Osceola County Conceptual Master Plansmedia2.planning.org/APA2012/Presentations/S600_Osceola...

36
APA Presentation Osceola County Conceptual Master Plans.

Transcript of Osceola County Conceptual Master Plansmedia2.planning.org/APA2012/Presentations/S600_Osceola...

APA Presentation

Osceola County Conceptual Master Plans.

A HISTORICAL PERSPECTIVE

Strong Historical Base

(1880’s Steamboats and Agriculture to 1980’s housing developments)

Reaction to Growth

1985 – Florida Growth Management Act

1991 – Osceola’s County’s First Future Land Use Map

Proactive Growth Approach

2007 – New Comprehensive Plan - Quality Growth, Transit, Job Centers Focus

2010 – 60,000 Ac. Planned Private/Public Partnership, Quality Growth (MUD)

2011 – Key Transportation Corridors Aligned with Land Use/Jobs and Housing Aligned

500,000 to 800,000 People

A Historic Base

A County’s Vision 1860-1890

A County’s Vision 1861-1980

A County’s Vision 1991-2007

Since 1991…….

1) Vehicle Miles of

Travel (VMT)

Growing Faster

Than Population

Growth

2) Less than 0.5 jobs

per household

3) Housing bust

A County’s Vision

Congestion

Wid

en

Congestion

Congestion

Tra

ffic

Wid

en

Capacity

Years

Land Use & Transportation – “Induced Demand”

Shift in Inertia

New Favored Quarter

Traditional Favored Quarter

Tourist Favored Quarter

A County’s Vision For the Next 20 Years

Mixed-Use Districts must

be developed to “explore

a range of build-out

opportunities and their

relationship to the size

and form of future

centers, the layout and

interconnectedness of

future transportation

networks, and the spatial

arrangement of the mix

of uses with the intent of

maximizing internal trip

capture

Master Planning a County

Job / Housing Balance

Making Transit Work

20,000 Acre

Public Master

Plan

Envi

ron

men

tal F

ram

ewo

rk

Mo

bili

ty F

ram

ewo

rk

Cen

ters

Fra

mew

ork

Cen

ter

Bu

ildin

g P

rogr

am

Nei

ghb

orh

oo

d F

ram

ewo

rk

Res

iden

tial

Bu

ildin

g P

rogr

am

Pu

blic

Fac

iliti

es

Structural Elements 1. Fine Grain Network

5 Acre Blocks

Two Lane Streets

Connectivity Index

Structural Elements 2. Framework Streets

Structural Elements 3. Place Types

8 Place Types

Implemented Via

Smart Code

Land Owner’s Perspective

Staging Area 1 – Concept Plan

can begin

Staging Area 2. Development

may proceed when:

4,000 jobs and 7,000 dwelling

units are in Staging Area 1

and The Osceola Parkway

Extension or Southport

Connector is started.

Staging Area 3. Development

may proceed when 14,000 jobs

and 14,000 dwelling units have

been constructed

Phasing

The Concept Plan shall

designate place types,

mixture of uses,

and their densities and

intensities for a phase or

portion of the

area encompassed by the

Conceptual Master Plan.

.

Concept Plan

The Site Development Plans

shall apply design and

development criteria to a phase

or portion of an area

encompassed within an

approved Concept Plan.

Site Plan

Economics!!!!!

Medical City

NE District 6.8 Miles

Orlando Airport

Transportation !!!!!

APA Presentation

Osceola County Conceptual Master Plans.