X Seminário de Gerenciamento de Projetos
Engº Paulo F. W. Keglevich de Buzin, MsC,CSM,ITIL®v3,PMP® CGEIT®, COBIT5®, MSP®, P3O® e PRINCE2TM Practitioner
APMG INTERNATIONAL Assessor, ISACA and ICCPM® - International Center for Complex Project Management member
Membro fundador e ex-Diretor do PMI-RS, OPM3® 2nd/3rd Edition Team member, TVC PMBOK® 4th Port. e
PMI Complexity Practice Guide team http://keglevich.ksc.com.br <> [email protected]
![Page 2: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/2.jpg)
Impactos da complexidade (3)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Agenda Introdução
O valor de uma boa definição em projetos -‐ Gestão Orientada a maior antecipação , garanBndo maior controle
A ineficácia dos modelos atuais de melhores práBca recomendadas para a crescente complexidade dos projetos e programas
CaracterísBcas dos Projetos Complexos Os vários contextos/mundos e suas dimensões Gerenciamento de Projetos de 2ª Ordem Algumas práBcas de mercado para o planejamento
e controle de projetos de 2ª Ordem O novo guia sobre complexidade de projetos e
programas do PMI Perfil de competências X Complexidade O desafio para as organizações
![Page 3: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/3.jpg)
Impactos da complexidade (4)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
A questão de busca do VALOR em GP
PLANEJAMENTO para obter maior VALOR a ser capitalizado no CONTROLE da execução do projeto e nos BENEFÍCIOS finalmente conquistados após a conclusão.
![Page 4: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/4.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (5)19:01
Impacto de uma boa definição de carteira de projetos
DEFINIÇÃO
Excelência Operacional
Gestão de Risco do Portfólio
Excelência em Gerenciamento de
Projetos
SELEÇÃO AVALIAÇÃO OPERAÇÃO EXECUÇÃO
Fase 2
Implantação do Projeto Realização do Valor Planejamento/Definição do Projeto
Identificação de Valor
Fase 4 Fase 5 Fase 3 Fase 1
Projeto bem definido Projeto bem executado
Valo
r
Falhando no planejamento, estamos planejando para falhar (Kerzner)
Projeto bem executado
Projeto mal executado
Projeto mal executado Projeto mal definido
![Page 5: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/5.jpg)
GP como valor em Projetos de Capital (6)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Grau de maturação do projeto
![Page 6: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/6.jpg)
GP como valor em Projetos de Capital (7)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
QUESTÃO: • Despeito de
– PMI, IPMA – PMBOK, ICB – PRINCE2 – Milhares de PMPs, etc.
Con$nuam exis$ndo níveis inaceitáveis de fracassos em projetos.
Por Que?
![Page 7: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/7.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (8)19:01
CaracterísRcas dos Sistemas Complexos
– Não-‐lineares • Pontos de ruptura/Mudança de Fase
– Emergentes • Macro diferente do micro; não-‐determinisBco
– Panorama mutável
![Page 8: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/8.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (9)19:01
![Page 9: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/9.jpg)
Impactos da complexidade (10)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Abordagem para administrar a Complexidade
Source: Strategic Management and Organizational Dynamics by Ralph Stacey in Agile Software Development
with Scrum by Ken Schwaber and Mike Beedle.
Objetivo no investimento em melhor definição/
planejamento = agregar VALOR
Sonho ?
Realidade!
![Page 10: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/10.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (11)19:01
Em algum lugar entre a simplicidade e o caos
– Ordenado – DeterminisBco
– Aleatório – Sensível a condições iniciais
Simplicidade Caos
Limiar do Caos
Cada vez mais forte e decisiva a influencia de eventos e aRtudes de fora dos limites usualmente considerados para os projetos (tanto antes como durante)
Edward Lorenz, 1979
![Page 11: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/11.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (12)19:01
Planejamento para minimizar a exposição ao Risco dos benefícios!
Tempo e esforço investido em planejamento!
RE =!P(L) * S(L)!
alto P(L): planos inadequados!alto S(L): muitos problemas!
(imprevistos,atrasos,retrabalhos)!
baixo P(L): planejamento completo!baixo S(L): problemas menores!
baixo P(L): poucos atrasos!baixo S(L): beneficios desde cedo!
alto P(L): atrasos.!inconformidades!alto S(L): demora !nos benefícios ! !
Probabilidade de perda—P(L) / Tamanho da perda—S(L) / Exposição total ao risco(RE) Balancing Agility and Discipline: A Guide for the Perplexed by Barry Boehm; Richard Turner
Sweet Spot!
- Perda devido ao planejamento inadequado - - Perda devido a erosão da oportunidade de mercado/mudança no
critério de sucesso!- Soma total da exposição ao risco
![Page 12: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/12.jpg)
Impactos da complexidade (13)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
COMPLEXO X COMPLICADO
INCERTEZA > COMPLEXIDADE
![Page 13: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/13.jpg)
GP como valor em Projetos de Capital (14)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Dimensões do Sucesso
Fonte: Dvir e Shenhar (2007)
![Page 14: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/14.jpg)
Impactos da complexidade (15)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
ICCPM® - International Center for Complex Project Management
• Projetos complexos são caracterizados pela incerteza, não-‐linearidade e recursividade, melhor vistos como sistemas dinâmicos e em evolução. (ICCPM) • CaracterisBcas dos Projetos Complexos
– Incerteza, ambigüidade, interfaces dinâmicas e influências políBcas ou externas significaBvas
– Executar durante um período que excede o tempo da tecnologia escolhida para ser uBlizada no início do projeto
– Você sabe o que você quer produzir, mas você não sabe como irá construí-‐lo
• Então, por que fingir que eles são previsíveis, definível e fixos -‐ e por que usamos modelos de ciclo de vida lineares para gerenciá-‐los???
Adapted from presentation by Stephen Hayes, CEO ICCPM, at the ICCPM Research and Innovation Conference, Lille, France, 16 Aug 2010
![Page 15: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/15.jpg)
Impactos da complexidade (16)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Sindrome do Marteleiro!!
“If the only tool you have is a hammer, you tend to see every problem as a nail.”― Abraham Harold Maslow
![Page 16: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/16.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (17)19:01
WORLD 3 Collaborators / Persons
Behaviour – Project-culture
WORLD 4 Foundations
Ways of Thinking
Systemic Views
Networking Circular
Processes
WORLD 2 Complexity Management
Cybernetic 2nd Order – Dynamic - Catalyst
Systemic-evolutionary – Self-organization
WORLD 1 Traditional Project Management
Cybernetic 1st Order - Command +Control Hard Reality –Plan / Actual– Hard Acting
RESULTS Project- Closing
Project-/Product-Processes Configuration and Realization of Project-Object/Product Project-Executing and Expiration - Project-Dynamic
IDEA Project- Initiating
Copyright © 1998/2004 by SPM-CONSULT - M. Saynisch
Mastering Complexity and Changes in Projects, Economy, and Society via Project Management Second Order (PM-‐2) December 2010 ■ Project Management Journal
![Page 17: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/17.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (18)19:01
WORLD 1 WORLD 2 WORLD 3 WORLD 4
Construction Proj. (in other culture)
Copyright © 2005 by SPM-CONSULT - M. Saynisch
Construction Proj. (traditional)
R & D - Projects (advanced techn.)
R & D - Projects (Mega Projects)
Organizational Proj. (self-reference)
Organizational Proj. (with IT systems)
Project Types
DISTRIBUIÇÃO DE CONTEXTOS CONFORME O TIPO DE PROJETO
![Page 18: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/18.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (19)19:01
COMPLEXITY Higher far of equilibrium Lower entropy Higher density of free energy flow Higher structural complexity Higher organization levels
TIME
continuous discontinuous continuous
Fluctuation + dynamic eruption synergetic convergence
EVOLUTION 1st ORDER
• Mutation, selection (Darwin)
• Trial-error processes • Slow change, stabilize • Fine adjustment
EVOLUTION 1st ORDER
EVOLUTION 2nd ORDER
• Rapid, jumping change & eruptions, great advance
• Create new formations • Bifurcation, Synergetic, Hypercycle, Chaos-dynamic
breakdown, collapse catastrophe
Copyright © 1993-2003 by SPM-CONSULT - M. Saynisch Source: E. Laszlo, E. Jantsch
![Page 19: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/19.jpg)
Impactos da complexidade (20)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Degrees of complexity: Hard and Soft
Crawford, L. and Pollack, J. (2004) Hard and sos projects: a framework for analysis. Interna$onal Journal of Project Management 22 (8):645-‐653.
Operações > projetos simples > projetos complicados > projetos complexos > Programas ?
![Page 20: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/20.jpg)
Impactos da complexidade (21)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Categorias de Risco Complexo • Estrutural: Enorme esforço, dificil de cronogramar e acompanhar, muitas aBvidades em paralelo, dixcil de monitorar todos os riscos • Técnico: Nunca feito ou mesmo visto antes • Direcional: Falta de consenso na direção estratégica, agendas extra projeto concorrentes com os objeBvos
• Temporal: Mudanças externas aos limites do projeto impactando em sua previsibilidade (legal, troca de liderança, poliBca)
Adapted from Remington, Kaye and Pollack, J., Tools for Complex Projects (Surrey, Gower Publishing Ltd, 2008) pp. 6-8
![Page 21: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/21.jpg)
Impactos da complexidade (22)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Cavanagh, M. (2013), Project Complexity Assessment. 12 ferramentas, algumas free. Cavanagh, M. (2012), 2nd Order Project Management.. Abordagens e técnicas de gestão da
complexidade.
![Page 22: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/22.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (23)19:01
![Page 23: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/23.jpg)
Impactos da complexidade (24)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Complexity in Programs and Projects: A PracRce Guide -‐ PMI
• Pesquisas patrocinadas pelo PMI desde 2008 e 2009, lideradas por Svetlana Cicmil, Terry Cooke-‐Davies, Lynn Crawford and Kurt Richardson. ‘Exploring the Complexity of Projects: ImplicaRons of Complexity Theory for Project Management PracRce’.
• Nova pesquisa em 2010 liderada por Ole Jonny Klakegg, Terry Williams, Derek Walker, Bjørn Andersen, and Ole Morten Magnussen. ‘EARLY WARNING SIGNS IN COMPLEX PROJECTS’.
![Page 24: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/24.jpg)
Impactos da complexidade (25)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Complexity in Programs and Projects: A PracRce Guide – PMI -‐ contents
• COMPLEXITY FOCUS CATEGORIES AND USEFUL PRACTICES – Focus Categories: Scope, CommunicaBons, Stakeholders and
Risk – Useful PracBces
• NAVIGATING COMPLEXITY: POSSIBLE ACTIONS TO CONSIDER – Assessing and NavigaBng Complexity – Using the Complexity Scenarios (12 Scenarios) – Monitoring Programs or Projects for Complexity
• ORGANIZATIONAL CONSIDERATIONS
![Page 25: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/25.jpg)
Impactos da complexidade (26)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
O Inter-‐relacionamento entre alguns dos atributos de complexidade e suas caracterísRcas
![Page 26: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/26.jpg)
Impactos da complexidade (27)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Relacionamentos entre categorias de foco e práRcas úteis > 12 cenários básicos
![Page 27: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/27.jpg)
Impactos da complexidade (28)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Complexity assessment: SCOPE
![Page 28: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/28.jpg)
Impactos da complexidade (29)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Complexity assessment: COMMUNICATIONS
![Page 29: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/29.jpg)
Impactos da complexidade (30)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Complexity assessment: STAKEHOLDERS
![Page 30: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/30.jpg)
Impactos da complexidade (31)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Complexity assessment: RISK
![Page 31: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/31.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (32)19:01
Matriz de avaliação de competência requerida
COMPLEXIDADE Teoria da entropia dos projetos: Todo o projeto tende naturalmente ao CAOS.
O Gerente de Projeto deve garanRr que não acabe em CAOS.
![Page 32: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/32.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (33)19:01
Componentes do sucesso nos projetos
![Page 33: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/33.jpg)
Impactos da complexidade (34)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Novo modelo de organização necessário
Obolensky, Nick. Complex Adaptive Leadership (Surrey, Gower Publishing, 2010) p. 23
![Page 34: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/34.jpg)
Impactos da complexidade (35)19:01 © Paulo Keglevich; h"p://keglevich.ksc.com.brr
Não adianta mais fugir das incertezas -‐ é preciso aprimorar a capacidade de gerenciá-‐las!
Conclusões
“Insanity is doing the same thing over and over again and expecBng different results.”
Albert Einstein
Aplicação práRca que mais se beneficia com melhor abordagem da Complexidade: -‐ -‐ Projetos intensivos em tecnologia -‐ -‐ Projetos muito dependentes de tecnologia voláRl -‐ -‐ Projetos de Inovação -‐ -‐ Métricas Agile
![Page 35: Os impactos da complexidade sobre os projetos e programas x seminário.pptx](https://reader038.fdocument.pub/reader038/viewer/2022110115/549136d2b479596d1c8b46de/html5/thumbnails/35.jpg)
© Paulo Keglevich; h"p://keglevich.ksc.com.brr Impactos da complexidade (36)19:01
Engº Paulo F. W. Keglevich de Buzin, MsC,CSM,ITIL®v3,PMP® CGEIT®, COBIT5®, MSP®, P3O® e PRINCE2TM Practitioner