,847.91 0.00 0.00 0.00
07.07 MURO DE CONTENCION 0.00
07.07.01.00 MOVIMIENTO DE TIERRAS 0.00P 454.88 222.85 222.85
E 232.03 222.84 0.01P 120.72 59.12 59.12
E 61.60 0.00 59.12
07.07.02.00 CONCRETO SIMPLE 0.00P 11,478.83 4705.79 4,705.79
E 6,773.04 4,705.79 0.00P 6,984.21 2184.26 2,184.26
E 4,799.95 2,184.26 0.00
07.08 VEREDAS 0.00
07.08.01 MOVIMIENTO DE TIERRAS 0.00P 7,437.04 7437.04 7,437.04
E - 631.76 6805.28P 10,153.29 10153.29 10,153.29
E - 1,855.57 8297.72
P 1,974.51 1974.51 1,974.51
E - 0.00 1974.51
07.08.02 CONCRETO SIMPLE 0.00P 30,974.43 30974.43 30,974.43
E - 2,976.86 27997.57
P 31,029.56 31029.56 31,029.56
E - 4,393.14 26636.43P 8,541.16 8541.16 8,541.16
E - 1,501.91 7039.25
P 2,952.54 2952.54 2,952.54
E - 1,076.07 1876.47P 2,107.21 2107.21 2,107.21
E - 0.00 2107.21
07.09 JARDINERAS
07.09.01 MOVIMIENTO DE TIERRAS
P 686.64 686.64 343.32
E - 80.40 606.24P 182.27 182.27 91.14
E - 0.00 182.27
AFIRMADO Y COMPACTADO PARA VEREDA
07.07.01.01 CORTE SUPERFICIAL MANUAL
07.07.01.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
07.07.02.01 CONCRETO SICLOPEO EN MUROS DE CONTENCION
07.09.01.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
07.07.02.02 ENCOFRADO Y DESENCOFRADO EN MUROS DE CONTENCION
07.08.01.01 CORTE SUPERFICIAL MANUAL
07.05.02.01 CONCRETO f'c=175 kg/cm2 PARA ESCALINATAS