    K.12 RP 2015-2016

    Utility

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    2/12

    Utility Unit:

    supporting unit in the plant

    preparing, supplying, and distributing sup

    materials needed for the plant

    Supporting materials to handle:

    1.Steam

    2.Water3.Electricity

    4.uel

    !."efrigerant

    #.$Waste treatment%

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    3/12

    Estimation of supporting materialssupplied by Utility UnitSteam:

    &here are t'o (inds of steam uthe chemical plants:

    a%superheated steam ) for rea

    and for turbine po'erb%saturated steam ) for heating

    &hey are both supplied at 1**+'ith allo'ance of 1*2*+

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    4/12

    Water

    &he use of 'ater in the chemical plan

    -rocess ooling

    /oiler feed

    0omesti(

    -rocess

    mount of 'ater for reaction, s

    absorber, etc

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    5/12

    ooling

    0epend on the cooling system, once through or recirculati

    nce through system: supplied at 1**+ and 1*2*+ allo'

    "ecirculation system: supplied only for cooling 'ater lost

    to'er. ooling 'ater lost at cooling to'er can be estimated as:

    Eaporation loss, We *.***5! Wc$&1) &2%

    0rift loss, Wd *.1*.2+ Wc

    /lo' do'n, Wb

    - Wc circulated 'ater, 'ith unit of or for W, consisten

    - &1and &2 cooling 'ater temperature at inlet and out

    to'er in 6.

    - cycles , usually cycles used is 3!.

    Estimation by 7urita, cooling 'ater lost in cooling to'er a

    1+ for eery !.56 temperature drop.

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    6/12

    /oiler feed

    0epend on the use of the steam

    a%Steam for reactant $superhsteam% ) supplied at 1**+ rateallo'ance of 1*2*+.

    b%Steam for heating $satusteam% and8or for tu$superheated steam% ) suponly for /W ma(e up due to

    losses in the steam traps and

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    7/12

    0omestic0omesti( 'ater usage

    ces

    ;aboratory

    -ublic facilities

    aybe 1 pile $1! ltr% a day, or 1 ?errican $2! ltr% a day

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    8/12

    -ublic facilities

    antine

    >usholla

    antine:

    0epend on the amount of customer. &he labothe facility may be of @!+ of total labour.

    Each person may need 'ater at ! ltr a day.

    >usholla:

    0epends on the amount of labour using the

    &his might be estimated at @!+ of total labothe need of 1* ltr er erson a da .

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    9/12

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    10/12

    Electricity

    >otor: pump, coneyor, elcompressor, blo'er, fan, apparatus, crusher, grinder, mills, setc

    Cllumination: degree of illumi

    illumination area, type of lamp$home 'or(: electricity needeilluminate control room, housingsplant area%

    Cnstrumentation and control s

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    11/12

    uel

    Energy conersion 9 efficiency

    or boiler, D 5*+ or generator, D

    D 2!+, gas fuel

    D 3!+, liuid fuelD 3!+, solid fuel $coal%

  • 7/25/2019 Pertemuan 04 Rancangan Pabrik (28 Oktober 2015)

    12/12

    "efrigerant $home 'or(% "ate of refrigerant recycled: , , , etc., conertei.e. Rf

    0etermination of the amount of refrigerarefrigerator:

    ssume 1 cycle, i.e. 1! mins

    mount of refrigerant in a refrigerator racycle $1!% (g

    "efrigerant is recycled 9 some lea(ings

    ;ea(ing by time: 1**+ at serice life $i.e. 2* yr

    Supply