AGENDA
1. INTRODUCCION
2. CODIGOS ASME APLICABLES
3. DOCUMENTOS DE REFERENCIA
4. DESARROLLO
4.1. ETAPA 1 – TRABAJOS PRELIMINARES
4.1.1. Taller 4.1.2. Obra
4.2. ETAPA 2 – ASPECTOS LOGÍSTICOS
4.3. ETAPA 3 – DESARROLLO DEL TRABAJO EN CAMPO
![Page 3: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/3.jpg)
1. INTRODUCCIÓN
![Page 4: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/4.jpg)
1. INTRODUCCION
• Proyecto: Pueblo Viejo (República Dominicana)
• Propietario: Barrick Gold (Canadá)
• Agente de Ingeniería: Hatch (Canadá)
• Fabricante de Columnas: Air Products (Reino Unido)
• Contratista: Cosapi (Perú)
• Subcontratista: Fima S.A. (Perú)
![Page 5: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/5.jpg)
1. INTRODUCCIÓN
Antecedentes:
• Equipos fabricados por Air Products bajo código ASME Sec VIII Div 1.
• Los Equipos fueron terminados y estampados “U” en origen (Reino Unido)
• Los Equipos se cortaron y entregaron en dos partes por factibilidad de despacho a Obra (restricción de ancho de vías en República Dominicana)
• La tuberías fueron diseñadas y prefabricadas según ASME B 31.3
• La unión soldada en obra se realizó bajo código ASME Sec IX, con aplicación de estampa “R” del National Board.
• Las tuberías se instalaron posterior al armado del tanque
![Page 6: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/6.jpg)
LOCACIONES
CANADA PROPIETARIO iNGENIERIA
USA INGENIERIA
REVISION ASME CONS. LIMPIEZA
PERU CONTRATISTA
REV INGENIERIA CALIFICACIONES
BRASIL AGENTE
AUTORIZADO ASME
REPUBLICA DOMINICANA TERMINACION INSTALACION
REINO UNIDO FABRICACION
ITALIA
ELECTRODOS
![Page 7: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/7.jpg)
2. CODIGOS ASME APLICABLES
![Page 8: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/8.jpg)
Usos: • En la Industria de Gas, Energía, Petróleo y Petroquímica • En la Industria de Generación (calderos) • En la Industria de Papel • En la Industria alimentaria • Procesos químicos y metalúrgicos en general
RECIPIENTES A PRESIÓN (VESSELS)
![Page 9: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/9.jpg)
• Comprende vessels de 15 psi a 3000 psi.
• No comprende:
- Internos del vessel, salvo que estén soldados al cuerpo.
- calentadores tubulares de fuego.
- sistemas y componentes de tuberías.
- recipientes a presión para ocupación humana.
- recipientes que tengan un diámetro interno, ancho y altura, menores a 6”.
• Los límites para las partes a presión de un tanque:
-Para conexiones con extremos soldados hasta la primera junta circunferencial.
-Para conexiones roscadas, hasta la primera junta roscada.
-Para conexiones bridadas, hasta la primera cara de la brida.
-Para accesorios, hasta la primera superficie del sello.
-Para tanques que tengan man-hole o hand-hole, hasta las tapas.
SECCIÓN VIII “PRESSURE VESSELS” Alcances de la Sección VIII Div. 1
![Page 10: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/10.jpg)
Para cada subsección, solo se mencionarán las mas aplicables durante una fabricación, los cuales no son limitantes. Subsección A: Requerimiento General de Fabricación UG-4 a UG-15; Materiales UG-16 a UG-35; Diseño UG-36 a UG-46; Aperturas, refuerzos, bridas UG-75 a UG-85; Fabricación UG-90 a UG-103 Pruebas e Inspecciones UG-125 a UG-137 Dispositivos de alivio de presión. Subsección B: Métodos de Fabricación Parte UW; Recipientes soldados; Tratamiento térmico, pruebas Radiograficas, Ultrasonido, Conexiones soldadas, Inspección y pruebas de soldadura. Parte UF y UB: Requerimientos para fabricación de vessels por “brazing”(fusión de metal); fabricación, inspección y pruebas
Organización del código ASME Sección VIII Div. 1
![Page 11: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/11.jpg)
Subsección C: Clases de materiales y tabla de esfuerzos UCS ; Para vessels fabricados en aceros al carbono
UHA, Para vessel s fabricados con aceros de alta aleación
UNF; Para vessels fabricados en material no ferroso
UCI; Para vessels fabricados en acero fundido (cast iron)
UCL; Para vessels fabricados en acero revestido
UCD; Para vessels fabricados de hierro ductil
Organización del código ASME Sección VIII Div. 1
![Page 12: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/12.jpg)
• Parte A: Especificaciones de Materiales ferrosos. Comprende tuberías de acero, bridas, planchas, pernos, etc. de acero fundido, forjado o hierro dúctil. La designación de estos materiales comienzan con SA, ejem. SA-53.
• Parte B: Especificaciones de Materiales no ferrosos. Comprende materiales como aluminio, cobre, níquel, titanio, zirconio y sus aleaciones. Sus designaciones comienzan con SB; como SB-61, SB-88, etc.
• Parte C: Especificaciones de materiales de soldadura. Comprende las especificaciones para varillas de soldadura, electrodos y material de aporte.
• Parte D: Propiedades de los Materiales; Comprende las propiedades de los todos los materiales que estan permitidos en en las secciones I, III y VIII del Codigo ASME.
SECCIÓN II ESPECIFICACIONES DE MATERIALES
![Page 13: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/13.jpg)
Esta sección comprende las tecnicas de Ensayos No Destructivos, entre los cuales se encuentran: • Líquidos Penetrantes, • Partículas Magnéticas, • Radiografía Industrial y • Ultrasonido. Los criterios de aceptacion y rechazo de las tecnicas mencionadas se encuentran establecidos en el Codigo ASME Sección VIII Division 1. Todo Ensayo No Destructivo, debe ser realizado por personal certificado según la Practica Recomendada SNT-TC-1A y de acuerdo con un procedimiento escrito revisado y validado por un Nivel III ASNT.
ASME SECCION V.- ENSAYOS NO DESTRUCTIVOS
![Page 14: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/14.jpg)
Esta sección describe los requerimientos para la calificación de los procedimientos de soldadura y soldadores que se emplearan en la construcción de recipientes a presión.
Un procedimiento de soldadura (WPS) es el conjunto de materiales, metodos de soldadura, condiciones operatorias, posiciones y a veces maquinas y herramientas que se emplean en la soldadura de una unión.
En el WPS se registra toda la información relacionada con el procedimiento a calificar, las variables esenciales y no esenciales y toda información adicional que establezca el código.
El WPS queda calificado con los resultados satisfactorios obtenidos de los ensayos mecanicos realizados a los cupones de prueba, los mismos que son detallados en el Registro de Calificacion de Procedimiento (PQR).
Un soldador es calificado bajo un procedimiento de soldadura aprobado.
ASME SECCION IX.- PROCEDIMIENTOS DE SOLDADURA Y CALIFICACIÓN DE SOLDADORES
![Page 15: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/15.jpg)
3. DOCUMENTOS DE REFERENCIA
![Page 16: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/16.jpg)
CODIGOS APLICABLES
![Page 17: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/17.jpg)
CODIGOS APLICABLES
![Page 18: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/18.jpg)
CODIGOS APLICABLES
![Page 19: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/19.jpg)
4. DESARROLLO
![Page 20: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/20.jpg)
• Certificaciones vigentes de Fima SA (ASME y National Board). • Consideraciones iniciales para calificación de WPS/PQR. • Plano de arreglo general y diseño de junta (revisión Ingeniería FIMA y Agencia Autorizada de ASME). • Material de aporte, según especificación de fabricante de columnas (Air Products). • Calificación de procedimientos de soldadura y calificación de soldadores. • Coordinación de Servicios de Agencia Autorizada para estampa “R”
TRABAJOS PRELIMINARES - TALLER
![Page 21: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/21.jpg)
CERTIFICACIONES FIMA: "S", "U" y "U2"
![Page 22: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/22.jpg)
CERTIFICACIONES FIMA: "NB y "R"
![Page 23: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/23.jpg)
CONSIDERACIONES INICIALES
![Page 24: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/24.jpg)
PLANO DE ARREGLO GENERAL
![Page 25: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/25.jpg)
DISEÑO DE JUNTA
![Page 26: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/26.jpg)
CONSUMIBLES PARA SOLDADURA
![Page 27: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/27.jpg)
CALIFICACION DE WPS/PQR y WPQ
![Page 28: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/28.jpg)
TRABAJOS PRELIMINARES - OBRA
• Recepción de Equipo en Puerto • Traslado de equipos hacia Obra • Almacenamiento e inspección de Equipo
![Page 29: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/29.jpg)
TRASLADO DE EQUIPOS A OBRA
![Page 30: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/30.jpg)
ALMACENAMIENTO DE EQUIPOS
![Page 31: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/31.jpg)
ASPECTOS LOGISTICOS
Relacionados al personal: • Traslado a obra • Campamentos
Relacionados a la ejecución de trabajos: • Instalaciones para pruebas en Obra • Instalaciones para ejecución • Adquisición e importación de equipos de soldadura • Adquisición e importación de consumibles de soldadura • Adquisición e importación de elementos especiales para limpieza
![Page 32: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/32.jpg)
MOVILIZACION DEL PERSONAL
![Page 33: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/33.jpg)
DESARROLLO DE TRABAJO EN CAMPO
• Disposición de coberturas para soldeo. • Simulación de alineamiento y aproximación de columnas. • Colocación de coberturas. • Recalificación de Soldadores en Obra (A solicitud de Air Products). • Retiro de elementos de protección (tapas). • Limpieza de bisel. • Aproximación y embonado de HP/LP. • Apuntalado de unión a soldar. • Validación de Fit-Up para iniciar a soldar. • Ejecución de soldadura (horario nocturno). • END sobre junta soldada (VT, PT y UT). • Instalación de tuberías • Prueba neumática de recipientes • Elaboración del Data Report, Form R-1. • Estampa “R” (por Inspector autorizado). • Limpieza exterior de columnas. • Acta de liberación. • Posición final de las Columnas.
![Page 34: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/34.jpg)
DISPOSICION DE COBERTURAS
![Page 35: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/35.jpg)
SIMULACION DE ALINEAMIENTO Y APROXIMACION DE COLUMNAS
![Page 36: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/36.jpg)
INICIANDO TRABAJOS DE COBERTURAS
![Page 37: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/37.jpg)
APROXIMACION DE PARTES HP/LP
![Page 38: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/38.jpg)
EMBONADO FINAL DE PARTES HP/LP
![Page 39: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/39.jpg)
APUNTALADO DE SECCIONES A UNIR
![Page 40: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/40.jpg)
JUNTA CON PASE DE RAIZ
![Page 41: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/41.jpg)
EJECUCION DE TRABAJOS DE NOCHE
![Page 42: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/42.jpg)
APLICACIÓN DE LIQUIDOS PENETRANTES
![Page 43: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/43.jpg)
REPORTES INSPECCION UT
![Page 44: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/44.jpg)
REPORTES INSPECCION UT
![Page 45: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/45.jpg)
EJECUCION DE PRUEBA NEUMATICA
![Page 46: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/46.jpg)
LIMPIEZA FINAL
![Page 47: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/47.jpg)
EJECUCION DE PRUEBA NEUMATICA
![Page 48: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/48.jpg)
DATA REPORT: FORM R-1
![Page 49: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/49.jpg)
ACTA DE LIBERACION
![Page 50: Presentación Cosapi Fima](https://reader030.fdocument.pub/reader030/viewer/2022033019/55cf8e36550346703b8fbc7d/html5/thumbnails/50.jpg)
IZAJE DE COLUMNAS – POSICION FINAL