Peco Facet Sewage Water Treatment Plant
STP 16 HA
2
Project: …………………………………………….…..Lankaran Court of Grave Crimes
Contractor:……………………………… Ministry of Justice of Azerbaijan Republic
Detailed design …………………….... “AzerDovletLayihe” State Design Institute
Civil works: ……………………………………………………….… “EL-SEYM Insaat” LLC
Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH
Date of order: ………………………………………………………………………….July 2011
Facet model: …………………………………………………………………………..STP-16HA
Max. design flow rate: …………………………………………………………….40 m³/day
Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE)
Commissioning date: …………………………………………………………….04.05.2012
Peco Facet Sewage Water Treatment Plant
Project Information
3
Peco Facet Sewage Water Treatment Plant
Lankaran City R Republic of Azerbaijan
270 kilometers from capital Baku
Lankaran
4
Lankaran Court of Grave Crimes Lankaran, Republic
of Azerbaijan
Peco Facet Sewage Water Treatment Plant
Facet
STP unit
http://courts.az/lankarangravecrimes/?lng=en
5
Peco Facet Sewage Water Treatment Plant
Waste Waters formed in toilets and kitchen to the Sewage Water Treatment Plant
installed by Facet Facet
STP unit
The unit has been build behind the Court walls
6
Peco Facet Sewage Water Treatment Plant
Sewage Water Treatment Plant STP16HA
Facet scope: Basic Design, Engineering, Supply of Equipment, Installation and Start-up
All civil works and sewer network system was made by EL-SEYM Insaat LLC (local construction
company)
7
Peco Facet Sewage Water Treatment Plant
Construction period – January 2012
EL-Seym Insaat LLC - Local Civil company has built Pumper well, Inlet
pit, Aeration Chamber and Control Cabin According to drawings provided by Facet
Control room
Aeration chamber & control room
Pumper well
Aeration Chamber
Place for Module
General View
8
Peco Facet Sewage Water Treatment Plant
Installation works has been carried out by sub-contractor of FACET GERMANY
Installation of Settling and Disinfection Chamber by Crane
Installation period – March 2012
9
Peco Facet Sewage Water Treatment Plant
Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)
Installation period – March 2012
10
Peco Facet Sewage Water Treatment Plant
Connections from Control Skid to the Module
Installation period – March 2012
11
Peco Facet Sewage Water Treatment Plant
Connections between Aeration Chamber and Settling/Desinfection Module
Installation period – March 2012
12
Peco Facet Sewage Water Treatment Plant
Installation of BioFilm Media and Air Diffuser in Aeration Chamber
Installation period – March 2012
13
Peco Facet Sewage Water Treatment Plant
Basket in pumper well
Installation period – March 2012
Outlet Pipe to Collection box
14
Peco Facet Sewage Water Treatment Plant
Water Filling – May 2012
15
Peco Facet Sewage Water Treatment Plant
Start up Commissioning – May 2012
Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC
16
Peco Facet Sewage Water Treatment Plant
Start up Commissioning – May 2012
Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC
17
Peco Facet Sewage Water Treatment Plant
General Plan
18
Peco Facet Sewage Water Treatment Plant
Effluent Conditions
Ph……………………………………………………6-8
BOD5 ……………………………………………..<25 mg/l
COD …..……………………………………………<125 mg/l
TSS …………………………………………………<35 mg/l
O2 dissolved (aeration chamber) ……..6-10 mg/l
Temperature ………………………………….. Ambient
Aspect ………………………………………..…. Odorless and Transparent
19
Thank you for attention
Peco Facet Sewage Water Treatment Plant