  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    PRELIMINARES

    CAMPAMENTO 18 M2 UN 1,524,675 1,547,111 1,508,337 1,519,232 1,533,346 1,519,533 1,540,466 1,507,365 1,522,001 1,546,003CAMPAMENTO 9 M2 UN 885,939 897,157 877,770 883,217 890,274 883,368 893,834 877,284 884,602 896,603CERCA EN ALAMBRE DE PUA 4 HILOS ML 10,216 10,216 10,216 10,216 10,216 10,216 10,216 10,216 10,216 10,216CERCA EN ALAMBRE DE PUA 5 HILOS ML 11,505 11,505 11,505 11,505 11,505 11,505 11,505 11,505 11,505 11,505CERCA EN ALAMBRE DE PUA 6 HILOS ML 13,377 13,377 13,377 13,377 13,377 13,377 13,377 13,377 13,377 13,377CERCA EN TABLA H=2.30 M ML 49,236 49,236 49,236 49,236 49,236 49,236 49,236 49,236 49,236 49,236CERCA EN TEJA DE ZINC H=1.80 M ML 35,525 35,780 35,351 35,459 35,594 35,478 35,682 35,322 35,494 35,738CERCA EN TELA VERDE H = 2.10 M ML 15,944 16,199 15,771 15,879 16,014 15,898 16,102 15,742 15,914 16,157DEMOLICIN ESCALERAS EN CONCRETO M2 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715 60,715DEMOLICIN BALDOSA DE PISO H=0.02 M M2 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753 4,753DEMOLICIN BALDOSA DE PISO H=0.04 M M2 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733 6,733DEMOLICIN ENCHAPE MURO M2 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157 5,157DEMOLICIN PAETE MURO M2 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587 5,587DEMOLICIN CIELO RASO FALSO M2 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747 6,747DEMOLICIN ADOQUN SOBRE ARENA, H=0.15 m M2 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731 6,731DEMOLICIN MUROS EN MAMPOSTERA 0.15 M M2 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093 10,093DEMOLICIN MUROS EN MAMAPOSTERA 0.25 M M2 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754 13,754DEMOLICIN PLACA ALIGERADA 0.30 M M2 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501 20,501DEMOLICIN PLACA ALIGERADA 0.40 M M2 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856 29,856DEMOLICIN PLACA ALIGERADA 0.50 M M2 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962 36,962DEMOLICIN PLACA MACIZA 0.15 M M2 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891 30,891DEMOLICIN PLACA MACIZA 0.20 M M2 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389 43,389DEMOLICIN PLACA MACIZA 0.25 M M2 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374 51,374DEMOLICIN PLACA MACIZA 0.30 M M2 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963 62,963DEMOLICIN PLACA PISO 0.05 M M2 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867 6,867DEMOLICIN PLACA PISO 0.10 M M2 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090 11,090DEMOLICIN PLACA PISO 0.15 M M2 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890 16,890DEMOLICIN PLACA PISO 0.20 M M2 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721 27,721DEMOLICIN VIGAS Y COLUMNAS M3 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736 154,736DESCAPOTE A MAQUINA E=0.20 M M2 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169 1,169DESCAPOTE MANUAL Y RETIRO E= 0.20 M APILE A 15 M M2 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383 4,383DESMONTE APARATOS SANITARIOS UN 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645 15,645DESMONTE DE CUBIERTAS (TEJA DE BARRO) M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539DESMONTE DE CUBIERTAS (ASBESTO CEMENTO) M2 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453 8,453DESMONTE DE CUBIERTAS (TERMOACSTICA) M2 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822 7,822DESMONTE DE CUBIERTAS (TEJA DE ZINC) M2 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307 7,307DESMONTE MUROS SECOS M2 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647 11,647DESMONTE MARCOS Y PUERTAS UN 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972 9,972DESMONTE VENTANAS M2 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539 8,539LETRINA DE 2.0x1.0 UN 625,875 631,410 624,239 627,307 627,961 626,407 629,842 624,548 624,673 630,495LOCALIZACIN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DE

    PRESICINM2 7,315 7,315 7,315 7,315 7,315 7,315 7,315 7,315 7,315 7,315

    REPLANTEO MANUAL DE CIMIENTOS M2 2,319 2,319 2,319 2,319 2,319 2,319 2,319 2,319 2,319 2,319RED ELCTRICA PROVISIONAL L=50M UN 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019 1,154,019RED TELEFNICA PROVISIONAL UN 164,636 164,636 164,636 164,636 164,636 164,636 164,636 164,636 164,636 164,636

    1.43

    1.44

    1.37

    1.38

    1.39

    1.40

    1.41

    1.42

    1.31

    1.32

    1.33

    1.34

    1.35

    1.36

    1.25

    1.26

    1.27

    1.28

    1.29

    1.30

    1.19

    1.20

    1.21

    1.22

    1.23

    1.24

    1.13

    1.14

    1.15

    1.16

    1.17

    1.18

    1.10

    1.11

    1.12

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCIN1

    1.7

    1.8

    1.9

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINRETIRO DE SOBRANTES A UNA DISTANCIA DE 5 KM (INCLUYE CARGUE) M3 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825 6,825

    CIMIENTOS

    BASE AGREGADO PTREO (MATERIAL DE AFIRMADO) M3 58,181 96,986 54,508 80,378 76,290 66,150 89,225 62,269 48,041 90,518BASE ARENA CEMENTO 1:20 M3 185,044 201,158 162,911 168,118 160,797 174,629 180,327 145,985 169,420 180,327DEMOLICIN CABEZAS DE PILOTES M3 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434 192,434DEMOLICIN CIMIENTO ENTERRADO M3 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040 131,040IMPERMEABILIZACIN INTEGRAL MORTERO XYPEX M2 4,615 4,615 4,615 4,615 4,615 4,615 4,615 4,615 4,615 4,615SOBRECIMIENTOS CONCRETO 3000 PSI 25x25 M3 537,415 562,111 520,275 531,168 544,949 532,599 553,315 517,986 534,464 558,891VIGA DE AMARRE EN CONCRETO 3500 PSI M3 551,957 578,047 534,374 545,198 558,667 547,393 567,832 531,198 548,834 573,402ZAPATAS EN CONCRETO 3500 PSI M3 516,453 540,883 499,990 510,125 522,736 512,180 531,318 497,015 513,529 536,534PILOTE DE MADERA D=20 CM ML 36,378 36,378 36,378 36,378 36,378 36,378 36,378 36,378 36,378 36,378PILOTE PRE EXCAVADO D=20 CM (INCLUYE RETIRO DE SOBRANTES A

    UNA DISTANCIA MENOR DE 5 KM)ML 110,984 110,984 110,984 110,984 110,984 110,984 110,984 110,984 110,984 110,984

    PILOTE PRE EXCAVADO D=30 CM (INCLUYE RETIRO DE SOBRANTES A

    UNA DISTANCIA MENOR DE 5 KM)ML 134,065 134,065 134,065 134,065 134,065 134,065 134,065 134,065 134,065 134,065

    PILOTE PRE EXCAVADO D=40 CM (INCLUYE RETIRO DE SOBRANTES A

    UNA DISTANCIA MENOR DE 5 KM)ML 161,976 161,976 161,976 161,976 161,976 161,976 161,976 161,976 161,976 161,976

    PILOTE PRE EXCAVADO D=50 CM (INCLUYE RETIRO DE SOBRANTES A

    UNA DISTANCIA MENOR DE 5 KM)ML 199,550 199,550 199,550 199,550 199,550 199,550 199,550 199,550 199,550 199,550

    PILOTE HINCADO 25X25 ML 92,352 94,179 91,172 91,864 92,703 92,083 93,376 90,877 92,133 93,735PILOTE HINCADO 30X30 ML 112,976 115,624 111,265 112,268 113,484 112,586 114,459 110,837 112,659 114,980DADOS EN CONCRETO 3500PSI M3 505,677 530,106 489,213 499,349 511,960 501,403 520,542 486,239 502,753 525,758MICROPILOTE D=6" (INCLUYE RETIRO DE SOBRANTES A UNA DISTANCIA

    MENOR DE 5 KM)ML 119,239 119,239 119,239 119,239 119,239 119,239 119,239 119,239 119,239 119,239

    DESAGES E INSTALACIONES SUBTERRNEAS

    SIFN PARA DRENAJE EN PVC DE 4" UN 28,368 28,468 28,230 28,263 28,217 28,303 28,338 28,125 28,271 28,338SIFN EN PVC 6" UN 144,878 144,979 144,741 144,773 144,728 144,814 144,849 144,636 144,781 144,849CAJA DE INSPECCIN DE 100X100 UN 361,130 393,995 353,998 374,605 372,124 366,039 384,915 356,713 350,593 387,388CAJA DE INSPECCIN DE 40X40 UN 181,654 186,379 179,225 182,105 183,160 181,291 185,037 179,309 180,251 185,763CAJA DE INSPECCIN DE 60X60 UN 205,052 212,593 200,960 205,447 206,741 204,343 210,054 200,697 202,542 211,119CAJA DE INSPECCIN DE 80X80 UN 274,285 284,788 267,247 273,327 276,015 272,307 280,904 266,309 270,684 282,625DUCTO ELCTRICO PVC 4" ML 75,207 75,506 75,217 75,416 75,347 75,307 75,446 75,277 75,118 75,456POZO SPTICO ETERNIT 1000 LT UN 960,793 963,778 960,891 962,881 962,186 961,786 963,181 961,488 959,896 963,281TUBERA CONCRETO CLASE I SIN REFUERZO 12" ML 87,430 88,536 85,911 86,268 85,765 86,715 87,106 84,749 86,357 87,106TUBERA CONCRETO CLASE II SIN REFUERZO 8" ML 50,591 51,175 49,790 49,978 49,713 50,214 50,421 49,177 50,026 50,421TUBERA DRENAJE PVC 110 ML 21,281 21,633 20,951 21,218 21,591 21,127 21,657 21,042 21,240 21,789TUBERA DRENAJE PVC 160 ML 31,974 32,326 31,645 31,911 32,285 31,821 32,351 31,735 31,933 32,482TUBERA DRENAJE PVC 200 ML 43,885 44,378 43,423 43,796 44,319 43,669 44,411 43,550 43,827 44,596TUBERA DRENAJE PVC 250 ML 59,440 60,003 58,913 59,339 59,937 59,194 60,042 59,058 59,374 60,253TUBERA DRENAJE PVC 315 ML 81,334 81,827 80,873 81,246 81,769 81,119 81,861 81,000 81,277 82,046

    SISTEMA SPTICO CON FILTRO ANAEROBIO 500LT (INCLUYE MATERIAL

    FILTRANTE)UN 747,092 752,725 741,818 746,080 752,057 744,631 753,112 743,267 746,431 755,221

    SISTEMA SPTICO CON FILTRO ANAEROBIO 1000LT (INCLUYE MATERIAL

    FILTRANTE)UN 1,067,752 1,079,017 1,057,204 1,065,726 1,077,681 1,062,830 1,079,790 1,060,101 1,066,430 1,084,010

    3.13

    3.14

    3.15

    3.16

    3.17

    3.7

    3.8

    3.9

    3.10

    3.11

    3.12

    3.1

    3.2

    3.3

    3.4

    3.5

    3.6

    2.14

    2.15

    2.16

    2.17

    3

    2.8

    2.9

    2.10

    2.11

    2.12

    2.13

    2.2

    2.3

    2.4

    2.5

    2.6

    2.7

    1.45

    2

    2.1

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINSISTEMA SPTICO CON FILTRO ANAEROBIO 2000LT (INCLUYE MATERIAL FILTRANTE)

    UN 1,415,174 1,437,704 1,394,078 1,411,123 1,435,032 1,405,329 1,439,251 1,399,872 1,412,529 1,447,689

    ESTRUCTURAS EN CONCRETO

    CASETN DE LONA 0.8 X 0.35 M2 27,959 27,959 27,959 27,959 27,959 27,959 27,959 27,959 27,959 27,959CASETN DE LONA 0.80X0.70 M2 36,763 36,763 36,763 36,763 36,763 36,763 36,763 36,763 36,763 36,763COLUMNAS 3500 PSI M3 659,223 683,653 642,760 652,895 665,506 654,950 674,088 639,785 656,299 679,304CONCRETO CICLPEO 2000 PSI, 40% RAJN M3 240,582 262,276 228,723 235,832 252,494 236,257 258,520 226,597 238,104 264,771ENTREPISO LMINA COLABORANTE 2", CAL 22, H=10 CM,INCL. MALLA

    DE REFUERZO, CONCRETO DE 3500 PSIM2 79,095 81,467 77,497 78,481 79,705 78,680 80,539 77,208 78,811 81,045

    ENTREPISO LMINA COLABORANTE 3", CAL 22, H=12 CM,INCL. MALLA

    DE REFUERZO, CONCRETO DE 3500 PSIM2 93,261 96,108 91,343 92,524 93,993 92,764 94,993 90,997 92,921 95,601

    ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.30 m (SIN REFUERZO) M2 105,880 109,675 103,323 104,897 106,856 105,216 108,189 102,861 105,426 108,999

    ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.35 M (SIN REFUERZO) M2 111,806 115,839 109,089 110,762 112,843 111,101 114,260 108,598 111,324 115,121

    ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.40 M (SIN REFUERZO) M2 129,156 134,137 125,800 127,866 130,437 128,285 132,187 125,193 128,560 133,250

    ENTREPISO CASETN CON VIGAS 3500 PSI, H=0.45 M (SIN REFUERZO) M2 144,121 149,814 140,285 142,647 145,585 143,126 147,585 139,592 143,440 148,800

    ENTREPISOS CASETN CON VIGAS, 3500 PSI H=0.50 m (SIN REFUERZO) M2 160,301 166,705 155,985 158,642 161,948 159,181 164,198 155,205 159,534 165,565

    ENTREPISO VIGUETA PLACA M2 74,458 74,807 74,142 74,283 74,368 74,341 74,581 74,006 74,324 74,635ESCALERA MACIZA 3500 PSI M3 767,632 792,061 751,168 761,303 773,915 763,358 782,497 748,193 764,707 787,712MURO LADRILLO ESTRUCTURAL E=0.12 cm M2 70,016 70,450 69,817 69,875 69,905 70,034 70,116 69,629 69,963 70,151ENTREPISO PLACA MACIZA 3500 PSI E=0.10 M M2 64,726 67,169 63,080 64,094 65,355 64,299 66,213 62,783 64,434 66,734ENTREPISO PLACA MACIZA 3500 PSI E=0.12 M M2 73,691 76,680 71,677 72,917 74,460 73,169 75,510 71,314 73,334 76,148ENTREPISO PLACA MACIZA 3500 PSI E=0.15 M M2 86,766 90,513 84,241 85,795 87,730 86,110 89,046 83,784 86,317 89,846MURO DE CONTENCIN EN CONCRETO 3500 PSI, H=2.0 M M3 594,226 618,656 577,763 587,898 600,509 589,953 609,091 574,788 591,302 614,307

    PASOS PREFABRICADOS ESCALERAS EN CONRETO 2500 PSI (ANCHO 1 M) UN 39,135 39,907 38,635 38,928 39,283 39,021 39,567 38,510 39,042 39,719

    PLACA FLOTANTE 0.9 ESTRUCTURAS 3500 PSI M2 236,942 247,853 229,590 234,116 239,748 235,034 243,581 228,261 235,636 245,910ACERO FIGURADO 37000 PSI KG 3,160 3,160 3,160 3,160 3,160 3,160 3,160 3,160 3,160 3,160ACERO FIGURADO 60000 PSI KG 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282 3,282REFUERZO MALLA ELECTROSOLDADA KG 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519 4,519TANQUE ELEVADO EN CONCRETO DE 3500 PSI M3 697,705 722,135 681,241 691,377 703,988 693,432 712,570 678,267 694,781 717,786TANQUE SUBTERRNEO EN CONCRETO DE 3500 PSI M3 650,007 676,731 631,983 643,089 656,914 645,318 666,293 628,750 646,809 672,007VIGA AREA 3500 PSI M3 697,650 722,080 681,187 691,322 703,933 693,377 712,515 678,212 694,726 717,731VIGA CINTA 3500 PSI M3 682,311 706,741 665,848 675,983 688,594 678,038 697,176 662,873 679,387 702,392VIGA CANAL EN CONCRETO 3500 PSI M3 841,422 865,852 824,959 835,094 847,705 837,149 856,287 821,984 838,498 861,503BASE EN CONCRETO POBRE 1500 PSI M3 295,398 321,075 276,700 289,169 305,321 289,514 313,470 275,588 292,338 319,807

    MAMPOSTERA

    ALFAJAS CONCRETO 2500 PSI E= 0.15 M ML 23,760 24,375 23,290 23,517 23,708 23,620 24,019 23,101 23,601 24,121ALFAJAS CONCRETO 2500 PSI E= 0.25 M ML 39,319 39,935 38,849 39,076 39,267 39,179 39,579 38,661 39,160 39,680

    4.29

    5

    5.1

    5.2

    4.23

    4.24

    4.25

    4.26

    4.27

    4.28

    4.17

    4.18

    4.19

    4.20

    4.21

    4.22

    4.11

    4.12

    4.13

    4.14

    4.15

    4.16

    4.5

    4.6

    4.7

    4.8

    4.9

    4.10

    4

    4.1

    4.2

    4.3

    4.4

    3.18

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINALFAJA EN LADRILLO PRENSADO MACIZO ML 24,942 25,042 24,805 24,837 24,791 24,877 24,913 24,699 24,845 24,913ARCOS EN LADRILLO PRENSADO ML 120,212 120,412 119,937 120,001 119,910 120,082 120,153 119,726 120,018 120,153DINTELES CONCRETO DE 2500 PSI 15x20 ML 35,123 35,896 34,624 34,917 35,271 35,009 35,556 34,499 35,031 35,708DINTELES EN BLOQUE 0.15 M ML 20,062 20,496 19,863 19,922 19,951 20,080 20,162 19,675 20,009 20,197ENCHAPES LADRILLO PRENSADO M2 67,876 68,277 67,326 67,456 67,274 67,618 67,759 66,906 67,488 67,759MESONES EN CONCRETO 2500 PSI, E=0.1M (INC. REFUERZO) M2 73,606 76,181 71,941 72,917 74,099 73,226 75,049 71,525 73,297 75,555MURO DRYWALL DOBLE CARA 0.12 M M2 53,710 53,710 53,710 53,710 53,710 53,710 53,710 53,710 53,710 53,710MURO DRYWALL DOBLE CARA 0.12 M (LINEAL) ML 32,889 32,889 32,889 32,889 32,889 32,889 32,889 32,889 32,889 32,889MURO DRYWALL DOBLE CARA 0.10 M M2 52,043 52,043 52,043 52,043 52,043 52,043 52,043 52,043 52,043 52,043MURO DRYWALL DOBLE CARA 0.10 M (LINEAL) ML 32,056 32,056 32,056 32,056 32,056 32,056 32,056 32,056 32,056 32,056MURO SUPERBOARD DOBLE CARA 0.10 M M2 65,260 65,260 65,260 65,260 65,260 65,260 65,260 65,260 65,260 65,260MURO SUPERBOARD DOBLE CARA 0.10 M (LINEAL) ML 39,671 39,671 39,671 39,671 39,671 39,671 39,671 39,671 39,671 39,671MURO SUPERBOARD DOBLE CARA 0.12 M M2 66,812 66,812 66,812 66,812 66,812 66,812 66,812 66,812 66,812 66,812MURO SUPERBOARD DOBLE CARA 0.12 M (LINEAL) ML 40,447 40,447 40,447 40,447 40,447 40,447 40,447 40,447 40,447 40,447MURO EN BLOQUE N 5 E=0.12 M M2 27,550 27,751 27,273 27,338 27,247 27,420 27,491 27,062 27,355 27,491MURO EN BLOQUE No. 5 E=0.12 (LINEAL) ML 17,060 17,161 16,922 16,955 16,909 16,995 17,031 16,816 16,963 17,031MURO EN BLOQUE DE CONCRETO 0.10 M M2 38,179 38,313 37,995 38,038 37,977 38,093 38,140 37,854 38,049 38,140MURO EN BLOQUE DE CONCRETO E=0.10 M (LINEAL) ML 23,187 23,254 23,094 23,116 23,086 23,143 23,167 23,024 23,122 23,167MURO EN BLOQUE DE CONCRETO 0.12 M M2 44,968 45,102 44,784 44,827 44,767 44,882 44,929 44,643 44,838 44,929MURO EN BLOQUE DE CONCRETO E=0.12 M (LINEAL) ML 27,094 27,161 27,002 27,024 26,993 27,051 27,074 26,931 27,029 27,074MURO EN BLOQUE DE CONCRETO 0.20 M M2 81,947 82,617 81,026 81,242 80,938 81,513 81,750 80,321 81,296 81,750MURO EN BLOQUE DE CONCRETO 0.20 M (LINEAL) ML 47,888 48,223 47,428 47,536 47,384 47,671 47,790 47,075 47,563 47,790MURO EN BLOQUE N 4 E= 0.10 M M2 25,333 25,467 25,148 25,192 25,131 25,246 25,293 25,008 25,203 25,293MURO EN BLOQUE N 4 E=0.10 M (LINEAL) ML 15,698 15,765 15,606 15,628 15,597 15,655 15,679 15,536 15,633 15,679MURO EN BLOQUE N 5 E=0.23 M M2 48,593 48,862 48,225 48,312 48,190 48,420 48,515 47,943 48,333 48,515MURO EN BLOQUE N 5 E=0.23 M (LINEAL) ML 30,132 30,266 29,947 29,991 29,930 30,045 30,092 29,806 30,002 30,092MURO EN LADRILLO ESTRUTURAL E=0.15 M M2 65,100 65,534 64,901 64,959 64,989 65,118 65,200 64,713 65,047 65,235MURO EN LADRILLO ESTRUCTURAL 0.15 M (LINEAL) ML 39,662 39,879 39,563 39,592 39,607 39,671 39,712 39,469 39,636 39,730MURO EN LADRILLO PRENSADO MACIZO E=0.24 M M2 122,842 123,781 121,552 121,856 121,429 122,235 122,567 120,566 121,932 122,567MURO EN LADRILLO PRENSADO MACIZO E=0.24 M (LINEAL) ML 75,430 75,899 74,785 74,937 74,724 75,127 75,293 74,292 74,975 75,293MURO EN LADRILLO PRENSADO MACIZO E=0.12 M M2 60,323 60,777 59,700 59,846 59,640 60,030 60,190 59,223 59,883 60,190MURO EN LADRILLO PRENSADO MACIZO, E=0.12 M (LINEAL) ML 37,274 37,501 36,962 37,036 36,932 37,127 37,207 36,724 37,054 37,207MURO EN LADRILLO TOLETE RECOCIDO 0.12 M M2 36,291 36,591 35,878 35,975 35,839 36,096 36,203 35,563 35,999 36,203MURO EN LADRILLO TOLETE RECOCIDO 0.12 M (LINEAL) ML 22,028 22,179 21,822 21,871 21,803 21,931 21,984 21,665 21,883 21,984MURO TOLETE COMN 0.06 M M2 25,924 26,058 25,740 25,783 25,722 25,838 25,885 25,599 25,794 25,885MURO TOLETE COMN 0.06 M (LINEAL) ML 15,784 15,852 15,692 15,714 15,684 15,741 15,765 15,622 15,719 15,765MURO TOLETE COMN 0.12 M M2 39,307 39,576 38,939 39,026 38,904 39,134 39,229 38,657 39,047 39,229MURO TOLETE COMN 0.12 M (LINEAL) ML 24,056 24,191 23,872 23,916 23,855 23,970 24,017 23,731 23,926 24,017MURO TOLETE COMN 0.25 M M2 75,133 75,535 74,580 74,710 74,528 74,873 75,015 74,158 74,743 75,015MURO TOLETE COMN 0.25 M (LINEAL) ML 45,752 45,954 45,476 45,541 45,450 45,622 45,694 45,265 45,557 45,694MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA M2 54,882 55,150 54,514 54,600 54,479 54,709 54,804 54,232 54,622 54,804

    MURO LADRILLO REJILLA 0.12 M, DOS CARAS A LA VISTA (LINEAL) ML 33,082 33,216 32,898 32,941 32,880 32,995 33,043 32,757 32,952 33,043

    MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA M2 117,183 118,122 115,894 116,197 115,771 116,577 116,909 114,908 116,273 116,909

    MURO LADRILLO REJILLA 0.25 M, DOS CARAS A LA VISTA (LINEAL) ML 70,994 71,463 70,349 70,501 70,288 70,690 70,856 69,856 70,539 70,856

    REMATES LADRILLO PRENSADO ML 21,985 22,085 21,847 21,879 21,834 21,920 21,955 21,742 21,888 21,955

    5.46

    5.47

    5.40

    5.41

    5.42

    5.43

    5.44

    5.45

    5.34

    5.35

    5.36

    5.37

    5.38

    5.39

    5.28

    5.29

    5.30

    5.31

    5.32

    5.33

    5.22

    5.23

    5.24

    5.25

    5.26

    5.27

    5.16

    5.17

    5.18

    5.19

    5.20

    5.21

    5.10

    5.11

    5.12

    5.13

    5.14

    5.15

    5.4

    5.5

    5.6

    5.7

    5.8

    5.9

    5.3

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINSOBRECIMIENTO 0.15 EN TOLETE RECOCIDO ML 28,152 28,478 27,703 27,809 27,661 27,941 28,056 27,361 27,835 28,056SOBRECIMIENTO 0.25 EN TOLETE RECOCIDO ML 47,284 47,719 46,686 46,827 46,629 47,002 47,156 46,229 46,862 47,156LAVADA DE FACHADA M2 4,007 4,007 4,007 4,007 4,007 4,007 4,007 4,007 4,007 4,007PASAMANOS EN CONCRETO 2500 PSI ML 39,489 40,104 39,019 39,246 39,437 39,348 39,748 38,830 39,330 39,850DOVELA, GROUTING 3000 PSI ML 7,621 7,621 7,621 7,621 7,621 7,621 7,621 7,621 7,621 7,621ANCLAJE 3/8" L=30CM UN 10,118 10,118 10,118 10,118 10,118 10,118 10,118 10,118 10,118 10,118ANCLAJE 1/2" L=50CM UN 13,241 13,241 13,241 13,241 13,241 13,241 13,241 13,241 13,241 13,241ANCLAJE 5/8" L=70CM UN 18,494 18,494 18,494 18,494 18,494 18,494 18,494 18,494 18,494 18,494ANCLAJE 3/4" L=70CM UN 27,618 27,618 27,618 27,618 27,618 27,618 27,618 27,618 27,618 27,618ANCLAJE 1" L= 70CM UN 4,162 4,341 4,038 4,117 4,217 4,127 4,278 4,021 4,141 4,318

    PAETES, REVOQUES Y REPELLOS

    ENTRAMADO MADERA CIELO RASO M2 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827 11,827FILOS O DILATACIONES B/PLACA ML 4,684 4,784 4,547 4,579 4,534 4,620 4,655 4,442 4,587 4,655FILOS O DILATACIONES S/MURO ML 5,587 5,687 5,450 5,482 5,437 5,523 5,558 5,345 5,490 5,558GOTERA EN MORTERO 1:4 ML 6,687 6,787 6,550 6,582 6,536 6,622 6,658 6,444 6,590 6,658IMPERMEABILIZACIN INTEGRAL MORTERO SIKA M2 4,348 4,348 4,348 4,348 4,348 4,348 4,348 4,348 4,348 4,348MALLA BAJO ENTRAMADO M2 10,340 10,340 10,340 10,340 10,340 10,340 10,340 10,340 10,340 10,340PAETE BAJO GUADUA 1:5, E=2 CM M2 19,673 19,991 19,237 19,340 19,195 19,468 19,580 18,903 19,365 19,580PAETE BAJO GUADUA 1:5, E=2 CM (LINEAL) ML 11,812 11,971 11,594 11,645 11,573 11,710 11,766 11,427 11,658 11,766PAETE BAJO MALLA 1:4, E=2 CM M2 17,319 17,600 16,932 17,023 16,895 17,137 17,236 16,636 17,046 17,236PAETE BAJO MALLA 1:4, E=2 CM (LINEAL) ML 10,399 10,540 10,205 10,251 10,187 10,308 10,358 10,057 10,262 10,358PAETE BAJO MALLA 1:5, E=2 CM M2 16,710 17,027 16,273 16,376 16,232 16,504 16,617 15,940 16,402 16,617PAETE BAJO MALLA 1:5, E=2 CM (LINEAL) ML 10,094 10,253 9,876 9,927 9,855 9,992 10,048 9,709 9,940 10,048PAETE CULATAS 1:4, E=2 CM M2 17,319 17,600 16,932 17,023 16,895 17,137 17,236 16,636 17,046 17,236PAETE CULATAS 1:4, E=2 CM (LINEAL) ML 10,399 10,540 10,205 10,251 10,187 10,308 10,358 10,057 10,262 10,358PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM M2 16,768 16,994 16,457 16,530 16,428 16,622 16,702 16,220 16,549 16,702PAETE IMPERMEABILIZADO MUROS 1:3, E=1.5 CM (LINEAL) ML 10,123 10,236 9,967 10,004 9,952 10,049 10,089 9,848 10,013 10,089PAETE LISO MUROS 1:4, E=1.5 CM M2 14,324 14,539 14,029 14,099 14,001 14,185 14,261 13,804 14,116 14,261PAETE LISO MUROS 1:4, E=1.5 CM (LINEAL) ML 8,682 8,789 8,534 8,569 8,520 8,612 8,650 8,422 8,578 8,650PAETE LISO MUROS 1:5, E=1.5 CM M2 13,860 14,102 13,528 13,606 13,496 13,704 13,789 13,274 13,626 13,789PAETE LISO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,450 8,571 8,284 8,323 8,268 8,372 8,414 8,157 8,332 8,414PAETE LISO PLACAS 1:4, E=2 CM M2 17,911 18,193 17,524 17,615 17,488 17,729 17,829 17,229 17,638 17,829PAETE LISO PLACAS 1:4, E=2 CM (LINEAL) ML 10,680 10,821 10,486 10,532 10,468 10,589 10,639 10,339 10,543 10,639PAETE LISO PLACAS 1:5, E=2 CM M2 17,302 17,620 16,866 16,969 16,825 17,097 17,209 16,533 16,994 17,209PAETE LISO PLACAS 1:5, E=2 CM (LINEAL) ML 10,375 10,534 10,157 10,209 10,136 10,273 10,329 9,990 10,221 10,329PAETE RSTICO MUROS 1:5, E=1.5 CM M2 14,325 14,567 13,993 14,071 13,961 14,169 14,254 13,738 14,090 14,254PAETE RSTICO MUROS 1:5, E=1.5 CM (LINEAL) ML 8,669 8,790 8,502 8,542 8,487 8,590 8,633 8,375 8,551 8,633PAETE RSTICO PLACAS 1:5, E=2 CM M2 17,980 18,297 17,544 17,646 17,502 17,774 17,887 17,210 17,672 17,887PAETE RSTICO PLACAS 1:5, E=2 CM (LINEAL) ML 11,022 11,181 10,804 10,855 10,783 10,919 10,975 10,637 10,868 10,975

    CUBIERTAS

    AFINADO CUBIERTAS PLANAS EN MORTERO 1:4 E=0.03 M M2 22,201 22,603 21,648 21,778 21,595 21,941 22,083 21,226 21,811 22,083AFINADO IMPERMEABILIZADO PARA TEJA DE BARRO EN ASFALTO

    (INCLUYE TELA IMPERMEABLE)M2 66,565 67,853 65,732 66,221 66,812 66,375 67,286 65,524 66,410 67,539

    BAJANTE PVC (AMAZONAS, RAINGO) ML 40,121 40,121 40,121 40,121 40,121 40,121 40,121 40,121 40,121 40,121BAJANTE PVC AGUAS LLUVIAS D=3" ML 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295

    7

    7.1

    7.2

    7.3

    7.4

    6.23

    6.24

    6.25

    6.26

    6.27

    6.28

    6.17

    6.18

    6.19

    6.20

    6.21

    6.22

    6.11

    6.12

    6.13

    6.14

    6.15

    6.16

    6.5

    6.6

    6.7

    6.8

    6.9

    6.10

    6

    6.1

    6.2

    6.3

    6.4

    5.52

    5.53

    5.54

    5.55

    5.56

    5.57

    5.48

    5.49

    5.50

    5.51

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINBAJANTE PVC AGUAS LLUVIAS D=4" ML 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569CABALLETE ARTICULADO TEJA FIBROCEMENTO ML 59,724 59,724 59,724 59,724 59,724 59,724 59,724 59,724 59,724 59,724CABALLETE FIJO TEJA FIBROCEMENTO ML 42,776 42,776 42,776 42,776 42,776 42,776 42,776 42,776 42,776 42,776CABALLETE FIJO CANALETA 43 FIBROCEMENTO ML 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,716 25,716CABALLETE ARTICULADO CANALETA 43 FIBROCEMENTO ML 58,129 58,129 58,129 58,129 58,129 58,129 58,129 58,129 58,129 58,129CABALLETE FIJO CANALETA 90 FIBROCEMENTO ML 75,047 75,047 75,047 75,047 75,047 75,047 75,047 75,047 75,047 75,047CABALLETE ARTICULADO CANALETA 90 FIBROCEMENTO ML 97,620 97,620 97,620 97,620 97,620 97,620 97,620 97,620 97,620 97,620CABALLETE CUBIERTA TERMOACSTICA ML 42,883 42,883 42,883 42,883 42,883 42,883 42,883 42,883 42,883 42,883CANAL PVC AMAZONAS ML 62,161 62,161 62,161 62,161 62,161 62,161 62,161 62,161 62,161 62,161CANAL PVC RAINGO ML 54,923 54,923 54,923 54,923 54,923 54,923 54,923 54,923 54,923 54,923TEJA CANALETA 43 FIBROCEMENTO L=6M M2 87,251 87,251 87,251 87,251 87,251 87,251 87,251 87,251 87,251 87,251TEJA CANALETA 90 FIBROCEMENTO L=6M M2 50,438 50,438 50,438 50,438 50,438 50,438 50,438 50,438 50,438 50,438TEJA CANALETA 90 LMINA GALVANIZADA L=6M M2 41,422 41,422 41,422 41,422 41,422 41,422 41,422 41,422 41,422 41,422CANAL EN LMINA GALVANIZADA CAL. 22; DS=50 ML 23,721 23,721 23,721 23,721 23,721 23,721 23,721 23,721 23,721 23,721TEJA DE BARRO M2 47,050 47,550 46,362 46,524 46,297 46,726 46,903 45,837 46,564 46,903TEJA EN LMINA GALVANIZADA CAL 26 PINTADA M2 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520 34,520TEJA EN LMINA GALVANIZADA CAL 26 M2 31,676 31,676 31,676 31,676 31,676 31,676 31,676 31,676 31,676 31,676TEJA FIBROCEMENTO N4 M2 26,861 26,861 26,861 26,861 26,861 26,861 26,861 26,861 26,861 26,861TEJA FIBROCEMENTO No. 6 M2 26,085 26,085 26,085 26,085 26,085 26,085 26,085 26,085 26,085 26,085TEJA FIBROCEMENTO No. 8 M2 26,842 26,842 26,842 26,842 26,842 26,842 26,842 26,842 26,842 26,842TEJA TERMOACSTICA M2 37,235 37,235 37,235 37,235 37,235 37,235 37,235 37,235 37,235 37,235TEJA PLSTICA No.6 M2 32,816 32,816 32,816 32,816 32,816 32,816 32,816 32,816 32,816 32,816TEJA ESPAOLA ETERNIT M2 60,260 60,260 60,260 60,260 60,260 60,260 60,260 60,260 60,260 60,260

    TEJA TIPO SANDWICH 525-C CAL. 26, POLIURETANO INYECTADO 30MM M2 109,625 109,625 109,625 109,625 109,625 109,625 109,625 109,625 109,625 109,625

    TEJA SIN TRASLAPO M2 49,318 49,318 49,318 49,318 49,318 49,318 49,318 49,318 49,318 49,318ESTRUCTURA DE MADERA PARA TEJA DE BARRO M2 31,786 31,786 31,786 31,786 31,786 31,786 31,786 31,786 31,786 31,786ESTRUCTURA DE MADERA PARA TEJA DE FIBROCEMENTO M2 25,098 25,098 25,098 25,098 25,098 25,098 25,098 25,098 25,098 25,098ESTRUCTURA METLICA PARA TEJA DE FIBROCEMENTO (TUBO

    ESTRUCTURAL ABIERTO 4"x2", 15 MM)M2 40,304 40,304 40,304 40,304 40,304 40,304 40,304 40,304 40,304 40,304

    FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=20 ML 14,841 14,841 14,841 14,841 14,841 14,841 14,841 14,841 14,841 14,841FLANCHE EN LMINA GALVANIZADA CAL. 22; DS=30 ML 17,770 17,770 17,770 17,770 17,770 17,770 17,770 17,770 17,770 17,770MEMBRANA IMPERMEABLE PARA CUBIERTA, DOS CAPAS M2 20,213 20,213 20,213 20,213 20,213 20,213 20,213 20,213 20,213 20,213MEMBRANA IMPERMEABLE PARA CUBIERTA, TRES CAPAS M2 26,018 26,018 26,018 26,018 26,018 26,018 26,018 26,018 26,018 26,018BAJANTE EN LMINA GALVANIZADA CAL. 22; DS=40 ML 16,269 16,269 16,269 16,269 16,269 16,269 16,269 16,269 16,269 16,269CANAL EN LMINA GALVANIZADA CAL. 22; DS=90 ML 38,168 38,168 38,168 38,168 38,168 38,168 38,168 38,168 38,168 38,168DOMO TERMOFORMADO PARA CUBIERTA 60 X 60 M2 224,186 224,186 224,186 224,186 224,186 224,186 224,186 224,186 224,186 224,186CUBIERTA EN POLICARBONATO ALVEOLAR M2 287,556 287,556 287,556 287,556 287,556 287,556 287,556 287,556 287,556 287,556CORTASOL TIPO CELOSCREEN 110-M1, PASO 200 M2 182,970 182,970 182,970 182,970 182,970 182,970 182,970 182,970 182,970 182,970CORTASOL CELOSIA C-23 EN ALUZINC M2 263,613 263,613 263,613 263,613 263,613 263,613 263,613 263,613 263,613 263,613

    MORTEROS Y CONCRETOS

    CONCRETO 4000 PSI M3 411,361 437,835 394,250 404,284 416,435 407,458 426,192 389,973 408,186 431,396CONCRETO 3500 PSI M3 359,954 383,672 343,970 353,810 366,054 355,805 374,386 341,082 357,115 379,450CONCRETO 3000 PSI M3 354,808 378,785 338,167 348,743 362,123 350,132 370,245 335,945 351,943 375,659CONCRETO 2500 PSI M3 319,462 345,221 302,813 312,576 324,399 315,665 333,892 298,652 316,373 338,955CONCRETO 2000 PSI M3 300,019 325,515 282,683 293,462 306,945 295,404 315,806 279,802 296,969 321,343

    8.3

    8.4

    8.5

    7.41

    7.42

    8

    8.1

    8.2

    7.35

    7.36

    7.37

    7.38

    7.39

    7.40

    7.29

    7.30

    7.31

    7.32

    7.33

    7.34

    7.23

    7.24

    7.25

    7.26

    7.27

    7.28

    7.17

    7.18

    7.19

    7.20

    7.21

    7.22

    7.11

    7.12

    7.13

    7.14

    7.15

    7.16

    7.5

    7.6

    7.7

    7.8

    7.9

    7.10

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINCONCRETO 1500 PSI M3 275,286 300,215 257,132 269,238 284,920 269,573 292,831 256,053 272,315 298,984MORTERO SECO 1:10 M3 221,081 234,893 202,110 206,573 200,298 212,153 217,037 187,602 207,689 217,037MORTERO 1:4 ARENA LAVADA DE PEA M3 401,347 414,759 382,926 387,260 381,167 392,679 397,421 368,839 388,344 397,421MORTERO 1:5 ARENA LAVADA DE PEA M3 372,349 387,471 351,578 356,465 349,595 362,574 367,922 335,695 357,687 367,922MORTERO 1:3 ARENA LAVADA DE PEA M3 425,576 439,719 406,151 410,721 404,295 416,435 421,436 391,295 411,864 421,436MORTERO IMPERMEABILIZADO 1:3 ARENA LAVADA DE PEA M3 554,096 568,239 534,671 539,241 532,815 544,955 549,956 519,815 540,384 549,956

    CARPINTERA EN MADERA

    BARANDA EN MADERA CEDRO MACHO ML 89,623 89,623 89,623 89,623 89,623 89,623 89,623 89,623 89,623 89,623CHAZOS PARA CARPINTERA EN MADERA UN 3,052 3,152 2,915 2,947 2,902 2,988 3,023 2,810 2,955 3,023DIFUSORES MARCO PARA VIDRIO H= 0.15M M2 100,948 100,948 100,948 100,948 100,948 100,948 100,948 100,948 100,948 100,948DIFUSORES MARCO PARA VIDRIO H= 0.20 M M2 123,056 123,056 123,056 123,056 123,056 123,056 123,056 123,056 123,056 123,056MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.15 M UN 170,007 170,007 170,007 170,007 170,007 170,007 170,007 170,007 170,007 170,007MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.20 M UN 189,847 189,847 189,847 189,847 189,847 189,847 189,847 189,847 189,847 189,847MARCO PUERTA Y ENCHAPE, TABLA CHAPA x 0.25 M UN 209,712 209,712 209,712 209,712 209,712 209,712 209,712 209,712 209,712 209,712HOJA PUERTA FORTEC 0.81 UN 148,717 148,717 148,717 148,717 148,717 148,717 148,717 148,717 148,717 148,717HOJA PUERTA FORTEC 0.91 UN 164,262 164,262 164,262 164,262 164,262 164,262 164,262 164,262 164,262 164,262HOJA PUERTA FORTEC 1.50 UN 243,533 243,533 243,533 243,533 243,533 243,533 243,533 243,533 243,533 243,533HOJA ENTAMBORADA PUERTA INTERS SOCIAL 0.76-1.10 UN 92,173 92,173 92,173 92,173 92,173 92,173 92,173 92,173 92,173 92,173HOJA PUERTA ENTAMBORADA TRIPLEX-TABLEX 0.76-1.0 M UN 122,330 122,330 122,330 122,330 122,330 122,330 122,330 122,330 122,330 122,330HOJA PUERTA ENTABLERADA TABLEX 0.76-1.0 M UN 135,490 135,490 135,490 135,490 135,490 135,490 135,490 135,490 135,490 135,490HOJA PUERTA ENTABLERADA MADECOR 0.76-1.0 M UN 344,399 344,399 344,399 344,399 344,399 344,399 344,399 344,399 344,399 344,399PASAMANOS ESCALERA EN CEDRO MACHO 0.15X0.02 M ML 30,506 30,506 30,506 30,506 30,506 30,506 30,506 30,506 30,506 30,506PIRLANES DE MADERA CEDRO MACHO 0.10 M ML 19,425 19,425 19,425 19,425 19,425 19,425 19,425 19,425 19,425 19,425VENTANERA EN MADERA CEDRO MACHO M2 71,080 71,080 71,080 71,080 71,080 71,080 71,080 71,080 71,080 71,080CERRADURA DE ENTRADA PRINCIPAL UN 88,298 88,298 88,298 88,298 88,298 88,298 88,298 88,298 88,298 88,298SUMINISTRO E INSTALACIN CERROJO DOBLE UN 68,668 68,668 68,668 68,668 68,668 68,668 68,668 68,668 68,668 68,668SUMINISTRO E INSTALACIN CERRADURA DE POMO ENTRADA UN 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513SUMINISTR E INSTALACIN CERRADURA DE POMO ALCOBA UN 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513 21,513SUMINISTRO E INSTALACIN CERRADURA DE POMO BAO UN 20,416 20,416 20,416 20,416 20,416 20,416 20,416 20,416 20,416 20,416ESPEJO INCOLORO 3 MM SIN BISELAR M2 75,791 75,791 75,791 75,791 75,791 75,791 75,791 75,791 75,791 75,791ESPEJO BISELADO INCOLORO 4 MM M2 97,943 97,943 97,943 97,943 97,943 97,943 97,943 97,943 97,943 97,943VIDRIO ESMERILADO INCOLORO 4 MM M2 44,778 44,778 44,778 44,778 44,778 44,778 44,778 44,778 44,778 44,778VIDRIO ESMERILADO INCOLORO 5 MM M2 53,639 53,639 53,639 53,639 53,639 53,639 53,639 53,639 53,639 53,639VIDRIO TEMPLADO PULIDO 10 MM M2 215,963 215,963 215,963 215,963 215,963 215,963 215,963 215,963 215,963 215,963VIDRIO TEMPLADO PULIDO 8 MM M2 193,812 193,812 193,812 193,812 193,812 193,812 193,812 193,812 193,812 193,812VIDRIO TRANSPARENTE 3 MM M2 48,101 48,101 48,101 48,101 48,101 48,101 48,101 48,101 48,101 48,101VIDRIO TRANSPARENTE 4 MM M2 55,854 55,854 55,854 55,854 55,854 55,854 55,854 55,854 55,854 55,854VIDRIO TRANSPARENTE 5 MM M2 62,499 62,499 62,499 62,499 62,499 62,499 62,499 62,499 62,499 62,499VIDRIO TRANSPARENTE 6 MM M2 66,487 66,487 66,487 66,487 66,487 66,487 66,487 66,487 66,487 66,487

    CARPINTERA METLICA

    CAJA CONTADOR DE AGUA UN 55,987 55,987 55,987 55,987 55,987 55,987 55,987 55,987 55,987 55,987CELOSA ALUMINIO 100CM X 60 CM M2 162,592 162,592 162,592 162,592 162,592 162,592 162,592 162,592 162,592 162,592ESCALERA DE GATO EN TUBO ESTUTRUCTURAL GALVANIZADO DE 1"

    (INCLUYE ANTICORROSIVO)ML 81,579 81,579 81,579 81,579 81,579 81,579 81,579 81,579 81,579 81,579

    MARCO PARA PUERTA EN LMINA CAL 18 -0.8 UN 106,404 106,404 106,404 106,404 106,404 106,404 106,404 106,404 106,404 106,40410.4

    9.32

    10

    10.1

    10.2

    10.3

    9.26

    9.27

    9.28

    9.29

    9.30

    9.31

    9.20

    9.21

    9.22

    9.23

    9.24

    9.25

    9.14

    9.15

    9.16

    9.17

    9.18

    9.19

    9.8

    9.9

    9.10

    9.11

    9.12

    9.13

    9.2

    9.3

    9.4

    9.5

    9.6

    9.7

    8.9

    8.10

    8.11

    9

    9.1

    8.6

    8.7

    8.8

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINMARCO TAPA CAJA DE INSPECCIN UN 101,625 101,625 101,625 101,625 101,625 101,625 101,625 101,625 101,625 101,625MARQUESINA EN LMINA COLD ROLLED CAL.16 M2 70,935 70,935 70,935 70,935 70,935 70,935 70,935 70,935 70,935 70,935PUERTA EN LMINA CAL 18 INC. ANTICORROSIVO M2 150,949 150,949 150,949 150,949 150,949 150,949 150,949 150,949 150,949 150,949PUERTA VENTANA EN LMINA CAL 18 INC. ANTICORROSIVO M2 80,778 80,778 80,778 80,778 80,778 80,778 80,778 80,778 80,778 80,778CERCHA PARA CUBIERTA EN NGULO INC. ANTICORROSIVO KG 4,863 4,863 4,863 4,863 4,863 4,863 4,863 4,863 4,863 4,863CERRAMIENTO MALLA ESLABONADA C. 10 INC. NGULO (PARAL EN

    TUBO ESTRUCTURAL GALVANIZADO 2")M2 74,359 74,359 74,359 74,359 74,359 74,359 74,359 74,359 74,359 74,359

    CORREA 2 D=1/2" 1 D=1/2" CELOSA EN 3/8" INC. ANTICORROSIVO ML 31,154 31,154 31,154 31,154 31,154 31,154 31,154 31,154 31,154 31,154

    DIVISIN DE BAO ALUMINIO Y VIDRIO TEMPLADO H= 1.8 M, E=6MM M2 392,925 392,925 392,925 392,925 392,925 392,925 392,925 392,925 392,925 392,925

    DIVISIN BAO ALUMINIO Y ACRLICO H= 1.8 M M2 141,967 141,967 141,967 141,967 141,967 141,967 141,967 141,967 141,967 141,967

    PANEL PARA BAO EN COLD ROLLED CAL.18 Y PINTURA

    ELECTROSTTICAM2 156,613 156,613 156,613 156,613 156,613 156,613 156,613 156,613 156,613 156,613

    DIVISIN PARA BAO EN ACERO INOXIDABLE 304 CAL.20 (INCLUYE

    PUERTAS Y ACCESORIOS)M2 358,895 358,895 358,895 358,895 358,895 358,895 358,895 358,895 358,895 358,895

    REJA BANCARIA EN VARILLA CUADRADA DE 1/2" INC. ANTICORROSIVO M2 94,704 94,704 94,704 94,704 94,704 94,704 94,704 94,704 94,704 94,704

    PUERTA CORTINA INCLUYE ESMALTE M2 286,282 286,282 286,282 286,282 286,282 286,282 286,282 286,282 286,282 286,282

    SUMINISTRO E INSTALACIN TEMPLETES 3/8" INC. ANTICORROSIVO ML 4,523 4,523 4,523 4,523 4,523 4,523 4,523 4,523 4,523 4,523

    VENTANA EN ALUMINIO CORREDIZA M2 202,040 202,040 202,040 202,040 202,040 202,040 202,040 202,040 202,040 202,040VENTANA LMINA CALIBRE 18 INC. ANTICORROSIVO M2 90,510 90,510 90,510 90,510 90,510 90,510 90,510 90,510 90,510 90,510REJILLA PISO 0.30 M M2 64,085 64,085 64,085 64,085 64,085 64,085 64,085 64,085 64,085 64,085TAPA SHUT EN LMINA COLD ROLLED CAL.16 UN 65,695 65,695 65,695 65,695 65,695 65,695 65,695 65,695 65,695 65,695CELOSA ANGULAR PARA POLIDEPORTIVO ASTM-36, INCLUYE: CORREAS,

    CONTRAVIENTOS, TENSORES, COLUMNAS, VIGAS DE AMARRE,

    ANCLAJES, TORNILLERA, PINTURA Y PLATINERA. CONTEMPLA

    TAMBIN:FABRICACIN, SUMINISTRO Y MONTAJE

    KG 7,494 7,494 7,494 7,494 7,494 7,494 7,494 7,494 7,494 7,494

    CELOSA TUBULAR PARA POLIDEPORTIVO, ASTM-4500 GRADO C,

    INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES, COLUMNAS ,VIGAS DE

    AMARRE, ANCLAJES, TORNILLERA, PINTURA Y PLATINERA.CONTEMPLA

    TAMBIEN:FABRICACIN, SUMINISTRO, MONTAJE

    KG 8,319 8,319 8,319 8,319 8,319 8,319 8,319 8,319 8,319 8,319

    ESTRUCTURA EN PERFILES LMINA DELGADA (LMINA CR), PARA

    POLIDEPORTIVO, INCLUYE:CORREAS, CONTRAVIENTOS, TENSORES,

    COLUMNAS, VIGAS DE AMARRE, ANCLAJES, TORNILLERA, PINTURA Y

    PLATINERA. CONTEMPLA TAMBIN:FABRICACIN, SUMINISTRO Y

    MONTAJE

    KG 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522

    INSTALACIONES HIDROSANITARIAS - RED CONTRA INCENDIO

    ACOMETIDA EN PVC 1/2" 5M UN 167,566 167,566 167,566 167,566 167,566 167,566 167,566 167,566 167,566 167,566ACOMETIDA EN PVC 3/4" 5M UN 199,611 199,611 199,611 199,611 199,611 199,611 199,611 199,611 199,611 199,611BAJANTE AGUAS LLUVIAS PVC 3" ML 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295 16,295BAJANTE AGUAS LLUVIAS PVC 4" ML 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569 25,569BAJANTE AGUAS RESIDUALES PVC 3" ML 24,730 24,730 24,730 24,730 24,730 24,730 24,730 24,730 24,730 24,730BAJANTE AGUAS RESIDUALES PVC 4" ML 31,596 31,596 31,596 31,596 31,596 31,596 31,596 31,596 31,596 31,596BAJANTE AGUAS RESIDUALES PVC 6" ML 64,832 64,832 64,832 64,832 64,832 64,832 64,832 64,832 64,832 64,83211.7

    11.1

    11.2

    11.3

    11.4

    11.5

    11.6

    10.22

    10.23

    10.24

    10.25

    11

    10.16

    10.17

    10.18

    10.19

    10.20

    10.21

    10.10

    10.11

    10.12

    10.13

    10.14

    10.15

    10.5

    10.6

    10.7

    10.8

    10.9

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINCONEXIN TANQUE ELEVADO PVC UN 167,600 167,600 167,600 167,600 167,600 167,600 167,600 167,600 167,600 167,600INSTALACIN APARATO SANITARIO UN 33,396 33,396 33,396 33,396 33,396 33,396 33,396 33,396 33,396 33,396INSTALACIN BOMBAS AGUA UN 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405 469,405INSTALACIN EQUIPO HIDRONEUMTICO UN 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422 966,422LLAVE MANGUERA UN 23,670 23,670 23,670 23,670 23,670 23,670 23,670 23,670 23,670 23,670NIPLE PASAMURO 2" UN 50,357 50,357 50,357 50,357 50,357 50,357 50,357 50,357 50,357 50,357NIPLE PASAMURO 4" UN 75,247 75,247 75,247 75,247 75,247 75,247 75,247 75,247 75,247 75,247PUNTO AGUA CALIENTE CPVC UN 62,702 62,702 62,702 62,702 62,702 62,702 62,702 62,702 62,702 62,702PUNTO HIDRULICO PVC-P/PARAL 1/2" UN 45,953 45,953 45,953 45,953 45,953 45,953 45,953 45,953 45,953 45,953PUNTO HIDULICO PVC-P/PARAL 3/4" UN 48,734 48,734 48,734 48,734 48,734 48,734 48,734 48,734 48,734 48,734PUNTO HIDRULICO PVC-P/PARAL 1 1/4" UN 61,528 61,528 61,528 61,528 61,528 61,528 61,528 61,528 61,528 61,528SALIDA SANITARIA PVC-S/PARAL 2" UN 48,889 48,889 48,889 48,889 48,889 48,889 48,889 48,889 48,889 48,889SALIDA SANITARIA PVC-S/PARAL 3" UN 60,820 60,820 60,820 60,820 60,820 60,820 60,820 60,820 60,820 60,820SALIDA SANITARIA PVC-S/PARAL 4" UN 64,979 64,979 64,979 64,979 64,979 64,979 64,979 64,979 64,979 64,979SALIDA SANITARIA PVC-S/SIFON 3" UN 54,384 54,384 54,384 54,384 54,384 54,384 54,384 54,384 54,384 54,384RED SUMINISTRO CPVC 1/2" ML 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222 9,222RED SUMINISTRO CPVC 3/4" ML 12,918 12,918 12,918 12,918 12,918 12,918 12,918 12,918 12,918 12,918RED SUMINISTRO PVC 1 1/2" ML 16,605 16,605 16,605 16,605 16,605 16,605 16,605 16,605 16,605 16,605RED SUMINISTRO PVC 1" ML 10,294 10,294 10,294 10,294 10,294 10,294 10,294 10,294 10,294 10,294RED SUMINISTRO PVC 1/2" ML 6,197 6,197 6,197 6,197 6,197 6,197 6,197 6,197 6,197 6,197RED SUMINISTRO PVC 2 1/2" ML 41,844 41,844 41,844 41,844 41,844 41,844 41,844 41,844 41,844 41,844RED SUMINISTRO PVC 2" ML 24,037 24,037 24,037 24,037 24,037 24,037 24,037 24,037 24,037 24,037RED SUMINISTRO PVC 3/4" ML 7,733 7,733 7,733 7,733 7,733 7,733 7,733 7,733 7,733 7,733RED SANITARIA PVC-S 2" ML 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,272 18,272RED SANITARIA PVC-S 3" ML 25,327 25,327 25,327 25,327 25,327 25,327 25,327 25,327 25,327 25,327RED SANITARIA PVC-S 4" ML 34,276 34,276 34,276 34,276 34,276 34,276 34,276 34,276 34,276 34,276RED SANITARIA PVC-S 6" ML 63,990 63,990 63,990 63,990 63,990 63,990 63,990 63,990 63,990 63,990REGISTRO 1" UN 83,524 83,524 83,524 83,524 83,524 83,524 83,524 83,524 83,524 83,524REGISTRO 1/2" UN 47,820 47,820 47,820 47,820 47,820 47,820 47,820 47,820 47,820 47,820REGISTRO 3/4" UN 58,581 58,581 58,581 58,581 58,581 58,581 58,581 58,581 58,581 58,581REGISTRO 1 1/2" UN 109,011 109,011 109,011 109,011 109,011 109,011 109,011 109,011 109,011 109,011REGISTRO 2 1/2" UN 281,316 281,316 281,316 281,316 281,316 281,316 281,316 281,316 281,316 281,316REGISTRO 2" UN 209,694 209,694 209,694 209,694 209,694 209,694 209,694 209,694 209,694 209,694REVENTILACIN 2" ML 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,767 12,767REVENTILACIN 3" ML 16,117 16,117 16,117 16,117 16,117 16,117 16,117 16,117 16,117 16,117

    TANQUE PLSTICO ELEVADO 250 LT (INCLUYE ACCESORIOS E

    INSTALACIN)UN 127,707 127,707 127,707 127,707 127,707 127,707 127,707 127,707 127,707 127,707

    TANQUE PLSTICO ELEVADO 500 LT (INCLUYE ACCESORIOS E

    ISNTALACIN)UN 207,196 207,196 207,196 207,196 207,196 207,196 207,196 207,196 207,196 207,196

    TANQUE PLSTICO ELEVADO 1000 LT (INCLUYE ACCESORIOS E

    INSTALACIN)UN 340,952 340,952 340,952 340,952 340,952 340,952 340,952 340,952 340,952 340,952

    TUBERA ACERO NEGRO ROSCADA 1" SCH-40 (INCLUYE ACCESORIOS Y

    SOPORTES)ML 35,481 35,481 35,481 35,481 35,481 35,481 35,481 35,481 35,481 35,481

    TUBERA ACERO NEGRO ROSCADA 1 1/2" SCH-40 (INCLUYE ACCESORIOS

    Y SOPORTES)ML 41,051 41,051 41,051 41,051 41,051 41,051 41,051 41,051 41,051 41,051

    11.43

    11.44

    11.45

    11.46

    11.47

    11.37

    11.38

    11.39

    11.40

    11.41

    11.42

    11.31

    11.32

    11.33

    11.34

    11.35

    11.36

    11.25

    11.26

    11.27

    11.28

    11.29

    11.30

    11.19

    11.20

    11.21

    11.22

    11.23

    11.24

    11.13

    11.14

    11.15

    11.16

    11.17

    11.18

    11.8

    11.9

    11.10

    11.11

    11.12

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINTUBERA ACERO NEGRO ROSCADA 2" SCH-40 (INCLUYE ACCESORIOS Y SOPORTES)

    ML 67,342 67,342 67,342 67,342 67,342 67,342 67,342 67,342 67,342 67,342

    TUBERA ACERO NEGRO RANURADA 2" SCH-40 (INCLUYE ACCESORIOS Y

    SOPORTES)ML 52,778 52,778 52,778 52,778 52,778 52,778 52,778 52,778 52,778 52,778

    TUBERA ACERO NEGRO RANURADA 2-1/2" SCH-40 (INCLUYE

    ACCESORIOS Y SOPORTES)ML 75,008 75,008 75,008 75,008 75,008 75,008 75,008 75,008 75,008 75,008

    TUBERA ACERO NEGRO RANURADA 3" SCH-40 (INCLUYE ACCESORIOS Y

    SOPORTES)ML 78,611 78,611 78,611 78,611 78,611 78,611 78,611 78,611 78,611 78,611

    TUBERA ACERO NEGRO RANURADA 4" SCH-40 (INCLUYE ACCESORIOS Y

    SOPORTES)ML 181,477 181,477 181,477 181,477 181,477 181,477 181,477 181,477 181,477 181,477

    PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 1/2" UN 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756 35,756PUNTO HIDRULICO PARA ROCIADOR AUTOMTICO 3/4" UN 35,898 35,898 35,898 35,898 35,898 35,898 35,898 35,898 35,898 35,898ROCIADOR AUTOMTICO 1/2" K=5.6 PENDIENTE UL-FM UN 28,958 28,958 28,958 28,958 28,958 28,958 28,958 28,958 28,958 28,958ROCIADOR AUTOMTICO 3/4" K=8.1 PENDIENTE UL-FM UN 32,772 32,772 32,772 32,772 32,772 32,772 32,772 32,772 32,772 32,772

    PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO DE HASTA

    2"ML 2,965 2,965 2,965 2,965 2,965 2,965 2,965 2,965 2,965 2,965

    PINTURA PARA TUBERA RED DE INCENDIOS CON DIMETRO MAYOR A

    2"ML 4,607 4,607 4,607 4,607 4,607 4,607 4,607 4,607 4,607 4,607

    GABINETE TIPO III UN 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186 1,029,186GABINETE TIPO I UN 812,271 812,271 812,271 812,271 812,271 812,271 812,271 812,271 812,271 812,271SIAMESA INYECCIN 4" X 2 1/2" X 2 1/2" UN 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132 1,284,132SIAMESA INYECCIN 3" X 2 1/2" X 2 1/2" UN 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887 1,226,887VLVULA MARIPOSA 3" UN 665,922 665,922 665,922 665,922 665,922 665,922 665,922 665,922 665,922 665,922VLVULA MARIPOSA 4" UN 760,145 760,145 760,145 760,145 760,145 760,145 760,145 760,145 760,145 760,145VLVULA DE TOMA Y EXPULSIN DE AIRE 1" UN 327,097 327,097 327,097 327,097 327,097 327,097 327,097 327,097 327,097 327,097

    INSTALACIONES ELCTRICAS

    ACOMETIDA AREA 10 M. PVC UN 227,803 227,803 227,803 227,803 227,803 227,803 227,803 227,803 227,803 227,803SALIDA LMPARA TOMA PVC COMPLETA UN 33,115 33,115 33,115 33,115 33,115 33,115 33,115 33,115 33,115 33,115SALIDA LMPARA TOMA EMT COMPLETA UN 40,807 40,807 40,807 40,807 40,807 40,807 40,807 40,807 40,807 40,807SALIDA LMPARA. CONMUTABLE PVC COMPLETA UN 44,338 44,338 44,338 44,338 44,338 44,338 44,338 44,338 44,338 44,338SALIDA LMPARA CONMUTABLE EMT COMPLETA UN 54,111 54,111 54,111 54,111 54,111 54,111 54,111 54,111 54,111 54,111SALIDA TELFONO PVC COMPLETA UN 36,146 36,146 36,146 36,146 36,146 36,146 36,146 36,146 36,146 36,146SALIDA TIMBRE PVC COMPLETA UN 36,174 36,174 36,174 36,174 36,174 36,174 36,174 36,174 36,174 36,174STRIP TELEFNICO 10 PARES UN 108,728 108,728 108,728 108,728 108,728 108,728 108,728 108,728 108,728 108,728SALIDA TOMA DOBLE PVC COMPLETA UN 31,305 31,305 31,305 31,305 31,305 31,305 31,305 31,305 31,305 31,305SALIDA TRIFSICA PVC COMPLETA UN 73,634 73,634 73,634 73,634 73,634 73,634 73,634 73,634 73,634 73,634SALIDA T.V PVC COMPLETA. UN 48,509 48,509 48,509 48,509 48,509 48,509 48,509 48,509 48,509 48,509SALIDA BIFSICA C.N. UN 28,480 28,480 28,480 28,480 28,480 28,480 28,480 28,480 28,480 28,480TABLERO PARCIAL 4 CIRCUITOS UN 81,933 81,933 81,933 81,933 81,933 81,933 81,933 81,933 81,933 81,933TABLERO PARCIALES 12 CIRCUITOS (INCLUYE TACOS DE 30A) UN 337,616 337,616 337,616 337,616 337,616 337,616 337,616 337,616 337,616 337,616TABLERO PARCIALES 18 CIRCUITOS (INCLUYE TACOS DE 30A) UN 454,302 454,302 454,302 454,302 454,302 454,302 454,302 454,302 454,302 454,302TUBERA PVC CONDUIT 1/2" ML 2,642 2,642 2,642 2,642 2,642 2,642 2,642 2,642 2,642 2,642TUBERA PVC CONDUIT 3/4" ML 3,439 3,439 3,439 3,439 3,439 3,439 3,439 3,439 3,439 3,439TUBERA PVC CONDUIT 1" ML 5,290 5,290 5,290 5,290 5,290 5,290 5,290 5,290 5,290 5,290TUBERA PVC CONDUIT 1 1/2" ML 9,502 9,502 9,502 9,502 9,502 9,502 9,502 9,502 9,502 9,502

    12.18

    12.19

    12.12

    12.13

    12.14

    12.15

    12.16

    12.17

    12.6

    12.7

    12.8

    12.9

    12.10

    12.11

    12

    12.1

    12.2

    12.3

    12.4

    12.5

    11.61

    11.62

    11.63

    11.64

    11.65

    11.55

    11.56

    11.57

    11.58

    11.59

    11.60

    11.49

    11.50

    11.51

    11.52

    11.53

    11.54

    11.48

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINLNEA A TIERRA TABLERO GENERAL (VARILLA COOPER WELL) UN 182,788 182,788 182,788 182,788 182,788 182,788 182,788 182,788 182,788 182,788LMPARA 2X32 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885 57,885LMPARA 2X48 BAJO PLACA LMINA LATERAL INDUSTRIAL UN 78,239 78,239 78,239 78,239 78,239 78,239 78,239 78,239 78,239 78,239LMPARA A PRUEBA DE HUMEDAD TIPO TORTUGA UN 27,925 27,925 27,925 27,925 27,925 27,925 27,925 27,925 27,925 27,925POSTE CONCRETO EXTRAREFORZADO 12 M - 1050 KG UN 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133 1,053,133POSTE CONCRETO EXTRAREFORZADO 12 M - 750 KG UN 779,488 779,488 779,488 779,488 779,488 779,488 779,488 779,488 779,488 779,488POSTE METLICO 6M UN 976,096 976,096 976,096 976,096 976,096 976,096 976,096 976,096 976,096 976,096FAROL COLONIAL CON POSTE 2 1/2" X 3M (INCLUYE LUMINARIA) UN 443,676 443,676 443,676 443,676 443,676 443,676 443,676 443,676 443,676 443,676APLIQUE PARED COLONIAL (INCLUYE LUMINARIA) UN 76,744 76,744 76,744 76,744 76,744 76,744 76,744 76,744 76,744 76,744LUMINARIA 70W SODIO UN 196,555 196,555 196,555 196,555 196,555 196,555 196,555 196,555 196,555 196,555LUMINARIA 150W SODIO UN 231,647 231,647 231,647 231,647 231,647 231,647 231,647 231,647 231,647 231,647REFLECTOR 400W CON CAMPANA EN ALUMINIO UN 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768 1,248,768REFLECTOR 250W CON CAMPANA EN ALUMINIO UN 919,776 919,776 919,776 919,776 919,776 919,776 919,776 919,776 919,776 919,776

    PISOS BASES

    ALISTADO ENDURECIDO 1:3, E=0.04 M2 35,152 35,696 34,404 34,580 34,333 34,800 34,992 33,833 34,624 34,992ALISTADO IMPERMEABILIZADO PISOS 1:3, E = 0.04 M2 30,105 30,649 29,358 29,534 29,287 29,754 29,946 28,787 29,578 29,946ALISTADO PARA LISTN M2 11,422 11,531 11,272 11,307 11,258 11,351 11,390 11,158 11,316 11,390ALISTADO PISOS 1:3, E=0.04 M2 24,997 26,085 23,503 23,854 23,360 24,294 24,679 22,360 23,942 24,679ALISTADO TERRAZAS 1:3, E= 0.08 M2 63,586 64,674 62,092 62,443 61,949 62,883 63,267 60,949 62,531 63,267CAUELA CONCRETO 2000 PSI 0.20X0.12 ML 21,311 21,821 20,964 21,179 21,449 21,218 21,626 20,906 21,250 21,737CONCRETO BASE GRADAS 2500 PSI M2 49,271 51,847 47,606 48,582 49,765 48,891 50,714 47,190 48,962 51,220CONCRETO ESTRIADO RAMPAS 2500 PSI M2 69,277 73,399 66,613 68,175 70,067 68,670 71,586 65,948 68,783 72,396MANTO FIBERGLASS 600X1 M2 22,466 22,466 22,466 22,466 22,466 22,466 22,466 22,466 22,466 22,466PEGANTE MORTERO-CONCRETO M2 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,268 19,268PERMA PLY 2 CAPAS M2 20,037 20,037 20,037 20,037 20,037 20,037 20,037 20,037 20,037 20,037PLACA BASE CONCRETO 0.08 2500 PSI M2 40,532 42,851 39,034 39,913 40,977 40,191 41,831 38,660 40,254 42,287PLACA BASE CONCRETO 0.10 2500 PSI M2 47,715 50,549 45,884 46,958 48,258 47,297 49,302 45,426 47,375 49,859PLACA BASE CONCRETO 0.15 2500 PSI M2 69,678 74,057 66,847 68,507 70,517 69,032 72,131 66,140 69,152 72,991TRITURADO FINO 1/2 M3 99,693 114,197 86,113 97,085 112,476 93,356 115,193 89,842 97,991 120,625TRITURADO GRUESO 3/4 M3 97,158 121,490 85,946 103,280 113,652 95,716 119,953 91,520 92,114 124,992

    PISOS,ACABADOS,ENCHAPES Y ACCESORIOS

    BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA M2 37,618 37,836 37,319 37,390 37,291 37,478 37,555 37,091 37,407 37,555

    BALDOSA CERMICA PISO-PARED 20X20 CALIDAD PRIMERA (LINEAL) ML 23,127 23,236 22,978 23,013 22,963 23,057 23,095 22,863 23,022 23,095

    ADOQUN CONCRETO 6CM M2 49,737 50,281 48,990 49,166 48,919 49,386 49,578 48,419 49,210 49,578ADOQUN CONCRETO 8CM M2 59,087 59,631 58,340 58,516 58,269 58,736 58,928 57,769 58,560 58,928ADOQUN GRES PEATONAL M2 48,667 49,211 47,920 48,096 47,848 48,315 48,508 47,348 48,140 48,508BALDOSA INSTITUCIONAL GRANO MARMOL P2; PAYANDE FONDO

    BLANCO. INCLUYE ALISTADOM2 52,557 52,774 52,258 52,328 52,229 52,416 52,493 52,029 52,346 52,493

    GRAVILLA PARA GRADAS ML 29,475 29,734 29,184 29,333 29,444 29,338 29,604 29,109 29,351 29,660

    ACABADO EN GRANITO (INCLUYE DILATACIN EN BRONCE Y PULIDA) M2 107,494 108,473 106,149 106,465 106,020 106,861 107,207 105,120 106,544 107,207

    ACABADO EN GRAVILLA LAVADA M2 37,394 38,022 36,663 36,997 37,168 37,051 37,620 36,398 37,042 37,733GUARDAESCOBA EN GRANITO ML 29,694 29,694 29,694 29,694 29,694 29,694 29,694 29,694 29,694 29,694GUARDAESCOBA EN GRAVILLA ML 8,440 8,699 8,149 8,298 8,409 8,303 8,569 8,074 8,316 8,625

    14.8

    14.9

    14.10

    14.11

    14.2

    14.3

    14.4

    14.5

    14.6

    14.7

    13.14

    13.15

    13.16

    14

    14.1

    13.8

    13.9

    13.10

    13.11

    13.12

    13.13

    13.2

    13.3

    13.4

    13.5

    13.6

    13.7

    12.30

    12.31

    12.32

    13

    13.1

    12.24

    12.25

    12.26

    12.27

    12.28

    12.29

    12.20

    12.21

    12.22

    12.23

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINGUARDAESCOBA PVC CARAMELO ML 7,329 7,329 7,329 7,329 7,329 7,329 7,329 7,329 7,329 7,329GUARDAESCOBA PVC CEDRO ML 9,286 9,286 9,286 9,286 9,286 9,286 9,286 9,286 9,286 9,286GUARDAESCOBA PINO CARIBE ML 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764 7,764GUARDAESCOBA CEDRO BLANCO ML 7,752 7,752 7,752 7,752 7,752 7,752 7,752 7,752 7,752 7,752GUARDAESCOBA EN MADERA SAPAN ML 12,266 12,266 12,266 12,266 12,266 12,266 12,266 12,266 12,266 12,266GUARDAESCOBA GRES Y CERMICA ML 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868 6,868LISTN M.H. AMARILLO M2 54,872 54,872 54,872 54,872 54,872 54,872 54,872 54,872 54,872 54,872PASO ESCALERA GRANITO ML 82,527 83,289 81,481 81,727 81,381 82,035 82,304 80,681 81,789 82,304PIRLANES ALUMINIO ML 5,763 5,763 5,763 5,763 5,763 5,763 5,763 5,763 5,763 5,763PIRLANES LADRILLO ML 25,025 25,225 24,750 24,815 24,724 24,896 24,967 24,540 24,831 24,967PISO VINILO TRFICO RESIDENCIAL M2 31,411 31,411 31,411 31,411 31,411 31,411 31,411 31,411 31,411 31,411PISO VINILO TRFICO PESADO M2 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,979 41,979PULIDA LACADA PISO MADERA M2 41,615 41,615 41,615 41,615 41,615 41,615 41,615 41,615 41,615 41,615TABLETA DE GRES 25X25 M2 37,384 37,601 37,085 37,155 37,057 37,243 37,320 36,857 37,173 37,320TABLN DE GRES LISO O RSTICO 33X 33 M2 38,062 38,279 37,763 37,833 37,734 37,921 37,998 37,534 37,851 37,998

    GUARDAESCOBA GRANO MRMOL P2; PAYANDE FONDO BLANCO ML 8,137 8,137 8,137 8,137 8,137 8,137 8,137 8,137 8,137 8,137

    ENCHAPE FACHADA EN TABLETA GRES 7 X 25 CM M2 34,769 35,069 34,357 34,454 34,317 34,575 34,681 34,041 34,478 34,681JABONERA PORCELANA ACUARIO UN 14,293 14,293 14,293 14,293 14,293 14,293 14,293 14,293 14,293 14,293JUEGOS INCRUSTAR (INCLUYE TOALLERO,PORTA ROLLO,

    JABONERA,CEPILLERA Y PERCHA SIMPLE)UN 99,271 99,271 99,271 99,271 99,271 99,271 99,271 99,271 99,271 99,271

    REJILLA PLSTICA SOSCO 3X2 UN 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,659 7,659REJILLA SIFN CON SOSCO 4.5CM X 3.5CM UN 15,765 15,765 15,765 15,765 15,765 15,765 15,765 15,765 15,765 15,765REJILLA METLICA TRADICIONAL 3X2 SOSCO UN 10,602 10,602 10,602 10,602 10,602 10,602 10,602 10,602 10,602 10,602REJILLA PLSTICA VENTILACIN 20X20 UN 10,092 10,092 10,092 10,092 10,092 10,092 10,092 10,092 10,092 10,092REMATES BOCEL ALUMINIO ML 6,412 6,412 6,412 6,412 6,412 6,412 6,412 6,412 6,412 6,412REMATES BOCEL PORCELANA ML 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522 6,522TAPA REGISTRO 20X20 UN 14,769 14,769 14,769 14,769 14,769 14,769 14,769 14,769 14,769 14,769TAPA REGISTRO 6X6 UN 13,015 13,015 13,015 13,015 13,015 13,015 13,015 13,015 13,015 13,015

    DESTRONQUE Y PULIDO DE PLOMO BALDOSA GRANO DE MRMOL N.5 M2 14,366 14,366 14,366 14,366 14,366 14,366 14,366 14,366 14,366 14,366

    DESTRONQUE PULIDA DE PLOMO BALDOSA GRANO DE MRMOL

    FUNDIDO EN SITIOM2 16,669 16,669 16,669 16,669 16,669 16,669 16,669 16,669 16,669 16,669

    CERMICA PISO TRFICO 5, CALIDAD PRIMERA M2 48,028 48,246 47,729 47,799 47,701 47,887 47,964 47,501 47,817 47,964MEDIA CAA EN GRANITO ML 57,676 57,676 57,676 57,676 57,676 57,676 57,676 57,676 57,676 57,676PISO VINILICO EN ROLLO PARA CAMPOS DEPORTIVOS M2 26,247 26,247 26,247 26,247 26,247 26,247 26,247 26,247 26,247 26,247PINTURA ACRLICA PARA PISOS M2 10,415 10,415 10,415 10,415 10,415 10,415 10,415 10,415 10,415 10,415PRADIZACIN EN GRAMA BERMUDA PARA CAMPOS DEPORTIVOS M2 11,885 11,885 11,885 11,885 11,885 11,885 11,885 11,885 11,885 11,885GRAMA SINTTICA PARA CAMPOS DEPORTIVOS M2 83,198 83,198 83,198 83,198 83,198 83,198 83,198 83,198 83,198 83,198

    CIELO RASO

    APLIQUE YESO ML 57,322 57,322 57,322 57,322 57,322 57,322 57,322 57,322 57,322 57,322ARMADURA MADERA Y MALLA M2 26,749 26,749 26,749 26,749 26,749 26,749 26,749 26,749 26,749 26,749CIELO RASO BOVEDAS DRYWALL (INCLUYE PINTURA) M2 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948 51,948CIELO RASO DURACUSTIC M2 51,286 51,286 51,286 51,286 51,286 51,286 51,286 51,286 51,286 51,286CIELO RASO PLANO DRYWALL (INCLUYE PINTURA) M2 47,458 47,458 47,458 47,458 47,458 47,458 47,458 47,458 47,458 47,458CIELO RASO TRIPLEX (INCLUYE ESTRUCTURA DE APOYO) M2 67,404 67,404 67,404 67,404 67,404 67,404 67,404 67,404 67,404 67,404

    15.2

    15.3

    15.4

    15.5

    15.6

    14.44

    14.45

    14.46

    15

    15.1

    14.38

    14.39

    14.40

    14.41

    14.42

    14.43

    14.32

    14.33

    14.34

    14.35

    14.36

    14.37

    14.26

    14.27

    14.28

    14.29

    14.30

    14.31

    14.20

    14.21

    14.22

    14.23

    14.24

    14.25

    14.14

    14.15

    14.16

    14.17

    14.18

    14.19

    14.12

    14.13

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINCORNISAS YESO ML 35,843 35,843 35,843 35,843 35,843 35,843 35,843 35,843 35,843 35,843LISTN M.H. PINO ROMERN (INCLUYE ESTRUCTURA DE APOYO) M2 74,990 74,990 74,990 74,990 74,990 74,990 74,990 74,990 74,990 74,990MALLA CON VENA M2 10,287 10,287 10,287 10,287 10,287 10,287 10,287 10,287 10,287 10,287

    EXCAVACIONES Y RELLENOS

    EXPLANACIN Y EXTENDIDA M3 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120 4,120EXCAVACIONES VARIAS A MQUINA SIN CLASIFICAR (INCLUYE RETIRO DE

    SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449 17,449

    EXCAVACIN MANUAL ZANJA EN TIERRA H=1.0 M M3 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730 19,730

    EXCAVACIN MANUAL EN MATERIAL COMN H=0.0-2.0 M (INCLUYE

    RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829 34,829

    EXCAVACIN MANUAL EN CONGLOMERADO H=0.0-2.0 M (INCLUYE

    RETIRO DE SOBRANTES A UNA DISTANCIA MENOR DE 5 KM)M3 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613 39,613

    EXCAVACIN MANUAL EN ROCA H=0.0-2.0 M (SECO SIN EXPLOSIVOS) M3 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704 59,704

    RELLENO CON MATERIAL DEL SITIO COMPACTADO MECNICAMENTE M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592

    RELLENO EN RECEBO COMN COMPACTADO MECNICAMENTE M3 45,831 84,636 47,098 72,968 63,940 58,740 76,875 54,859 34,163 78,168RELLENO GRAVILLA DE RO COMPACTADO MECNICAMENTE M3 111,536 128,109 96,018 108,556 126,144 104,294 129,247 100,279 109,590 135,455RELLENOS AGREGADO EN MATERIAL DE BASE COMPACATADO

    MECNICAMENTEM3 132,872 178,145 132,872 117,350 176,851 145,807 171,677 128,992 152,275 178,145

    AFRIMADO (NORMA INVIAS 311) M3 53,781 92,586 50,109 75,979 71,890 61,750 84,825 57,870 43,641 86,119SUBBASE GRANULAR (NORMA INVIAS 320) M3 125,622 170,895 125,622 110,100 169,601 138,557 164,427 121,742 145,025 170,895BASE GRANULAR (NORMA INVIAS 330) M3 133,513 178,786 133,513 117,991 177,492 146,448 172,318 129,633 152,916 178,786

    APARATOS SANITARIOS

    SUMINISTRO E INSTALACIN SANITARIO TANQUE (INCLUYE GRIFERA) UN 219,425 219,425 219,425 219,425 219,425 219,425 219,425 219,425 219,425 219,425

    SUMINISTRO E INSTALACIN SANITARIO FLUXMETRO (INCLUYE

    GRIFERA)UN 693,262 693,262 693,262 693,262 693,262 693,262 693,262 693,262 693,262 693,262

    SUMINISTRO E INSTALACIN SANITARIO INFANTIL (INCLUYE GRIFERA) UN 391,651 391,651 391,651 391,651 391,651 391,651 391,651 391,651 391,651 391,651

    SUMINISTRO E INSTALACIN LAVAMANOS COLGAR (INCLUYE GRIFERA) UN 125,611 125,611 125,611 125,611 125,611 125,611 125,611 125,611 125,611 125,611

    SUMINISTRO E INSTALACIN LAVAMANOS PEDESTAL (INCLUYE

    GRIFERA)UN 155,828 155,828 155,828 155,828 155,828 155,828 155,828 155,828 155,828 155,828

    SUMINISTRO E INSTALACIN LAVAMANOS DE EMPOTRAR(INCLUYE

    GRIFERA)UN 184,468 184,468 184,468 184,468 184,468 184,468 184,468 184,468 184,468 184,468

    SUMINISTRO E INSTALACIN ORINAL DE LLAVE (INCLUYE GRIFERA) UN 285,276 285,276 285,276 285,276 285,276 285,276 285,276 285,276 285,276 285,276

    SUMINISTRO E INSTALACIN ORINAL DE FLUXMETRO (INCLUYE

    GRIFERA)UN 749,760 749,760 749,760 749,760 749,760 749,760 749,760 749,760 749,760 749,760

    SUMINISTRO E INSTALACIN ORINAL INFANTIL (INCLUYE GRIFERA) UN 233,762 233,762 233,762 233,762 233,762 233,762 233,762 233,762 233,762 233,762

    17.6

    17.7

    17.8

    17.9

    17

    17.1

    17.2

    17.3

    17.4

    17.5

    16.9

    16.10

    16.11

    16.12

    16.13

    16.3

    16.4

    16.5

    16.6

    16.7

    16.8

    15.8

    15.9

    16

    16.1

    16.2

    15.7

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINSUMINISTRO E INSTALACIN DUCHA MEZCLADORA SIN SALIDA A BAERA

    UN 112,067 112,067 112,067 112,067 112,067 112,067 112,067 112,067 112,067 112,067

    SUMINISTRO E INSTALACIN DUCHA SENCILLA UN 63,454 63,454 63,454 63,454 63,454 63,454 63,454 63,454 63,454 63,454

    SUMINISTRO E INSTALACIN LAVAPLATOS DE EMPOTRAR EN ACERO

    INOXIDABLE 45 X 49 cm (INCLUYE ACCESORIOS Y GRIFERA)UN 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113 186,113

    SUMINISTRO E INSTALACIN LAVAPLATOS DE SOBREPONER EN ACERO

    INOXIDABLE 120 X 60 cm (INCLUYE ACCESORIOS Y GRIFERA)UN 297,860 297,860 297,860 297,860 297,860 297,860 297,860 297,860 297,860 297,860

    PINTURAS

    IMPERMEABILIZACIN FACHADA EN SIKA TRANSPARENTE O SIMILAR M2 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478 4,478

    ANTICORROSIVO SOBRE LMINA LINEAL ML 2,235 2,235 2,235 2,235 2,235 2,235 2,235 2,235 2,235 2,235ANTICORROSIVO SOBRE LMINA LLENA M2 8,419 8,419 8,419 8,419 8,419 8,419 8,419 8,419 8,419 8,419BARNIZ SOBRE MUEBLES M2 32,127 32,127 32,127 32,127 32,127 32,127 32,127 32,127 32,127 32,127CARBURO SOBRE PAETES M2 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334 4,334COLORPLAST FACHADA SOBRE FACHADA M2 10,669 10,669 10,669 10,669 10,669 10,669 10,669 10,669 10,669 10,669DEMARCACIN CON MARMOLINA ML 2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697ESMALTE SOBRE LMINA LINEAL ML 1,940 1,940 1,940 1,940 1,940 1,940 1,940 1,940 1,940 1,940ESMALTE SOBRE LMINA LLENA M2 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059 10,059ESMALTE SOBRE MADERA LINEAL ML 3,020 3,020 3,020 3,020 3,020 3,020 3,020 3,020 3,020 3,020ESMALTE SOBRE MADERA LLENA M2 11,172 11,172 11,172 11,172 11,172 11,172 11,172 11,172 11,172 11,172ESMALTE SOBRE MARCOS LMINA M2 3,959 3,959 3,959 3,959 3,959 3,959 3,959 3,959 3,959 3,959ESMALTE SOBRE MARCOS MADERA M2 4,719 4,719 4,719 4,719 4,719 4,719 4,719 4,719 4,719 4,719ESTUCO M2 5,893 5,893 5,893 5,893 5,893 5,893 5,893 5,893 5,893 5,893ESTUCO (LINEAL) ML 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628 3,628ESTUCO Y VINILO 3 MANOS M2 12,317 12,317 12,317 12,317 12,317 12,317 12,317 12,317 12,317 12,317ESTUCO Y VINILO 3 MANOS (LINEAL) ML 7,589 7,589 7,589 7,589 7,589 7,589 7,589 7,589 7,589 7,589LACA PISOS MADERA M2 18,109 18,109 18,109 18,109 18,109 18,109 18,109 18,109 18,109 18,109LNEAS TRFICO 0.10 ML 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086MARMOLINA SOBRE PAETE M2 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822 8,822TINTILLA SOBRE MADERA LINEAL ML 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571TINTILLA SOBRE MADERA LLENA M2 9,802 9,802 9,802 9,802 9,802 9,802 9,802 9,802 9,802 9,802VINILO SOBRE PAETE 2 MANOS M2 5,373 5,373 5,373 5,373 5,373 5,373 5,373 5,373 5,373 5,373VINILO SOBRE PAETE 2 MANOS (LINEAL) 3,387 3,387 3,387 3,387 3,387 3,387 3,387 3,387 3,387 3,387WASH-PRIMER SOBRE ALUMNIO M2 16,469 16,469 16,469 16,469 16,469 16,469 16,469 16,469 16,469 16,469PINTURA EPXICA M2 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132 10,132PINTURA EPXICA (LINEAL) ML 6,215 6,215 6,215 6,215 6,215 6,215 6,215 6,215 6,215 6,215

    DOTACIONES DEPORTIVAS

    CANCHA MINIBALONCESTO Y/O MINIFTBOL (PAR) UN 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939 3,768,939CANCHA MLTIPLE TUBO A.N. INCL.TABLERO ACRLICO CON

    RODACHINES Y CILINDRO PARA MOVILIZAR (PAR)UN 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770 6,615,770

    CANCHA PARA MICROFTBOL (PAR) UN 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608 1,984,608

    CANCHA PARA BALONCESTO CON RODACHINES Y CILINDRO (PAR) UN 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136 5,562,136

    CANCHA PARA BALONCESTO DE ANCLAR AL PISO (PAR) UN 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648 5,537,648

    19.4

    19.5

    18.27

    19

    19.1

    19.2

    19.3

    18.21

    18.22

    18.23

    18.24

    18.25

    18.26

    18.15

    18.16

    18.17

    18.18

    18.19

    18.20

    18.9

    18.10

    18.11

    18.12

    18.13

    18.14

    18.3

    18.4

    18.5

    18.6

    18.7

    18.8

    17.12

    17.13

    18

    18.1

    18.2

    17.10

    17.11

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINDEMARCACIN CON PINTURA TIPO TRFICO E=0.10 M ML 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086 2,086TABLERO PARA BALONCESTO EN ACRLICO 10 MM (PAR) UN 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050 1,980,050MALLA NYLON PETROLIZADA VOLEIBOL UN 63,495 63,495 63,495 63,495 63,495 63,495 63,495 63,495 63,495 63,495SOPORTE MALLA VOLEIBOL CON TENSOR UN 1,116,950 1,117,215 1,116,779 1,116,879 1,117,001 1,116,911 1,117,098 1,116,736 1,116,918 1,117,150CERRAMIENTO CONTRA IMPACTO H=5.00M TIPO IDRD ML 577,495 583,489 573,335 575,979 579,324 576,326 581,354 572,779 576,779 582,708

    INSTALACIONES RED GASES

    TUBERA COBRE 1/2" TIPO L (INCLUYE ACCESORIOS) ML 23,244 23,244 23,244 23,244 23,244 23,244 23,244 23,244 23,244 23,244TUBERA COBRE 3/4" TIPO L (INCLUYE ACCESORIOS) ML 34,452 34,452 34,452 34,452 34,452 34,452 34,452 34,452 34,452 34,452TUBERA COBRE 1" TIPO L (INCLUYE ACCESORIOS) ML 42,549 42,549 42,549 42,549 42,549 42,549 42,549 42,549 42,549 42,549

    TUBERA DE ACERO GALVANIZADO 1/2" SCH 40 (INCLUYE ACCESORIOS) ML 25,544 25,544 25,544 25,544 25,544 25,544 25,544 25,544 25,544 25,544

    TUBERA DE ACERO GALVANIZADO 3/4" SCH 40 (INCLUYE ACCESORIOS) ML 29,210 29,210 29,210 29,210 29,210 29,210 29,210 29,210 29,210 29,210

    TUBERA DE ACERO GALVANIZADO 1" SCH 40 (INCLUYE ACCESORIOS) ML 42,767 42,767 42,767 42,767 42,767 42,767 42,767 42,767 42,767 42,767

    TUBERA DE POLIETILENO 1/2" (INCLUYE ACCESORIOS) ML 19,828 19,828 19,828 19,828 19,828 19,828 19,828 19,828 19,828 19,828TUBERA DE POLIETILENO 3/4" (INCLUYE ACCESORIOS) ML 20,913 20,913 20,913 20,913 20,913 20,913 20,913 20,913 20,913 20,913TUBERA DE POLIETILENO 1" (INCLUYE ACCESORIOS) ML 25,885 25,885 25,885 25,885 25,885 25,885 25,885 25,885 25,885 25,885VLVULA DE BOLA GAS 1/2" UN 11,765 11,765 11,765 11,765 11,765 11,765 11,765 11,765 11,765 11,765VLVULA DE BOLA GAS 3/4" UN 18,362 18,362 18,362 18,362 18,362 18,362 18,362 18,362 18,362 18,362VLVULA DE BOLA GAS 1" UN 27,499 27,499 27,499 27,499 27,499 27,499 27,499 27,499 27,499 27,499VLVULA POLIETILENO GAS 1/2" UN 163,550 163,550 163,550 163,550 163,550 163,550 163,550 163,550 163,550 163,550VLVULA POLIETILENO GAS 3/4" UN 168,210 168,210 168,210 168,210 168,210 168,210 168,210 168,210 168,210 168,210VLVULA POLIETILENO GAS 1" UN 272,558 272,558 272,558 272,558 272,558 272,558 272,558 272,558 272,558 272,558ACOMETIDA GAS 1/2" ML 225,126 225,126 225,126 225,126 225,126 225,126 225,126 225,126 225,126 225,126

    INSTALACIONES RED VOZ Y DATOS

    SENSOR DE HUMO FOTOELCTRICO UN 99,360 99,360 99,360 99,360 99,360 99,360 99,360 99,360 99,360 99,360CABLE DETECTOR LINEAL DE CALOR ML 24,786 24,786 24,786 24,786 24,786 24,786 24,786 24,786 24,786 24,786SIRENA DE 110 V UN 70,241 70,241 70,241 70,241 70,241 70,241 70,241 70,241 70,241 70,241CMARA CCTV UN 204,876 204,876 204,876 204,876 204,876 204,876 204,876 204,876 204,876 204,876PARLANTE-CIELO FALSO UN 40,030 40,030 40,030 40,030 40,030 40,030 40,030 40,030 40,030 40,030AMPLIFICADOR 100W UN 432,095 432,095 432,095 432,095 432,095 432,095 432,095 432,095 432,095 432,095AMPLIFICADOR 300W UN 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194 1,071,194ACOMETIDA CABLE RG-6 PARA MICRFONO ML 32,761 32,761 32,761 32,761 32,761 32,761 32,761 32,761 32,761 32,761MICRFONO PG 48LC (INCLUYE BASE) UN 171,265 171,265 171,265 171,265 171,265 171,265 171,265 171,265 171,265 171,265TOMA PARA MICRFONO UN 33,911 33,911 33,911 33,911 33,911 33,911 33,911 33,911 33,911 33,911CABLE BLINDADO STEREO PARA MICRFONO ML 2,621 2,621 2,621 2,621 2,621 2,621 2,621 2,621 2,621 2,621SPLITERS UN 4,226 4,226 4,226 4,226 4,226 4,226 4,226 4,226 4,226 4,226TUBERA CONDUIT EMT GALVANIZADA 1/2". ML 14,222 14,222 14,222 14,222 14,222 14,222 14,222 14,222 14,222 14,222TUBERA CONDUIT EMT GALVANIZADA 3/4". ML 18,719 18,719 18,719 18,719 18,719 18,719 18,719 18,719 18,719 18,719TUBERA CONDUIT EMT GALVANIZADA 1". ML 25,780 25,780 25,780 25,780 25,780 25,780 25,780 25,780 25,780 25,780BANDEJA PORTACABLE ACERO GALVANIZADO 30x80 ML 95,532 95,532 95,532 95,532 95,532 95,532 95,532 95,532 95,532 95,532

    TAPA PARA BANDEJA PORTACABLE ACERO GALVANIZADO 30X120 ML 25,118 25,118 25,118 25,118 25,118 25,118 25,118 25,118 25,118 25,118

    21.16

    21.17

    21.10

    21.11

    21.12

    21.13

    21.14

    21.15

    21.4

    21.5

    21.6

    21.7

    21.8

    21.9

    20.16

    21.1

    21.1

    21.2

    21.3

    20.10

    20.11

    20.12

    20.13

    20.14

    20.15

    20.4

    20.5

    20.6

    20.7

    20.8

    20.9

    19.10

    20

    20.1

    20.2

    20.3

    19.6

    19.7

    19.8

    19.9

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINBANDEJA PORTACABLES PARA RACK UN 82,312 82,312 82,312 82,312 82,312 82,312 82,312 82,312 82,312 82,312RACK 2' X 24" UN 131,617 131,617 131,617 131,617 131,617 131,617 131,617 131,617 131,617 131,617RACK 3' X 24" UN 160,129 160,129 160,129 160,129 160,129 160,129 160,129 160,129 160,129 160,129RACK 5' X 24" UN 252,804 252,804 252,804 252,804 252,804 252,804 252,804 252,804 252,804 252,804RACK 7' X 24" UN 327,375 327,375 327,375 327,375 327,375 327,375 327,375 327,375 327,375 327,375PATCH PANEL 48 PUERTOS CATEGORA 6A UN 371,139 371,139 371,139 371,139 371,139 371,139 371,139 371,139 371,139 371,139PATCH PANEL 24 PUERTOS CATEGORA 6A UN 222,657 222,657 222,657 222,657 222,657 222,657 222,657 222,657 222,657 222,657

    SALIDA DE DATOS COMPLETA (INCLUYE FACE PLATE Y MARCACIN) UN 53,919 53,919 53,919 53,919 53,919 53,919 53,919 53,919 53,919 53,919

    PATCH CORD 2M CATEGORA 6A UN 5,601 5,601 5,601 5,601 5,601 5,601 5,601 5,601 5,601 5,601PATCH CORD 5M CATEGORA 6A UN 14,230 14,230 14,230 14,230 14,230 14,230 14,230 14,230 14,230 14,230CABLE UTP CATEGORA 6A ML 2,609 2,609 2,609 2,609 2,609 2,609 2,609 2,609 2,609 2,609CANALETA METLICA 4X6 CMS ML 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187 26,187CANALETA METLICA 4X10 CMS ML 27,339 27,339 27,339 27,339 27,339 27,339 27,339 27,339 27,339 27,339CANALETA METLICA 6X10 CMS ML 27,914 27,914 27,914 27,914 27,914 27,914 27,914 27,914 27,914 27,914CANALETA PLSTICA 13X7 MM ML 15,520 15,520 15,520 15,520 15,520 15,520 15,520 15,520 15,520 15,520CANALETA PLSTICA 20X12 MM ML 17,377 17,377 17,377 17,377 17,377 17,377 17,377 17,377 17,377 17,377CANALETA PLSTICA 32X12 MM ML 17,306 17,306 17,306 17,306 17,306 17,306 17,306 17,306 17,306 17,306CANALETA PLSTICA 40X60 MM ML 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745 27,745SWITCH 10/100/1000 24 PUERTOS UN 375,070 375,070 375,070 375,070 375,070 375,070 375,070 375,070 375,070 375,070SWITCH 10/100/1000 16 PUERTOS UN 237,162 237,162 237,162 237,162 237,162 237,162 237,162 237,162 237,162 237,162SWITCH 10/100/1000 8 PUERTOS UN 63,067 63,067 63,067 63,067 63,067 63,067 63,067 63,067 63,067 63,067CABLE TELEFNICO 2 PARES ML 1,361 1,361 1,361 1,361 1,361 1,361 1,361 1,361 1,361 1,361CABLE TELEFNICO 10 PARES ML 6,599 6,599 6,599 6,599 6,599 6,599 6,599 6,599 6,599 6,599CABLE TELEFNICO 20 PARES ML 8,838 8,838 8,838 8,838 8,838 8,838 8,838 8,838 8,838 8,838CABLE TELEFNICO 40 PARES ML 12,319 12,319 12,319 12,319 12,319 12,319 12,319 12,319 12,319 12,319CABLE TELEVISIN RG6 ML 1,672 1,672 1,672 1,672 1,672 1,672 1,672 1,672 1,672 1,672ACOMETIDA TELEFNICA 1/2" ML 16,053 16,053 16,053 16,053 16,053 16,053 16,053 16,053 16,053 16,053ACOMETIDA TELEFNICA 1" ML 24,699 24,699 24,699 24,699 24,699 24,699 24,699 24,699 24,699 24,699ACOMETIDA TELEVISIN 1" RG6" ML 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269 13,269

    CABLE DE FIBRA PTICA 50/125 MULTIMODO (INCLUYE CERTIFICACIN) ML 10,844 10,844 10,844 10,844 10,844 10,844 10,844 10,844 10,844 10,844

    BANDEJA PARA FIBRA PTICA HASTA 24 HILOS UN 486,148 486,148 486,148 486,148 486,148 486,148 486,148 486,148 486,148 486,148

    21.46

    21.47

    21.48

    21.40

    21.41

    21.42

    21.43

    21.44

    21.45

    21.34

    21.35

    21.36

    21.37

    21.38

    21.39

    21.28

    21.29

    21.30

    21.31

    21.32

    21.33

    21.22

    21.23

    21.24

    21.25

    21.26

    21.27

    21.18

    21.19

    21.20

    21.21

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINACUEDUCTO

    CODO 45 PVC UNIN MECNICA 2" UN 19,694 19,694 19,694 19,694 19,694 19,694 19,694 19,694 19,694 19,694CODO 45 PVC UNIN MECNICA 4" UN 65,511 65,511 65,511 65,511 65,511 65,511 65,511 65,511 65,511 65,511CODO 45 PVC UNIN MECNICA 8" UN 367,555 367,555 367,555 367,555 367,555 367,555 367,555 367,555 367,555 367,555CODO 45 PVC UNIN MECNICA 10" UN 784,386 784,386 784,386 784,386 784,386 784,386 784,386 784,386 784,386 784,386CODO 90 PVC UNIN MECNICA 4" UN 90,129 90,129 90,129 90,129 90,129 90,129 90,129 90,129 90,129 90,129CODO 90 PVC UNIN MECNICA 8" UN 547,459 547,459 547,459 547,459 547,459 547,459 547,459 547,459 547,459 547,459CODO 90 PVC UNIN MECNICA 10" UN 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281 1,177,281COLLAR DE DERIVACIN PVC UNIN MECNICA 2" X 1/2" UN 9,694 9,694 9,694 9,694 9,694 9,694 9,694 9,694 9,694 9,694COLLAR DE DERIVACIN PVC UNIN MECNICA 2 1/2" X 1/2" UN 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882 11,882COLLAR DE DERIVACIN PVC UNIN MECNICA 3" X 1/2" UN 14,853 14,853 14,853 14,853 14,853 14,853 14,853 14,853 14,853 14,853COLLAR DE DERIVACIN PVC UNIN MECNICA 4" X 1/2" UN 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214 16,214COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 1/2" UN 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381COLLAR DE DERIVACIN PVC UNIN MECNICA 6" X 2" UN 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381 19,381TAPN PVC UNIN MECNICA 3" UN 76,938 76,938 76,938 76,938 76,938 76,938 76,938 76,938 76,938 76,938TAPN PVC UNIN MECNICA 4" UN 89,151 89,151 89,151 89,151 89,151 89,151 89,151 89,151 89,151 89,151TAPN PVC UNIN MECNICA 8" UN 275,707 275,707 275,707 275,707 275,707 275,707 275,707 275,707 275,707 275,707TEE PVC UNIN MECNICA 2" UN 103,474 103,474 103,474 103,474 103,474 103,474 103,474 103,474 103,474 103,474TEE PVC UNIN MECNICA 4" UN 170,562 170,562 170,562 170,562 170,562 170,562 170,562 170,562 170,562 170,562TEE PVC UNIN MECNICA 8" UN 753,934 753,934 753,934 753,934 753,934 753,934 753,934 753,934 753,934 753,934TEE PVC UNIN MECNICA 10" UN 868,489 868,489 868,489 868,489 868,489 868,489 868,489 868,489 868,489 868,489TUBERA PVC UNIN MECNICA RDE 21 2" ML 10,074 10,074 10,074 10,074 10,074 10,074 10,074 10,074 10,074 10,074TUBERA PVC UNIN MECNICA RDE 26 2" ML 8,933 8,933 8,933 8,933 8,933 8,933 8,933 8,933 8,933 8,933TUBERA PVC UNIN MECNICA RDE 26 4" ML 21,201 21,201 21,201 21,201 21,201 21,201 21,201 21,201 21,201 21,201TUBERA PVC UNIN MECNICA RDE 26 8" ML 85,084 85,084 85,084 85,084 85,084 85,084 85,084 85,084 85,084 85,084TUBERA PVC UNIN MECNICA RDE 26 10" ML 126,077 126,077 126,077 126,077 126,077 126,077 126,077 126,077 126,077 126,077TUBERA PVC UNIN MECNICA RDE 32.5 4" ML 20,912 20,912 20,912 20,912 20,912 20,912 20,912 20,912 20,912 20,912TUBERA PVC UNIN MECNICA RDE 32.5 8" ML 71,536 71,536 71,536 71,536 71,536 71,536 71,536 71,536 71,536 71,536TUBERA PVC UNIN MECNICA RDE 32.5 10" ML 105,389 105,389 105,389 105,389 105,389 105,389 105,389 105,389 105,389 105,389UNIN RPIDA DE CONSTRUCCIN PVC 2 1/2" UN 21,895 21,895 21,895 21,895 21,895 21,895 21,895 21,895 21,895 21,895UNIN RPIDA DE CONSTRUCCIN PVC 4" UN 45,011 45,011 45,011 45,011 45,011 45,011 45,011 45,011 45,011 45,011UNIN RPIDA DE CONSTRUCCIN PVC 8" UN 180,529 180,529 180,529 180,529 180,529 180,529 180,529 180,529 180,529 180,529UNIN REPARACION PVC 4" UN 52,467 52,467 52,467 52,467 52,467 52,467 52,467 52,467 52,467 52,467UNIN REPARACIN PVC 8" UN 209,925 209,925 209,925 209,925 209,925 209,925 209,925 209,925 209,925 209,925UNIN REPARACIN UNIN Z PVC 6" UN 126,758 126,758 126,758 126,758 126,758 126,758 126,758 126,758 126,758 126,758UNIN REPARACIN UNIN Z PVC 10" UN 358,287 358,287 358,287 358,287 358,287 358,287 358,287 358,287 358,287 358,287VLVULA COMPUERTA ELSTICA 6" UN 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503 1,056,503VLVULA COMPUERTA ELSTICA 8" UN 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074 1,561,074

    ALCANTARILLADO - EXCAVACIONES

    ENTIBADO TIPO 1 (1/7 UTILIZACIONES) M2 8,109 8,109 8,109 8,109 8,109 8,109 8,109 8,109 8,109 8,109ENTIBADO TIPO 2 (1/7 UTILIZACIONES) M2 18,628 18,628 18,628 18,628 18,628 18,628 18,628 18,628 18,628 18,628RELLENO CON MATERIAL DE EXCAVACIN M3 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592 10,592RELLENO TIPO 1 "GRAVILLA" M3 99,321 115,140 84,507 96,476 113,265 92,408 116,227 88,575 97,463 122,152RELLENO TIPO 2 "RECEBO" M3 42,651 81,456 43,919 69,789 60,760 55,560 73,695 51,680 30,984 74,989

    2.4

    2.5

    1.37

    2

    2.1

    2.2

    2.3

    1.31

    1.32

    1.33

    1.34

    1.35

    1.36

    1.25

    1.26

    1.27

    1.28

    1.29

    1.30

    1.19

    1.20

    1.21

    1.22

    1.23

    1.24

    1.13

    1.14

    1.15

    1.16

    1.17

    1.18

    1.7

    1.8

    1.9

    1.10

    1.11

    1.12

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    URBANISMO1

  • DESCRIPCIN UNIDAD Arbelaz Cabrera Fusagasug Granada Pandi Pasca San_Bernardo Silvania Tibacuy Venecia

    GOBERNACIN DE CUNDINAMARCA

    LISTA DE PRECIOS CONSTRUCCIN, URBANISMO Y VAS (2013)

    PROVINCIA: SUMAPAZESTOS PRECIOS CONTEMPLAN SUMINISTRO, INSTALACIN Y TRANSPORTE

    TEM

    CONSTRUCCINRELLENO TIPO 4 "SUBBASE B-200" M3 55,001 93,806 51,329 77,199 73,110 62,970 86,045 59,090 44,861 87,339RELLENO TIPO 5 "TRITURADO GRUESO" M3 83,045 99,225 80,995 80,358 97,780 80,995 100,855 77,283 81,383 107,004RELLENO TIPO 6 "RAJN-PIEDRA" M3 84,547 101,042 82,458 81,808 99,569 82,458 102,703 78,674 82,853 108,971RELLENO TIPO 7 "ARENA DE PEA" M3 90,678 103,690 72,807 77,011 71,100 82,269 86,869 59,140 78,063 86,869

    ALCANTARILLADO - TUBERA

    CODO 45 PVC ALCANTARILLADO 8" UN 81,996 81,996 81,996 81,996 81,996 81,996 81,996 81,996 81,996 81,996CODO 45 PVC ALCANTARILLADO 16" UN 854,814 854,814 854,814 854,814 854,814 854,814 854,814 854,814 854,814 854,814CODO 90 PVC ALCANTARILLADO 8" UN 107,163 107,163 107,163 107,163 107,163 107,163 107,163 107,163 107,163 107,163CODO 90 PVC ALCANTARILLADO 16" UN 989,762 989,762 989,762 989,762 989,762 989,762 989,762 989,762 989,762 989,762CODO 90 PVC ALCANTARILLADO 24" UN 689,639 689,639 689,639 689,639 689,639 689,639 689,639 689,639 689,639 689,639SILLA TEE PVC ALCANTARILLADO 10 X 4" UN 58,088 58,088 58,088 58,088 58,088 58,088 58,088 58,088 58,088 58,088SILLA TEE PVC ALCANTARILLADO 10 X 6" UN 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711SILLA TEE PVC ALCANTARILLADO 16 X 4" UN 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615SILLA TEE PVC ALCANTARILLADO 16 X 6" UN 192,614 192,614 192,614 192,614 192,614 192,614 192,614 192,614 192,614 192,614SILLA TEE PVC ALCANTARILLADO 20 X 6" UN 309,173 309,173 309,173 309,173 309,173 309,173 309,173 309,173 309,173 309,173SILLA YEE PVC ALCANTARILLADO 10 X 4" UN 81,712 81,712 81,712 81,712 81,712 81,712 81,712 81,712 81,712 81,712SILLA YEE PVC ALCANTARILLADO 10 X 6" UN 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711 81,711SILLA YEE PVC ALCANTARILLADO 16 X 4" UN 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615SILLA YEE PVC ALCANTARILLADO 16 X 6" UN 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615 192,615SILLA YEE PVC ALCANTARILLADO 20 X 6" UN 309,174 309,174 309,174 309,174 309,174 309,174 309,174 309,174 309,174 309,174TUBERA CONCRETO CLASE II REFORZADO 24" ML 284,104 284,104 284,104 284,104 284,104 284,104 284,104 284,104 284,104 284,104TUBERA CONCRETO CLASE II REFORZADO 30" ML 455,746 455,746 455,746 455,746 455,746 455,746 455,746 455,746 455,746 455,746TUBERA CONCRETO CLASE II REFORZADO 44" ML 727,978 727,978 727,978 727,978 727,978 727,978 727,978 727,978 727,978 727,978TUBERA CONCRETO CLASE II SIN REFUERZO 10" ML 45,472 45,472 45,472 45,472 45,472 45,472 45,472 45,472 45,472 45,472TUBERA CONCRETO CLASE II SIN REFUERZO 24" ML 239,454 239,454 239,454 239,454 239,454 239,454 239,454 239,454 239,454 239,454TUBERA CONCRETO CLASE III REFORZADO 24" ML 260,444 260,444 260,444 260,444 260,444 260,444 260,444 260,444 260,444 260,444TUBERA CONCRETO CLASE III REFORZADO 44" ML 763,163 763,163 763,163 763,163 763,163 763,163 763,163 763,163 763,163 763,163TUBERA CONCRETO CLASE I SIN REFUERZO 10" ML 43,121 43,255 42,937 42,980 42,919 43,034 43,082 42,796 42,991 43,082TUBERA CONCRETO CLASE I SIN REFUERZO 24" ML 217,510 217,510 217,510 217,510 217,510 217,510 217,510 217,510 217,510 217,510TUBERA PVC ALCANTARILLADO 8" ML 35,890 35,890 35,890 35,890 35,890 35,890 35,890 35,890 35,890 35,890TUBERA PVC ALCANTARILLADO 10" ML 50,671 50,671 50,671 50,671 50,671 50,671 50,671 50,671 50,671 50,671TUBERA PVC ALCANTARILLADO 12" ML 73,031 73,031 73,031 73,031 73,031 73,031 73,031 73,031 73,031 73,031TUBERA PVC ALCANTARILLADO 16" ML 112,031 112,031 112,031 112,031 112,031 112,031 112,031 112,031 112,031 112,031TUBERA PVC ALCANTARILLADO REFORZADO 20" ML 179,857 179,857 179,857 179,857 179,857 179,857 179,857 179,857 179,857 179,857TUBERA PVC ALCANTARILLADO REFORZADO 24" ML 264,064 264,064 264,064 264,064 264,064 264,064 264,064 264,064 264,064 264,064TUBERA PVC ALCANTARILLADO REFORZADO 27" ML 333,299 333,299 333,299 333,299 333,299 333,299 333,299 333,299 333,299 333,299TUBERA PVC ALCANTARILLADO REFORZADO 33" ML 437,879 437,879 437,879 437,879 437,879 437,879 437,879 437,879 437,879 437,879TUBERA PVC ALCANTARILLADO REFORZADO 36" ML 600,645 600,645 600,645 600,645 600,645 600,645 600,