EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
2011 2,600,000 0 0.0% 0.0%
2012 2,418,301 64,500 2.7% 0.1% 21,000 10,500 7,500 25,500
2013 26,134,270 21,500 8.2% 0.0% 7,500 3,000 11,000
2009 79,804 79,804 100.0% 0.4% 79,804
2010 187,676 187,676 100.0% 0.9% 1,468 186,208
2011 0 0 0.0% 0.0%
2012 1,877,395 114,600 6.1% 0.5% 70,600 44,000
2013 25,757,455 4,857,569 18.9% 22.9% 351,318 3,047,342 298,150 400,410 492,944 167,605 0 99,800
2011 220,665 219,038 99.3% 0.6% 23,831 43,924 72,431 10,461 12,217 28,374 8,000 19,800
2012 0 0 0.0% 0.0%
2013 23,311,169 54,985 0.2% 0.2% 5,225 4,125 8,335 6,742 6,806 6,614 10,007 7,131 0
2009 552,215 795 0.1% 0.0% 795
2010 9,640,327 569,469 5.9% 1.6% 164,995 164,995 219,993 19,486
2011 16,089,846 7,106,236 44.2% 19.5% 3,203,152 3,190,068 333,556 299,802 79,658
2012 9,611,468 287,077 3.0% 0.8% 86,400 8,000 90,107 77,007 4,000 4,000 9,563 8,000
2013 12,212,545 24,203,547 198.2% 66.5% 5,657,321 0 1,152,934 4,158,625 752,377 4,547,044 7,935,246
2012 0 0 0.0% 0.0%
2013 11,182,349 0 0.0% 0.0%
2011 300,000 139,400 46.5% 0.8% 8,000 131,400
2012 202,518 199,311 98.4% 1.2% 102,200 87,111 10,000
2013 9,784,000 31,875 0.3% 0.2% 0 29,150 0 0 0 0 0 0 2,725
2012 326,663 326,623 100.0% 3.3% 97,987 97,987 130,649
2013 9,042,576 6,942,580 76.8% 70.1% 1,666,059 195,782 1,039,004 1,483,015 1,569,487 981,478 7,755
2012 5,896,815 1,080,040 18.3% 18.6% 4,500 4,500 1,071,040
2013 7,965,463 4,320,551 54.2% 74.5% 222,099 1,316,094 40,526 546,773 1,202,810 992,249 0
2010 2,551,091 2,491,438 97.7% 268,796 143,631 181,469 137,757 134,772 143,205 342,847 156,747 142,836 158,659 142,767 537,952
2011 2,918,217 2,774,368 95.1% 266,695 151,261 221,508 146,286 142,927 139,104 225,635 140,242 127,457 122,568 188,081 902,604
2012 2,873,338 2,510,304 87.4% 218,673 164,526 177,068 150,150 154,617 176,995 246,341 144,898 184,736 161,449 185,029 545,822
2013 7,740,500 2,004,750 25.9% 281,957 162,602 165,695 197,350 249,167 163,577 401,733 249,098 133,571
2012 0 0 0.0% 0.0%
2013 6,643,195 4,358,754 65.6% 74.8% 1,270,728 1,097,601 513,311 544,335 932,779 0
2012 8,000 8,000 100.0% 0.2% 8,000
2013 6,114,538 180,084 2.9% 3.8% 0 0 180,084
11 167862 2159992
REHABILITACION DEL SISTEMA DE
DRENAJE SUPERFICIAL EXISTENTE EN
LOS DISTRITOS DE HUMAY,
INDEPENDENCIA, SAN CLEMENTE,
TUPAC AMARU INCA, SAN ANDRES Y
PISCO, PROVINCIA DE PISCO Y EL
CARMEN PROVINCIA DE CHINCHA,
REGION ICA.
(petacc).
4,798,457.00 PETACC
10 94723 2163595
MEJORAMIENTO DE LA CARRETERA
PARA LA INTEGRACION DE LOS CC.PP.
DE LOS DISTRITOS DE SANTIAGO,
PACHACUTEC Y TATE DE LA PROVINCIA
DE ICA.
5,831,098.00 EN EJECUCION
9 S/C (*) 2000270GESTION DE PROYECTOS.
(Petacc). -- PETACC
8 43493 2041190CONSTRUCCION DEL RELLENO
SANITARIO PARA LA PROVINCIA DE ICA.5,798,381.00
OBRA
CULMINADA
7 43019 2150293
MEJORAMIENTO DEL SISTEMA DE AGUA
POTABLE E INSTALACION DEL SISTEMA
DE ALCANTARILLADO EN EL CENTRO
POBLADO SAN MARTIN DE PORRES Y
ANEXOS DEL DISTRITO Y PROVINCIA DE
ICA.
9,904,429.00 EN EJECUCION
6 63638 2078310
IRRIGACION LISCAY SAN JUAN DE YANAC-
CHINCHA.
(Petacc).
16,976,730.00 PETACC
5 152836 2160648
MEJORAMIENTO DE LA CARRETERA
DEPARTAMENTAL IC 113, TRAMO: DV
PANAMERICANA SUR (KM 421)-
SINCCACHI, DISTRITO DE EL INGENIO-
NASCA.
15,767,697.00
OBRA EN
PROCESO DE
SELECCIÓN
4 104598 2091554
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DE LOS SERVICIOS DE
SALUD DEL HOSPITAL SAN JOSE DE
CHINCHA-DIRESA-ICA.
(Bonos Soberanos).
36,385,792.00 EN EJECUCION
3 101558 2113116SISTEMA DE RIEGO LA ACHIRANA.
(Petacc).34,493,733.00 PETACC
MEJORAMIENTO Y AMPLIACION DEL
SISTEMA DE TRATAMIENTO DE AGUAS
RESIDUALES DE LA PLANTA CACHICHE-
CIUDAD DE ICA.
55,259,815
EXPEDIENTE
TECNICO PARA
PROCESO DE
SELECCIÓN
2 96490 2094540
AMPLIACION, MEJORAMIENTO Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EN EL HOSPITAL DE
APOYO DE NASCA.
21,208,039.00OBRA POR
INICIAR
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
GOBIERNO
REGIONAL
DE ICA
1 142852 2131992
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2010 1,050,262 879,835 83.8% 397,538 34,150 28,350 25,000 27,350 346,592 3,520 7,120 10,215
2011 1,390,040 308,422 22.2% 3,600 24,000 32,256 26,009 38,751 20,009 83,763 80,034
2012 1,277,864 550,540 43.1% 110,108 220,216 220,216
2013 6,000,000 1,156,761 19.3% 103,540 163,386 22,834 54,285 212,155 210,517 162,954 227,090
2009 1,500,000 427,402 28.5% 1.1% 427,402
2010 14,537,541 1,006,723 6.9% 2.7% 568,000 284,000 148,600 6,123
2011 39,781,349 25,843,637 65.0% 69.2% 3,753,479 3,638,478 2,498,575 2,772,789 4,110,196 2,349,473 1,540,377 2,688,783 2,491,487
2012 13,484,177 4,528,739 33.6% 12.1% 881,338 1,059,364 643,974 8,106 478,837 350,478 448,648 3,500 7,500 646,994
2013 6,000,000 1,113,516 18.6% 3.0% 79,046 3,500 117754 296299 7000 0 602,917 7,000
2012 5,515,213 10,000 0.2% 0.2% 10,000
2013 5,713,279 5,523,729 96.7% 122.2% 1,094,601 1,901,503 1,343,287 635,803 26,624 521,911
2012 3,808,711 144,546 3.8% 3.2% 43364 43,364 57,818
2013 5,654,210 4,602,575 81.4% 101.8% 1,027,195 1,101,481 550,184 676,070 607,233 377,503 146,797 116,112
2012 4,526,476 879,307 19.4% 879,307
2013 4,985,613 4,275,577 85.8% 1,397,113 1,132,635 581,800 768,848 240,357 154,824
2009 456,000 71,667 15.7% 1.8% 551 138 70,978
2010 0 0 0.0% 0.0%
2011 0 0 0.0% 0.0%
2012 4,954,031 913,631 18.4% 22.3% 996 912,635
2013 4,919,031 2,497,087 50.8% 61.0% 1,825,269 138,388 0 132,185 0 383,492 15,007 2,746
2,011 151,216 0 0.0% 0.0%
2,012 351,001 154,330 44.0% 4.6% 45,360 105,840 3,130
2,013 4,127,194 0 0.0% 0.0%
2010 0 0 0.0% 0.0%
2011 0 0 0.0% 0.0%
2012 10,900 0 0.0% 0.0%
2013 3,986,522 520,538 13.1% 21.5% 520,538
2010 5,380 5,379 100.0% 0.0% 4,944 435
2011 0 0 0.0% 0.0%
2012 0 0 0.0% 0.0%
2013 2,329,972 117,422 5.0% 0.2% 10,415 3,570 13,970 44,065 13,970 19,610 4,719 7,103
2011 114,680 0 0.0% 0.0%
2012 114,680 34,404 30.0% 1.0% 34,404
2013 3,362,466 6,700 0.2% 0.2% 4,000 1,700 1,000
21 182824 2148053
MEJORAMIENTO DE CARRETERA IC-105;
DV PANAMERICANA SUR KM 303-PROG
13+000 SECTOR LOMA LODULLADO-
DISTRITO DE ICA-PROVINCIA DE ICA-
DEPARTAMENTO DE ICA.
3,477,146.00
EXPEDIENTE
TECNICO
OBSERVADO
20 12462 2031222
CONSTRUCCION DE POZAS DE
REGULACION Y CONTROL DE AVENIDAS
DEL RIO ICA.
(Petacc).
61804405 PETACC
19 141205 2163990
MEJORAMIENTO E INSTALACION DEL
SISTEMA DE AGUA POTABLE Y DESAGUE
DEL C.P. SAN JOSE, DISTRITO EL CARMEN-
CHINCHA-ICA.
2,416,266.00
OBRA PARA
PROCESO DE
SELECCIÓN
18 147407 2115900
MEJORAMIENTO DE CARRETERA
VECINAL RUTA IC-576, TRAMO
PROGRESIVA 21+500 A LA PROGRESIVA
60+501.956, DISTRITO DE TIBILLO-
PALPA.
3,357,001.00 EN EJECUCION
17 78892 2078063
CONSTRUCCION DEL PUENTE
CARROZABLE Y OBRAS
COMPLEMENTARIAS EN EL SECTOR AJA-
CIUDAD DE NASCA.
4,090,488.00OBRA
PARALIZADA
16
FICHA
TECNICA
PIP DE
EMERGE
NCIA
S/C (*)
2154690
REHABILITACIÓN DE EMISOR, COLECTOR
PRINCIPAL DE LA AV. LOS MAESTROS,
EMISOR Y COLECTOR SECUNDARIO DE
PROLONGACIÓN AYABACA DEL
DISTRITO, PROVINCIA Y
DEPARTAMENTO DE ICA AFECTADOS
POR EL SISMO DEL 30 DE ENERO DEL
2012.
--OBRA
CULMINADA
15 48363 2148596
MEJORAMIENTO Y CONSTRUCCION DEL
SISTEMA DE AGUA POTABLE Y
ALCANTARILLADO DE LOS PUEBLOS
JOVENES SEÑOR DE LUREN Y ANEXOS
COLINDANTES DEL DISTRITO DE
SUBTANJALLA-ICA.
4,521,513.00 EN EJECUCION
14 175959 2161496
CONSTRUCCION DEFENSAS RIBEREÑAS
M. I. RIO INGENIO SECT. SAN PABLO-EL
INGENIO-NAZCA, RIO MATAGENTE M. D.
SECT. RONCEROS BAJO-EL CARMEN, RIO
CHICO M. I. SECT. CANYAR-CHINCHA
BAJA, TAMBO DE MORA M. D. Y CRUZ
VERDE M. I. -TAMBO DE MORA-
CHINCHA-REGION ICA.
4,518,425.00OBRA
CULMINADA
13 83948 2094097
MEJORAMIENTO Y AMPLIACION DE LOS
SISTEMAS DE AGUA POTABLE Y
ALCANTARILLADO DE NASCA Y VISTA
ALEGRE.
37,372,306.00OBRA
PARALIZADA
12 S/C (*) 001-813ESTUDIOS DE PRE-INVERSION.
(Sede Central).-- EN EJECUCION
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2012 4,708,479 1,403,878 29.8% 34.0% 877,800 10,489 4,531 511,058
2013 3,251,441 2,573,702 79.2% 62.2% 203,884 2,000 1,987 700,258 935,357 448,882 281,334
2010 1,815,101 1,699,383 93.6% 127,178 77,837 69,320 128,592 51,881 36,502 62,970 116,899 109,788 151,387 121,650 645,379
2011 5,016,682 4,921,522 98.1% 75,210 62,476 222,524 113,124 97,705 112,737 72,926 107,702 214,326 347,193 1,359,709 2,135,890
2012 2,831,046 2,220,669 78.4% 82,037 125,239 117,040 169,983 149,842 52,233 144,013 232,042 209,395 193,761 34,895 710,189
2013 3,285,008 2,567,354 78.2% 78,828 96,438 364,377 134,098 118,991 140,877 675,148 445,209 513,388
2012 10,218,344 7,745,220 75.8% 77.6% 1,738,858 3,946,223 390,991 359,806 581,198 6,800 721,344
2013 2,564,756 1,573,290 61.3% 15.8% 595,560 37,883 661,160 278,687
25 152354 2157122
CONSTRUCCION DE TROCHA
CARROZABLEDESDE PUENTE LAMBRAS
AL CENTRO POBLADO DE TAMBULLA EN
EL DISTRITO DE SAN PEDRO DE
HUACARPANA PROVINCIA DE CHINCHA-
ICA.
2,581,056.00 2013 2,988,813 1,754,583 58.7% 68.0% 8,462 483,696 403,323 19,341 733,639 106,122 EN EJECUCION
26 S/C (*) 2022788
GESTION DEL PROGRAMA Y OTROS -
PROGRAMA DE CAMINOS
DEPARTAMENTALES.
(A cargo de la Dirección Regional de
Transportes y Comunicaciones (DRTyC
Ica).
(Provias)
2013 3,269,101 157,557 4.8% 157,557
DIRECCION
REGIONAL
TRANSPORTES
2012 54,000 54,000 100.0% 2.2% 54,000
2013 2,453,755 2,129,213 86.8% 85.7% 116,503 935,653 352,840 714,510 4,247 0 0 5,460
2011 54,441 54,440 100.0% 2.0% 16,332 38,108
2012 3,056,992 800,012 26.2% 30.1% 1,095 996 797,921
2013 2,115,572 2,092,442 98.9% 78.6% 479,501 570,846 457,560 251,368 326,167 0 7,000 0
2012 3,948,472 2,349,679 59.5% 62.9% 430,543 452,589 368,315 177,142 183,994 737,096
2013 2,063,484 24,849 1.2% 0.7% 2,498 0 22,351 0
30 78602 2111849
INSTALACIONES DE SISTEMA DE AGUA
POTABLE PARA LA COMUNIDAD
CAMPESINA SAN ANDRES DE
QUILCANTO Y SAN NICOLAS DE PULPO-
YAUCA DEL ROSARIO-ICA.
1,462,318.00 2013 1,813,262 1,182,870 65.2% 80.9% 319,121 862,662 1,087 EN EJECUCION
2011 27,040 16,223 60.0% 1.4% 16,223
2012 1,046,727 10,816 1.0% 0.9% 10,816
2013 1,542,057 1,327,983 86.1% 111.3% 223,093 176,769 445,205 380,139 102,777 0 0
31 165371 2132728
CONSTRUCCION DE INFRAESTRUCTURA
Y EQUIPAMIENTO PARA LA FORMACION
PROFESIONAL DE LAS ESPECIALIDADES
DE MECANICA AUTOMOTRIZ Y DE
PRODUCCION EN EL INSTITUTO
SUPERIOR TECNOLOGICO CATALINA
1,192,701.00OBRA
CULMINADA
29 135513 2116356
MEJORAMIENTO DE LA
INFRAESTRUCTURA TECNICO-
PRODUCTIVO Y EQUIPAMIENTO DEL
INSTITUTO SUPERIOR TECNOLOGICO
PALPA, DISTRITO DE RIO GRANDE,
PROVINCIA DE PALPA-ICA.
3,736,788.00OBRA
CULMINADA
28 157122 2132916
MEJORAMIENTO Y REHABILITACION DE
VIA VECINAL VILLA PERIODISTA I -
SANTA ROSA DE CACHICHE - VILLA
PERIODISTA II ENLACE A CAMINO DE
HUACACHINA , PROVINCIA DE ICA - ICA.
2,661,725.00OBRA
CULMINADA
27 150806 2115880
MEJORAMIENTO DE LA CARRETERA DE
ACCESO DESDE EL C.P. OCUCAJE-C.P.
BARRIO NUEVO-C.P LA CAPILLA,
DISTRITO DE OCUCAJE, PROVINCIA DE
ICA.
2,484,461.00OBRA
CULMINADA
24 102556 2113225
MEJORAMIENTO DE LA CARRETERA DE
ACCESO AL VALLE LAS TRANCAS, TRAMO
Dv. PANAMERICANA SUR Km 463-
SANTA LUISA-DISTRITO DE VISTA
ALEGRE-NASCA.
9,987,256.00OBRA
CULMINADA
23 S/C (*) 2000351OPERACION Y MANTENIMIENTO.
(Petacc).-- PETACC
22 152550 2121113
CONSTRUCCION DE PISTAS Y VEREDAS
EN EL AA.HH ACOMAYO ZONA B, TUPAC
AMARU, PP.JJ ANDRES AVELINO
CACERES Y ASOCIACION DE VIVIENDA EL
SAUCE, DISTRITO DE PARCONA-ICA-ICA.
4,134,942.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
32 132655 2110876
MEJORAMIENTO DE LAS EDIFICACIONES
INTERNAS, EXTERNA E
IMPLEMENTACION DE SERVICIOS,
COMUNICACIONES, SEGURIDAD Y
ORNATO DE LA SEDE CENTRAL DEL
GOBIERNO REGIONAL DE ICA.
1,197,334.47 2013 1,383,299 56,256 4.1% 4.7% 0 56,256 0 EN EJECUCION
33 145334 2163989
INSTALACION DEL SISTEMA DE DESAGUE
DEL C.P. SAN REGIS, DISTRITO DE EL
CARMEN-CHINCHA-ICA.
796,843.00 2013 1,099,141 1,066,768 97.1% 133.9% 15,635 689,229 174,624 120,818 66,462OBRA
CULMINADA
2012 1,160,236 787,438 67.9% 57.8% 13,800 10,350 10,350 312,000 440,938
2013 1,084,129 873,762 80.6% 64.2% 232,433 123,023 143,036 149,049 10,266 215,955 0
2011 54,590 54,589 100.0% 16,377 7,315 30,897
2012 2,226,570 1,148,976 51.6% 1,148,976
2013 1,078,595 606,756 56.3% 162,062 111,499 186,090 147,105
2009 45,000 1,908 4.2% 0.0% 1,908
2010 139,500 98,000 70.3% 1.6% 42,592 55,408
1011 0 0 0.0% 0.0%
2012 6,269,598 4,839,827 77.2% 80.1% 1,072,571 2,150,749 513,610 481,340 621,557
2013 1,376,710 507,429 36.9% 8.4% 117,206 181,029 62,790 74,434 0 53,832 8,270 9,868
2010 2,869,558 193,559 6.7% 7.3% 53,700 134,800 284 3,922 853
2011 2,597,503 2,146,072 82.6% 80.7% 461,762 923,524 229,176 117,469 219,937 19,184 72,681 2,500 2,834 84,094 12,911
2012 2,250,928 1,093,526 48.6% 41.1% 5,360 5,390 8,190 7,200 3,010 4,800 2,400 7,000 1,050,176
2013 958,329 323,788 33.8% 12.2% 45,237 37,852 71,110 79,168 77,691 12,730 0
2009 111,400 106,045 95.2% 1.9% 98,000 1,045 7,000
2010 0 0 0.0% 0.0%
2011 3,896,953 3,562,933 91.4% 65.2% 1,000 1,130,157 2,431,776
2012 3,424,377 3,084,768 90.1% 56.4% 85,530 4,936 50,101 53,556 179,089 51,828 648,981 1,062,348 685,466 262,933
2013 943,370 876,939 93.0% 16.0% 671,057 9,733 102,720 93,429
2012 2,829,136 1,806,179 63.8% 76.0% 5,260 1,870 75,487 263,180 312,003 646,789 495,593 5,997
2013 887,988 707,642 79.7% 29.8% 4,650 0 702,992
2010 129,527 129,527 100.0% 6.7% 38,858 90,669
2011 0 0 0.0% 0.0%
2012 2,324,917 1,294,482 55.7% 67.3% 5,000 390,058 673,455 5,000 6,449 214,520
2013 823,785 735,759 89.3% 38.3% 191,722 228,470 138,683 102,280 3,157 71,447
2012 1,482,384 623,424 42.1% 52.0% 52,419 62,474 508,531
2013 765,162 469,128 61.3% 39.2% 169,385 184,606 13,290 84,410 7,737 0 9,700
41 132967 2131175
SUSTITUCION, AMPLIACION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA EN EL
CETPRO SR DE LUREN-DISTRITO DE
VISTA ALEGRE-NASCA-ICA.
1,198,281.73OBRA
CULMINADA
40 112254 2094596
CONSTRUCCION DE PUENTE VEHICULAR
EN UCUCHIMPANA KM 37 + 500 RUTA I-
C 108 EMP PE 1S RIO GRANDE - PALPA -
ICA.
1,923,240.00 EN EJECUCION
39 136042 2127890
MEJORAMIENTO DEL SISTEMA DE AGUA
POTABLE Y CONSTRUCCION DEL
SISTEMA DE ALCANTARILLADO EN LOS
CENTROS POBLADOS DEL DISTRITO DE
HUANCANO, PROVINCIA DE PISCO - ICA.
2,377,728.00 EN EJECUCION
38 101616 2092499
SISTEMA DE RIEGO MACACONA-
QUILLOAY.
(Petacc).
5,464,628.00 PETACC
37 112324 2094595
CONSTRUCCION DE PUENTE VEHICULAR
EN HUARACCO KM 22+000 RUTA I-C 108
EMP PE 1S RIO GRANDE - PALPA - ICA.
2,659,672.00OBRA
PARALIZADA
36 31196 2092086
MEJORAMIENTO DE LA
INFRAESTRUCTURA Y EQUIPAMIENTO
EN EL CENTRO DE SALUD LA TINGUIÑA-
ICA.
6,045,380.00 EN EJECUCION
35FICHA
FORSUR2117126
RECONSTRUCCION Y EQUIPAMIENTO
DEL RESERVORIO DE AGUA DEL SECTOR
EL ALTO COMATRANA DEL DISTRITO,
PROVINCIA Y DEPARTAMENTO DE ICA,
AFECTADO POR EL SISMO DEL 15 DE
AGOSTO DEL 2007.
OBRA
PARALIZADA
34 165218 2148597
MEJORAMIENTO DE INFRAESTRUCTURA
EDUCATIVA Y EQUIPAMIENTO EN DOS
NIVELES EN LA I.E.Nº22446 ISAAC
MONTALVAN NIVEL INICIAL Y PRIMARIA
MENORES, DISTRITO DE
INDEPENDENCIA-PISCO.
1,361,811.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2011 3,085,460 80,729 2.6% 2.8% 10,759 69,970
2012 3,154,266 2,537,225 80.4% 89.5% 559,901 324,459 293,367 769,253 172,132 340,726 17,160 35,480 5,000 19,747
2013 669,816 80,300 12.0% 2.8% 48,800 31,500
43 145336 2163992
INSTALACION DEL SISTEMA DE DESAGUE
DEL C.P. EL GUAYABO, DISTRITO DE EL
CARMEN-CHINCHA-ICA.
1,003,583.00 2013 659,956 335,581 50.8% 33.4% 206,399 128,775 0 0 407OBRA
PARALIZADA
2011 1,173,905 583,492 49.7% 24.2% 3,000 3,000 1,500 482,671 93,321
2012 2,446,530 1,932,729 79.0% 80.2% 860,773 245,248 15,370 207,992 252,813 350,533
2013 601,902 341,428 56.7% 14.2% 340,626 802
2010 10,750 10,750 100.0% 0.9% 10,750
2011 0 0 0.0% 0.0%
2012 1,236,123 674,493 54.6% 58.1% 2,672 236,281 435,540
2013 551,445 137,694 25.0% 11.9% 123,732 0 0 13,962
2009 1,976,117 1,500 0.1% 0.1% 1,500
2010 50,000 0 0.0% 0.0%
2011 3,089,073 40,234 1.3% 2.0% 40,234
2012 2,892,447 2,477,506 85.7% 125.4% 3,801 1,566,746 5,591 188,928 9,465 387,211 315,764
2013 520,803 260,058 49.9% 13.2% 242,192 17,866 0 0 0 0 0 0
2012 1,211,403 753,727 62.2% 65.0% 462 183,496 442,458 100,732 21,138 5,441
2013 516,741 0 0.0% 0.0%
2010 107,630 64,578 60.0% 0.3% 32,289 32,289
2011 1,842,937 42,944 2.3% 0.2% 42,944
2012 13,576,823 262,774 1.9% 1.4% 13,470 21,180 228,124
2013 19,531,783 5,850,054 30.0% 30.9% 145,654 5,686,900 7,000 3,500 7,000
49 125735 2143207
RECONSTRUCCION Y EQUIPAMIENTO I.E.
Nº143, ZONA NUEVA, DISTRITO DE
PARCONA-ICA-ICA.
526,761.24 2013 492,214 486,513 98.8% 92.4% 319,061 10,292 157,160OBRA
CULMINADA
2012 506,934 91,687 18.1% 17.8% 91,687
2013 415,247 381,087 91.8% 73.8% 155,550 213,537 12,000 0 0
2010 351,554 350,693 99.8% 25,861 10,140 8,740 5,143 135,809 135,000 30,000
2011 1,426,500 779,999 54.7% 20,000 18,000 53,462 82,915 605,622
2012 860,160 854,033 99.3% 28,499 28,650 110,268 144,453 92,355 103,807 63,324 13,889 43,099 163,925 33,966 27,798
2013 1,304,250 528,992 40.6% 110,000 165,000 58,992 195,000
2012 1,688,650 1,277,821 75.7% 99.1% 242,511 290,756 463,204 156,772 68,711 29,425 6,705 19,737
2013 392,925 7,224 1.8% 0.6% 7,224
53 175557 2227598
CONSTRUCCION Y EQUIPAMIENTO DE
PUESTO DE SALUD PAMPA BLANCA EN
EL DISTRITO DE RIO GRANDE,
PROVINCIA DE PALPA-ICA.
298,629.41 2013 377,599 0 0.0% 0.0% EN EJECUCION
2012 8,889 8,889 100.0% 8,889
2013 375,836 0 0.0%
54
FICHA
FORSUR
S/C (*)
2154728
2154728: RECONSTRUCCION,
REHABILITACION Y MEJORAMIENTO
POSTA MEDICA PNP-PISCO-
DEPARTAMENTO ICA, PROVINCIA DE
PISCO, DISTRITO DE PISCO.
EXPEDIENTE
TECNICO
APROBADO
52 81004 2110497
FORTALECIMIENTO DE LA ATENCION Y
MANEJO INTEGRAL DE PACIENTES CON
TUBERCULOSIS EN EL HOSPITAL
REGIONAL DE ICA-DIRESA ICA.
(Convenio Care Perú).
1,289,574.00OBRA
CULMINADA
51 S/C (*) 002-1139ESTUDIOS DE PRE-INVERSION.
(Petacc).PETACC
50 174984 2161495
MEJORAMIENTO DE LA
INFRAESTRUCTURA DEPORTIVA EN LA
I.E. Nº22401 MARIA REICHE NEUMANN,
DISTRITO DE NASCA Y DEPARTAMENTO
DE ICA.
516,311.00OBRA
CULMINADA
48 125735 2114169
MEJORAMIENTO DE LOS SERVICIOS DE
PREVENCION DE LA COMISION DE
DELITOS Y FALTAS EN LA JURISDICCION
DE LA DIRECCION TERRITORIAL DE
POLICIA DE ICA.
18,955,772.00OBRA
CULMINADA
47 150635 2116994
MEJORAMIENTO DEL SISTEMA DE AGUA
POTABLE Y ALCANTARILLADO DEL CC.PP
SAN TADEO-HUMAY-PISCO.
1,160,056.16OBRA
PARALIZADA
46 58627 2087349
CONSTRUCCION Y MEJORAMIENTO DE
LA INFRAESTRUCTURA EDUCATIVA EN
LA I.E. JOSEFINA MEJIA DE BOCANEGRA -
NASCA - ICA.
1,976,117.00OBRA
CULMINADA
45 134712 2131176
SUSTITUCION, AMPLIACION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA EN EL
CETPRO CAJUCA-NASCA-ICA.
1,161,642.99OBRA
PARALIZADA
44 54823 2094593
CONSTRUCCION DE MINIPRESAS
LARGASHJA - CHUYA DISTRITO DE
CHAVÍN.
2,411,140.00OBRA
CULMINADA
42 144161 2113082
MEJORAMIENTO DE INFRAESTRUCTURA
EDUCATIVA Y EQUIPAMIENTO EN DOS
NIVELES EN LA I.E INDEPENDENCIA
NIVEL SECUNDARIO MENORES,
DISTRITO DE INDEPENDENCIA - PISCO.
2,835,592.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2009 331,920 77,097 23.2% 1.8% 77,097
2010 0 0 0.0% 0.0%
2011 51,400 51,398 100.0% 1.2% 51,398
2012 4,180,844 3,839,898 91.8% 91.1% 262,645 959,504 424,850 397,856 441,527 490,147 459,020 404,349
2013 340,947 12,772 3.7% 0.3% 12,772
2012 2,274,702 1,801,587 79.2% 77.5% 2,672 1,205,397 593,518
2013 316,454 286,799 90.6% 12.3% 272,092 3,750 0 0 10,957
2012 413,139 127,543 30.9% 42.6% 3,570 3,570 120,403
2013 284,783 282,117 99.1% 94.2% 284,361 0 0 -2,244
2012 6,103,280 5,822,362 95.4% 111.4% 1,038,717 1,329,779 697,076 614,746 579,133 413,816 247,381 350,680 551,034
2013 325,918 262,823 80.6% 5.0% 2,000 47,815 61,820 0 109,332 41,856
2012 230,480 10,657 4.6% 4.3% 10,557 100
2013 258,173 0 0.0% 0.0%
2010 5,165,000 3,861,044 74.8% 65.4% 5,672 4,883 1,070,928 2,779,561
2011 1,564,815 1,248,721 79.8% 21.2% 1,237,629 9,947 1,060 85
2012 0 0 0.0% 0.0%
2013 251,895 251,895 100.0% 4.3% 235,021 16,874
61 225575 2173509
MEJORAMIENTO, SUSTITUCION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA
POLIDOCENTE AL AÑO 2010, EN LA
PROVINCIA DE PISCO.
9,934,268.00 2013 245,412 0 0.0% 0.0%
EXPEDIENTE
TECNICO PARA
PROCESO DE
SELECCIÓN
2012 398,111 153,328 38.5% 53.1% 1,308 4,685 147,335
2013 244,744 243,522 99.5% 84.4% 243,741 -219
63 112995 2115649
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA Y REFERENCIA DE
PACIENTES EN SITUACION DE
EMERGENCIA EN EL CENTRO DE SALUD
CLAS SAN ISIDRO - DISTRITO DE PUEBLO
NUEVO - CHINCHA.
180,680.00 2013 234,950 182,714 77.8% 101.1% 182,714OBRA
CULMINADA
2010 1,227,584 402,511 32.8% 29.4% 379,169 1,206 16,321 5,815
2011 353,759 0 0.0% 0.0%
2012 232,437 0 0.0% 0.0%
2013 232,437 0 0.0% 0.0%
64 24606 2087372
CONSTRUCCION DE TROCHA
CARROZABLE SAN PEDRO DE
HUACARPANA-SANLORENZO EN LA
PROVINCIA DE CHINCHA-ICA.
1,368,309.00OBRA
CULMINADA
62 135246 2162335
REHABILITACION DE DIQUE EN EL RIO
GRANDE, PARA REDUCIR LA
VULNERABILIDAD DEL SECTOR CHILLO,
MARGEN DERECHA, DISTRITO LLIPATA,
PROVINCIA PALPA-REGION ICA.
(Petacc).
288,485.40 PETACC
60 139456 2109937
CONSTRUCCION DE PISTAS Y VEREDAS
EN LA EXPANSION SUR DEL, DISTRITO DE
PARCONA - ICA - ICA.
5,900,582.00OBRA
CULMINADA
59 139752 2113628
CONSTRUCCION DE MODULO DE WAWA
WASI COMUNAL EN EL SECTOR I DEL P.V
DAMNIFICADOS DEL FENOMENO DEL
NIÑO DEL DISTRITO DE SUBTANJALLA-
ICA
250,462.07 EN EJECUCION
58 138887 2126257
MEJORAMIENTO DE LA
INFRAESTRUCTURA Y EQUIPAMIENTO
DE LA I.E VICTOR MANUEL MAURTUA
DE PARCONA, DISTRITO DE PARCONA-
ICA-ICA.
5,228,213.00OBRA
CULMINADA
57 133787 2162336
REHABILITACION DE DIQUE EN EL RIO
GRANDE, PARA REDUCIR LA
VULNERABILIDAD DEL SECTOR FLORITA
ACEQUION, MARGEN DERECHA,
DISTRITO RIO GRANDE, PROVINCIA
PALPA-REGION ICA.
(Petacc).
299,376.56 PETACC
56 187439 2152406
MEJORAMIENTO DE CARRETERA
DEPARTAMENTAL IC-107 TRAMO Dv
PANAMERICANA SUR Km 307-
PROGRESIVA 3+200 PONTON LA
ACHIRANA DISTRITO LOS AQUIJES-
PROVINCIA DE ICA-DEPARTAMENTO DE
ICA.
2,323,591.00OBRA
CULMINADA
55 68869 2086775
CONSTRUCCION DE LINEA DE
CONDUCCION RESERVORIO ELEVADO Y
LINEA DE ADUCCION EN EL DISTRITO DE
SAN ANDRES-PISCO.
4,213,533.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
65 226122 2167028
MEJORAMIENTO, SUSTITUCION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA
POLIDOCENTE AL AÑO 2010, EN LA
PROVINCIA DE ICA.
7,070,218.00 2013 228,266 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
FORMULACION
2012 497,783 190,417 38.3% 64.0% 10,000 180,417
2013 225,253 220,667 98.0% 74.2% 222,819 0 0 -2,152
2012 2,139,272 1,916,108 89.6% 124.4% 10,000 397,854 1,508,254
2013 223,164.00 202,363 90.7% 13.1% 117,131 46,059 35,828 548 0 0 2,797
68 186229 2159993
CREACION, MEJORAMIENTO E
IMPLEMENTACION DE LA
INFRAESTRUCTURA DEPORTIVA DE
BASQUETBOL Y VOLEIBOL EN LAS
INSTITUCIONES EDUCATIVAS DE LA
PROVINCIA DE ICA, PALPA, NASCA,
PISCO, CHINCHA-REGION ICA.
6,964,455.00 2013 236,843 80,853 34.1% 1.2% 66,853 3,500 0 10,500
EXPEDIENTE
TECNICO
APROBADO
2012 227,761 10,557 4.6% 4.3% 10,557
2013 220,799 212,923 96.4% 86.0% 95,077 104,071 13,775
2009 90,300 86,227 95.5% 2.0% 46,000 26,000 14,227
2010 3,423 3,423 100.0% 0.1% 2,773 650
2011 4,877,305 4,821,177 98.8% 111.8% 9,470 942,514 264,235 3,604,958
2012 815,777 689,513 84.5% 16.0% 82,105 42,453 11,711 131,521 29,278 73,752 308,693 10,000
2013 220,000 210,527 95.7% 4.9% 210,527
2009 207,600 177,539 85.5% 12.8% 1,200 2,502 9,450 7,110 9,364 10,486 7,233 6,400 8,395 13,402 86,363 15,634
2010 230,035 119,547 52.0% 8.6% 12,860 6,495 1,350 1,954 8,063 35,811 53,014
2011 254,000 190,136 74.9% 13.7% 1,542 22,371 17,105 21,929 14,904 28,582 83,703
2012 400,000 173,523 43.4% 12.5% 1,080 3,866 1,499 255 31,442 3,555 46,931 1,258 6,069 34,476 43,092
2013 350,817 87,312 24.9% 6.3% 13,500 0 0 25,597 43,029 5,186
72 131987 2164046
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL PUESTO DE SALUD DE
BELLAVISTA SAN PEDRO DE
HUACARPANA-CHINCHA-ICA.
244,725.28 2013 219,882 162,100 73.7% 66.2% 159,135 0 2,965 0OBRA
CULMINADA
2012 216,509 10,775 5.0% 4.4% 10,542 233
2013 207,156 191,525 92.5% 79.0% 54,039 69,835 43,722 23,929
2009 872,279 715 0.1% 0.0% 715
2010 3,466,340 114,701 3.3% 2.6% 33,551 78,286 2,864
2011 3,752,236 819,950 21.9% 18.7% 350,404 361,121 3,460 9,217 67,723 28,025
2012 886,146 451,011 50.9% 10.3% 784 2,015 133,453 111,874 202,885
2013 199,981 149,767 74.9% 3.4% 66,600 83,094 73
74 71824 2088551
FORTALECIMIENTO DE LA CAPACIDAD
RESOLUTIVA DEL CENTRO DE SALUD
ALTO LARAN - MICRORED PUEBLO
NUEVO- RED PISCO DE LA DIRESA ICA.
4,384,826.00 EN EJECUCION
73 139677 2113622
CONSTRUCCION DE MODULO DE WAWA
WASI COMUNAL EN A.H MICAELA
BASTIDAS DEL DISTRITO DE PARCONA-
ICA
242,428.69OBRA
CULMINADA
71 59186 2057958
FORTALECIMIENTO DE LAS
CAPACIDADES OPERATIVAS Y TECNICAS
PARA LA DEMARCACION TERRITORIAL
DE LA REGION ICA.
1,390,310.00
EXPEDIENTE
TECNICO
OBSERVADO
70 101572 2092500SISTEMA DE RIEGO AMARA SANTA ANA.
(Petacc).4,312,915.00 PETACC
69 139768 2113623
CONSTRUCCION DE MODULO DE WAWA
WASI COMUNAL EN SECTOR SEBASTIAN
BARRANCA DEL DISTRITO DE SANTIAGO-
ICA.
247,556.75OBRA
CULMINADA
67 127501 2158202
CONSTRUCCION DE DEFENSAS
RIBEREÑAS CON FINES DE REDUCIR LA
VULNERABILIDAD DE LOS CANALES DE
CONDUCCION DE CAUCATO Y FIGUEROA-
EL PUEBLO EN AMBAS MARGENES DEL
RIO PISCO, DISTRITO DE SAN CLEMENTE
Y CERCADO, PROVINCIA DE PISCO-
REGION ICA.
(Petacc).
1,539,859.00 PETACC
66 136700 2114738
CONSTRUCCION DE DEFENSAS
RIBEREÑAS CON ENROCADO EN LA
MARGEN DERECHA DEL RIO PISCO,
SECTOR FRANCIA BAJA, DISTRITO DE
SAN CLEMENTE, PROVINCIA DE PISCO,
REGION ICA.
(Petacc).
297,488.00 PETACC
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
75 228416 2232188
MEJORAMIENTO, SUSTITUCION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA
POLIDOCENTE AL AÑO 2010, EN LA
PROVINCIA DE PALPA.
3,943,192.00 2013 183,500 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
FORMULACION
76 43386 2057745
SUSTITUCION, AMPLIACION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA DE LA
INSTITUCION EDUCATIVA MARGARITA
SANTA ANA DE BENAVIDES-ICA.
1,666,139.00 2013 172,397 172,396 100.0% 10.3% 172,396OBRA
CULMINADA
2012 2,720,665 2,529,236 93.0% 102.4% 490,644 426,469 2,240 490,180 841,130 5,250 5,250 268,073
2013 171,459 155,533 90.7% 6.3% 14,848 109,594 31,091
2011 810,095 161,427 19.9% 20.6% 161,427
2012 839,595 618,217 73.6% 78.8% 292,522 323,601 907 1,187
2013 166,938 0 0.0% 0.0%
79 225132 2173510
MEJORAMIENTO, SUSTITUCION Y
EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA
POLIDOCENTE AL AÑO 2010, EN LA
PROVINCIA DE CHINCHA.
6,725,041.00 2013 157,202 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
FORMULACION
80 142731 2113073
CONSTRUCCION Y EQUIPAMIENTO DEL
NUEVO LOCAL INSTITUCIONAL DE LA
SEDE CENTRAL DE LA UNIDAD DE
GESTION EDUCATIVA LOCAL DE NASCA,
PROVINCIA DE NASCA-ICA.
3,156,042.00 2013 156,042 0 0.0% 0.0%
EXPEDIENTE
TECNICO
APROBADO
2012 377,590 197,763 52.4% 1,664 76,500 3,500 116,099
2013 153,959 47,263 30.7% 6,875 1,487 0 38,901 0
2011 1,195,920 90,527 7.6% 8.4% 90,527
2012 1,344,591 1,057,371 78.6% 97.9% 4,044 287,739 281,508 109,119 170,281 104,070 10,530 10,469 12,239 67,372
2013 147,512 192,393 130.4% 17.8% 0 146,670 45,723
2012 228,249 103,094 45.2% 42.4% 10,557 92,537
2013 137,387 115,937 84.4% 47.7% 7,000 108,937
84 216621 2161178
2161178: REHABILITACION POST
DESASTRE DE LOS SERVICIOS
EDUCATIVOS DE LA I. E. JOSE SEBASTIAN
BARRANCA, DISTRITO DE SANTIAGO-ICA-
ICA.
4,974,261.00 2013 150,939 56,832 37.7% 1.1% 40,332 13,500 3,000 0
EXPEDIENTE
TECNICO
OBSERVADO
83 139743 2113624
CONSTRUCCION DE MODULO DE WAWA
WASI COMUNAL EN LA ASOCIACION
VIRGEN DEL ROSARIO DEL DISTRITO DE
LOS AQUIJES-ICA.
243,284.34OBRA
CULMINADA
82 176534 2133866
CONSTRUCCION DE AMBIENTES
ADMINISTRATIVOS EN LA SEDE CENTRAL
DEL GOBIERNO REGIONAL DE ICA.
1,080,001.00OBRA
CULMINADA
81 S/C (*) 2154694
REHABILITACION DEL PUENTE
COLGANTE MIRAFLORES, AFECTADO
POR LAS INTENSAS LLUVIAS EN EL
CENTRO POBLADO PANTAYCO, EN EL
KM 36.5 DE LA VIA LOS LIBERTADORES
WARI, DISTRITO DE HUMAY, PROVINCIA
DE PISCO, DEPARTAMENTO DE ICA.
OBRA
CULMINADA
78 129853 2110023
INSTALACION DE REDES SECUNDARIAS Y
CONEXIONES DOMICILIARIAS DE
ALCANTARILLADO EN EL AA.HH VISTA
ALEGRE DEL CC.PP URBANO TUPAC
AMARU-PISCO.
784,925.83OBRA
CULMINADA
77 146388 2126563
MEJORAMIENTO DE VIA A NIVEL DE
ASFALTO EN CALIENTE PARA LA
INTEGRACIÓN DE LOS CC.PP PRIMAVERA
PARIÑA GRANDE, CAMINO CHICO LAS
SILVAS , Y PUEBLO NUEVO DEL DISTRITO
DE PUEBLO NUEVO - ICA.
2,468,856.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2010 3,583,724 237,000 6.6% 4.4% 71,100 94,800 71,100
2011 5,684,462 5,119,579 90.1% 95.0% 600,000 892,443 481,187 464,830 969,332 511,542 526,955 428,488 244,802
2012 571,112 273,273 47.8% 5.1% 83,046 61,420 1,000 1,000 2,000 124,807
2013 130,718 0 0.0% 0.0%
86 209687 2231665
MEJORAMIENTO DEL SERVICIO
EDUCATIVO CON INFRAESTRUCTURA DE
PROTECCION SOLAR EN LAS I.E. DE LA
PROVINCIA DE CHINCHA, REGION ICA.
3,749,729.00 2013 124,179 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
PROCESO DE
SELECCIÓN
2012 1,337,185 1,238,166 92.6% 106.1% 6,231 401,493 245,256 227,098 15,168 240,315 102,605
2013 121,705 22,669 18.6% 1.9% 9,693 12,976
88 S/C (*) 300-816ESTUDIOS DE PRE-INVERSION-REGION
ICA-EDUCACION.2013 117,453 0 0.0% 0 0 0
DIRECCION
REGIONAL
EDUCACION
89 209703 2231666
MEJORAMIENTO DEL SERVICIO
EDUCATIVO CON INFRAESTRUCTURA DE
PROTECCION SOLAR EN LAS I.E. DE LA
PROVINCIA DE ICA, REGION ICA.
3,996,197.00 2013 130,733 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
PROCESO DE
SELECCIÓN
2012 49,210 24,605 50.0% 0.9% 9,842 14,763
2013 104,022 32,105 30.9% 1.2% 4,000 3,000 500 0 0 24,605
2010 3,486,442 1,754,364 50.3% 38.3% 1,754,364
2011 2,841,872 2,650,645 93.3% 57.8% 134,237 293,564 234,392 402,318 473,066 134,957 306,840 1,056 670,215
2012 191,228 36,795 19.2% 0.8% 1,783 13,078 17,585 4,349
2013 102,526 0 0.0% 0.0%
92 209695 2231667
MEJORAMIENTO DEL SERVICIO
EDUCATIVO CON INFRAESTRUCTURA DE
PROTECCION SOLAR EN LAS I.E. DE LA
PROVINCIA DE PISCO, REGION ICA.
3,041,557.00 2013 102,048 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
PROCESO DE
SELECCIÓN
2011 1,024,164 428,539 41.8% 43.3% 138,000 290,539
2012 721,088 665,015 92.2% 67.2% 1,265 591,753 15,931 4,235 51,831
2013 97,083 45,538 46.9% 4.6% 40,339 5,199 0 0
94 218440 2163132
MEJORAMIENTO Y AMPLIACION DE LA
GESTION INTEGRAL DE RESIDUOS
SOLIDOS MUNICIPALES EN EL DISTRITO
DE INGENIO, DISTRITO DE EL INGENIO-
NAZCA-ICA.
2,507,629.00 2013 107,772 65,603 60.9% 2.6% 56,563 3,500 3,500 2,040
EXPEDIENTE
TECNICO EN
FORMULACION
95 209719 2165500
MEJORAMIENTO DEL SERVICIO
EDUCATIVO CON INFRAESTRUCTURA DE
PROTECCION SOLAR EN LAS I.E. DE LA
PROVINCIA DE NASCA, REGION ICA.
2,804,078.00 2013 94,627 0 0.0% 0.0%
EXPEDIENTE
TECNICO
PROCESO DE
SELECCIÓN
96 56943 2163471
MANEJO INTEGRAL CON ENFASIS EN LA
REFORESTACION DE LA PARTE ALTA DEL
DISTRITO DE CHAVIN-CHINCHA.
2,558,632.00 2013 88,996 0 0.0% 0.0%
EXPEDIENTE
TECNICO
OBSERVADO
93 148536 2111902
MEJORAMIENTO Y EQUIPAMIENTO DE
INFRAESTRUCTURA DEPORTIVA Y
RECREATIVA EN EL CC.PP URBANO RIO
GRANDE, SECTOR MIRAFLORES,
DISTRITO DE RIO GRANDE- PALPA-ICA.
988,934.20OBRA
CULMINADA
91 146382 2111197
CONSTRUCCION DE PISTAS Y VEREDAS
EN LAS CALLES PRINCIPALES DEL
CENTRO POBLADO SAN CLEMENTE
GRUPO 2, DISTRITO DE SAN CLEMENTE -
PISCO - ICA
4,584,361.00OBRA
CULMINADA
90 187942 2156624
CREACION E IMPLEMENTACION DEL
CENTRO DE EVALUACION PARA EL
OTORGAMIENTO DE LICENCIAS DE
CONDUCIR EN LA REIGION ICA.
2,698,022.00
EXPEDIENTE
TECNICO
APROBADO
87 132257 2111196
MEJORAMIENTO DEL SERVICIO
EDUCATIVO EN LA I.E 22498 FAUSTINO
ROSAS BARBOZA DEL CENTRO POBLADO
TOMA DE LEON DEL DISTRITO DE
INDEPENDENCIA-PISCO-ICA.
1,166,784.92OBRA
CULMINADA
85 88649 2094601
CONSTRUCCION DE UN COLISEO
DEPORTIVO Y UN GIMNASIO PARA EL
DESARROLLO FISICO DE LOS ALUMNOS
DE LA INSTITUCION EDUCATIVA SAN
LUIS GONZAGA DE ICA EN LA CIUDAD DE
ICA PROVINCIA Y DEPARTAMENTO DE
ICA.
5,389,371.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
97 234252 2230612
MEJORAMIENTO DE LA PRODUCCION Y
COMERCIALIZACION DE PALTA,
MEDIANTE LA TRANSFERENCIA DE
TECNOLOGIA A LOS PEQUEÑOS
PRODUCTORES, EN ARTICULACION CON
LOS GOBIERNOS LOCALES, DE LAS
PROVINCIAS DE PISCO Y CHINCHA DE LA
REGION ICA.
4228380 2013 87,798 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
PROCESO DE
SELECCIÓN
98 147212 2163472
MEJORAMIENTO DE CANAL DE
IRRIGACION PAMPA DE ÑOCO EN EL
SECTOR RURAL EN LOS DISTRITOS DE
CHINCHA ALTA, PUEBLO NUEVO Y
GROCIO PRADO EN LA PROVINCIA DE
CHINCHA-REGION ICA.
4,881,491.00 2013 85,602 0 0.0% 0.0%
EXPEDIENTE
TECNICO PARA
PROCESO DE
SELECCIÓN
99 170345 2160205
CONSTRUCCION DE DEFENSA
MARITIMA, SECTOR CRUZ VERDE,
DISTRITO DE TAMBO DE MORA,
PROVINCIA DE CHINCHA, REGION ICA.
3,232,447.00 2013 87,650 62,405 71.2% 1.9% 16,830 42,075 3,500 0 0
EXPEDIENTE
TECNICO EN
REVISION
2011 327,332 327,332 100.0% 2.8% 327,332
2012 12,627,741 12,301,367 97.4% 106.0% 6,780,588 258 237,206 1,819,170 982,054 943,603 1,538,488
2013 79,536 71,875 90.4% 0.6% 0 71,875 0
101 228444 2232187
2232187: MEJORAMIENTO,
SUSTITUCION Y EQUIPAMIENTO DE LA
INFRAESTRUCTURA EDUCATIVA
POLIDOCENTE AL AÑO 2010, EN LA
PROVINCIA DE NASCA.
2,204,808.00 2013 78,500 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
FORMULACION
2012 59,132 29,566 50.0% 0.9% 14,783 14,783
2013 77,132 10,000 13.0% 0.3% 7,000 3,000 0
2010 136,493 277 0.2% 277
2011 180,895 117,090 64.7% 8,676 5,465 10,715 11,680 8,100 15,722 53,732 3,000
2012 101,516 59,138 58.3% 40,551 534 18,053
2013 70,837 17,836 25.2% 17,836
2011 20,000 20,000 100.0% 0.6% 20,000
2012 0 0 0.0% 0.0%
2013 68,400 8,200 12.0% 0.2% 3,500 1,300 0 3,400 0
105 235083 2177933
2177933: AMPLIACION Y
MEJORAMIENTO DE LOS SERVICIOS DE
AGUA POTABLE Y ALCANTARILLADO EN
LOS CCPP. LOS JUAREZ, LOS PINOS Y
ZONAS ADYACENTES A LA VICTORIA-ICA-
ICA-ICA.
1042592.16 2013 59,437 3,861 6.5% 0.4% 3,861
EXPEDIENTE
TECNICO EN
FORMULACION
106 209705 2165499
2165499: MEJORAMIENTO DEL
SERVICIO EDUCATIVO CON
INFRAESTRUCTURA DE PROTECCION
SOLAR EN LAS I.E. DE LA PROVINCIA DE
PALPA, REGION ICA.
1,536,545.00 2013 55,017 0 0.0% 0.0%
EXPEDIENTE
TECNICO EN
FORMULACION
104 140422 2130148
2130148: DESARROLLO DE
CAPACIDADES PARA EL ORDENAMIENTO
TERRITORIAL EN LA REGION ICA.
3,539,629.00
EXPEDIENTE
TECNICO
APROBADO
103
FICHA
FORSUR
S/C (*)
2113870
2113870: RECONSTRUCCION DE
INFRAESTRUCTURA EDUCATIVA Y
EQUIPAMIENTO EN LA INSTITUCION
EDUCATIVA Nº 22346 SAN MARTIN DE
PORRES, CASERIO CASA BLANCA,
DISTRITO DE SANTIAGO, PROVINCIA DE
ICA, AFECTADA POR EL TERREMOTO DEL
15 DE AGOSTO DEL 2007.
OBRA
CULMINADA
102 101512 2105752
2105752: MEJORAMIENTO DEL
SERVICIO EDUCATIVO EN EL INSTITUTO
SUPERIOR TECNOLOGICO PUBLICO LUIS
FELIPE DE LAS CASAS EN EL DISTRITO DE
MARCONA-NASCA-ICA.
3,390,295.00
EXPEDIENTE
TECNICO EN
OBSERVADO
100 112338 2129698
2129698: MEJORAMIENTO A NIVEL DE
ASFALTADO DE LA CARRETERA PONTON
LA ACHIRANA-LOS AQUIJES-SANTUARIO
DE YAUCA DEL ROSARIO, EN LA
PROVINCIA DE ICA.
11,602,641.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2012 403,912 351,685 87.1% 119.3% 10,000 341,685
2013 52,227 46,652 89.3% 15.8% 49,270 -2,618
2011 69,988 20,996 30.0% 0.3% 20,996
2012 48,992 38,493 78.6% 0.6% 17,497 20,996
2013 50,299 11,600 23.1% 0.2% 5,200 3,900 2,500
2012 302,523 252,993 83.6% 98.8% 8,300 49,371 112,449 82,873
2013 49,450 22,298 45.1% 8.7% 3,950 17,329 1,019
2012 221,284 173,210 78.3% 101.1% 28,323 27,746 32,780 27,117 57,244
2013 48,074 1,376 2.9% 0.8% 1,376
2010 481,361 450 0.1% 450
2011 548,850 511,395 93.2% 171,481 187,115 23,101 3,894 36,408 2,701 86,695
2012 26,510 333 1.3% 333
2013 43,855 25,041 57.1% 16,899 8,142 0
2012 409,702 367,317 89.7% 123.7% 367,317
2013 41,572 38,926 93.6% 13.1% 40,612 545 -2,231
2010 18,593 18,593 100.0% 1.6% 7,437 11,156
2011 0 0 0.0% 0.0%
2012 10,500 0 0.0% 0.0%
2013 40,500 14,000 34.6% 1.2% 3,500 0 10,500 0
114 165292 2162333
2162333: CONSTRUCCION DE DEFENSAS
RIBEREÑAS SECTORES CHIQUERILLO, RIO
GRANDE, PALLASCA, MONTESIERPE, SAN
IGNACIO, FRANCIA Y LA CUCHILLA,
PISCO EN LA REGION ICA.
(Petacc).
4,273,497.00 2013 40,000 39,500 98.8% 0.9% 39,500 0 0 0 PETACC
113 125026 2092988
2092988: RECONSTRUCCION E
IMPLEMENTACION DE LA SEDE
INSTITUCIONAL DE LA DIRECCION
REGIONAL DE PRODUCCION ICA EN LA
CIUDAD DE PISCO.
1,171,252.22OBRA POR
INICIAR
112 133778 2162337
2162337: REHABILITACION DEL DIQUE
EN EL RIO GRANDE, PARA REDUCIR LA
VULNERABILIDAD DEL SECTOR PERNIL
ALTO, MARGEN DERECHA, DISTRITO RIO
GRANDE, PROVINCIA DE PALPA-REGION
ICA.
(Petacc).
296,885.46 PETACC
111
FICHA
FORSUR
S/C (*)
2113867
2113867: RECONSTRUCCION DE
INFRAESTRUCTURA EDUCATIVA Y
EQUIPAMIENTO EN LA INSTITUCION
EDUCATIVA ADELA LENGUA CALDERON,
LA VENTA BAJA, DISTRITO DE
SANTIAGO, PROVINCIA DE ICA,
AFECTADA POR EL TERREMOTO DEL 15
DE AGOSTO DEL 2007.
OBRA
CULMINADA
110 151143 2122382
CONSTRUCCION DEL CERCO
PERIMETRICO Y SERVICIOS HIGIENICOS
DE LA I.E. Nº 22374 CAMINO DE REYES
DEL DISTRITO DE SAN JUAN BAUTISTA-
ICA-ICA.
171,377.83OBRA
CULMINADA
109 139761 2113625
2113625: CONSTRUCCION DE MODULO
DE WAWA WASI COMUNAL EN EL
SECTOR LOS SAUCES DEL DISTRITO DE LA
TINGUIÑA-PROVINCIA DE ICA-
DEPARTAMENTO DE ICA.
256,067.51OBRA
CULMINADA
108 72653 2111396
2111396: CONSTRUCCION Y
EQUIPAMIENTO DEL NUEVO LOCAL
INSTITUCIONAL DE LA SEDE CENTRAL DE
LA DIRECCION REGIONAL DE
EDUCACION ICA.
6,890,640.00
EXPEDIENTE
TECNICO EN
OBSERVADO
107 136230 2114654
2114654: CONSTRUCCION DE DEFENSAS
RIBEREÑAS CON FINES DE PROTECCION
DE LA TOMA DEL CANAL DE
CONDUCCION Y DRENAJE DOS PALMAS
EN LA MARGEN DERECHA DEL RIO PISCO
SECTOR DOS PALMAS, DISTRITO DE
INDEPENDENCIA, PROVINCIA DE PISCO,
REGION ICA.
(Petacc).
294,708.03 PETACC
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
115 137297 2160206
2160206: MEJORAMIENTO DE LA
INFRAESTRUCTURA Y EQUIPAMIENTO
EN EL CETPRO JULIO C. TELLO DEL
DISTRITO DE ICA, PROVINCIA DE ICA,
REGION ICA
914,775.50 2013 45,680 45,680 100.0% 5.0% 38,680 0 3,500 3,500OBRA POR
INICIAR
2010 1,575,369 15,000 1.0% 15,000
2011 2,175,553 669,424 30.8% 35,000 10,775 623,649
2012 1,471,131 1,378,248 93.7% 16,183 421,971 415,107 425,788 4,322 43,690 2,000 49,187
2013 34,370 0 0.0%
2012 252,391 223,586 88.6% 91.9% 10,542 280 74,958 137,806
2013 30,249 8,506 28.1% 3.5% 4,000 2,000 1,877 629
2012 3,787,528 3,753,603 99.1% 99.6% 690,245 361,420 291,240 546,262 549,560 569,954 744,922
2013 29,610 23,814 80.4% 0.6% 23,059 0 755
2012 523,423 499,028 95.3% 98.9% 254,993 244,035
2013 27,990 8,610 30.8% 1.7% 0 8,610 0
2010 437,394 25,000 5.7% 7,500 17,500
2011 597,454 399,710 66.9% 399,710
2012 208,873 87,870 42.1% 66,308 1,188 10,390 9,984
2013 26,280 20,480 77.9% 20,480
121 128677 2162711
2162711: CONSTRUCCION DE DEFENSAS
RIBEREÑAS EN LOS SECTORES DE SAN
JUAN Y CABILDO EN LA MARGEN
DERECHA DEL RIO GRANDE, DISTRITO DE
CHANGUILLO, PROVINCIA DE NASCA,
REGION ICA.
(Petacc).
1,565,377.00 2013 25,000 25,000 100.0% 1.6% 25,000 PETACC
2010 25,288 186 0.7% 186
2011 28,414 16,132 56.8% 2,867 3,588 9,677
2012 26,012 11,983 46.1% 3,311 7,270 1,402
2013 24,459 10,361 42.4% 396 6,336 0 0 3,629
2010 40,590 237 0.6% 237
2011 51,910 43,736 84.3% 3,470 6,498 3,736 8,668 16,996 4,368
2012 26,391 2,179 8.3% 2,179
2013 24,212 8,065 33.3% 7,042 1,023 0 0
123
FICHA
FORSUR
S/C (*)
2113866
2113866: RECONSTRUCCION DE
INFRAESTRUCTURA EDUCATIVA Y
EQUIPAMIENTO EN LA INSTITUCION
EDUCATIVA Nº 22348 SANTIAGO
BARRIOS TORREALVA, CASERIO SAN
FELIPE, DISTRITO DE OCUCAJE,
PROVINCIA DE ICA, AFECTADA POR EL
TERREMOTO DEL 15 DE AGOSTO DEL
2007.
OBRA
CULMINADA
122
FICHA
FORSUR
S/C (*)
2113869
2113869: RECONSTRUCCION DE
INFRAESTRUCTURA EDUCATIVA Y
EQUIPAMIENTO EN LA INSTITUCION
EDUCATIVA Nº 22352, CASERIO LOS
FLORES, LA VENTA ALTA, DISTRITO DE
SANTIAGO, PROVINCIA DE ICA,
AFECTADA POR EL TERREMOTO DEL 15
DE AGOSTO DEL 2007-(SAGRADO
CORAZON)
OBRA
CULMINADA
120
FICHA
FORSUR
S/C (*)
2113685
2113685: RECONSTRUCCIÓN Y
EQUIPAMIENTO DE LA INSTITUCIÓN
EDUCATIVA Nº 188 "ANGELITOS DEL
DIVINO NIÑO" - HUMAY - PISCO- ICA.
(Forsur).
OBRA
CULMINADA
119 218433 2158290
2158290: INSTALACION PROVISIONAL
DE LOS SERVICIOS DE EDUCACION
INICIAL DE LA I.E. Nº014 MERCEDES
DIBOS DE CAMINO DISTRITO DE ICA,
PROVINCIA DE ICA, DEPARTAMENTO DE
ICA.
504,476.36OBRA
CULMINADA
118 128366 2111667
MEJORAMIENTO DE LA PLAZA DE
ARMAS DEL DISTRITO DE PACHACUTEC-
ICA.
3,767,334.00OBRA
CULMINADA
117 139696 2113626
CONSTRUCCION DE MODULO DE WAWA
WASI COMUNAL EN EL CERCADO DEL
DISTRITO DE SUBTANJALLA-ICA
243,293.06OBRA
CULMINADA
116
FICHA
FORSU
R
S/C (*)
2113683
2113683 RECONSTRUCCIÓN,
REHABILITACIÓN Y EQUIPAMIENTO DE
LA INFRAESTRUCTURA EN LA IE JULIO C.
TELLO.
(Forsur).
OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2011 586,385 513,424 87.6% 41.8% 513,424
2012 751,562 687,262 91.4% 55.9% 7,509 191,630 257,692 151,285 78,995 151
2013 24,141 0 0.0% 0.0%
2012 122,450 98,421 80.4% 85.6% 62,758 31,203 4,460
2013 23,530 0 0.0% 0.0%
2012 1,186,486 1,135,755 95.7% 95.4% 417,836 236,591 481,328
2013 22,924 0 0.0% 0.0%
2009 2,900,306 32,874 1.1% 32,874
2010 3,014,071 2,125,844 70.5% 886 180 565,340 537,280 490,051 532,107
2011 783,590 635,312 81.1% 172,228 236,221 5,857 171,025 6,983 2,727 4,725 29,676 5,870
2012 318,207 295,564 92.9% 295,564
2013 22,643 22,642 100.0% 22,642
2010 107,571 499 0.5% 499
2011 180,861 168,526 93.2% 9,349 6,872 16,951 7,523 84,244 29,558 14,029
2012 28,321 16,820 59.4% 7,819 7,833 1,168
2013 21,931 7,024 32.0% 6,740 0 0 284
129 123932 2163549
2163549: CONSTRUCCION DE DEFENSAS
RIBEREÑAS EN AMBAS MARGENES DEL
RIO ICA PARA ASEGURAR EL SERVICIO
DE AGUA DE RIEGO, EN LOS SECTORES
AMARA Y SANTA ANA, DISTRITO DE
OCUCAJE, PROVINCIA Y REGION ICA.
(Petacc).
744,445.00 2013 20,000 20,000 100.0% 2.7% 20,000 PETACC
2012 10,000 10,000 100.0% 4.0% 10,000
2013 20,000 20,000 100.0% 7.9% 20,000
2012 10,000 10,000 100.0% 3.4% 10,000
2013 20,000 20,000 100.0% 6.8% 20,000
2012 265,490 251,470 94.7% 90.2% 10,542 378 46,262 80,285 114,003
2013 14,860 3,374 22.7% 1.2% 2,310 1,064
132 139756 2113627
CONSTRUCCION DE MODULO DE WAWA
WASI COMUNAL EN C.P SAN JOSE DE
LOS MOLINOS DEL DISTRITO DE SAN
JOSE DE LOS MOLINOS-ICA.
278,808.23OBRA
CULMINADA
131 132348 2162994
2162994: REHABILITACION DEL DIQUE
EN EL RIO PISCO, CON FINES DE
REDUCIR LA VULNERABILIDAD DEL
SECTOR NUÑEZ CANCHARI-CASALLA-M.
I, DISTRITO DE TUPAC AMARU INCA,
PROVINCIA DE PISCO, REGION ICA.
(Petacc).
293,827.97 PETACC
130 132321 2162747
2162747: REHABILITACION DE DIQUE EN
EL RIO PISCO CON FINES DE REDUCIR LA
VULNERABILIDAD DEL SECTOR
BERNALES-M. IZQUIERDA, DISTRITO DE
HUMAY, PROVINCIA DE PISCO, REGION
ICA.
(Petacc).
252428.9 PETACC
128
FICHA
FORSUR
S/C (*)
2113868
2113868: RECONSTRUCCION DE
INFRAESTRUCTURA EDUCATIVA Y
EQUIPAMIENTO EN LA INSTITUCION
EDUCATIVA Nº 22732, CP SANTA
DOMINGUITA, DISTRITO DE SANTIAGO,
PROVINCIA DE ICA, AFECTADA POR EL
TERREMOTO DEL 15 DE AGOSTO DEL
2007.
OBRA
CULMINADA
127FICHA
FORSUR2090181
RECONSTRUCCION DE LA COMISARIA
PNP CHINCHA ALTA - CHINCHA - ICA,
AFECTADO POR EL SISMO DEL 15 DE
AGOSTO DEL 2007.
(Forsur).
OBRA
CULMINADA
126 137111 2111439
2111439: CONSTRUCCION DE PISTAS Y
VEREDAS EN EL CENTRO POBLADO
PAMPANO, DISTRITO DE HUANCANO-
PISCO.
1,190,456.54OBRA
CULMINADA
125 147677 2116133
AMPLIACION DE REDES DE
DISTRIBUCION PRIMARIA EN 22,9 KV
PARA ELECTRIFICAR LOS C.P. SANTA
MONICA, SANTA CRUZ DE VILLACURI I Y
II ETAPA Y VIRGEN DEL ROSARIO DEL C.P
SANTA CRUZ DE VILLACURI DEL
DISTRITO DE SALAS-ICA-ICA
115,011.08OBRA
CULMINADA
124 90884 2112492
2112492: REHABILITACION DEL CAMINO
VECINAL DV PANAMERICANA SUR Km
381+500 PUEBLO NUEVO - EL CARMEN -
ALTO LARAN - LOCARI - ORONGO -
SOTELO.
1,228,442.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
133 148903 2163470
2163470: MEJORAMIENTO DEL
SERVICIO EDUCATIVO EN LA I.E. 22290
C.P. EL GUAYABO, DEPARTAMENTO ICA,
PROVINCIA CHINCHA, DISTRITO
SUNAMPE.
627,239.00 2013 21,816 3,000 13.8% 0.5% 3,000
EXPEDIENTE
TECNICO EN
FORMULACION
2010 380,247 4,200 1.1% 4,200
2011 648,055 534,050 82.4% 9,800 194,487 22,216 118,056 10,063 148,350 31,078
2012 21,198 10,398 49.1% 4,728 5,670
2013 10,580 10,580 100.0% 10,580
135 223187 2229809
2229809: MEJORAMIENTO Y
AMPLIACION DEL SERVICIO DE
COMERCIALIZACION DE PRODUCTOS DE
PRIMERA NECESIDAD DEL MERCADO DE
ABASTO MUNICIPAL, DISTRITO DE
PUEBLO NUEVO-CHINCHA-ICA.
9,986,423.00 2013 10,500 0 0.0% 0.0%
OBRA PARA
PROCESO DE
SELECCIÓN
2012 1,211,173 1,178,198 97.3% 102.3% 235,142 594,290 348,766
2013 9,437 9,436 100.0% 0.8% 9,436
2012 26,275 26,275 100.0% 3.4% 10,510 15,765
2013 7,883 0 0.0% 0.0%
2012 423,349 399,881 94.5% 70.6% 49,900 91,198 235,615 3,020 20,148
2013 6,175 1,771 28.7% 0.3% 1,771
2012 828,060 822,860 99.4% 98.5% 366,284 225,280 120,176 108,025 3,095
2013 5,200 0 0.0% 0.0%
2011 378,888 258,348 68.2% 91.5% 258,348
2012 116,725 110,181 94.4% 39.0% 99,164 8,326 2,691
2013 3,861 0 0.0% 0.0%
2012 10,900 10,900 100.0% 1.3% 0 0 10,900
2013 10,500 10,500 100.0% 1.2% 0 0 10,500
2159892: MEJORAMIENTO DE LA
CALIDAD EDUCATIVA DE LA I.E. Nº91 EN
EL AA.HH. SEÑOR DE LUREN III ETAPA,
DISTRITO, PROVINCIA Y
DEPARTAMENTO DE ICA.
2159892172208 853,425.00
140 155401 2131991
2131991: SUSTITUCION DE LA LINEA DE
ABASTECIMIENTO DE AGUA POTABLE Y
AMPLIACION DE REDES DE
DISTRIBUCION DE AGUA POTABLE AL
CC.PP LA VICTORIA-LOS JUAREZ,
DISTRITO DE ICA.
282,277.02OBRA
CULMINADA
139 147690 2117929
AMPLIACION DE REDES DE
DISTRIBUCION SECUNDARIA Y
ALUMBRADO PUBLICO PARA
ELECTRIFICAR LOS C.P. SANTA MONICA,
SANTA CRUZ DE VILLACURI I Y II ETAPA Y
VIRGEN DEL ROSARIO DEL C.P SANTA
CRUZ DE VILLACURI DEL DISTRITO DE
SALAS - ICA-ICA
835,054.70OBRA
CULMINADA
138 149196 2133478
CONSTRUCCION DE ALAMEDA
TURISTICA DEL ANEXO DE HUARACCO-
DISTRITO RIO GRANDE, PROVINCIA DE
PALPA-ICA.
566,368.00OBRA
CULMINADA
137 188630 2150903
2150903: MEJORAMIENTO DEL SISTEMA
DE COMUNICACIÓN PARA LA
PREVENCION Y ATENCION DE LAS
EMERGENCIAS DEL GOBIERNO
REGIONAL DE ICA.
775,104.00
EXPEDIENTE
TECNICO
APROBADO
136 143136 2115792
CONSTRUCCION DE PISTAS Y VEREDAS
DE CONCRETO EN LAS PRINCIPALES
CALLES DEL DISTRITO DE SAN PEDRO DE
HUACARPANA-CHINCHA.
1,152,135.49OBRA
CULMINADA
134
FICHA
FORSUR
S/C (*)
2113688
2113688 RECONSTRUCCIÓN DE
AMBIENTES Y ADQUISICIÓN DE
EQUIPAMIENTO BIÓMEDICO BÁSICO
DEL PUESTO DE SALUD CONDORILLO
ALTO DEL DISTRITO DE CHINCHA ALTA,
PROVINCIA DE CHINCHA, DPTO DE ICA,
AFECTADOS POR EL SISMO DEL 15 DE
AGOSTO DEL 2007.
(FORSUR).
OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA
EJECUCION% de
Avance
% de
Avance
respecto respecto
al PIM
Anual
a la
inversión
viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic
EJECUCION MENSUALIZADA ESTADO DE
PIPTOTAL (S/.)
(**)
SNIP DGPP
PRESUPUESTO ACUMULADO DE PROYECTOS AL III TRIMESTRE DEL 2013
Ejecutora Item
Código
DenominaciónMonto de la
ViabilidadAños PIM
2011 1,247,840 663,043 53.1% 46.9% 663,043
2012 717,332 662,753 92.4% 46.9% 11,142 349,439 50,833 1,064 6,936 238,880 4,459
2013 2,350 2,350 100.0% 0.2% 2,350
2010 20,318 165 0.8% 165
2011 20,153 12,727 63.2% 4,666 2,614 3,328 2,119
2012 8,926 858 9.6% 858
2013 1,919 419 21.8% 0 0 419
2011 993,588 969,020 97.5% 89.8% 435,680 94,941 96,087 61,127 74,940 190,450 -335 16,130
2012 24,567 4,304 17.5% 0.4% 4,304
2013 1,584 1,584 100.0% 0.1% 1,584
144
2. Si el monto de inversión total con el que fue declarado viable el PIP es > a S/.3 millones de N/S y < o igual a S/.6millones de N/S, la modificación no deberá incrementarlo en mas de 30% respecto de lo declarado viable.
(*) S/C Sin Código - Proyectos que no pasaron por el SNIP
Nota: (**)
De acuerdo al Artículo Nº27 respecto a las Modificaciones de un PIP durante la fase de Inversión, señala:
1. si el monto de inversión total con el que fue declarado viable el PIP es < o igual a S/.3 millones de N/S, la modificación no deberá incrementarlo en mas de 40% respecto de o
3. Si el monto de inversión total con el que fue declarado viable el PIP es > a S/.6 millones de N/S, la modificación no deberá incrementarlo en mas de 20% respecto de lo declarado viable.
144 132459 2113629
2113629: MEJORAMIENTO DE LA
CAPACIDAD RESOLUTIVA PARA LA
OFERTA DE SERVICIOS DEL PUESTO DE
SALUD BERNALES, DISTRITO DE HUMAY-
PISCO-ICA.
1,079,634.97OBRA
CULMINADA
143
FICHA
FORSUR
S/C (*)
2113865
2113865: RECONSTRUCCION DE
INFRAESTRUCTURA EDUCATIVA Y
EQUIPAMIENTO EN LA INSTITUCION
EDUCATIVA INICIAL Nº 080, CASERIO
SAN JOSE DE PINILLA DISTRITO DE
OCUCAJE, PROVINCIA DE ICA, AFECTADA
POR EL TERREMOTO DEL 15 DE AGOSTO
DEL 2007.
OBRA
CULMINADA
142 113837 2113226
2113226: REHABILITACION Y
MEJORAMIENTO DE LAS REDES DE
AGUA POTABLE Y ALCANTARILLADO DEL
CENTRO POBLADO DE SAN IDELFONSO
LA TINGUIÑA-ICA.
1,413,911.00OBRA
CULMINADA
GOBIERNO
REGIONAL
DE ICA