PREPARED BY: ENGR. ARprdp.da.gov.ph/wp-content/uploads/2019/01/TOR-PDA-IPLAN.pdf · Reporting...
Transcript of PREPARED BY: ENGR. ARprdp.da.gov.ph/wp-content/uploads/2019/01/TOR-PDA-IPLAN.pdf · Reporting...
![Page 1: PREPARED BY: ENGR. ARprdp.da.gov.ph/wp-content/uploads/2019/01/TOR-PDA-IPLAN.pdf · Reporting directly to the I-PLAN Component Head/Altemate Component Head, the Project Development](https://reader033.fdocument.pub/reader033/viewer/2022041716/5e4be80293fba437307674a6/html5/thumbnails/1.jpg)
RepubIic of the P掴ppines
Department of Agricuiture
PHiLIPPiNE RURAしDEVEしOPIVIENT PROJECT
NatjonaI Project Coordination O簡ce
4th FIoor】 DA Bui-ding, E-1ipticaI Road, D硝man
避㌢ Quez五重声霜;晶面詰
TERMS OF REFERENCE (TOR)
〔PROJECT DEVELOPMENT ASSOCIATE〕
NPCOトPLAN Component
BACKGROU ND
The Government of the Philippines 〔GOP〕 has received a Ioan from the International Bank for
Reconstruction and Development 〔IBRD or the ′`Bank・・〕, SPeCifically under Loan Agreement for
IBRD Loan No" 8421-PH dated September 8′ 2014 in an amount equivalent to FIVE HUNDRED
ONE MILLION TWO HUNDRED FI門Y THOUSAND UNITED STATES DOLLARS (US$501,250,000)
for the purpose ofpart誼nancing the Philippine Rura- Development project 〔PRDP〕, and another
loan from the same Bank in the amount of ONE HUNDRED AND SEVENTY MILLION UNITED
STATES DOLLARS 〔$170,000,00O〕, under Loan Agreement for IBRD Loan No, 8816_PH dated
The development objective of the Project is to increase rural incomes and enhance farm and
fishery productivfty in targeted areas in alI the 16 regions of the country. It is envisaged to
PrOmOte mOre inclusive ruraI deveIopment by suppo巾ng smallholders and fisher-folk to
increase their marketable surpluses′ and by improving access to markets, The PRDP would also
SuPPOrt reforms in the plaming resource programming and implementation practices of the
DA. It will facilitate the integration and financing of priority local investments derived from the
DA’s agrjcuItural and fisheries modernization pIans which have been deveIoped using a value
Chain approach, and through a consultative process with Iocal stakeholders. The Project w刑be
implemented over a period of sixyears 〔2014 to 2020),
Spec脆e jnvestments and血erventions are impIemented under four (4) centraI components of
the Project enumerated and briefly described as foIIows:
Component l: Local and National Levels Planning (トPIAN〕・ This component supports the
implementation and mainstreaming of the DA′s AFMP planning framework thereby providing
an OPerationaI platform for integrated technical support serviee delivery at the local and
national levels. At the regional and local leveIs’regional AFMPs are being developed taking into
aCCOunt SPatial and va山e chain anaIysis and using tooIs for vAInerabi匝y and suitabilfty
aSSeSSment’Participatory resource analysis. The Ioca重AFMPs shaH build on the success of local
gOVernmentS in the impIementation oftheir own deveIopment pIans.
Component 2: Infrastructure Development (トBU萱LD)t A network of strategic rural
infrastructure is being estabIished, linking priority value chains in targeted Project areas that
are iden珊ed through the regional AFMPs. Bythe end ofthe Project the component wilI be able
to establish an improved access to strategic and climate-reSilient rura=nfrastructure and
faci舶es that primarily benefit target bene触aries・ These rural infrastructures include farm-tO-
market roads (FMRs)′ bridges′ COmmuna=rrigation systems 〔CIS〕, POtable water systems
(PWS)′ PrOduction and post-PrOduction faciIities and other infrastructure such as軸1andings,
fish sanctuary/Protected Area guardhouses, amOng Others.
1
![Page 2: PREPARED BY: ENGR. ARprdp.da.gov.ph/wp-content/uploads/2019/01/TOR-PDA-IPLAN.pdf · Reporting directly to the I-PLAN Component Head/Altemate Component Head, the Project Development](https://reader033.fdocument.pub/reader033/viewer/2022041716/5e4be80293fba437307674a6/html5/thumbnails/2.jpg)
Component 3: Enterprise DeveIopment (I-REAP)〃 This aims to strengthen and develop
viabIe rural agro- industries through investments in the appropriate segments of e綿cient value
Chains of key agricultural and fishery products in targeted Project areas. Specifically, I-REAP is
designed to: 〔i〕 increase productivity and marketability of agriculture and軸ery products
through increased access to information and support services; and 〔ii〕 increase farm and fishery
household incomes through engagement in value-adding activities.
Component 4: Project Implementation Support (I-SUPPORT), Providing overall operational
SuPPOrt tO the implementation is the I-SUPPORT component that ensures e飾cient and effective
delivery of the Project transactions in terms of financial management, PrOCurement mOnitoring
& eva】uation・ geOtagg申g socia】 and environmentaI safeguards and grjevance redress
mechanism. It Ieads in the introduction of innovations and refoms towards more e飾ective and
efficient administrative support system in Project implementatfon, mainly working through the
existing DA bureaucracy" At the national leveI, the National Project Coordination O珊ce 〔NPCO〕
is established‘at the DA Central O鯖ce to steer the overall implementation of the Project. Four
〔4) Project Support O餓ces 〔PSOs) have been established to support the implementation in the
main islands of the country (2 in Luzon, 1 in Visayas and l in Mindanao). A Regiona】 Project
Coordination O節ce 〔RPCO) is formed and functioning in each Regional O飾ce of the DA to focus
On the implementation ofthe Project in the re由On.
SCOPE OF THE ASSIGNMENT
The Project Development Associate will be engaged essent血ly to provide the necessary
administrative and records management support to the I-PLAN Component.
Reporting directly to the I-PLAN Component Head/Altemate Component Head, the Project
Development Associate. He/She shall also secure the conduct of activities and prepare
necessary documents and reports. If needed, he/She shall also act as liaison and coordinator
for the actil融es to be conducted and implemented by I-PRAN Component.
DUTIES AND RESPONSIBILITIES
. Overa旧n-Charge ofthe administrative and records management needs of I-PLAN
Component
・ Monitor/Fac描tate incoming and outgoing communications/ COrreSPOndence/files of I-
PLAN Componenし
● Coordinate/faciIitate meetings, WOrkshops and seminars
● Facilitate processing ofpre and post traveI documents of I-PLAN personneI
● Prepare and facilitate processing of traveI cIaims ofI-PLAN personnel, P「OCurement
documents and transactions
● AssistトPLAN staffin Workand Financial PIanning
. AssistM&E in data managementthrough the MIS
・ Prepare/PrOCeSS documentary requirements for processing ofconsuItaney fees and other
PrOCurement transactions.
. Manage and maintain filing ofdocuments.
● Attend meetings, WOrkshops and seminars ofcomponents/units or invitation from other
O鯛ce(S〕.
. Perfom other functions as maybe assigned bythe supervisors.
REQUIRED EDUCATION AND QUALIFICATION
A" Education and Relevant Experiences
・ Must be graduate of Agribusiness′ Agricultural Economics, Agriculture or related
nelds
![Page 3: PREPARED BY: ENGR. ARprdp.da.gov.ph/wp-content/uploads/2019/01/TOR-PDA-IPLAN.pdf · Reporting directly to the I-PLAN Component Head/Altemate Component Head, the Project Development](https://reader033.fdocument.pub/reader033/viewer/2022041716/5e4be80293fba437307674a6/html5/thumbnails/3.jpg)
・ At least one (1) year experience in project implementation, Preferably in
agribusiness/marketing 〔Knowledge in value chain analysis and rapid market
appraisal has the advantage)
. Experience in administrative and records management related jobs
B" Knowledge, Competencies and SkiIIs
. Competence in basic computer operations’e.g. Microsoft O綿ce, ExceI, and Power
Poin亡;
. Good business writingskilI
. Good human relations and ateam player
PREPARED BY: APPROVED BY:
ENGR. AR
Unde rsecr
and PRDP
L T. CAYANAN
tary for Operations
National Project Director
存
3